You are on page 1of 69

4 3 2 1

LINE DESIGNATION
PIPING AND COMPONENTS SYMBOLS LINE NUMBER SHALL BE ASSIGNED TO ALL PIPING AND 1. AUTOCAD BLOCK NAMES ARE SHOWN IN ROUND BRACKETS UNDER THE
LDT (LINE DESIGNATION TABLES) AS FOLLOWS: SYMBOL DESCRIPTION.
X - GR - ###YYY - ZZZ
3=WAY VALVE ELEVATED FIRE MONITOR
MAIN LINE PROCESS END CAP SCREWED OR X - NOMINAL LINE SIZE
F=FAIL POSITION E (SELF SUPPORTED) VALVE POSITIONS DESIGNATIONS
& UTILITY SOCKETWELD (ENDSCR) GR - COMMODITY
(VA3WY)
F ### - PLANT UNIT NUMBER
LINE BREAK
F (V) - VACUUM SERVICE HAND OPERATED VALVES
SECONDARY PROCESS LINE HOSE CONNECTION 4=WAY VALVE ELEVATED FIRE MONITOR NO - NORMALLY OPEN
S YYY - LINE NUMBER (1 THRU 999) NC - NORMALLY CLOSED
& SERVICE LINE (HC) (VA4WY) (SUPPORTED)
F ZZZ - PIPE MATERIAL CLASS LO - LOCKED OPEN
LC - LOCKED CLOSED
D FOR EACH SPECIFIC UNIT AND FOR EACH SPECIFIC FLUID LN - LOCKED NEUTRAL D
FUTURE CONTROL VALVE T-TYPE PERMANENT DESIGNATION WITHIN THAT UNIT THE LINE NUMBERING WILL CSO - CAR SEALED OPEN
INITIAL FEED TO THE
FUTURE LINE 245 AND DIAPHRAGM ACTUATOR STRAINERS BEGIN AT 001. CSC - CAR SEALED CLOSED
UNIT (ARROW 3)
(CV) (TTP)
COMMODITY DESIGNATIONS
CW RETURN CONTROL VALVE P & ID No.
CONTINUATION ARROW Y-TYPE PERMANENT
AND DIAPHRAGM ACTUATOR
UNDERGROUND LINE TO ANOTHER DRAWING STRAINERS GR UTILITY CONTROL VALVES
[WITH HANDLEWHEEL]
(ARROW 1) (YTP) FO - FAIL OPEN
TO HEADER (CV1) FOR GR, USE THESE SYMBOLS
FC - FAIL CLOSED
AA - AERATION AIR FL - FAIL LOCK LAST POSITION
LINE CONTINUED ON THE CONTROL VALVE AC - COMBUSTION AIR FL(O) - FAIL LOCK (ULTIMATE OPEN)
BASKET TYPE STRAINER AI - INSTRUMENT AIR
TRACED LINE A SAME DRAWING AND MANUAL ACTUATOR FL(C) - FAIL LOCK (ULTIMATE CLOSE)
(BASKET) AP - PROCESS AIR
(ARROW 2) (HV) FX(C) - FAIL INTERMEDIATE (ULTIMATE CLOSE)
AR - REGENERATION AIR FX(O) - FAIL INTERMEDIATE (ULTIMATE OPEN)
CONTROL SELF ACTUATED AU - UTILITY AIR TSO - TIGHT SHUTOFF
BATTERY LIMIT LP STEAM REGULATOR. BA - BREATHING AIR
CONTINUATION ARROW DUPLEX TYPE STRAINER BD - BLOWDOWN & RELIEF
(XXX=MATCHING AREA POINTS TO CONTROLLED
AREA XXX TO/FROM ANOTHER DRAWING (DUPLEX) BO - BOILER BLOWDOWN
CODE NUMBER) TO / FROM HEADER PRESSURE SIDE
B/L (CVINTER) CA - CATALYST
M
CL - CHLORINE
CT - COMPRESSOR TRIM
GATE VALVE MOTOR OPERATED VALVE SPECTACLE BLIND (CLOSED) CWS - COOLING WATER SUPPLY
PACKAGE UNIT BOUNDARY
(VGA) (MV) (BLDC) CWR - COOLING WATER RETURN
DM - AMINE DRAIN
DO - OILY DRAIN
SINGLE ACTION DT - DUCT TRIM
LINES CONNECTED GLOBE VALVE CYLINDER ACTUATOR SPECTACLE BLIND (OPEN) ET - EXCHANGER TRIM
(ARROWS AS REQUIRED) (VGL 1) (AIR (PISTON) OPERATED VALVE) (BLDO) FL - FLARE HEADER (UNDETERMINED)
(AIRV) GC - CARBON DIOXIDE GAS
GF - FUEL GAS
S
R SOLENOID VALVE GH - HYDROGEN GAS
LINES CROSSING Y TYPE GLOBE SPADE BLIND GHH - HIGH PRESSURE H2
MANUAL RESET
NOT CONNECTED (VGLY) (BLD) GHL - LOW PRESSURE H2
(SOLEMANR)
GI - INERT GAS (NITROGEN)
GN - NATURAL GAS
C PNEUMATIC SIGNAL CONVAL VALVE SLIDE VALVE [MANUAL] SPACER
GO - OXYGEN GAS C
GP - PURGE GAS
[INSTAIR] W/HILTAP COUPLING (SLDE) (SPACER) GR - REFORMED GAS
GS - SYNTHESIS GAS
GW - WASTE GAS TIE-IN POINTS SHALL BE DESIGNATED AS FOLLOWS
FIRE ISOLATION VALVE GX - HYDROGEN SULPHIDE GAS
ELECTRICAL SIGNAL NEEDLE VALVE CONCENTRIC REDUCER HS - SULPHURIC ACID PLT. UNIT NO.
[GREENWOOD TYPE]
[ELECTRICAL] (VND) (RED) HT - HEATER TRIM
(FIV)
IN - INHIBITOR ###
KA - AMMONIA, ANHYDROUS ---
PROCESS MEASUREMENT DRAIN OR VENT WITH PLUG ECCENTRIC REDUCER KC - CAUSTIC
KP - PROCESS CHEMICALS SEQUENCE NO.
OR MECHANICAL LINKAGE POST INDICATOR VALVE OR BLIND FLANGE (ECCFOT)
[PROCESS] (DRORVT) (ECCFOB) KS - SULPHUR
KW - AMMONIA, AQUEOUS
OF - FUEL OIL
OH - HOT OIL
INSTRUMENT CAPILLARY PLUG VALVE SILENCER FLAME ARRESTOR OL - LUBE OIL & SEAL OIL
TUBING (CAPILL) (VPLG) (SIL) (FLAME) OS - SLOP OIL
OP - PURGE/FLUSHING OIL
OPH - HIGH PRESSURE OIL
INTERMITTENT PURGE OPL - LOW PRESSURE OIL
SOFTWARE LINK CHECK VALVE REFER TO COMMODITY OM - OIL MIST
XX DETONATION ARRESTOR
(SOFTWARE) (VCHK) DESIGNATIONS FOR XX P - PROCESS PIPING
(PURGEINT) PA - PROCESS AMMONIA
PC - PROCESS CONDENSATE
CONTINUOUS PURGE PT - PUMP TRIM
FOUNDATION FIELDBUS STOP CHECK VALVE REFER TO COMMODITY TRAP STATION RA - AMMONIA REFRIGERANT
XX T
SIGNAL (FF) (VCHK_STOP) DESIGNATIONS FOR XX (TRAP) RE - ETHYLENE REFRIGERANT
(PURGECON) RP - PROPYLENE REFRIGERANT
XXX
001 SCH - HIGH PRESSURE CONDENSATE
SC - STEAM CONDENSATE
HYDRAULIC MIN. FLOW CHECK VALVE TIE POINT SYMBOL (TP). SCL - LOW PRESSURE CONDENSATE
X NOTE NUMBER
(HYDRA) (VCHKMIN) SEE NOTES SE - EXHAUST STEAM
SP SH - HIGH-PRESSURE STEAM (2500 kPa(ga) SAT.)
001 SI - HIGH-PRESSURE SULPHUR PLANT STEAM (4200 kPa(ga))
ELECTROMAGNECTIC, SL - LOW - PRESSURE STEAM (350 kPa(ga))
SONIC OR NUCLEAR
BALL VALVE
(VBA)
DIAPHRAGM SEAL
(SEAL)
SPECIALTY TAG
(SPTAG)
SM - SATURATED STEAM
ADDITIONS / MODIFICATIONS B
SIGNAL (ELECMAG) SS - HIGH-PRESSURE STEAM (4500 kPa(ga) SUPERHEATED)
SN - MEDIUM-PRESSURE STEAM (900kPa(ga) SUPERHEATED)
SO - STEAM OUT
SEWER DRAIN ST - STEAM TRACING
BALL VALVE
ELECTROMAGNECTIC, (SEWEROP) SV - VACUUM STEAM
HIGH PRESSURE HUB JOINT
SONIC SIGNAL (NOT GUIDED) REFER TO SEWER TT - TANK TRIM
SIDE SHADED
DESIGNATIONS FOR XX VA - ATMOSPHERIC VENT
XX
VT - VESSEL TRIM
P&ID NO. CLOSED SEWER DRAIN WA - RAW WATER
JACKETED PIPE DOUBLE BLOCK & BLEED HUB JOINT (SEWERCL) WB - BOILER FEED WATER
((JACKET) GAUGE VALVE WITH BLIND XX REFER TO SEWER WC - TEMPERED WATER SUPPLY
SS DESIGNATIONS FOR XX WD - DOMESTIC WATER
P&ID NO. 001 WF - FIRE WATER
WH - HOT WATER SUPPLY A 05/08/10 ISSUED FOR REVIEW
FLOW ARROW MULTI PORT VALVE LINE SIZE ORIFICE (ORIF) WI - DEMINERALIZED WATER
S-4 SAMPLE POINT ISSUED
(ARRFLW) (VMULTI) ANNOTATE RO DIAMETER WK - HOT WATER RETURN REV DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT
DATE APP
WL - CHILLED WATER SUPPLY
- MP - 001 WM - CHILLED WATER RETURN
WP - PROCESS WATER
INSTRUMENT ARROW RELIEF VALVE GRADE WR -TEMPERED COOLING WATER RETURN
MIXING OR INJECTION POINT

FILE:\\F:\1025\DRAWINGS\UTILITIES\200\200.007.pid MODEL DATE:2/1/2011 5:34:34 PM BY:ahm14887


(ARRINT) (RV) (GRADE) WS - SOUR WATER
WT - TREATED WATER
INSULATED LINE ANNOTATE WU - UTILITY WATER
PP H-HEAT OR C-COLD CONSERVATION, WW - WASTE WATER
SEAL LEG UTILITY STATION WX - CIRCULATING WATER
50 A-ACOUSTIC, PP-PERSONNEL PROTECTION VACUUM RELIEF VALVE UT
(SLEG) (USTN) WF - FILTERED WATER
SYMBOLS CAN BE COMBINED AS REQUIRED
(INSUL). SHOW INSULATION THICKNESS WZ - CLARIFIED WATER
XT - MISCELLANEOUS TRIM, SAMPLE POINTS
ET 20 TRACED LINE ANNOTATE
UTILITY CONNECTION (UTCON).
50 ET [ELECTRICAL], GT[GLYCOL] & ST[STEAM] PRESSURE / VACUUM TEMPORARY STRAINER OTHER_DESIGNATIONS
XX REFER TO COMMODITY
SHOW TRACING MAINTENANCE TEMP.
(INSULTRCD)
(RVPRES) T.S. (TS)
DAB(U) CAB
DESIGNATION FOR XX AE
NNF
- ANALYZER
- NORMALLY NO FLOW
SHELL CANADA
SPEC BREAK HV - HAND CONTROL VALVE QUEST CCS PROJECT
EXPANSION JOINT DIAPHRAGM VALVE RS (SPECBRK) FP - FULL PORT
REMOVABLE SPOOL
(EXJ) (VDIA)
SEWER_DESIGNATIONS A
FOR XX, USE THESE SYMBOLS
UP 1:500 LEVEL R
FLEXIBLE HOSE BUTTERFLY VALVE DA - ACID SEWER
O FIRE HYDRANT
(FH) (VBFY) CHANGE OF SLOPE DB - BENZENE DRAIN
(SLOPE) DC - CAUSTIC SEWER PIPING AND INSTRUMENT DIAGRAM
DF - DRAIN FLUSH (CLOSED HYDROCARBON DRAIN)
DK - CHEMICAL SEWER QUEST CCS PROJECT
END CAP BUTTWELD ANGLE VALVE FIRE HYDRANT DISSIMILAR MATERIAL DM - AMINE SEWER
O
(ENDCAP) (VANG) WITH MONITOR WELDING DO - OILY WATER SEWER (OPEN) UNIT 200 - COMMON
DP - PROCESS DRAIN
DR - STORM SEWER LEGENDS AND SYMBOLS
VALVE WITH BLEED FREE DRAINING DS - SANITARY SEWER
END FLANGED SCALE: NONE
OR PURGE CONNECTION FREE DRAINING EF - POND EFFLUENT
(ENDFLG)

200.007
(VBLEED) OS - OILY SEWER (CLOSED - ABOVE GROUND) SHELL DWG NO.: REV.
200.0000.000.041.007 A
4 3 2 1
4 3 2 1
INSTRUMENT IDENTIFICATION LETTERS LEGEND FOR LEGEND FOR
MEASURED VARIABLES
APPLICATION OF INSTRUMENT IDENTIFICATION TO P.&I.D.'S FUNCTIONAL LOGIC DIAGRAMS FUNCTIONAL LOGIC DIAGRAMS

MISCELLANEOUS
1. AS A GENERAL GUIDE, THE EXTENT OF INSTUMENTATION SHOWN ON THE P&ID SHOULD BE SUFFICIENT TO PERMIT 1. ALL REDUNDANT TRANSMITTERS HAVE DEVIATION ALARMS IN THE DCS.

MULTI VARIABLE
VOLTAGE (EMF)
BURNER FLARE

TEMPERATURE
TEMPERATURE
CONDUCTIVITY

MOISTURE OR
NUMBER DISPLAYED IN OR NEXT TO

TIME OR TIME
THE OBSERVER TO IDENTIFY THE MAIN COMPONENTS AND THE FINAL READOUT CONTROL AND/OR ALARM ACTION THE DEVIATION ALARMS ARE NOT SHOWN ON THE P&ID.

FLOW TOTAL

DIFFERENCE

DIFFERENCE
FLOW RATIO

PRESSURE
PRESSURE
1 A SYMBOL REPRESENTS THE LOGIC

SCHEDULE
AND TO UNDERSTAND THE FULL FUNCTION OF THE INSTRUMENT SYSTEM. IDENTIFICATION OF ALL COMPONENTS

VISCOSITY
ANALYZER

OR EVENT
QUANTITY
CURRENT

HUMIDITY

POSITION
GAUGING
DENSITY

WEIGHT
AND THE FULL SCHEMATIC RELATIONSHIP ARE SHOWN ON THE INSTRUMENT HARD WIRED LOOP DWGS. GATE NUMBER.

