MATCH LINE - C
3-D16 11 11b
LD
LD
3-D20 3-D16
11 11b 2150
2L-D12 2L-D12 2L-D12 2L-D12 2L-D12 2L-D12 2L-D12 2L-D12 2L-D12 2L-D12
@100 C/C @100 C/C @100 C/C @100 C/C @100 C/C @100 C/C @100 C/C @100 C/C @100 C/C @100 C/C
AB27:300x600 AB28:300x600 AB29:300x600 AB30:300x600 AB31:300x600 AB32:300x600 AB33:300x600 AB34:300x600 AB35:300x600 AB36:300x600
6682 5500 3419 3262 3726 3725
+6.500M +6.500M +6.500M
MATCH LINE - C
MATCH LINE - D
12 300 300 300
3-D16 2-D12 10 3-D16 3-D16 11a
LD
LD
LD
3-D16
LD
3-D16 3-D16
2-D12
2-D10EF
600
600
LD
LD
STP 2L-D10 STP 2L-D10
LD
750
STP 2L-D10
LD
LD
3-D16 3-D16
2-D12
2-D10EF
600
600
STP 2L-D12 STP 2L-D12
750
STP 2L-D12
LD
3-D16
11b 2150
3-D25 3-D25
2150 SFR 2-D10EF
2L-D12 2L-D12 2L-D12 2L-D12 2L-D12 2L-D12 3-D16
12a 3-D20
@100 C/C @100 C/C @100 C/C @100 C/C @100 C/C @100 C/C 2L-D12 2L-D12 2L-D12 3-D25 3-D20
@100 C/C @100 C/C @100 C/C SECTION - 11a 3-D25 SECTION - 11b
AB43:300x600 AB44:300x600 AB45:300x600 AB46:300x600 AB47:300x600 AB48:300x600 2036 2036
SECTION - 12a
AB49:300x750
10100
+6.500M 800
3030 3030 10100 1750
7-D25 +6.500M +6.500M +6.500M +6.500M
LD 14 LD 15 16 16a 350 350 350 350
4-D20 7-D25 4-D20 4-D20 4-D25 2-D20
LD
LD
LD
3-D25
LD
4-D25 4-D25 3-D25
3-D25
2-D20 2-D20
2-D12EF 3-D25
1200
3-D16EF
900
900
900
900
STP 4L-D8 STP 4L-D8 STP 2L-D8 STP 2L-D8
LD
LD
LD
LD
STP 6L-D8 SFR 2-D12EF SFR 2-D12EF SFR 2-D12EF SFR 2-D12EF
4-D32 4-D25 4-D25
LD LD SFR 3-D16EF 2025 15 16 2025 16a 4-D25 2-D20 2-D20
7-D25
14 4-D25 4-D25 3-D25 3-D25
6L-D8 6L-D8 6L-D8 4L-D8 4L-D8 4L-D8 4L-D8
7-D25 4-D32 4-D32 3-D25 3-D25
@100 C/C @200 C/C @100 C/C @100 C/C @200 C/C @100 C/C @100 C/C
2867 2867 3100 3100 SECTION - 15 SECTION - 16 SECTION - 17 SECTION - 18
SECTION - 14
AB55,AB72:800x1200 AB56,AB69:350x900 AB56a,AB69a:350x900
+6.500M +6.500M
(GROUT)
350 350
10100 1750
50
@150c/c
10100 1750 3-D25
20 4-D25
LD 2150 2150 LD 3-D25
3050 16b 16b 2-D20
LD LD 3-D25
3-D25 17 3-D25 3-D25 18 18a 19
6-D25 7-D25 7-D25 2-D25
LD
LD
+6.500M
LD
450
16a 16a
LD
900
900
STP 4L-D8 STP 2L-D8
SFR 2-D12EF SFR 2-D12EF
LD
LD
2-D12EF LD
3-D16EF
150
LD
4-D32 3-D25
LD
LD
LD
2L-D8 2L-D8 2L-D8 2L-D8 LD LD
7-D20
@100 C/C @200 C/C @100 C/C @100 C/C 19 20
6L-D8 6L-D8 6L-D8 6L-D8 300
3100 3100
@100 C/C @200 C/C @100 C/C @100 C/C (TYP)
AB57:350x900 AB58:350x900 2867 2867
SECTION - 15a NOTES:
AB59,AB63,AB67:800x1200 AB60,AB64,AB68:800x1200 (1 NOS. - P3) 1. ALL DIMENSIONS IN MILLIMETRES & LEVELS IN METER
+6.500M 800
+6.500M 800 UNLESS NOTED OTHERWISE.
