Professional Documents
Culture Documents
MS For Installation of CCTV System
MS For Installation of CCTV System
CCTV System
Page 1
Contents
1.0 OBJECTIVE.................................................................................................................
2.0 SCOPE..........................................................................................................................
3.0 REFERENCES & DEFINITIONS.............................................................................
3.1 REFERENCES........................................................................................................................................
3.2 DEFINITIONS........................................................................................................................................
4.0 RESPONSIBILITIES..................................................................................................
4.1 Service Provider Project Manager........................................................................................................
4.2 Installation Supervisor.........................................................................................................................
4.3 Client Project Manager........................................................................................................................
5.0 MANPOWER AND EQUIPMENT REQUIREMENTS..........................................
5.1 Manpower Requirements....................................................................................................................
5.2 Tool Requirements...............................................................................................................................
5.3 Safety Control Measures......................................................................................................................
6.0 PROCEDURE / METHOD TO BE EMPLOYED....................................................
6.1 Overall Procedure................................................................................................................................
6.1.1 Work area / Installation area inspection............................................................................................
6.1.2 Handling Storage of Materials............................................................................................................
6.2 CCTV & ANPR Installation Procedure....................................................................................................
6.2.1 Civil work............................................................................................................................................
6.2.2 Structure cable...................................................................................................................................
6.2.3 Network switches...............................................................................................................................
6.2.4 Cameras (Dome, Bullet & Face Recognition)......................................................................................
6.2.5 ANPR Camera...................................................................................................................................
6.2.6 Control and Recording Equipment...................................................................................................
7.0 QUALITY CONTROL..............................................................................................11
8.0 HEALTH AND SAFETY PROVISIONS................................................................11
9.0 RISK ASSESSMENT.................................................................................................12
10.0 EMERGENCY PROCEDURES AND PREPAREDNESS....................................13
11.0 EMERGENCY CONTACT DETAILS....................................................................14
11.1 Service Provider Emergency Contact Details...................................................................................
11.2 Client Emergency Contact Details...................................................................................................
11.3 Emergency Contact Protocol Diagram............................................................................................
11.4 UAE emergency contact service.....................................................................................................
Page 2
1.0 OBJECTIVE
The objective is to confirm the activities to be carried out during installation of the
CCTV system (IP or Analogue). The Installation Activities for CCTV system
components (CCTV structure cabling, CCTV Cameras, CCTV network Switches, CCTV
DVR/NVR/Storage devices, CCTV Monitoring, CCTV VMS, etc.) will be executed,
controlled and documented strictly in compliance with project documents, client
requirements as well as TECHNOSTREAM Standards.
This document ensures that the team responsible for CCTV installation activities are
familiar with the CCTV system and its components, Having extensive knowledge and
experience on performing and carrying Installation and maintenance of CCTV
system in compliance with HSE and QA/QC procedures and requirements.
2.0 SCOPE
The scope of this method statement is intended to highlight the procedures to be
adopted for CCTV system Installation.
3.2 DEFINITIONS
Definitions and Abbreviation
Project / Contract - to be confirmed project wise.
Client - to be confirmed project wise.
Service Provider - TECHNOSTREAM as authorized service provider to carry
out installation & maintenance activities for CCTV system.
PM - Project Manager
OM - Operation Manager
SM - Security Manager
PPM - Planed Preventive Maintenance
Page 3
Corrective Visit - Maintenance visit based on client required due
malfunction/error/issue on CCTV system
DM - Dubai Municipality.
HSE - Health, Safety and Environmental
PPE - Personal Protective Equipment
VMS - Video Management System
SIRA - Security Industry Regulatory Agency
Video Guard - Division of SIRA, responsible for Connecting CCTV to SIRA.
City Ring - Division of SIRA, responsible for Connecting ANPR to SIRA
and Dubai Police
POE - Power over Ethernet
LAN - Local Area Network
VLAN - Virtual Lan
HDD - Hard Disk Drive
CCTV - Closed-Circuit Television
IDF - Intermediate Data frame
MDF - Main Data Frame.
ANPR - Automatic Number Plate Recognition Camera.
4.0 RESPONSIBILITIES
4.1 Service Provider Project Manager
Service provider project manager shall be responsible for following:
Overall project execution.