POWER

SPEED
LEVEL
"OR" LOGIC GATE

FLOW

HAND
OR
FOR ELABORATE CONTROL SYSTEMS A SEPARATE DRAWING (EITHER VENDOR OR CONTRACTOR) MAY BE REQUIRED. NUMBER DISPLAYED IN A SQUARE
INSTRUMENT FUNCTION A B C D E F FF FQ G H I J K L M P PD Q S T TD U V W X Z IN SUCH A CASE, A BLOCK WILL BE DRAWN ON THE P&ID WITH A DRAWING NUMBER IDENTIFICATION AND SHOWING 1 REPRESENTS THE STEP NUMBER
ALL THE INPUT AND OUTPUT SIGNALS. SHOWN ON THE SQUENCE STEP INDICATOR.
ALARM AA BA CA DA EA FA FFA FQA GA HA IA JA KA LA MA PA PDA QA SA TA TDA UA VA WA XA ZA
ALARM LOW (L), MEDIUM (M), HI (H) AAL - CAL DAL EAL FAL FFAL FQAL GAL HAL IAL JAL KAL LAL MAL PAL PDAL QAL SAL TAL TDAL UAL VAL WAL XAL ZAL LETTER DISPLAYED IN A DIAMOND
CONTROL AC -C CC DC EC FC FFC FQC GC HC IC JC KC LC MC PC PDC QC SC TC TDC UC VC WC XC ZC 2. O/C REPRESENTS AN EXTERNAL CONNECTION AND "AND" LOGIC GATE
XHS OPEN CLOSED HAND SWITCH MOUNTED ON A LOCAL PANEL FOR ACTUATING BETWEEN THE LOAD SIDE OF AN OUTPUT
CONTROL VALVE (SELF OPERATING) - - - - FCV - - - - - - - LCV - PCV PDCV - - TCV TDCV UCV - WCV XCV - A
A "XV" ON/OFF VALVE. MODULE AND THE LINE SIDE OF AN
D ELEMENT AE BE CE DE - FE - - GE - - - KE LE ME PE - QE SE TE - - VE - XE ZE LP INPUT MODULE FOR TRIAC FAILURE D
GAUGE GLASS (TUBE) - BG - - - FG - - - - - - KG LG - PG PDG - - TG - - VG - XG - DETECTION.
INDICATOR AI CI DI EI FI FFI FQI GI HI II JI KI LI MI PI PDI QI SI TI - UI VI WI XI ZI O/C
XHIS DCS COMPOSITE POINT SELECTOR SWITCH WITH OPEN/CLOSED INDICATION SOLENOID VALVE COIL
INDICATING CONTROLLER AIC CIC DIC EIC FIC FFIC FQIC GIC HIC IIC JIC KIC LIC MIC PIC PDIC QIC SIC TIC TDIC UIC VIC WIC XIC ZIC OR "NOR" LOGIC GATE
FROM "XV" LIMIT SWITCHES OR POSITION TRANSMITTER.
INDICATING CONTROL STATION AIK CIK DIK EIK FIK FFIK FQIK GIK HIK IIK JIK KIK LIK MIK PIK PDIK QIK SIK TIK TDIK UIK VIK WIK XIK ZIK PILOT LIGHT
INDICATING SWITCH AIS CIS DIS EIS FIS FFIS FQIS GIS HIS IIS JIS KIS LIS MIS PIS PDIS QIS SIS TIS TDIS UIS VIS WIS XIS ZIS R R = RED Y = AMBER
INDICATING TRANSMITTER AIT CIT DIT EIT FIT FFIT FQIT GIT - IIT JIT KIT LIT MIT PIT PDIT QIT SIT TIT TDIT UIT VIT WIT XIT ZIT G = GREEN B = BLUE
3. ALL CONTROLLERS COMING INTO DCS DO NOT NEED TO BE MARKED AS AN IC OR
RECORDER AR CR DR ER FR FFR FQR GR HR IR JR KR LR MR PR PDR QR SR TR TDR UR VR WR XR ZR RC AS I AND R ARE IMPLICIT FOR EVERY POINT. KR "NAND" LOGIC GATE
RECORDING CONTROLLER ARC CRC DRC ERC FRC FFRCFQRC GRC HRC IRC JRC KRC LRC MRC PRC PDRC QRC SRC TRC TDRC URC VRC WRC XRC ZRC ALARM PRESENTATION (MINIMIZE NUMBER OF BALLOONS) AND
RELAY
RECORDING SWITCH ARS CRS DRS ERS FRS FFRS FQRS GRS HRS IRS JRS KRS LRS MRS PRS PDRS QRS SRS TRS TDRS URS VRS WRS XRS ZRS THE OPERATOR HAS THE ABILITY TO SET AN H OR L FOR ANY POINT.
KR RELAY COIL
RECORDING TRANSMITTER ART CRT DRT ERT FRT FFRT FQRT GRT - IRT JRT KRT LRT MRT PRT PDRT QRT SRT TRT TDRT URT VRT WRT XRT ZRT THESE OPERATOR ALERTS WILL NOT BE SHOWN ON P&ID ALARMS UNDER ENGINEERING CHANGE CONTACTS
CONTROL WILL BE SHOWN AS: H
SWITCH AS BS CS DS ES FS FFS FQS GS HS IS JS KS LS MS PS PDS QS SS TS TDS US VS WS XS ZS PI FI ELECTRONIC ALARM RELAY CONTACT
SWITCH LOW (L), MEDIUM (M), HI (H) ASL CSL DSL ESL FSL FFSL FQSL GSL HSL ISL JSL KSL LSL MSL PSL PDSL QSL SSL TSL TDSL USL VSL WSL XSL ZSL L OPEN ON POWER FAILURE AND ABOVE
TRANSMITTER AT - CT DT ET FT FFT FQT GT - IT JT KT LT MT PT PDT QT ST TT TDT UT VT WT XT ZT HI OR BELOW LO SET POINTS. CLOSED SIGNAL INVERTER
CONTROL VALVE OR DAMPER AV BV CV DV EV FV FFV FQV GV HV IV JV KV LV MV PV PDV QV SV TV TDV UV VV WV XV ZV IF MEASUREMENT POINT HAS A LOGIC INTERLOCK; THE INDICATED VALUE WILL BE AVAILABLE DURING NORMAL OPERATING LIMITS.
IN THE DCS. THE LL OR HH SIGNIFIES THE TRIP ACTION UNDER ENGINEERING CONTROL,
MISCELLANEOUS AX BX CX DX EX FX FFX FQX GX HX IX JX KX LX MX PX PDX QX SX TX TDX UX VX WX XX ZX WHICH THE OPERATOR CANNOT ADJUST.
RELAY TRANSDUCER ETC AY BY CY DY EY FY FFY FQY GY HY IY JIY KY LY MY PY PDY QY SY TY TDY UY VY WY XY ZY LIMIT SWITCH
LTE E SINGLE - POLE
DRIVE OR ACTUATOR AZ BZ CZ DZ EZ FZ FFZ FQZ GZ HZ IZ JZ KZ LZ MZ PZ PDZ QZ SZ TZ TDZ UZ VZ WZ XZ ZZ
SINGLE - THROW [SPST]
THE COMBINATION OF LETTERS SHOWN INCLUDE THOSE MOST FREQUENTLY ENCOUNTERED. OTHER COMBINATIONS MAY BE DERIVED FROM TABLE 1 ISA-S-5.1 LL GENERAL NOTES FOR
STANDARD. IF AN INSTRUMENT HAS ADDITIONAL FUNCTIONS, IT SHOULD BE SHOWN BY TWO GROUPS OF LETTERS RATHER THAN EXCEEDING THREE LETTERS PRESSURE SWITCH, SPST FUNCTIONAL LOGIC
4. ELECTRICAL ACCESSORIES, COIL RELAYS, AMPLIFIERS AND I/P TRANSDUCERS AT
(E.G. FQI AND FRC NOT FQIRC). OPENS ON DECREASING
X- IS USED TO IDENTIFY COMPUTING TYPE RELAYS, FUNCTION CAN BE CONTROL VALVES, ARE NORMALLY OMITTED ON THE P&ID. THE LATTER MAY DIAGRAMS
ANALYZERS MAY BE FURTHER IDENTIFIED BY DESCRIPTIVE LETTERS OR BE SHOWN FOR THE LOOPS, WITH TWO OR MORE VALVES OR SEPARATE DEVICES, OR PRESSURE
A- SHOWN OUTSIDE BALLOON.
WORDS WRITTEN OUTSIDE THE TAGGING BALLOON. WITH THE AIR SIGNAL GOING TO AN INSTRUMENT PRIOR TO THE VALVE.
Y- IS USED TO SHOW ON/OFF TYPE NON ADJUSTABLE RELAYS IN A LOOP. 5. THE BALLOONS MAY BE DRAWN TANGENTIALLY TO SHOW A COMMON INSTRUMENT WHERE PRACTICAL. LEVEL SWITCH, SPST 1. GRAPHICS LOGIC SHOWN ON DWGS. CONFORM TO ISA
C- IS USED WITH ZSC TO GIVE CLOSED POSITION.
- I.E.- SOLENOIDS, PNEUMATIC 3-WAY VALVES ETC. OPENS ON DECREASING GRAPHIC SYMBOLS.
6. FAILURE ACTION FOR SOLENOID AND PNEUMATIC 3-WAY INSTRUMENT VALVES
ARE MODIFYING LETTERS FOR DIFFERENCE (D), FRACTION OR RATIO (F), WILL BE SHOWN WITH AND ARROW AND FO, FC, NOMENCLATURE- SIMILAR TO THAT LEVEL
E- THE SUFFIX LETTER "E" IS TO BE USED TO IDENTIFY COMPONENTS OF 2. ALL ELECTRICALLY AND ELECTRONIC CONTROLLED
AND QUALITY OR TOTAL (Q). THEY MAY BE USED WITH OTHER FIRST USED FOR CONTROL VALVES. FLOW SWITCH, SPST
D, F, Q,- A SAFETY SYSTEM - I.E.- SHUTDOWN, DEPRESSURING, LOCK UP, ETC., DEVICES ARE SHOWN IN THE DE - ENERGIZED
LETTERS THAN THOSE SHOWN IN THE TABLE , E.G. KQ-TOTAL TIME, OPENS ON DECREASING
(PALE - ALARM ON LOW PRESSURE SHUTDOWN). CONDITION PRIOR TO START-UP POSITION, UNLESS
SD-SPEED DIFFERENCE, DF DENSITY RATIO. FLOW
7. SOLENOID VALVES ON NON- EMERGENCY SYSTEMS SHOULD BE TAGGED AS UYI- XXX. OTHERWISE SPECIFICALLY NOTED.
V- WILL BE USED OUTSIDE BALLOON TO IDENTIFY VENDOR SUPPLIED INSTRUMENTS.
J- IS USED FOR SCANNING - I.E.- FOR TEMPERATURE TJI OR TJR.
C H/L - TWO STAGE VABIABLE ALARMS SHALL BE IDENTIFIED BY H AND HH, 8. SOLENOID VALVES ON EMERGENCY SYSTEMS SHOULD BE TAGGED AS *YE-XXX, I.E. XYE-001. PUSHBUTTON, MOMENTARY TYPE 3. LOGIC SYMBOLS REPRESENT FUNCTIONAL AND C
IS USED FOR PILOT LGHT. THE LETTER "L" MAY BE USED ALONE NORMALLY CLOSED CONTACT BLOCK OPERATIONAL SEQUENCE OF EVENTS AND DO NOT
OR L AND LL, - I.E.- H- HIGH LEVEL ALARM SOLENOID VALVES ON NON-EMERGENCY SYSTEMS SHOULD BE TAGGED AS *YI-XXX, I.E. LYI-001.
L- OR IF PART OF A LOOP, IT CAN TAKE THE LOOP LETTERS AS A PREFIX. NECESSARILY REFLECT ACTUAL LOGIC GATES.
- HH- VERY HIGH LEVEL ALARM
E.G.F. , ETC. 9. TYPICAL CUTBACK CONTROL REPRESENTATION SEE APPLICABLE PUSHBUTTON, MOMENTARY TYPE
NOTE: SAFETY SYSTEM WILL BE GENERALLY BE HE NOT HHE. CB 4. STATE OF LOGIC IS SHOWN AT LOGIC "0" WITH POWER OFF
P&ID FOR COMPLETE INTERACTION. NORMALLY OPEN CONTACT BLOCK
N- IS USER'S CHOICE - EITHER AS A MEASUREMENT OR OUTPUT FUNCTION. AND ALL INPUTS AND OUTPUTS IN THE FAIL SAFE CONDITION.
LP - WILL BE USED OUTSIDE BALLOON TO IDENTIFY INSTRUMENTS AT LOCAL PANELS. 147 B
IS USED WITH F TO GIVE FO, FLOW ORIFICE RESTRICTION. IF MORE THAN ONE PANEL, THEN IDENTIFY THEM NUMERICALLY AND RESISTOR 5. ALL CONTACTS THAT REQUIRE ANNUNCIATOR POINTS
O- AND/OR VALVE STATUS LIGHTS SHALL BE EITHER
IS USED WITH ZSO TO GIVE OPEN POSITION. REFERENCE IN GENERAL NOTES.
F DOUBLE-POLE FOR INTERLOCK AND THE OTHER FOR
R- IS USED AS A MEASURED VARIABLE FOR RADIOACTIVITY MEASUREMENT. ANNUNCIATOR OR STATUS LIGHT, OR DIRECT INPUT TO
WILL BE USED FOR DIGITAL INPUT/OUTPUT TO MICROPROCESSOR BASED SYSTEMS. ANNUNCIATOR [FIRST OUT]
N- PLC WITH REPEATED OUTPUT TO AUXILIARY DEVICE.
S- IS ALSO USED TO MEAN SAFETY AS IN PSE RUPTURE DISC. - I.E.- MECHANICAL EQUIPMENT ON/OFF MANUAL CONTROL OR EQUIPMENT STATUS-
RUN/STOP. S
IS USED TO SHOW A MULTIFUNCTION INSTRUMENT. - I.E.- COMBINATION
U- RECORDING SCANNING, TOTALIZING, ETC. OR MULTIFUNCTION SYSTEM LC- WILL BE USED OUTSIDE BALLOON TO IDENTIFY INSTRUMENT AT LOCAL CONSOLES. ANNUCIATOR [STANDARD]
THAT MAY BE DETAILED SEPARATELY.
CB- CUT BACK CONTROL
W- IS USED WITH T AS TW FOR TEMPERATURE WELL.
DCS ALARM
INSTRUMENTS SYMBOLS
MOTOR CONTROL INSTRUMENT ABBREVIATION
INSTRUMENT MOTOR CONTROL DISPLAYS IN THE DCS ARE DESIGNATED AS BELOW: DCS STATUS LIGHT
FUNCTION UE A/S - INSTRUMENT AIR SUPPLY SP - REMOTE SET POINT
PI FX FIC R/S - SOFT HAND SWITCH OR
197 HIS
113 113 113 PUSH BUTTON WITH FE - FLOW ELEMENT RTD - RESISTANCE TEMPERATURE DETECTOR
MULTIFUNCTION 401 RUN/STOP ACTION
LOOP NO. BACK OF PANEL INSTRUMENT IDENTIFICATION_NUMBERS
FRONT PANEL LOGIC FOR AND RUN STOPPED STATUS DISPLAY FO - FLOW RESTRICTION ORIFICE V - WITH VENDOR SUPPLIED EQUIPMENT
FIELD OR LOCAL OR RACK MOUNTED INSTRUMENT EMERGENCY MOTOR CONTROL ITEMS ON LOCAL PANEL OR FIELD MOUNTED ARE DESIGNATED AS BELOW:
INSTRUMENT INSTRUMENT SYSTEMS SIS - SAFETY INSTRUMENTED SYSTEM
STOP - ILLUMINATED PUSH BUTTON RUN - INDICATING LIGHT THE IDENTIFICATION NUMBER FOR LOOPS WILL HAVE SIX DIGITS, THE FIRST THREE BEING UPGRADER COMPLEX UNIT NUMBER.
HS WITH STOP ACTION L THE FOLLOWING THREE DIGITS WILL PROVIDE A SINGLE SEQUENCE OF LOOP NUMBERS FOR EACH PROCESS VARIABLE
LP
PSHE *YE FR TXE 402 LOCAL PANEL MOUNTED 403 IDENTIFICATION OF EACH LOOP.
8 LP LP
005 197 113 147 THE LOOP NUMBERING SEQUENCE WILL BEGIN WITH THE NUMBER 001 FOR EACH PROCESS VARIABLE IDENTIFICATION FOR
HOA - LOCAL HAND-OFF-AUTO
HS EACH UNIT, INCLUSIVE OF THE FOLLOWING LOCAL INSTRUMENTS.
HIGH PRESSURE SOLENOID VALVE INSTRUMENT RELAY TO MOTOR
SHUTDOWN ON EMERGENCY ON LOCAL FUNCTION 404 (ONE BALLOON CAN REPRESENT MORE PG - PRESSURE GAUGES
SWITCH SYSTEMS PANEL =SUMMING THAN ONE FUNCTION)
IDENTIFICATION LETTERS: TG - DIAL THERMOMETER B
SNAP
E I FT TXE HS - HAND SWITCH OR PUSH BUTTON TW - TEMPERATURE TEST WELL
002 001 004 147 L - INDICATING LIGHT, IF ASSOCIATED WITH HAND SWITCHES LG - LEVEL GAUGES
*E OR PUSH BUTTONS OR ALARM IF USED FOR ALARM AL, ALH
SNAP ACTING FI - PURGEMETERS
SIS INTERLOCK DCS INTERLOCK HEAT TRACED NOTES
RELAY ON TEMP. FG - SIGHT FLOW GLASS
NO.002 NO.001 TRANSMITTER
TRIP SYSTEM
1. THE SWITCH/LIGHT FUNCTION SHALL BE SHOWN OUTSIDE OF CIRCLE FO - FLOW ORIFICE
AUXILIARY LOCATION START HAND MANUAL PSE - RUPTURE DISC
NORMALLY INACCESSIBLE STOP OFF TRIP
TO AN OPERATOR 2. SOME TYPICAL FUNCTIONS ARE: RV - PRESSURE SAFETY VALVE
RUN AUTO RESET
READY JOG ARMED FSV - EXCESS FLOW VALVE
NOTES FUNCTIONAL ABBREVIATIONS MAYBE USED:
RV - RELIEF VALVE (SYMBOL REF. DWG. 245.0000.000.041.001) A 05/08/10 ISSUED FOR REVIEW
-S/S - START/STOP
* - E SYMBOL USED WHEN TRACING POWER COMES FROM -HOA - HAND-OFF-AUTO ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT
EMERGENCY SYSTEM. REV
3. NUMBERING SHALL FOLLOW THE SAME PROCEDURE AS INSTRUMENTS. DATE APP