10100 2. CONCRETE GRADE = M30
7-D25 7-D25
REINFORCEMENT GRADE = Fe500
(GROUT)
6-D25 7-D25 +6.500M 350
+6.500M 350 400
21 22 3. DISCREPENCY IN DRAWINGS IF ANY, SHALL BE BROUGHT
50
2-D25 4-D25 2-D20
@150c/c
TO THE NOTICE OF CONCERNED ENGINEER.
LD
LD
125
LD
LD
4-D25 4-D25 10b 10b == 4. THE DRAWING SHOULD NOT BE SCALED OFF ONLY WRITTEN
4 NOS.
2-D20 2-D20 M20 CAST DIMENSIONS TO BE FOLLOWED.
2-D12EF
1200
1200
+6.500M
IN SITU BOLTS.
REFERENCES
450
400
10a 10a 1. FOR GENERAL NOTES AND SPECIFICATIONS
900
900
STP 6L-D8 STP 6L-D8 STP 4L-D8 STP 4L-D8
LD
LD
LD
LD
SFR 3-D16EF SFR 3-D16EF SFR 2-D12EF SFR 2-D12EF REFER DWG. NO. 1-GEN-G-01,1-GEN-G-02
125
==
2025 4-D32 4-D25 4-D25 2025
22 4-D25
4
150
7-D20 7-D20 4L-D8 4L-D8 4L-D8 4-D25 4-D25 SECTION 10b 3
@100 C/C @200 C/C @100 C/C 4-D32 4-D32
21 2
SECTION - 19 SECTION - 20 3100 3100
SECTION - 21 SECTION - 22 400
1 SECMEC 1-WLP-M-01
NO. TITLE DRAWING NO.
+6.500M AB61,AB62,AB65,AB66:350x900 12-D12
2150 2800 300 REFERENCE DRAWINGS
300 D8
400
LD 3-D20 23 (TYP) LINKS
3-D20 10100
LD A 29.08.2023 RELEASED FOR CONSTRUCTION JDT BKB PGK
+6.500M
SECTION - 9a
3-D25 24 300 2 21.03.2023 RELEASED FOR APPROVAL JDT BKB PGK
(1 NOS. - P2)
600
STP 2L-D10
SECTION 10a 03.02.2023
LD
LD
1 RELEASED FOR APPROVAL JDT BKB PGK
LD
3-D25
LD
LD
3-D20 3-D20 REV. DATE DESCRIPTION MADE CHECK APPR.
3-D25 2L-D10 2L-D10 2L-D10
@100 C/C @150 C/C @100 C/C 3-D25 REVISION
2-D10EF
23 833 833 SECTION - 23
2L-D10
5a NATHDWARA CEMENT WORKS
900
@150 C/C STP 2L-D10 860
LD
LD
2L-D10
@100 C/C
2L-D10
@100 C/C 3-D25 SFR 2-D10EF
860 (UTCL)
24 150 280 280 150
533 533 AB71:300x600 7a 2L-D10 2L-D10 2L-D10
@100 C/C @250 C/C @100 C/C D12@200c/c
3-D25
250
604 3117 3117
AB70:300x600 AB73:300x900 601,B-Wing,Godrej Coliseum,
150 304 150 SECTION - 24 D8 LINKS
10 NOS. off Eastern Express Highway,
100SQ.x300
150
Chunabhatti,Sion,Mumbai-400 022
700
DEEP POCKET
604
1900
1900
400 RELEASED FOR CONSTRUCTION
200
2-D8
+6.500M
50 THK.
GROUT
400 125
1060
760
4 NOS.
== D12@200c/c NDCW, (RAJASTHAN)
700
M20 CAST
12-D12 IN SITU BOLTS. 8a 8a 3-D8
D8 LINKS
300
300
D8
150
LINKS +6.500M WLP : WAGON LOADING BUILDING FOR CEMENT
1060
250
300 6a 6a
350
250
125
==
12.5 (TYP)
150
RC BEAM DETAILS AT +6.500M LVL.
D21C17A-1-WLP-R-03_A
SECTION 16b 5a SECTION - 6a REINFORCEMENT
SECTION 16a 7a 300
250
SECTION - 7a SECTION - 8a (TYP) SECTION - 5a DETAIL B REINF. FOULING WITH POCKETS TO BE LOCALLY JOB NO
DESIGN:
ADS
MADE:
JDT
DATE:
29.08.2023
DWG. NO.: REV:
DETAIL C ADJUSTED AT SITE TO CLEAR POCKETS
D21C17A CHECK: APPR: REV.:
PGK PGK 1 WLP R 03 A