Overall timely completion of project in accordance to confirm PPM schedule all
other contractual requirements.
Coordination with client, and shall be responsible for progress monitoring,
attending review meeting and resource management where applicable.
Implementing this method of statement, where applicable, during carrying out the
installation & Maintenance activities.
Coordination with the client for the safe and proper execution of the Installation
Activities.
Coordination with the client for any new supplied materials and equipment by
obtaining client approval for the same.
Make sure that work progress is carried out according to the planned program and
as per client and site requirements, and make sure that all the tools required to
execute the works are available with site team.
Make sure that specific attention is paid to all safety measures and HSE
requirement in coordination with project document and.
Ensure that all necessary PPE will be provided as per the requirement of the job,
whether each of installation and/or maintenance team is using necessary PPE.
Ensure that all necessary permits, where applicable, shall be obtained from client
Page 4
Maintain the Installation logs/reports and reporting the same to client as per
agreed schedule and format;
Proper distribution of required resources to complete installation in coordination
with client where applicable.
Meeting with Client where applicable.
Page 6
5.3 Safety Control Measures
Helmets
Safety shoes
Hi-Vis Jacket
Safety Glasses
Hand Gloves
Page 8
Ensure that labeling for CCTV system on camera, patch panel and patch cord.
Ensure termination of the CCTV cables on the patch panels is done using the
keystone jack modules.
Check cables are dressed neatly and labelled correctly.
Check the Fiber optic interconnection between all the racks are done properally
Check power cable for ANPR system or CCTV.
Page 11
9.0 RISK ASSESSMENT
TECHNOSTREAM Project Safety Plan as well as client safety plan and procedure
shall be strictly enforced.
All work shall be carried out in accordance to all applicable UAE Laws and
Regulations, DM Regulations, DCCA Codes of Practice, and RTA (Railway Agency).
Installation Supervisors shall check and ensure all safety precautions are taken
prior to commencement of work.
Permits
Where required, Permits to work will be provided prior to
commencement of works.
Personal Protective Equipment
Task specific PPE must be worn at all times during the work, including
hard hat, gloves, safety glasses, safety shoes, duct mask and coveralls.
All required PPE shall be issued to installation and/or maintenance workers;
maintained and replaced, if damaged / defective. Constant monitoring and
supervision of the works shall ensure that at all times the appropriate PPE is worn
by affected operatives.
Access and Egress
Safe access / egress shall be provided and explained by client. Where
emergency routes are required, these shall be determined, arranged,
and instructions given prior to commencement of the works. If
working on scaffolding platforms greater than 1.8m high, personnel
must ensure it is green tagged ‘safe for use’ and also done a full body
harness and observe 100% tie off procedures.
Materials and Waste Management
Material shall be stored as per factory recommendation. Any waste
materials, containers, etc. disposed of properly in the designated skips
/ waste points.
TECHNOSTREAM supervision shall ensure that all material deliveries are
coordinated and all vehicles are parked in a position where they present no
additional risk to the general public or people associated with this project. Where
vehicles are offloaded from public areas, the activity shall be supervised and a
dedicated offloading / storage area shall be provided.
Lighting: At all times, appropriate and suitable lighting shall be provided by the
client to ensure the works can be undertaken in a safe and competent manner.
Housekeeping: At all times and if required as per project documents,
TECHNOSTREAM supervision shall monitor the works so as to reduce as far as
reasonably practical the storage of rubbish, waste materials and debris at the
Page 12
workface. All waste materials shall be removed from the workplace to a suitable
area.
Working at height: When required to work more than 1.8 meters, m/s
TECHNOSTREAM has to arrange the scaffolding, and related safety equipment.
When required, and working above 1.8m and a potential fall could arise all
appropriate measures shall be enforced to ensure that operatives are afforded a
safe and proper temporary working platform. Materials will be stacked in a safe
and secure manner. Scaffolds shall be inspected before use to make sure it is safe
for use.
Any injury / illness sustained whilst at work must be reported immediately and
treated using FIRST AID KITS. Incident escalation reporting procedure shall be
followed at all times.
Page 14
11.3 Emergency Contact Protocol Diagram
1 POLICE 999
2 AMBULANCE 998
3 FIRE 997
Page 15