GENERAL_INSTRUMENTS_SYSTEMS 4. FOR MOTOR CONTROL SWITCHES AND LIGHTS, ONLY PANEL MOUNTED ITEMS ARE SHOWN
ON P&ID'S EXCEPT WHERE LOCAL DEVICES ARE OTHER THAN START/STOP. EXAMPLE
ALL LOCAL DEVICES ARE THE RESPONSIBILITY OF THE ELECTRICAL DEPT.

FILE:\\F:\1025\DRAWINGS\UTILITIES\200\200.008.pid MODEL DATE:2/1/2011 4:22:31 PM BY:ahm14887


FUNCTION IN DCS SYSTEM
DISPLAY TO OPERATE 5. INDICATING LIGHTS SHALL BE COLOR CODED AS FOLLOWS: FC-245 017
RUNNING/OPEN - BLUE
STOPPED/CLOSED - YELLOW
FUNCTION IN DCS SYSTEM LETTER CODE PER TABLE UNIT NO. LOOP NO.
NOT REQUIRED TO BE
6.
DISPLAYED TO OPERATE R/S SEL R/S WITH THE EXCEPTION OF HAND SWITCHES, FOR INSTRUMENTS THAT ARE LOCATED ON IDENTICAL PARALLEL EQUIPMENT,
HIS HS HIS THE IDENTICAL INSTRUMENTS ON EACH PIECE OF EQUIPMENT SHALL BE NUMBERED XXXA, XXXB, XXXC ETC. EXAMPLE: PARALLEL
INSTRUMENTS SHALL BE NUMBERED 017A, 017B & 017C.
I HARDWIRED INTERLOCK SYSTEM 110 112 111

THE FIRST THREE DIGITS (UNIT NUMBER) WILL BE OMITTED FROM THE BALLOONS FOR IMPROVED READABILITY OF LOOP
IDENTIFICATION NUMBERS. A GENERAL NOTE ON THE P&ID WILL REFERENCE THIS AND IDENTIFY THE OMITTED PLANT NUMBER.
SHELL CANADA
THE INSTRUMENT LOOP NUMBERS WILL THEN BE THREE DIGITS, I.E. 017.
E HARDWIRED SHUTDOWN INTERLOCK SYSTEM
HOA HOA
QUEST CCS PROJECT
HS I HS
110 111
INTERLOCK NUMBERS ARE SIX DIGITS AND ARE ASSIGNED BY THE INSTRUMENT DEPARTMENT. THE FIRST THREE DIGITS DESIGNATE
THE UNIT AND THE LATTER THREE ARE SEQUENTIAL, COMMENCING AT 001 IN EACH UNIT. THE FIRST THREE DIGITS ARE OMITTED ON
A
THE P&ID.
DUAL FUNCTION (FOR SERVICES) INSTRUMENT
EXAMPLE R

I I I
TO PUMP TO PUMP PIPING AND INSTRUMENT DIAGRAM
DCS OR PLC INTERLOCK 001 002
P-100A MOTOR P-100B MOTOR
QUEST CCS PROJECT
START/STOP AND H-O-A HAND SWITCHES FOR PUMP "A" WILL HAVE A
E SEQUENTIAL NUMBER. A DIFFERENT SEQUENTIAL NUMBER IS USED FOR PUMP "B". UNIT 200 - COMMON
SIS INTERLOCK
THE DCS SOFT DEVICE BLOCK TAG WILL NOT HAVE A SUFFIX (I.E. HS-110) THE INSTR ID LETTERS SYMBOLS AND LOOP NO
LOCAL HAND SWITCHES FOR H-O-A AND LOCAL START/STOP WILL HAVE SUFFIX
STARTING WITH A (I.E. HS-110A). COMMON HAND SWITCH FOR BOTH PUMPS SCALE: NONE
HEXAGON DENOTES COMPUTER OR RTU FUNCTION (I.E. SELECTOR SWITCH) WILL HAVE ITS OWN SEQUENTIAL NUMBER.

200.008
SHELL DWG NO.: REV.
200.0000.000.041.008 A
4 3 2 1
4 3 2 1
IN LINE AND TANK MOUNTED INSTRUMENTS
PNEUMATIC OR ELECTRONIC PER PROJECT REQUIREMENT
CONTROL VALVE FLOW LEVEL PRESSURE TEMPERATURE CONT. 1. INSTRUMENT TAG REQUIRED FOR INTEGRAL DESUPERHEATING VALVE.
2. AUTOCAD BLOCK NAMES ARE SHOWN IN ROUND BRACKETS UNDER THE SYMBOL
FE DESCRIPTION.
169
PG
s ORIFICE PLATE WITH 042
FLANGE TAPS LG GAUGE GLASS
SOLENOID EXTERNALLY
OPERATED 018 PRESSURE GAUGE TE TE TE
FE CONNECTED
DIAPHRAGM VALVE DIRECT CONNECTED 577 578 579
169 ORIFICE PLATE
WITH SMART TANK
COMPLETE WITH LOCAL
POSITIONER
D FAILS CLOSED
FLOW INDICATOR PSE D
046 MULTI-ELEMENT
TANK THERMOCOUPLE FOR
FC DIFFERENT ELEVATIONS
SIZE AND SET
PRESSURE WITH WELL IN TANK
RUPTURE
FE DISC
FO 172 ORIFICE PLATE
DIAPHRAGM GLOBE WITH VENA
CONTRACTA FURNACE
WITH SMART POSITIONER LG LEVEL INDICATOR
WITHOUT HANDWHEEL RADIUS OR TE
020 MAGNETIC TYPE PG
FAILS OPEN PIPE TAPS MAG 581
TANK 043
THERMAL RADIATION
TYPE TEMPERATURE
FT ELEMENT
FC REMOTE PRESSURE
FE 173 GAUGE WITH CAPILLARY
FL
173 ORIFICE PLATE & LINE MOUNTED
SINGLE ACTING DOUBLE ACTING CONNECTED TO DIAPHRAGM SEAL TYPICAL LOOPS
CYLINDER DIFFERENTIAL MICROPROCESSOR (DCS/PLC) BASED SYSTEM
CYLINDER
THREE WAY VALVE PRESSURE PG
ANGLE VALVE
FAILS LOCKED FLOW TRANSMITTER 044
FAILS CLOSED
IN LAST POSITION LEVEL TRANSMITTER
LT
FI PURGEMETER INTERNAL FLOAT H
OR ROTAMETER 322 SIDE CONNECTION FC
081
TANK PRESSURE GAUGE 001
L
DIAPHRAGM SEAL
FE LINE MOUNTED
PCV
WATER 176 FT
999
SLIDE VALVE 001
PITOT OR
HP 1 PITOT VENTURI PP FV
STEAM
DESUPERHEATER OR ANNUBAR 001
045
(DESUPER)
FSV
C LP 099 LT FC
C
STEAM PRESSURE POINT
FC 020 TYPICAL FLOW LOOP
EXCESS FLOW WINTERIZED
TANK
BUTTERFLY VALVE WITH SMART VALVE LEVEL TRANSMITTER
POSITIONER WITH HANDWHEEL EXTERNAL FLOAT
FAILS CLOSED
FE
177
TEMPERATURE
M
H
FC
VENTURI TUBE 006
L
OR FLOW NOZZLE FYE
TEMPERATURE
MOTOR OPERATED 006
FE
TEST CONNECTION E S
(MOV) VALVE WITH WELL 002
WITH HANDWHEEL 178 R
LEVEL TRANSMITTER FT
DP TYPE TW 006
TANK
WEDGE 064
FV
LT
SELF-ACTUATED REGULATORS 006
323
(REFER TO PROJECT FT TEMPERATURE ELEMENT
DWG. 245.0000.000.041.002) 179 WITH OR WITHOUT WELL FO
(NOT CONNECTED TO
TYPICAL FLOW LOOP INCLUDING SIS
SECONDARY INSTRUMENT)
ULTRASONIC INTERLOCK & SOLENOID VALVE
PCV FLOW METER LT
TE
420 324
066
FE
SELF-CONTAINED LEVEL TRANSMITTER H
186 FC
DP TYPE WITH
BUBBLER SYSTEM & 001
L
DIP TUBE FILLED SYSTEM FYI
PCV FLUME
LY WITH WELL
I 001
421 AI
S
324
003 R ADDITIONS / MODIFICATIONS B
WITH EXTERNAL ROTAMETER OR TI FT
TANK
PRESSURE TAP FI PURGEMETER 067 001
087 WITH NEEDLE
VALVE ON INLET FV
001
PRESSURE RELIEF VALVES
FT THERMOMETER
FO
180
RV TYPICAL FLOW LOOP INCLUDING DCS INTERLOCK
SIZE AND SET
023 TANK LEVEL INDICATOR TG
PRESSURE TURBINE OR
LI FLOAT WITH WIRE 069
PROPELLER
AND PULLEY
FLOW METER 325 A 05/08/10 ISSUED FOR REVIEW
FQI ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT
VACUUM RELIEF REV
RV DATE APP
SAFETY VALVE 182 TEMPERATURE TRANSMITTER
024
SIZE AND SET WITH TW & TE
PRESSURE VAC POSITIVE H SP
LT LC FC
DISPLACEMENT

FILE:\\F:\1025\DRAWINGS\UTILITIES\200\200.009.pid MODEL DATE:2/1/2011 4:21:15 PM BY:ahm14887


METER TT 002 002 004
LS L
327 070
PVSV
FT
PRESSURE/VACUUM 025 FG FLOW SIGHT FE FV
SAFETY VALVE GLASS CAPACITANCE, 004
087 TANK 004 004
SIZE AND SET DIELECTRIC OR
PRESSURES CONDUCTIVITY
TYPE SWITCH
TEMPERATURE TI TYPICAL LEVEL - FLOW CASCADE LOOP. WINTERIZED
(REFER TO PROJECT FT INLINE FLOWMETER 311 SHELL CANADA
DWG. 245.0000.000.041.002) WITH INTEGRAL
184 TRANSMITTER FLOW COMP QUEST CCS PROJECT
HH FX FC
TSE E E 011 011 A
TANK FO
536 101 101
185
FUSIBLE PLUG
OR DISC FIXED R
RESTRICTION LX LT TTE TTE TAHH TI
RADIOACTIVE OR PI
ORIFICE TANK TANK
329 329 SONIC SOURCE 311 311 311 009 010 PIPING AND INSTRUMENT DIAGRAM
LEVEL POSITIVE DISPLACEMENT WEDGE
(POSDISPL) (WEDGE) QUEST CCS PROJECT
STRAIGHTING VANES CORIOLIS TT FT PT UNIT 200 - COMMON
P&ID ABBREV. ACTUAL 009 011 010
LEVEL REGULATOR (STVANES) (CORIO) FE FV
LCV
WITH MECHANICAL
ID LETTERS SYMBOLS AND LOOP NO.
TANK 011 010
314 LINKAGE VORTEX M MAGNETIC SCALE: NONE

200.009
SHELL DWG NO.: REV.
TEMPERATURE AND PRESSURE COMPENSATION FO 200.0000.000.041.009 A
4 3 2 1
4 3 2 1

1. AUTOCAD BLOCK NAMES ARE SHOWN IN ROUND BRACKETS UNDER THE SYMBOL
DESCRIPTION.

PIPING AND INSTRUMENT DIAGRAM (P&ID) SYMBOLS

D CURRENT D
TXT FIELD INSTRUMENT TO CURRENT
I
NO. (INSTR1) I TRANSDUCER
(FDR1) FUNCTION DESIGNATIONS FOR RELAYS (ISA S5.1)
THE FUNCTION DESIGNATIONS ASSOCIATED WITH RELAYS SHALL BE USED AS FOLLOWS, INDIVIDUALLY OR IN COMBINATION

TXT FRONT PANEL INSTRUMENT PROPORTIONAL NO. SYMBOL FUNCTION


K
NO. (INSTR2) (FDR5)
1. 1-0 or ON - OFF AUTOMATICALLY CONNECT, DISCONNECT, OR TRANSFER ONE OR MORE CIRCUITS
PROVIDED THAT IS NOT THE FIRST SUCH DEVICE IN A LOOP
LP 2. or ADD ADD OR TOTALIZE (ADD AND SUBTRACT)
TXT INSTRUMENT ON LOCAL PANEL n EXPONENTIAL
X
NO. (INSTR3) (FDR6)
3. or DIFF SUBTRACT * *

BACK OF PANEL OR ANALOG TO 4. BIAS *


TXT A
RACK MOUNTED INSTRUMENT D
DIGITAL
NO. (INSTR4) (FDR7) 5. AVG. AVERAGE

PROGRAMMABLE LOGIC TYPE VOLT TO 6. % or 1:3 or 2:1 [TYPICAL] GAIN OR ATTENUATE (INPUT : OUTPUT) *
I E
INTERLOCK SYSTEM I
CURRENT
(INTLOCK4) TRANSDUCER 7. MULTIPLY * *

8. DIVIDE * *
d DERIVATIVE
WINTERIZED dt (FDR10)
9. SQ. RT. EXTRACT SQUARE ROOT

n 1/n
EXTRACT 10. X or X RAISE TO POWER
SQUARE ROOT
(FDR11) 11. f(x) CHARACTERIZE

NONLINEAR OR 12. 1:1 BOOST


C UNSPECIFIED C
f(x)
FUNCTION
(FDR12) 13. or HIGHEST (MEASURED HIGH- SELECT. SELECT HIGHEST (HIGHER) MEASURED VARIABLE (NOT SIGNAL,
VARIABLE) UNLESS SO NOTED).
FUNCTION 14. or LOWEST (MEASURED LOW- SELECT. SELECT LOWEST (LOWER) MEASURED VARIABLE (NOT SIGNAL,
f(t) OF TIME VARIABLE) UNLESS SO NOTED).
(FDR13) 15. REV. REVERSE

16. A/D or D/A FOR INPUT / OUTPUT SEQUENCES OF THE FOLLOWING:


REV
REVERSE A - ANALOG, D - DIGITAL
(FOR14)
17. INTEGRATED (TIME INTEGRAL)

AUTO 18. D or d/dt DERIVATIVE OR RATE


A
M
MANUAL
(FDR15) 19. I/D INVERSE DERIVATE

RESET FOR 20. AS REQUIRED UNCLASSIFIED


LATCH TYPE
R
SOLENOID
(FDR16) * USED FOR SINGLE - INPUT RELAY.

** USED FOR RELAY TWO OR MORE INPUTS.


SUMMATION
(FDR17)

MULTIPLY
X
(FDR18)

BOOST B
1:1
(FDR19)

HIGH
SELECTION
(FDR20)

CURRENT TO
I PNEUMATIC
P TRANSDUCER
(FDR21)

PNEUMATIC
A 05/08/10 ISSUED FOR REVIEW
P TO CURRENT
I TRANSDUCER ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT
REV
DATE APP
(FDR22)

LOW

FILE:\\F:\1025\DRAWINGS\UTILITIES\200\200.010.pid MODEL DATE:1/5/2011 10:21:29 AM BY:ahm14887


SELECTION
(FDR24)

SHELL CANADA
QUEST CCS PROJECT
A

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT
UNIT 200 - COMMON
FUNCTION DESIGNATIONS
SCALE: NONE

200.010
SHELL DWG NO.: REV.
200.0000.000.041.010 A
4 3 2 1
4 3 2 1

NOTES:
VERTICAL IN-LINE PUMP DEMISTER
(PMPINL)
CENTRIFUGAL IDENTIFICATION OF EQUIPMENT 1. AUTOCAD BLOCK NAMES ARE SHOWN IN ROUND BRACKETS UNDER THE SYMBOL
DESCRIPTION.
COMPRESSOR
SCHOEPENTOETER
WITH GUIDE VANES 1. ALL EQUIPMENT SHALL BE REPRESENTED BY A TAG NUMBER. COMPOSED OF A
HORIZONTAL
(COMPC) LETTER PLUS A NUMBER. THE FIRST THREE DIGITS OF WHICH ARE THE PLANT
VESSEL DISTRIBUTOR NUMBER AND THE FINAL TWO DIGITS ARE A NUMBER RUNNING CONSECUTIVELY
WITH BOOT TROUGH & TRAY FROM 01 FOR EACH GROUP OF EQUIPMENT.
(VESBOOT)
2. WHERE A CHOICE BETWEEN TWO OR MORE LETTERS HAS TO BE MADE THE MORE
CENTRIFUGAL PUMP LIQUID SPRAY IMPORTANT FUNCTION SHOULD PREVAIL FOR EXAMPLE, IF A JET IS USED FOR
VERTICAL
(PMPCENT) (PERFORATED) MIXING PUPPOSES, Mx IS USED OVER I.
VESSEL
BASIC SYMBOL 3. DRIVERS ARE NUMBERED BY THE DRIVER EQUIPMENT AND TYPE OF DRIVER.
(VES) LIQUID SPRAY E.G. EM-MOTOR FOR AIR COOLER, CT-TURBINE MOTOR FOR AIR COOLER,
STEAM TURBINE (NOZZLE)
D RECIPROCATING PUMP T (STMTUR)
CT -TURBINE FOR COMPRESSOR, PM-PUMP MOTOR, EF-AIR COOLER FAN.
D
(PMPRECIP)

TOTAL DRAW-OFF LETTER OF


DECSRIPTION
GROUP
VACUUM PUMP B FIRED BOILERS
(PMPVAC) PARTIAL DRAW-OFF
TURBINE WITH
PNEUMATIC COMPRESSORS & BLOWERS
T C
SPEED CONTROL LIQ RING VAC PUMP
(STMTURPN) SPHERE CHIMNEY
CG COMPRESSOR GEARS
(SPHERE)
TOP SUCTION/DISCH. PUMP CT COMPRESSOR TURBINE
(PMPTT) HALF PIPE
MANWAY CM COMPRESSOR MOTOR
(MANWAY)
CENTRIFUGAL FAN SWIRL DECK
OR BLOWER E EXCHANGERS, HEAT TRANSFER EQUIPMENT
HIGH SPEED VANE TYPE INLET
(CFB)
CENTRIFUGAL (HORIZONTAL)
VORTEX BREAKER EG EMERGENCY GENERATOR
PUMP
(VORTEX)
(PMPHSC)
VESSEL
EM EXCHANGER MOTOR
SWAGED VANE TYPE INLET
(VESSWG) (VERTICAL)
ER EMERGENCY EQUIPMENT.
MULTISTAGE
PUMP AIR COOLER FANS AND
(PMPMULTI) F
RECIPROCATING DIFFUSER COOLING TOWER FANS
COMPRESSOR
(RCOMP) G GENERATORS

OPEN TANK GT GAS TURBINE GENERATOR


CONICAL ROOF TANK (TKOPEN) CYCLONE
C CENTRIFUGAL CANNED PUMP
(TK) C
H FIRED HEATERS, INCINERATORS
(PMPCCAN) TRAYS DOLLAR PLATE
GENERAL I JETS (INJECTORS & EJECTORS)
GRID
ROTARY LOBE PACKED SECTION
SIEVE M MOTORS
BLOWER (RLB)
VALVE
BUBBLE CAP REDISTRIBUTION ME ELECTRIC MOTORS
(LIQUID/LIQUID)
VERTICAL IN-LINE
CANNED PUMP MF FAN MOTOR
(PMPICAN) TRAY WITH REDISTRIBUTION
SHELL & TUBE
DOWNCOMERS (GAS/LIQUID) MM MIXER MOTORS
(HORIZONTAL)
(STHORIZ)
1) SINGLE PASS BAFFLE WITH Mx MIXERS, AGITATORS
OPEN TOP FLGATER PARTITION
INTERNAL FLGATER (TKOPF)
CETRIFUGAL SIDE (TKGF) P PUMPS
IN/OUT BETWEEN VORTEX BREAKER
BEARING PUMP DOUBLE PIPE PG PUMP GEARS
(DPIPE)
INTERNALS WHEN DRAWN TO BE DASHED PM PUMP MOTORS
EXAMPLES:
2) TWO PASSES
METERING PUMP INDICATION OF PT PUMP TURBINE
(PMPMETER) POINT OF CHANGE
NON-INTEGAL SPECIAL (SILENCERS, STACKS, PACKAGE UNITS
G S DETONATION ARRSTOR FLAME ARRSTOR, STATIC
GEAR BOX
(GEARBOX) MIXER STRAINER, SUMP)
3) CALMING
SECTION ST STEAM TURBINE
VENDOR PACKED COLUMN
INJECTION PUMP CHANGE IN
BASIC SYMBOL
(PMPINJEC) KETTLE REBOILER RESPONSIBILITY PLATE & FRAME T TURBINE
(REBOIL) (PLATEEXCH)
Tk TANKS (ATMOSPHERIC) ADDITIONS / MODIFICATIONS B
FIRED HEATER DEPICTION VESSELS INCLUDING COLUMNS, PRESSURE
M (HTRFIRE)
V
STORAGE & FILTERS
HIC T.L. ELEV. (TYP.)
ELEVATION FROM
FINISHED SURFACE FORCED DRAFT SINGLE (COOLER) X STATIONARY TRANSPORT EQUIPMENT
VERTICAL SUMP PUMP SEPARATE
AT GRADE BAY AIR COOLER
(PMPSUMP) CONVECTION COIL
(LOUVERS AS REQUIRED) XM STATIONARY TRANSPORT EQUIPMENT MOTOR

XZ BULK LOADING ARM MOTOR

Z BULK LOADING ARMS


24 A 05/08/10 ISSUED FOR REVIEW
LOADING ARM MAP TIC
ROTARY SCREW ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT
(LOADARM) 15 4. EQUIPMENT NUMBERING ON FLOW DAIGRAMS SHOULD PREFERABLY BE DONE REV
DATE APP
PUMP (PMPROTS) TRAYED COLUMN
14 FROM LEFT TO RIGHT.
AV VFD BASIC SYMBOL
EXAMPLE OF EQUIPMENT NUMBERING: V-41101.
TRAY NUMBERS
FROM BOTTOM V-EQUIPMENT DESIGNATION (REFER TO PARAGRAPH 1) 41101- VESSEL
No. 01 IN PROCESS UNIT 411.

FILE:\\F:\1025\DRAWINGS\UTILITIES\200\200.011.pid MODEL DATE:2/1/2011 5:51:43 PM BY:ahm14887


VARIABLE/SINGLE SPEED EQUIPMENT SPARING WILL BE SHOWN AS FOLLOWS:
VERTICAL CYLINDRICAL NATURAL
MOTOR SHOWN AS REQUIRED EXAMPLE: (PUMP) P-41112A, B, C, ETC.
ROTARY SCREW DRAFT FURNACE WITH SEPARATE
(HORIZONTAL OR CROSS FLOW) VFD_VARIABLE FREQUENCY ANY EXISTING EQUIPMENT WHICH IS TO BE REPLACED WITH NEW
COMPRESSOR (COMPROTS) 1
CONVECTION SECTION DRIVE EQUIPMENT IN THE SAME SERVICE WILL RETAIN ITS OLD EQUIPMENT
NUMBER WITH THE EXCEPTION THAT A "R" WILL BE ADDED TO THE
TYPICAL ARRANGEMENT SHOWN TYPICAL ARRANGEMENT SHOWN
TRUCK LOADING END. IE) E-42011 WILL BECOME E-42011R.
ACTUAL SYMBOL TO CONFIRM TO ACTUAL SYMBOL TO CONFIRM TO
FILTER (FLT) STATION ANY EQUIPMENT THAT IS BEING COMPLETELY REMOVED FROM SERVICE
CORRECT CONFIGURATION CORRECT CONFIGURATION
(TRKLOAD) WILL HAVE ITS NUMBER RETIRED AND NOT REUSED FOR OTHER EQUIPMENT.
FOR REUSED EQUIPMENT IN THE SAME UNIT, THE EQUIPMENT NUMBER
EJECTOR/INJECTOR
EDUCTOR
WILL STAY THE SAME AND THE SERVICE DESCRIPTION WILL CHANGE. SHELL CANADA
BASIC SYMBOL REUSED EQUIPMENT TO BE USED IN A DIFFERENT UNIT WILL RECEIVE A
(EJECTOR) NEW EQUIPMENT NUMBER AND SERVICE DESCRIPTION, THAT IS QUEST CCS PROJECT
OIL MIST CONSISTENT WITH THE UNIT THAT IT IS BEING INSTALLED IN.
DISTRIBUTION STEAM DRUM A
IN-LINE STATIC MIXER BLOCK WITH 2
(INMIX) RECLASSIFIERS.
ADD RECLASSIFIERS R
AS REQUIRED. ROTATING DISC
TANK MIXER
(OILMIST) CONTACTOR
(TKMIX)
PIPING AND INSTRUMENT DIAGRAM
ELECTRIC MOTORS
AC MOTOR MUD DRUM
QUEST CCS PROJECT
AIR
*VFD FOR VARIABLE
E ELIMINATOR UNIT 200 - COMMON
FREQUENCY DRIVE
(AIREL)
(EM) SHELL & TUBE
VERTICAL
SHELL & TUBE FLOW DIAGRAM SYMBOLS FOR EQUIPMENT
SYNCHRONOUS MOTOR VERTICAL THERMOSYPHON
(OVHD_EXCH)
*DC FOR DC MOTORS (VERT_THER) SCALE: NONE
(EMDC)

200.011
SHELL DWG NO.: REV.
200.0000.000.041.011 A
4 3 2 1
4 3 2 1

P P P P
VA
MIN. 8m 1. SEE DRAWING 200.0000.000.041.007, 008, 009, 010, & 011 FOR SYMBOL
8 8
ABOVE GRADE IDENTIFICATION AND GENERAL NOTES.
APPLICATION AND DESCRIPTION
ACTUAL DETAIL ARRANGEMENT

2. ARRANGEMENT S-1 TO BE USED ONLY WHERE THE SAMPLING VALVE CAN BE

PIPING
INSTR.
3 WELDED DIRECTLY TO A NORMALLY FLOWING LINE IN AN ACCESSIBLE LOCATION.

NO

NO

NO
NO

NO
LOWER PRESSURE

NO
3 PIPING PIPING PIPING PIPING PIPING PIPING PIPING PIPING TO BE CONFIRMED IN EPC.
SIDE CLASS PIPING
SAMPLE POINT

INSTR. INSTR. INSTR. INSTR. INSTR. INSTR. INSTR. INSTR. INSTR. 3. BRIDGE WELD ALL ROOT VALVES TO THE MAIN LINE EXCEPT IN ARRANGEMENT
MAIN LINE
CLASS LOCATION. TO BE CONFIRMED IN EPC.
3/4"
13 NC 4. SEWER CHOICE PER AVAILABILITY.
3/4"
9 7 5. SAMPLE COOLER MODEL NO. LATER.
PI PI PI 6. ALL SAMPLE POINTS TO BE LOCATED AT GRADE. WHERE POSSIBLE, INCORPORATE
5 7 7 7 7 3/4" SAMPLE POINT WITH ANALYZER CONDITIONING TO REDUCE ADDITIONAL COOLING,
AU
D (TYPICAL FOR ALL TYPES) 3/4" 3/4"
CWR
ETC. WHERE POSSIBLE, SAMPLES TO BE COOLED BELOW 45°C FOR PERSONNEL
PROTECTION.
D
PI 13 16
3/4" SAMPLE BOMB 7. PRESSURE LIMIT FOR SNAP- ON SAMPLE BOMB FITTINGS IS 45 MPa AT 65°C. FOR

3/4"
16 SAMPLE BOMB
(BY SHELL) (BY SHELL) HIGHER PRESSURES USE DIRECT SCREWED BOMB CONNECTIONS.
TG 3/4"
3/4" 8. SAMPLE CONNECTION ON TOP OF HORIZONTAL LINE FOR GAS. SAMPLE
7 3/4"
SHORT NIPPLE AND CAP FL FL CONNECTION ON SIDE OF HORIZONTAL LINE FOR LIQUID SAMPLE.
SAMPLE BOTTLE
13 16 MAIN LINE CLASS (BY SHELL) 9. DELETE SECOND VALVE WHEN ROOT VALVE IS ACCESSIBLE FROM THE SAMPLE
MAIN LINE CLASS
VALVE.
MIN.
2 3/4" 10. THE TYPE OF FITTING (SOCKOLET OR WELDOLET WITH FLANGE) AND THE FIRST

3/4"
10 VALVE OR VALVES AT THE MAIN LINE SHALL BE AS PER VENT (OR DRAIN)
S-1 S-2 CWS S-3 S-4 S-4A S-8 REQUIREMENTS FOR THE MAIN LINE PIPING CLASS. SEE SPECIFICATION
LIQUID HYDROCARBONS AND WATER LIQUID HYDROCARBONS HYDROCARBONS SWEET/SOUR HYDROCARBON GAS/LIQUID SWEET/SOUR HYDROCARBON GAS/LIQUID SOUR LIQUIDS (SOUR WATER AMINE) 245.0311.035.005.
BELOW 45°C BELOW 45°C 45°C AND ABOVE BELOW 45°C BELOW 45°C BELOW 45°C 11. THE STEEL CABINET IS TO BE COMPLETE WITH AN INTEGRALLY MOUNTED AIR
EJECTOR. THE FRONT WALL TO BE A CLEAR PLASTIC DOOR. PROVIDE SLOTS IN
THE FLOOR FOR VENTILATION. SEVERAL SAMPLING CONNECTIONS CAN BE BR-
OUGHT INTO THE SAME CABINET. HOWEVER EACH CONNECTION MUST HAVE ITS
OWN SPIGOT TO PREVENT CONTAMINATION.
17 17 17 17
12. ISOKINETIC SAMPLE PROBE (JONAS) REQUIRED FOR STEAM SAMPLE.
13. SAMPLE LINE PIPING CLASS SHALL CORRESPOND TO THE PIPING CLASS OF THE
P P P P MAIN LINE.
14. DO NOT MANIFOLD MORE THAN ONE SAMPLE LINE TO ONE COOLER TO PREVENT
3/4"
8 8 8 CONTAMINATION.
P&ID WILL SHOW

S-1
15. ADD APPROPRIATE WINTERIZATION AND PERSONNEL PROTECTION.
16. SAMPLING VALVES MUST BE CLOSE CONNECTED TO FAST LOOP (SAMPLING
BYPASS).

3/4"

3/4"
3/4"

3/4"
3/4"
3/4"

3/4"

3/4"

3/4"
17. ANY DEVICE OR INSTRUMENT THAT CREATES A PRESSURE DROP
P TO ASSURE OF SUFFICIENT FLOW THROUGH THE FAST LOOP.
S-2 S-3 S-4 S-4A FL S-8 P&ID SYMBOL MAY VARY ACCORDING TO DEVICE BEING USED.

S-1 S-2 S-3 S-4 S-4A S-8


LIQUID HYDROCARBONS AND WATER HYDROCARBONS SWEET/SOUR HYDROCARBON GAS/LIQUID SWEET/SOUR HYDROCARBON GAS/LIQUID SOUR LIQUIDS (SOUR WATER AMINE)
LIQUID HYDROCARBONS
C BELOW 45°C 45°C AND ABOVE BELOW 45°C BELOW 45°C BELOW 45°C C
BELOW 45°C

P P P
75
12 8 8
FLOW
D

MIN. DISTANCE
SEE DETAIL

3/4"
3/4"

NO

NO

3/4"
FOR ACCESS LOWER PRESSURE

NO
PIPING PIPING PIPING VA PIPING PIPING
TO RIGHT SIDE CLASS
3/4" 3/4" INSTR. INSTR. INSTR. MIN. 8m INSTR. INSTR.
3" BLIND MAIN LINE
ABOVE GRADE
ACTUAL DETAIL ARRANGEMENT

CLASS
APPLICATION AND DESCRIPTION

3/4" PIPE FLANGE AND AWAY FROM


9 OPERATING
PIPING INSTR. 3/4" VALVE
3/4" PLATFORM 9
9 5
SAMPLE POINT

CWR 5
TO SAMPLE COOLER
3/4" 3/4" 3/4"
CWR CWR
5 3/4" 3/4"
PI
2" AND SMALLER PI TG
IG 3/4"
TG FLOW 45°
AU
7 7
16 13
13 3/4"
3/4"

CWS 16 FL
3/4" 3/4" 11 SAMPLE BOMB MAIN LINE CLASS
(BY SHELL)
4 CWS SAMPLE BOTTLE CWS
(BY SHELL)
3/4" VALVE
MIN.

B
S-5 12 S-9 S-12
STEAM AND CONDENSATE AND HOT WATER SOUR LIQUIDS (SOUR WATER AMINE) SWEET/SOUR HYDROCARBON GAS/LIQUID
ABOVE 45°C 45°C AND ABOVE 45°C AND ABOVE

17 17 17

P P P

8 8 A 05/08/10 ISSUED FOR REVIEW


P&ID WILL SHOW

ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT


REV
DATE APP

3/4"
3/4"

3/4"
3/4"

3/4"

3/4"
S-5 S-9 S-12

FILE:\\F:\1025\DRAWINGS\UTILITIES\200\200.012.pid MODEL DATE:2/1/2011 4:15:06 PM BY:ahm14887


S-5 S-9 S-12
STEAM AND CONDENSATE SOUR LIQUIDS (SOUR WATER AMINE) SWEET/SOUR HYDROCARBON GAS/LIQUID
ABOVE 45°C 45°C AND ABOVE 45°C AND ABOVE

SHELL CANADA
QUEST CCS PROJECT
A

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT
UNIT 200 - COMMON
STANDARD DETAIL - SAMPLING SYSTEMS
SCALE: NONE

200.012
SHELL DWG NO.: REV.
200.0000.000.041.012 A
4 3 2 1
4 3 2 1

FIELD MOUNTED PRESSURE INSTRUMENT (PG, PT, PS, PP)


EACH PRESSURE DIFFERENTIAL TAP IS AS SHOWN. 1. FOR GENERAL NOTES AND DETAILS SEE DWGS. 245.0311.000.053.005, 006, 007,
008, 009, 010, 011, 012, 013, 018 AND 019.
2. LEGEND:
3/4"
- 3/4" 'PHOENIX' DOUBLE BLOCK & BLEED GAUGE VALVE.
1/2"
INST. INST. - 1/2" 'SWAGELOK' DOUBLE BLOCK & BLEED GAUGE VALVE.
PIPING PIPING 3. EXCEPT PIPING SPECS, UAB, UAZ, UAY, UJB, ULB.
4. PIPING/INSTRUMENTATION SCOPE BREAKS ARE NOT TO BE SHOWN ON THE P&ID'S.
BLEED BLEED DETAILS ON THESE CONNECTIONS SHOW IMPLIED BREAKS.
1/2" 1/2"

X"

X"
D INST.
PIPING
3/4" 3/4" D
INST.

3/4"
3/4"
PIPING

X"

X"
PIPING SPECS ALL PIPING CLASSES 3 PIPING CLASSES PIPING CLASSES
(UAB, UAZ, UAY, UJB, ULB) (150#, 300#, 600#) (900#, 1500#, 2500#)

INST. INST.
PIPING PIPING

BLEED BLEED
1/2" 1/2"

X"

X"
INST. 3/4" 3/4"
PURGE PIPING
3/4"

X"

X"
PURGE PURGE

ALL PIPING CLASSES PIPING CLASSES PIPING CLASSES


(150#, 300#, 600#) (900#, 1500#, 2500#)

C FIELD MOUNTED TEMPERATURE INSTRUMENT (TG, TT) C

INST. INST.
PIPING
1"

1"

PIPING
3/4" 3/4"

TT TT
TT
2"

2"

1-1/2" INST. INST.


PIPING PIPING

PIPING CLASSES PIPING CLASSES PIPING SPECS WITH PIPING SPECS PIPING SPECS
(150#, 300#, 600#) (900#, 1500#, 2500#) THREADED CONNECTION (150#, 300#, 600#, 1500#) (1500#, 2500#)

ANALYZER CONNECTIONS

AT AT

X"x3/4" 3/4" X"x3/4" 3/4"


PIPING

PIPING
INST.

INST.

2" INST. 2" INST.


PIPING PIPING
B

PIPING SPECS PIPING CLASSES 3 PIPING SPECS PIPING SPECS


(UAB, UAZ, UAY, UJB, ULB) (150#, 300#, 600#, 900#, 1500#) (150# TO 2500#) (900# TO 2500#)
(FOR VESSEL CONNECTION) (FOR VESSEL CONNECTION)

A 05/08/10 ISSUED FOR REVIEW


PURGE ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT
REV
DATE APP
X"x3/4" 3/4"
PIPING
INST.

FILE:\\F:\1025\DRAWINGS\UTILITIES\200\200.013.pid MODEL DATE:2/1/2011 4:13:45 PM BY:ahm14887


PIPING CLASSES
(150#, 300#, 600#, 900#, 1500#)
(FOR VESSEL CONNECTION)

SHELL CANADA
QUEST CCS PROJECT
A
PURGE
IF REQUIRED
X"x3/4" 3/4" R

PIPING AND INSTRUMENT DIAGRAM


PIPING
INST.

QUEST CCS PROJECT


UNIT 200 - COMMON
PIPING CLASSES PRESSURE INSTRUMENT CONNECTION DETAILS
(1500#, 2500#)
(FOR VESSEL CONNECTION) SCALE: NONE

200.013
SHELL DWG NO.: REV.
200.0000.000.041.013 A
4 3 2 1
4 3 2 1

LEVEL OR D/P INSTRUMENT ON VESSEL (PDT, LT,LTE)


1. FOR GENERAL NOTES AND DETAILS SEE DWGS 245.0311.000.053.005, 006, 007,
008, 009, 010, 011, 012, 013, 018 AND 019.
2. LEGEND:
3/4"
BLEED BLEED - 3/4" "PHOENIX" DOUBLE BLOCK & BLEED GAUGE VALVE.

PIPING

PIPING
PIPING PIPING

INST.
1/2"

INST.

1/2"

1/2"
3/4"
INST. INST. - 1/2" "SWAGELOK" DOUBLE BLOCK & BLEED GAUGE VALVE.

X"x3/4" 3/4" X" 3/4" 3" 3" 3" 3" 3. EXCEPT PIPING SPECS, UAB, UAZ, UAY, UJB, ULB.
4. PIPING/INSTRUMENTATION SCOPE BREAKS ARE NOT TO BE SHOWN ON THE P&ID'S.
DETAILS ON THESE CONNECTIONS SHOW IMPLIED BREAKS.

3/4"
4 4
D D
X"x3/4" 3/4" X" 3/4" 3" 3" 3" 3"

3/4"
PIPING
PIPING
INST.

INST.

3/4"
INST. INST.

1/2"

1/2"
PIPING PIPING
BLEED BLEED
PIPING SPECS ALL PIPING CLASSES
PIPING CLASSES PIPING CLASSES
(UAB, UAZ, UAY, UJB, ULB) (150#, 300#, 600#, 900#, 1500#) 3
(150#, 300#, 600#) (600# H2 SERVICE, 900#, 1500#)

BLEED
PIPING

1/2"
3/4"
PURGE INST.
PIPING
X" 3/4" INST. 3" 3"

4
X" 3/4" 3" 3"

INST.
PURGE PIPING

3/4"
INST.

1/2"
PIPING
BLEED
PIPING CLASSES
(150#, 300#, 600#, 900#, 1500#) PIPING CLASSES
(1500# , 2500#)
C C

PURGE BLEED
IF REQUIRED PURGE PIPING

1/2"
3/4"
INST.
PIPING
X" 3/4" INST. 3" 3"

4
X" 3/4" 3" 3"

INST.

3/4"
PURGE PIPING
INST.

1/2"
IF REQUIRED PURGE PIPING
BLEED
PIPING CLASSES
PIPING CLASSES (1500#, 2500#)
(1500#, 2500#)

LEVEL INSTRUMENT (LG/LT, LS)

V V

PIPING

PIPING

PIPING
INST.

INST.

INST.
IF REQUIRED
B

3/4"

3/4"

3/4"
V
PURGE PIPING

3/4"

3/4"
X"x3/4" INST.
2" MAG/ 2" 2" MAG/ 2" 2" MAG/
CAPACITANCE/ CAPACITANCE/ CAPACITANCE/
GUIDED WAVE GUIDED WAVE GUIDED WAVE

X"x2" 2"x3/4" 2" 2" 2" 2" 2"

INST.

3/4"
3/4"
2"

PURGE PIPING

PIPING
INST.
INST.

INST.

3/4"
3/4"

3/4"
PIPING

PIPING
IF REQUIRED D
D D
(1500#, 2500#) A 05/08/10 ISSUED FOR REVIEW
WITH UTILITY CONNECTION
PIPING SPECS PIPING CLASSES 3 PIPING CLASSES ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT
REV
(UAB, UAZ, UAY, UJB, ULB) (150#, 300#, 600#) (600# H2 SERVICE, 900#, 1500#) DATE APP

FILE:\\F:\1025\DRAWINGS\UTILITIES\200\200.014.pid MODEL DATE:2/1/2011 4:13:08 PM BY:ahm14887


BLEED BLEED
PURGE PIPING PURGE PIPING
1/2"

1/2"
3/4"

3/4"

INST. INST.

3" 3" 3" 3"


GWR GWR
PIPING

PIPING
INSTR.
INST.

4 4
SHELL CANADA

3/4"
3" 3" 3" 3" 2" 3/4" 2" 2" 3/4"
V V
QUEST CCS PROJECT
3/4"

3/4"

INST. INST. A
1/2"
1/2"

PURGE PIPING PURGE PIPING


2" 2" 2"
BLEED BLEED
3/4"
3/4"

3/4"
R
INST.
PIPING

PIPING
INSTR.
PIPING CLASSES PIPING CLASSES D D
(150#, 300#, 600#) (600# H2 SERVICE, 900#, 1500#)
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
PIPING SPECS PIPING CLASSES 3 UNIT 200 - COMMON
(UAB, UAZ, UAY, UJB, ULB) (150#, 300#, 600#)
LEVEL INSTRUMENT CONNECTION DETAILS
SCALE: NONE

200.014
SHELL DWG NO.: REV.
200.0000.000.041.014 A
4 3 2 1
4 3 2 1

ORIFICE FLANGE - MOUNTED FLOW MEASUREMENT (FT)


FT FT
1. FOR GENERAL NOTES AND DETAILS SEE DWGS. 245.0311.000.053.005, 006, 007
FT 008, 009, 010, 011, 012, 013, 018 AND 019.
INST. INST. 2. LEGEND:
PIPING PIPING 3/4"

3/4"

3/4"

3/4"

3/4"
- 3/4" "PHOENIX" DOUBLE BLOCK & BLEED GAUGE VALVE.
INST.
PIPING PIPING 1/2"

1/2" OR 3/4"

1/2" OR 3/4"
PIPING - 1/2" "SWAGELOK" DOUBLE BLOCK & BLEED GAUGE VALVE.
INST. INST.
3. PIPING/INSTRUMENTATION SCOPE BREAKS ARE NOT TO BE SHOWN ON THE P&ID'S.
DETAILS ON THESE CONNECTIONS SHOW IMPLIED BREAKS.

PIPING

PIPING
INST.

INST.
D INST. D
PIPING

3/4"

3/4"
PIPING
FE INST.

FT

PIPING CLASSES
(150#, 300#, 600#, 900#) PIPING CLASSES
(1500#, 2500#)

VENTURI - MOUNTED FLOW MEASUREMENT (FT)


FT

FT
INST.
PURGE PIPING PURGE
3/4"

IF REQUIRED IF REQUIRED
3/4"

INST.

1/2" OR 3/4"
1/2" OR 3/4"
PIPING
PIPING
INST.

PIPING PIPING
INST. INST.
PIPING

PIPING
INST.

INST.

FE

FE

C PIPING CLASSES C
(1500#, 2500#)
PIPING CLASSES

FT
WEDGE - MOUNTED FLOW MEASUREMENT (FT)

INST.
1/2" OR 3/4"

PIPING FT
3/4"

PIPING
INST. FE
INST.
PURGE PIPING
PURGE
IF REQUIRED

3/4"

3/4"
IF REQUIRED

INST. PIPING PIPING


1/2" OR 3/4"

PIPING INST. INST.


3/4"

PIPING
INST.
FE
FT

PIPING CLASSES
PIPING CLASSES
(150#, 300#, 600#, 900#, 1500#)

FT FT
FT
B
INST.
PIPING 1/2" INST. 1/2" 1/2" INST. 1/2"
BLEED BLEED BLEED BLEED
3/4"
3/4"

PIPING PIPING
PIPING
2"

2"

2"

2"
INST. FE 3/4" 3/4" 3/4" 3/4"
2"

2"

2"

2"
PIPING PIPING PIPING PIPING
PIPING

PIPING
INST.

INST.

INST. X" INST. INST. X" INST.


INST.
PIPING
3/4"
3/4"

A 05/08/10 ISSUED FOR REVIEW


PIPING ISSUED
REV DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT
INST. FE FE DATE APP

FT

FILE:\\F:\1025\DRAWINGS\UTILITIES\200\200.015.pid MODEL DATE:2/1/2011 4:12:18 PM BY:ahm14887


PIPING CLASSES PIPING CLASSES
PIPING CLASSES (150#, 300#, 600#) (900#, 1500#)
(1500#, 2500#)

FT FT

INST. INST.
PIPING PIPING SHELL CANADA
3/4"

3/4"

3/4"

3/4"

1/2" INST. 1/2" 1/2" INST. 1/2"


PIPING PIPING BLEED PIPING BLEED BLEED PIPING BLEED
FE INST. INST. QUEST CCS PROJECT
2"

2"

3/4" 3/4" 3/4" 3/4"


A
2"

2"

PURGE PURGE PURGE PURGE


R
INST. PIPING PIPING PIPING PIPING
PIPING INST. X" INST. INST. X" INST.
PIPING AND INSTRUMENT DIAGRAM
3/4"

3/4"

PIPING
INST.
QUEST CCS PROJECT
FE FE UNIT 200 - COMMON
FT
FLOW ELEMENT CONNECTION DETAILS
PIPING CLASSES PIPING CLASSES SCALE: NONE
PIPING CLASSES (150#, 300#, 600#) (900#, 1500#)

200.015
SHELL DWG NO.: REV.
(150#, 300#, 600#, 900#, 1500#) 200.0000.000.041.015 A
4 3 2 1
4 3 2 1

WEDGE - MOUNTED FLOW MEASUREMENT (FT)


1. FOR GENERAL NOTES AND DETAILS SEE DWGS 245.0311.000.053.005, 006, 007,
008, 009, 010, 011, 012, 013, 018 AND 019.
FT 2. LEGEND:
3/4"
- 3/4" "PHOENIX" DOUBLE BLOCK & BLEED GAUGE VALVE.
1/2"
- 1/2" "SWAGELOK" DOUBLE BLOCK & BLEED GAUGE VALVE.
1/2" INST. 1/2" 3. PIPING/INSTRUMENTATION SCOPE BREAKS ARE NOT TO BE SHOWN ON THE P&ID'S.
PIPING DETAILS ON THESE CONNECTIONS SHOW IMPLIED BREAKS.
BLEED BLEED

2"
2"
D D
PURGE PURGE
IF REQUIRED IF REQUIRED

2"

2"
PIPING
INST.
X"

FE

PIPING CLASSES
(1500#, 2500#)

FT FT FT FT

1/2" 1/2" 1/2" 1/2" INST. 1/2" 1/2" 1/2" 1/2" INST.
PIPING PIPING
BLEED BLEED BLEED BLEED BLEED BLEED BLEED BLEED

2"

2"

2"

2"
3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4"
3/4"

2"

2"

2"

2"
C C

PIPING PIPING PIPING


INST. INST. INST.
X" X"

FE FE

PIPING CLASSES PIPING CLASSES


(150#, 300#, 600#) (900#, 1500#)

FT FT FT FT

1/2" 1/2" 1/2" 1/2" INST. 1/2" 1/2" 1/2" 1/2" INST.
PIPING PIPING
BLEED BLEED BLEED BLEED BLEED BLEED BLEED BLEED

3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4"

PURGE PURGE PURGE PURGE PURGE PURGE PURGE PURGE

PIPING PIPING PIPING PIPING


INST. INST. INST. INST.
X" X"

FE FE

A 05/08/10 ISSUED FOR REVIEW


PIPING CLASSES PIPING CLASSES
ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT
(150#, 300#, 600#) (900#, 1500#) REV
DATE APP

FT FT

FILE:\\F:\1025\DRAWINGS\UTILITIES\200\200.016.pid MODEL DATE:2/1/2011 4:06:58 PM BY:ahm14887


1/2" 1/2" 1/2" 1/2" INST.
PIPING
BLEED BLEED BLEED BLEED

3/4" 3/4" 3/4" 3/4"

PURGE PURGE PURGE PURGE


SHELL CANADA
IF REQUIRED IF REQUIRED IF REQUIRED IF REQUIRED QUEST CCS PROJECT
A

R
PIPING PIPING
INST. INST.
X" PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
FE UNIT 200 - COMMON
FLOW ELEMENT CONNECTION DETAILS
PIPING CLASSES SCALE: NONE

200.016
(1500#, 2500#) SHELL DWG NO.: REV.
200.0000.000.041.016 A
4 3 2 1
4 3 2 1

1. SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.

D D

HOA(TOA)
HIS

HOA(TOA)
HS I

MOTOR RUN STATUS


MONITORING
CONTROL
HOA(TOA)
ES SIS ES HS
VFD MCC

WINDING TEMP

WINDING TEMP
SIS

C VIB VIB VIB VIB


C

TEMP TEMP TEMP TEMP

DCS VFD CONTROL NON DCS STARTER CONTROL

HOA(TOA) A/B HOA(TOA)


HIS HS HIS

HOA(TOA) HOA(TOA)
HSZ I HS

SIS SIS

CONTROL CONTROL
B
ES MONITORING MONITORING ES
MCC MCC
WINDING TEMP

WINDING TEMP
VIB VIB VIB VIB

C 12/02/10 ISSUED FOR CLIENT REVIEW


B ISSUED FOR PRELIMINARY REVIEW
TEMP TEMP TEMP TEMP
ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT
REV
DATE APP

'A' MOTOR 'B' MOTOR

FILE:\\F:\1025\DRAWINGS\UTILITIES\200\200.XX1.pid MODEL DATE:2/2/2011 2:35:55 AM BY:bes29451


DCS STARTER CONTROL
SHELL CANADA
QUEST CCS PROJECT
A

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT
UNIT 200 - COMMON

SCALE: NONE

200.XX1
SHELL DWG NO.: REV.
200.0000.000.041.XX1
4 3 2 1
4 3 2 1
FIRE
1-1/2H3
V-24118 SET@
AMINE ABSORBER 1 3500 kPa-g
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
V
SIZE: 3350 mm ID x 23400 mm T/T RV GENERAL NOTES AND CONNECTION DETAILS.

3/4"
DESIGN PR. & TEMP: 3500 kPa-g @ 95 °C / HV @ 150° C 023 240.030 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "241" UNLESS OTHERWISE
6"x3" 6"-FL-241020-PAC
ANTI-FOAM MATERIAL(VESSEL/INTERNALS): CS + 3 mm 304L SS CLAD / 316L SS STATED.
FL
3/4"-KP-241001-PJG(0.4) INSULATION TYPE/THK: H/ 7 FREE DRAINING
242.021 12967 12039 3 . BOTTOM OF COLUMN IS PACKED WITH 600 mm OF #2 RASCHIG RINGS.
TRIM: P-241080-HJE(0.4) (TOP)

2"x1-1/2"

3/4" 3/4"
TO V-24218 P-241084-DJE(0.4) (BTM) 3/4" CSO 4 . H2 RAW GAS BYPASS REQUIRED FOR SYSTEM PURGE AND PRESSURIZATION AT
PAC
B START-UP.
HJE(0.4)

ET 10
5 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012.

ET 10 FREE DRAINING
38

CSO
6 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE.

CSC
5

S-4
ANTI-FOAM 7 . ELECTRIC TRACE TO HLL (ET 10).
ET 10 6
3/4"-KP-246005-PJG(0.4) 38 8 . LOCALIZED DEGASSING OF CO2 MAY OCCUR AT RESTRICTIONS, BENDS, TEES,
D 12286 246.014 2"-P-241057-HJE(0.4) SP D
ETC. RESULTING IN LOCALIZED TWO-PHASE FLOW AND VIBRATION.
FROM P-24606

3/4" 3/4"
001 9 . 316 SS HARDFACED TRIM MATERIAL IS REQUIRED FOR THIS CHECK VALVE.

38
10 10 . TWO CHECK VALVES IN SERIES, ONE IN THE HORIZONTAL AND ONE IN THE VERTICAL
LEAN AMINE FLOW SIGNAL H H2 RAW GAS POSITION, SEPARATED BY AT LEAST 500 mm.
12"-P-241056-HJE(0.4)
246.011 12981 38 12055 241.022 11 . INADVERTANT SIMULTANEOUS CLOSING OF BOTH HV-014 AND HV-015 PREVENTED
FREE DRAINING
TO UC-246002 TO V-24119 BY INTERLOCK I-102
10 E 12 . VALVES ARE FOR BATTERY LIMIT ISOLATION OF UNIT.
V
SET POINT
FC 451 12" 13 . TOP CONNECTION.

4"
12206 246.002
075 3/4" 14 . 316 STAINLESS STEEL INJECTION QUILL. OUTLET OF INJECTION QUILL TO BE
FROM LX-246001 L
FYE CENTERED IN PROCESS LINE.
H D
TI I HH TT S 075 HOLDS:
030 104 030

DJE(0.4)
FT FO 8" FV • NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

DAE
16"-P-246080-DAG 075 • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

DAG
12"-P-241061-DAG 075 MIN

DAE
PJG(0.4) 12"-P-241062-DAE 36"
LEAN AMINE 1-1/2" 12 MP-001 • DETAILS FOR INJECTION QUILL TO BE FINALIZED.
16"x12" ET 10 DAG MW
12"x8" 12"-P-241063-DJE(0.4) 16"x12" 16"
• SAMPLE STATION SPECIALITY ITEM NUMBERS.
12642 246.011 50 M

FROM P-24602A/B/C 12"x8" FC • CONFIRM AVAILABILITY OF DCS AND SIS INTERLOCK SEQUENCE NUMBERS ADDED
V-24118

3/4"
FOR QUEST.
3/4"

3/4"
D SP DETAIL 'A'
D PDT 3" 3"
ET 10
50

007 8" 064 25

LEAN AMINE
DETAIL "A"
242.021 12633 CSC H INJECTION QUILL
PDI
TO V-24218
064
12"-P-241074-DAG
E
450
HZTE E PJG(0.4)
I 14
C 015 453 DAG C
104 FLOW

I
HYE
103
S 015
I HIC
11
102 015
FO

ET 38 H2 RAW GAS
14"-P-241055-HJE(0.4) 75 14"x12" 14"-P-241055-HJE(0.4)
12054 241.022
12"x8" FO 12"x8"14"x12" BYPASS TO HMU 1 PSA
8" HV
015
E
453
HIC
014 E
450

1
HYE
S 24"
I 014 HZTE MW
11
3"

102 014
3"
FO
SP
3/4"

14" 13 002 9
H2 RAW GAS ET 38 18"x14" 18"
14"-P-241054-HJE(0.4)
241.009 75
FC PP
FROM HMU 1 HV MIN MIN
E HH
014
MIN

451
2"
B
4

3/4"
GWR
E LTE

3/4"
3" 3"
450 LL 154
CSC V
2"

HJE(0.4)
3/4"

3/4"

3/4"
240.028 ULB 3/4" 2" 2" 2" 2"
2"-GI-240022-ULB 2"
GI
12717
START-UP SWING G 06/13/11 ISSUED FOR PHA III
ELBOW HHLL=4400 mm
DP F 04/20/11 ISSUED FOR ESTIMATE
H
LT LI LHS LC E 03/01/11 ISSUED FOR PHA II
HLL=3500 mm 7 155A 155A 155 155 D 01/10/11 ISSUED FOR CLIENT REVIEW
L
C 12/02/10 ISSUED FOR INTERNAL REVIEW
NLL=2800 mm 24"
MAG B ISSUED FOR PRELIMINARY REVIEW
MW
LG LT LI REV
ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT
DATE APP
2" 2" LLL=1900 mm 3" 3" 155 155B 155B

E XZI
3/4"
3/4"

SWING 3" 2" 2" 450 020

FILE:\\F:\1025\DRAWINGS\HMU\241\241.021.pid MODEL DATE:6/14/2011 1:17:48 PM BY:bes29451


ELBOW LLLL=300 mm
3/4"

3/4"
D

TI
3/4"

XYE ISSUED FOR HAZOP


D

SO
020 031
s
2"x3/4"
2"-P-241065-DJE(0.4)
A/S
240.029 3 3/4"
3"-SL-240020-SAB 3" XZTE FO D
SL
12715
020
XV
TT
031
6" LV SHELL CANADA
3/4"
1"

N/A
4000 mm

155 8"-P-241064-DJE(0.4)
ET 10 D 020 12 RICH AMINE QUEST CCS PROJECT
1"-SL-241XXX-SAB

16" 16"x12" 8"-P-241064-DJE(0.4) 8" 1-1/2" 8"x6" 8"x6" ET 10


50 12635 242.021
12"x8" FC FC A
TO E-24602A/B
4"

3/4"
3/4"
3/4" 3/4"

3/4"
8
D

3/4"
3/4" D D D TWO PHASE FLOW
240.029 R
1"-SCL-241XXX-SAB
SCL T
12716
S-9 PIPING AND INSTRUMENT DIAGRAM
3/4"

4"-P-241066-DJE(0.4)
QUEST CCS PROJECT
4"

SP 5 6 SP
003 004 UNIT 241 - HYDROGEN MANUFACTURING UNIT TRAIN 1
VACUUM TRUCK AMINE ABSORBER 1
SCALE: NONE

241.021
SHELL DWG NO.: REV.
241.0000.000.041.021 G
4 3 2 1
4 3 2 1

V-24119 7
ABSORBER 1 WASH WATER VESSEL 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
SET POINT FHS
SIZE: 1800 mm ID x 10900 mm T/T GENERAL NOTES & CONNECTION DETAILS.
3500 kPa-g @ 60 °C / HV @ 150 °C TO PSA LOGIC 074
DESIGN PR. & TEMP: 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "241" UNLESS OTHERWISE
MATERIAL(VESSEL/INTERNALS): CS + 3 mm 304L SS CLAD / 316L SS STATED.
INSULATION TYPE/THK: H/ 5 3
P-241081-HJE(0.4) 3 . CALCULATE AMOUNT OF CO2 REMOVED FROM RAW H2 GAS.
TRIM:
FC SIGNAL 4 . H2 RAW GAS BYPASS REQUIRED FOR SYSTEM PURGE AND PRESSURIZATION AT
FI FX START-UP.
241.009
074A 074B 5 . ELECTRIC TRACE TO HLL (ET 10).
FROM FC-377
6 . EITHER LTE-241156 OR LTE-241159 SHALL BE SELECTABLE AS THE INPUT TO
SAFETY INTERLOCKS E-452 AND E-453. A DEVIATION ALARM TO MONITOR THE
TWO INSTRUMENTS SHALL BE PROVIDED AT THE DCS.
D FI 7 . HAND SWITCH TO SEND FLOW SETPOINT FROM FC-377 TO PSA WHEN QUEST IS D
ISOLATED.
074B
f(x) 8 . TWO CHECK VALVES IN SERIES, ONE IN THE HORIZONTAL AND ONE IN THE
VERTICAL POSITION, SEPARATED BY AT LEAST 500 mm.
FX 9 . VALVES ARE FOR BATTERY LIMIT ISOLATION OF UN IT.
H2 RAW GAS 074A
ET 38
14"-P-241055-HJE(0.4) 75
12054 241.021 HOLDS:
FROM HMU 1 BYPASS
CO2 CO2 LEAN • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
H AI I
PC • INTERLOCK I-101 ACTIONS, IF ANY, TO BE CONFIRMED.
067 016 101 • CONFIRM AVAILABILITY OF DCS AND SIS INTERLOCK SEQUENCE NUMBERS
CO2 RICH
HOLD ADDED FOR QUEST.

HJE(0.4)
PV

PAC
10"-FL-241021-PAC H
AIT TI DETAIL "B"
067 240.030
6" 10"x6" ET 10 016 032 SAMPLE QUILL
50 FL
FC FREE DRAINING 12061

3/4"
TSO

3/4" 3/4" 240.030


AE
E FL
016 13045
450

ET 38
PI 3/4" 3/4" INST

63
AP
E 065
PIPING
016C
453

6"-P-241059-HJE(0.4)
FLOW

XYE
019 PT AP
PT S
065 016B
067 TT FT
A/S

FREE DRAINING
032 074
XZTE FO AP
C C

3/4" 3/4"

3/4" 3/4"
016A

3/4"
019 XV
12" 019 INST 1-1/2"
14"x12" ET 38 H2 RAW GAS
PIPING 14"-P-241058-HJE(0.4)
75 241.009
FREE DRAINING FC
DETAIL "B" TO HMU 1 PSA
4
2"
FLOW SIGNAL

3/4"
E 3"
246.022 13030
453 V 12"
TO FX-246076 CSC

3"
3"
FC
FYE
2"-SCH-241XXX-SAG

WASH WATER 076 S


L 076
2"-SCH-242XXX-SAG
242.022 12969
24"
TO V-24219 FO MW
HJE(0.4)

FT
SAD

MIN H
076 FV PDT PDI
9 076 8 8 066 066
WASH WATER 2"x1" 2"x1" ET 10 2"x1" 2"x1" 3"x2" 3"
2"-SCH-246003-SAG 1" 24"
12968 246.022 38
FC
V-24119 MW
FROM P-24609A/B
3/4"

3/4"

HJE(0.4)
PJE(0.4)
D 1" 2"-SCH-241XXX-SAD
7
8
CSC 4" 4"x3" ET 10 CIRCULATING WATER
24" 3"-P-241XXX-HJE(0.4) 38 3"-P-241073-PJE(0.4)
241.023 12408
SAG
SAD

MW
FROM E-24129
6

GWR PP 8
LTE B
156
1 3" 3"
H2 RAW GAS H 14"x12" 14"
3/4" 3/4"

3/4" 3/4"
12"-P-241056-HJE(0.4)
12055 241.021 38
FREE DRAINING
3/4"

FROM V-24118 3/4" 2" 2" 3" 3" G 06/13/11 ISSUED FOR PHA III

F 04/20/11 ISSUED FOR ESTIMATE


3/4"

3/4"

6 3" 3" 5 2" 2" E 03/01/11 ISSUED FOR PHA II


LI H HHLL=2450 mm
MAG D 01/10/11 ISSUED FOR CLIENT REVIEW
156 L C 12/02/10 ISSUED FOR INTERNAL REVIEW
DP 24" LG LT LI
HH 2" 2" MW 157 157A 157A B ISSUED FOR PRELIMINARY REVIEW
E LTE HLL=2300 mm DP
H 2" 2" LC SIGNAL ISSUED DESCRIPTION BY CKD PRS CS MC PEM CLIENT
LI 453 159 LT LI LHS REV
DATE
PDP APE
APP
3/4"

6
12409 241.023
159 E NLL=1050 mm 157B 157B 157A
3/4"

L
3/4"

TO LC-157
3/4"

452 LL D 3" 3" LLL=870 mm 3" 3" D


3/4"

FILE:\\F:\1025\DRAWINGS\HMU\241\241.022.pid MODEL DATE:6/14/2011 1:17:50 PM BY:bes29451


3/4"

2" LLLL=300 mm

SO

6"
SHELL CANADA
CIRCULATING WATER
7860 mm

ET 10
50 6"-P-241067-PJE(0.4)
12407 241.023 QUEST CCS PROJECT
TO P-24108A/B
A
3"

D
R

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT
UNIT 241 - HYDROGEN MANUFACTURING UNIT TRAIN 1
ISSUED FOR HAZOP
ABSORBER 1 WASH WATER VESSEL
SCALE: NONE

241.022
SHELL DWG NO.: REV.
241.0000.000.041.022 G
4 3 2 1
4 3 2 1

E-24129
ABSORBER 1 CIRCULATING WATER COOLER 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
RATED DUTY: 0.2 MW GENERAL NOTES & CONNECTION DETAILS.
SURFACE AREA: 37.9 m^2
TEMA TYPE: BEU 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "242" UNLESS OTHERWISE
SHELL TUBE STATED.
DESIGN PRESS: 3900 kPa-g / HV 3010 kPa-g / 3 . FOR PIPING DETAILS OF SAMPLE STATION SEE DRAWING 200.0000.000.041.012.
DESIGN TEMP: 60 °C / 150 °C 58 °C / 4 . CV OF CONTROL VALVE TO BE MINIMUM.
MATERIAL: CS + 3 mm 304L SS CLAD SUPER DUPLEX 2507 + 0.38 mm CA 5 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE.
INSULATION TYPE/THK: / / 6
6 6 . ELECTRIC TRACE (ET 10).
TRIM: P-241082-PJE(0.4) CWR-241004-PJE(0.4)
7 . AUTO-START STAND-BY PUMP ON RUN FAILURE OF PRIMARY PUMP.
LC SIGNAL H PURGE WATER 8 . VALVES ARE FOR BATTERY LIMIT ISOLATION OF UNIT.
LC LHS 2"-P-242076-PJE(0.4)
D 12409 241.022 242.023 12638
D
157 157B
FROM LHS-157A L FROM E-24229
HOLDS:

LV • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.


157A 3/4"
8 D • COMFIRM AVAILABILITY OF DCS AND SIS INTERLOCK SEQUENCE NUMBERS

4
ADDED FOR QUEST.
2"x1" 1" 2"x1"

FC

3/4"
8 PURGE WATER
ET 10 3"x2"
XZI D 2"-P-241076-PJE(0.4) 3"-P-241076-PJE(0.4)
LV 38 12637 246.006
018
157B

3/4"
TO V-24602
2"x1" 1" 2"x1" D

2"-P-241075-PJE(0.4)
FC
E

3/4"
PI

3/4" 3/4"
452 D 4 070
SP
005
XYE
S 018 3/4" 3/4" PT
S-8 TW
A/S 070
035 V
XZTE FO 3 5
1-1/2"

2"
COOLING WATER RETURN

3/4" 3/4"
018 XV 6"x4" 6"x4" ET 10
38 4"-CWR-241003-UAB
12619 242.023
CIRCULATING WATER 018
ET 10 3"-P-241072-PJE(0.4) TO HEADER
6"-P-241067-PJE(0.4) 50
12407 241.022 CSO
FC
FROM V-24119 3/4"
D

RS
C 6 UAB C

NC
PJE(0.4)

E-24129

3"-P-241072-PJE(0.4)

3"-P-241077-PJE(0.4)
FC I PJE(0.4)
077 103 UAB

RS
L LL

TG FT
033 077

1-1/2"
CIRCULATING WATER ET 10 6"x3" 6"x3" 3"x2" 3"x2" ET 10 COOLING WATER SUPPLY
3"-P-241073-PJE(0.4) 38 3"-P-241073-PJE(0.4) 38 4"-CWS-242003-UAB
241.022 12408 242.023 12618

TO V-24119 FROM HEADER


3/4"

3"
D
D
BACK FLUSH

6"x3"
TG 1-1/2"
034

6"x3"
ET 10
50

SEL
B
HS
XXX
7

7 G 06/13/11 ISSUED FOR PHA III


R/S HOA R/S HOA F 04/20/11 ISSUED FOR ESTIMATE
HIS I HS HIS I HS
016 100 016A 017 100 017 A E 03/01/11 ISSUED FOR PHA II

D 01/10/11 ISSUED FOR CLIENT REVIEW

3/4" XA VFD 3/4" XA VFD C 12/02/10 ISSUED FOR INTERNAL REVIEW


N/A10

E E

ET 10
V 016 FAULT V 017 FAULT
3"-P-241070-PJE(0.4)

3"-P-241071-PJE(0.4)
I I B ISSUED FOR PRELIMINARY REVIEW

N/A
ET

452 452
XL LOCAL/ XL LOCAL/ REV
ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT
ET 10

ET 10

REMOTE REMOTE DATE APP


50

50

016 017
SI 3/4" SI 3/4"
VFD VFD
016 017
MIN.

MIN.
6"-P-241068-PJE(0.4)

6"-P-241069-PJE(0.4)

D D

FILE:\\F:\1025\DRAWINGS\HMU\241\241.023.pid MODEL DATE:6/14/2011 1:17:52 PM BY:bes29451


PP TO PP TO
GRADE GRADE
PP 3/4" PP 3/4"
SP SP
3/4"

006A 006B
3/4"

6"x3" 3"x2" 6"x3" 3"x2"


3/4
"
3/4
" SHELL CANADA
3/4"

3/4"

D D
3/4"

3/4"

D D QUEST CCS PROJECT


D P-24108A D P-24108B
A

P-24108A /B 7
PIPING AND INSTRUMENT DIAGRAM
ABSORBER 1 CIRCULATING WATER WASH PUMPS
RATED FLOW: 39.1 m^3/hr QUEST CCS PROJECT
DIFF. PR.: 322 kPa
DRIVER: 5.6 kW UNIT 241 - HYDROGEN MANUFACTURING UNIT TRAIN 1
CASING INTERNALS ISSUED FOR HAZOP
MATERIAL: 316 SS 316 SS
ABSORBER 1 WASH WATER COOLER
INSULATION TYPE/THK: / 6 SCALE: NONE
TRIM: P-241083-PJE(0.4)
SHELL DWG NO.: REV.

241.023
241.0000.000.041.023 G
4 3 2 1
4 3 2 1
FIRE
V-24218 1-1/2H3
SET@
AMINE ABSORBER 2 3500 kPa-g
V 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
SIZE: 3350 mm ID x 23400 mm T/T RV GENERAL NOTES AND CONNECTION DETAILS.

3/4"
DESIGN PR. & TEMP: 3500 kPa-g @ 95 °C / HV @ 150 °C 023 6"x3" 240.030 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "242" UNLESS OTHERWISE
MATERIAL(VESSEL/INTERNALS): CS + 3 mm 304L SS CLAD / 316L SS 6"-FL-242020-PAC
FL STATED.
INSULATION TYPE/THK: H /

2"x1-1/2"
7 FREE DRAINING
TRIM: P-242080-HJE(0.4) (TOP) 12063 3 . BOTTOM OF COLUMN IS PACKED WITH 600 mm OF #2 RASCHIG RINGS.

3/4" 3/4"
P-242084-DJE(0.4) (BTM) CSO 4 . H2 RAW GAS BYPASS REQUIRED FOR SYSTEM PURGE AND PRESSURIZATION AT
PAC START-UP.
3/4"
B HJE(0.4)

CSC
ANTI FOAM 5 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012.
ET 10
3/4"-KP-241001-PJG(0.4) 6 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE.

FREE DRAINING
38

CSO
12967 241.021
5 7 . ELECTRIC TRACE TO HLL (ET 10).
FROM P-24606

S-4
8 . LOCALIZED DEGASSING OF CO2 MAY OCCUR AT RESTRICTIONS, BENDS, TEES,
D 10
6 ETC. RESULTING IN LOCALIZED TWO-PHASE FLOW AND VIBRATION. D
2"-P-242057-HJE(0.4)
SP 9 . 316 SS HARDFACED TRIM MATERIAL IS REQUIRED FOR THIS CHECK VALVE.
001 10 . TWO CHECK VALVES IN SERIES, ONE IN THE HORIZONTAL AND ONE IN THE VERTICAL
LEAN AMINE FLOW SIGNAL

3/4" 3/4"
ET 10
POSITION. SEPARATED BY AT LEAST 500 mm.
10

38
246.011 12982
11 . INADVERTANT SIMULTANEOUS CLOSING OF BOTH HV-014 AND HV-015 PREVENTED
TO UC-246002 H H2 RAW GAS BY INTERLOCK I-102
12"-P-242056-HJE(0.4)
38 12064 242.022
FREE DRAINING 12 . VALVES ARE FOR BATTERY LIMIT ISOLATION OF UNIT.
TO V-24219 13. TOP CONNECTION.
E V 14. 316 STAINLESS STEEL INJECTION QUILL. OUTLET OF INJECTION QUILL TO BE
SET POINT 12"
FC 451 CENTERED IN PROCESS LINE.

4"
12403 246.002
075 3/4"
FROM LX-246001 L HOLDS:
D FYE
S 075
• NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
• INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
FT FO 8" FV
MIN • DETAILS FOR INJECTION QUILL TO BE FINALIZED.
075 075
MP-001 PJG(0.4) 12"-P-242062-DAE • CONFIRM AVAILABILITY OF DCS AND SIS INTERLOCK SEQUENCE NUMBERS ADDED
LEAN AMINE 12 DAG 36" FOR QUEST.
ET 10 12"x8" 16"x12" 16" MW
50 12"-P-242063-DJE(0.4)
12633 241.021 M
FC
FROM P-24602A/B/C 12"x8"
V-24218
3/4"

3/4"
SP DETAIL 'A'

3/4"
12"-P-241074-DAG D D DAE DJE(0.4) PDT 3"
007
8" 064 25
DETAIL "A"
INJECTION QUILL
CSC H
PDI
DAG DAE
064

E
C 450 PJG(0.4)
14
C
HZTE E DAG
I
015 453 FLOW
104
I
HYE
103
S 015
I HIC
11
102 015
FO

ET 38 H2 RAW GAS
14"-P-242055-HJE(0.4) 75 14"x12" 14"-P-242055-HJE(0.4)
12065 242.022
12"x8" FO 12"x8" 14"x12" BYPASS
TO HMU 2 PSA
8" HV
E 015
453
E
HIC 450
014
HYE 1
11 S 014 24"
HZTE MW
3"

I 014
FO
3"
102 HV
SP
014
3/4"

14" 13 9 002
H2 RAW GAS ET 38 18"x14" 18"
14"-P-242054-HJE(0.4) 75
242.009
FC MIN PP
FROM HMU 2
15 MIN
E
HH B
2" 451
MIN

3/4"

3/4" 3/4"
GWR
E LTE 3"
450 154
CSC LL
3/4"

3/4"

G 06/13/11 ISSUED FOR PHA III


4 V 3/4" 2" 2" 2" 2"
HJE(0.4)
2"

F 04/20/11 ISSUED FOR ESTIMATE


3/4"

240.028 ULB
2"-GI-240020-ULB 2" HHLL=4400 mm
E 03/01/11 ISSUED FOR PHA II
GI
12713
START-UP SWING D 01/10/11 ISSUED FOR CLIENT REVIEW
ELBOW DP C 12/02/10 ISSUED FOR INTERNAL REVIEW
H
HLL=3500 mm LT LI LHS LC
7 B ISSUED FOR PRELIMINARY REVIEW
155A 155A 155 155
L ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT
24" REV
NLL=2800 mm DATE APP
MW
LG LT LI
2" 2" 3"
LLL=1900 mm 155 155B 155B
MAG
3/4"

3/4"

FILE:\\F:\1025\DRAWINGS\HMU\242\242.021.pid MODEL DATE:6/14/2011 2:02:39 PM BY:bes29451


E XZI
3" 2" 2" 450 020
SWING
ELBOW LLLL=300 mm
SO
3/4"
3/4"

TI ISSUED FOR HAZOP


3/4"

D XYE
D 031
s 020
2"x3/4"
2"-P-242065-DJE(0.4)
A/S
240.029
3"-SL-240018-SAB 3" 3
XZTE FO
3/4"
D
SHELL CANADA
SL TT
12711
020 XV 031 6"
QUEST CCS PROJECT
3/4"

LV 12 10"-P-242064-DJE(0.4)
4000 mm

N/A 020
ET 10 D 155 RICH AMINE
A
1-1/2"
1"-SL-242XXX-SAB

16" 16"x12" 8" 10"x8" ET 10


8"-P-242064-DJE(0.4) 50 12634 246.001
12"x8" FC 8"x6" FC 8"x6"
D FROM V-24118
4"

R
3/4"

3/4"

3/4"
8
3/4"

3/4"
4"-P-242066-DJE(0.4) D D D TWO PHASE FLOW
240.029 3/4" PIPING AND INSTRUMENT DIAGRAM
1"-SCL-242XXX-SAB
SCL T
12712 QUEST CCS PROJECT
S-9 8"-P-241064-DJE(0.4)
3/4"

D RICH AMINE UNIT 242 - HYDROGEN MANUFACTURING UNIT TRAIN 2


4"

SP
5 6 SP 241.021 12635 AMINE ABSORBER 2
003
004 FROM V-24118
SCALE: NONE
VACUUM TRUCK
TWO PHASE FLOW

242.021
SHELL DWG NO.: REV.
242.0000.000.041.021 G
4 3 2 1
4 3 2 1

V-24219
7
ABSORBER 2 WASH WATER VESSEL 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
SIZE: 1800 mm ID x 10900 mm T/T GENERAL NOTES & CONNECTION DETAILS.
DESIGN PR. & TEMP: 3500 kPa-g @ 60 °C / HV @ 150 °C SET POINT TO FHS
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "242" UNLESS OTHERWISE
MATERIAL(VESSEL/INTERNALS): CS + 3 mm 304L SS CLAD / 316L SS PSA LOGIC 074 STATED.
INSULATION TYPE/THK: H/ 5 FI 3 . CALCULATE AMOUNT OF CO2 REMOVED FROM RAW H2 GAS.
TRIM: P-242081-HJE(0.4) 074B 4 . H2 RAW GAS BYPASS REQUIRED FOR SYSTEM PURGE AND PRESSURIZATION AT
START-UP.
3 5 . ELECTRIC TRACE TO HLL (ET 10).
FC SIGNAL 6 . EITHER LTE-242156 OR LTE-242159 SHALL BE SELECTABLE AS THE INPUT TO SAFETY
FI FX INTERLOCKS E-452 AND E-453. A DEVIATION ALARM TO MONITOR THE TWO
242.009
074A 074B INSTRUMENTS SHALL BE PROVIDED AT THE DCS.
D FROM FC-377 7 . HAND SWITCH TO SEND FLOW SETPOINT FROM FC-377 TO PSA WHEN QUEST D
IS ISOLATED.
f(x) 8 . TWO CHECK VALVES IN SERIES, ONE IN THE HORIZONTAL AND ONE IN THE VERTICAL
POSITION, SEPARATED BY AT LEAST 500 mm.
FX
9 . VALVES ARE FOR BATTERY LIMIT ISOLATION OF UNIT.
H2 RAW GAS 074 A
ET 38
14"-P-242055-HJE(0.4) 75
12065 242.021
FROM HMU 2 BYPASS
CO2 CO2 LEAN
AI I
H
PC 016 101 HOLDS:
CO2 RICH
067 HOLD
• INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
• INTERLOCK I-101 ACTIONS, IF ANY, TO BE CONFIRMED.
H • CONFIRM AVAILABILITY OF DCS AND SIS INTERLOCK SEQUENCE NUMBERS
PV AIT TI
ADDED FOR QUEST.
067 016 032
6" 10"x6" ET 10 240.030
50 10"-FL-242021-PAC FL
FC FREE DRAINING 12146
TSO

3/4"
3/4" 3/4" 240.030
HJE(0.4) PAC AE
FL
016 12707

ET 38
PI 3/4" 3/4"

75
AP
E E
065 016C
450 453

6"-P-242059-HJE(0.4)
XYE PT AP
PT
019 S 065 016B
067 XZTE TT FT

FREE DRAINING
A/S 019 032 074
FO AP
C C

3/4" 3/4"
3/4" 3/4"

3/4" 3/4"
019 016A
XV 12" INSTR 1-1/2"
14"x12" ET 38 H2 RAW GAS
PIPING 14"-P-242058-HJE(0.4)
75 242.009
FREE DRAINING FC TO HMU 2 PSA
DETAIL 'B'
2"

3/4"
E 3"
453 V 12"
CSC

3"
3"
FLOW SIGNAL 4
FC
246.022 13031 FYE
076 S
TO FX-246076 L 076

24"
FO MW
FT FV H
076 076 2"-SCH-242XXX-SAD PDT PDI
WASH WATER 9 8 8 066 066
2"x1" 2"x1" ET 10 2"x1" 1" 2"x1" 3"x2" 3" DETAIL 'B'
2"-SCH-241XXX-SAG 24"
12969 241.022 38
FC
V-24219 MW
SAMPLE QUILL
FROM P-24609A/B
3/4"

MIN
3/4"

HJE(0.4)
PJE(0.4)
D D 1"
SAD HJE(0.4) 7
8 8
CSC 4" 4"x3" ET 10 CIRCULATING WATER
24" 3"-P-242XXX-HJE(0.4) 38 3"-P-242073-PJE(0.4) INST.
SAG SAD 242.023 12411
MW PIPING
FROM E-24229
6 FLOW

GWR PP
LTE B
156
1 3" 3"
H2 RAW GAS H 14"x12" 14"
3/4"

3/4" 3/4"
12"-P-242056-HJE(0.4)
12064 242.021 38
FREE DRAINING
3/4"
3/4"

FROM V-24218 3/4" 2" 2" 3" 3" G 06/13/11 ISSUED FOR PHA III
6 F 04/20/11 ISSUED FOR ESTIMATE
3/4"
3/4"

HHLL=2450 mm E 03/01/11 ISSUED FOR PHA II


3" 3" 2" 2"
D 01/10/11 ISSUED FOR CLIENT REVIEW
LI H
MAG C 12/02/10 ISSUED FOR INTERNAL REVIEW
156 DP HLL=2300 mm
L B ISSUED FOR PRELIMINARY REVIEW
E HH LTE 2" 2" 24" LG LT LI
MW 157 157A 157A ISSUED PEM CLIENT
LI H 453 159 DP REV DESCRIPTION BY CKD PRS CS PDP MC APE
NLL=1050 mm DATE APP
3/4"

6 2" 2" LC SIGNAL


159 L E LT LI LHS
3/4"

5 12413 242.023
452 LL D 3" 3" 157B 157B 157A
LLL=870 mm
3/4"

TO LC-157
3/4"

3" 3" D
3/4"

FILE:\\F:\1025\DRAWINGS\HMU\242\242.022.pid MODEL DATE:6/14/2011 1:50:47 PM BY:bes29451


LLLL=300 mm
2"
3/4"

SO

6"
SHELL CANADA
CIRCULATING WATER
7860 mm

ET 10
50 6"-P-242067-PJE(0.4)
12412 242.023 QUEST CCS PROJECT
TO P-24208A/B
A
3"

D
R

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT
ISSUED FOR HAZOP UNIT 242 - HYDROGEN MANUFACTURING UNIT TRAIN 2
ABSORBER 2 WASH WATER VESSEL
SCALE: NONE

242.022
SHELL DWG NO.: REV.
242.0000.000.041.022 G
4 3 2 1
4 3 2 1

E-24229
ABSORBER 2 CIRCULATING WATER COOLER 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
RATED DUTY: 0.2 MW
GENERAL NOTES & CONNECTION DETAILS.
SURFACE AREA: 37.9 m^2
TEMA TYPE: BEU 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "242" UNLESS OTHERWISE
SHELL TUBE STATED.
DESIGN PRESS: 3900 kPa-g / HV 3010 kPa-g / 3 . FOR PIPING DETAILS OF SAMPLE STATION SEE DRAWING 200.0000.000.041.012.
DESIGN TEMP: 60 °C / 150 °C 58 °C / 4 . CV OF CONTROL VALVE TO BE MINIMUM.
MATERIAL: CS + 3 mm 304L SS CLAD SUPER DUPLEX 2507 + 0.38 mm CA
5 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE.
INSULATION TYPE/THK: / 6 / 6 6 . ELECTRIC TRACE (ET 10).
TRIM: P-242082-PJE(0.4) WR-242004-PJE(0.4)
7 . AUTO-START STAND-BY PUMP ON RUN FAILURE OF PRIMARY PUMP.

D LC SIGNAL
D
H
LC LHS
12413 242.022 HOLDS:
157 157B
FROM LHS-157A L
• INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
• CONFIRM AVAILABILITY OF DCS AND SIS INTERLOCK SEQUENCE NUMBERS
ADDED FOR QUEST.
LV
157A

4
1"
2"x1" FC 2"x1"

3/4"
ET 10 PURGE WATER
D 2"-P-242076-PJE(0.4)
38 12638 241.023
LV
157B TO V-24602
1"
XZI FC
2"x1" 2"x1"

2"-P-242075-PJE(0.4)

3/4"
018

3/4" 3/4"
D 4

SP
PI
E 005
070 COOLING WATER RETURN
452 3/4" 3/4" ET 10
50 6"-CWR-242003-UAB
S-8 240.003
TO HEADER
PT TW
3 5
XYE 070 035
V
S 018 4"-CWR-242XXX-UAB

2"
1-1/2"
A/S COOLING WATER RETURN

3/4" 3/4"
6"x4" 6"x4" ET 10
50 4"-CWR-241003-UAB
XZTE FO 241.023 12619

C 018 XV
3"-P-242072-PJE(0.4) FROM E-24129 C
CSO
CIRCULATING WATER 018 3/4"
ET 10 D
6"-P-242067-PJE(0.4) 50
12412 242.022
UAB

RS
FC 6
FROM V-24219
PJE(0.4)

NC
FC
E-24229
077 COOLING WATER SUPPLY
ET 10
50 6"-CWS-240015-UAB
240.003
PJE(0.4)

3"-P-242077-PJE(0.4)
UAB FROM HEADER

RS
I
103 LL 4"-CWS-240XXX-UAB

ET 10 COOLING WATER SUPPLY


38 4"-CWS-242003-UAB
12618 241.023
TO E-24129
TG FT

3"
033 077 D
BACK FLUSH
CIRCULATING WATER 1-1/2"
ET 10 6"x3" 6"x3" 3"x2" 3"x2" 3"-P-242073-PJE(0.4)
3"-P-242073-PJE(0.4) 38
242.022 12411

TO V-24219
3/4"

6"x3"
D
TG 1-1/2"
034
ET 10
6"x3"
50

HS
SEL B

7 7
G 06/13/11 ISSUED FOR PHA III
R/S HOA R/S HOA F 04/20/11 ISSUED FOR ESTIMATE
HIS I HS HIS I HS
016 100 016A 017 100 017A E 03/01/11 ISSUED FOR PHA II

D 01/10/11 ISSUED FOR CLIENT REVIEW


3/4" 3/4"
3"-P-242070-PJE(0.4)

3"-P-242071-PJE(0.4)
V XA VFD V XA VFD C 12/02/10 ISSUED FOR INTERNAL REVIEW
ET 10

ET 10
E 016 FAULT E 017 FAULT

N/A
N/A

I I B ISSUED FOR PRELIMINARY REVIEW


452 452
XL LOCAL/ XL LOCAL/ REV
ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT
ET 10

ET 10

REMOTE REMOTE DATE APP


50

50

016 017
SI 3/4" SI 3/4"
VFD VFD
016 017
MIN.

MIN.
6"-P-242068-PJE(0.4)

6"-P-242069-PJE(0.4)

D D

FILE:\\F:\1025\DRAWINGS\HMU\242\242.023.pid MODEL DATE:6/14/2011 1:52:05 PM BY:bes29451


PP TO PP TO
GRADE GRADE
PP 3/4" PP 3/4"
SP SP
3/4"

006A 006B
3/4"

6"x3" 3"x2" 6"x3" 3"x2"


3/4
"
3/4
" SHELL CANADA
3/4"

3/4"

D D
3/4"

3/4"

D D QUEST CCS PROJECT


D P-24208A D P-24208B
A

P-24208A /B 7
PIPING AND INSTRUMENT DIAGRAM
ABSORBER 2 CIRCULATING WATER WASH PUMPS
RATED FLOW: 39.1 m^3/hr QUEST CCS PROJECT
DIFF. PR.: 322 kPa ISSUED FOR HAZOP
DRIVER: 5.6 kW UNIT 242 - HYDROGEN MANUFACTURING UNIT TRAIN 2
CASING INTERNALS
MATERIAL: 316 SS 316 SS
ABSORBER 2 WASH WATER COOLER
INSULATION TYPE/THK: / 6 SCALE: NONE
TRIM: P-242083-PJE(0.4)
SHELL DWG NO.: REV.

242.023
242.0000.000.041.023 G
4 3 2 1
4 3 2 1

E-24602A/B
LEAN / RICH AMINE EXCHANGER 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
RATED DUTY: 64.5 MW (TOTAL) GENERAL NOTES & CONNECTION DETAILS.
SURFACE AREA: 1521.0 m^2
HOT COLD 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
DESIGN PRESS: 2700 kPa-g / HV 3500 kPa-g / HV STATED.
DESIGN TEMP: 130 °C / 150 °C 120 °C / 150 °C 3 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE.
MATERIAL: PLATES: 316L SS / GRAPHITE 4 . SYMMETRICAL PIPING.
FRAME: CS 5 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012.
INSULATION TYPE/THK: / 9 / 9
TRIM: P-246121-DJE(0.4) 6 . EXCHANGER TO BE DRAINED IF ISOLATED FOR MAINTENANCE.
P-246122-DJE(0.4) 7 . LOCALIZED DEGASSING OF C02 MAY OCCUR AT RESTRICTIONS, BENDS, TEES, ETC.
TEMA TYPE: COMPABLOC RESULTING IN LOCALIZED TWO-PHASE FLOW AND VIBRATION.
8 . A PERMANENT SELF VENTING CONNECTION IS REQUIRED TO PREVENT
D ACCUMULATION AND TRAPPING OF GASES. D
9 . ELECTRIC TRACE (ET 10).
10. VALVES ARE FOR BATTERY LIMIT ISOLATION.

HOLDS:

• INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

FC SIGNAL
12225 246.003
TO FFX-001A
TI
004

PT PI
003 003
TT
004

3/4" 3/4"
1-1/2" ET 10 LEAN AMINE
16"-P-246051-DAB
63 12181 246.008
TO E-24604A

H
PDI
002
SP
001
C ET 10 ET 10 C
38 S-9 38

3 5

PI
2"-P-246105-DJE(0.4) 028
TI
DAB DJE(0.4) 8 003
2" 2"
ET 10 RS RS
63 V PT
12"-P-246049-DJE(0.4)
20" 20" 028

2"
3"
ET 10 12"
RS RS TT
50
20" 20" 003

10"-P-246005-DJE(0.4)
2" 2"

3/4" 3/4"
16"x12"
10"-P-246003-DJE(0.4)
E-24602A

D
6

2"
H LEAN AMINE

2"
FC TI PI PI 1-1/2" ET 10
D 246.033 16"-P-246048-DJE(0.4)
2" 4 63 246.007 12230
001 001 001 002
L DM FROM P-24601A/B/C
D 13143

2"-DM-246004-DAB
246.033
2"

13144

16"x12"
DM

NC
2"-DM-246003-DAB V

8"
3" DJE(0.4) DAB 3" PT
PT 3/4"
002 D
001
CSO

CSO
TI TT
10"

12"
TT

10"
FT
001 002 002

8"
3/4" 3/4"
001
3/4" 3/4"

3"

14"x10"
V 2"
3/4" 3/4"

3/4" 3/4"

START-UP
14"x10"

7 14"-P-246007-DJE(0.4)
242 246
RICH AMINE 1-1/2" RICH AMINE
ET 10 14"x10" ET 10 ET 10
12634 242.021
10"-P-242064-DJE(0.4) 50 14"-P-246001-DJE(0.4)
M 63
1-1/2"
4 4 63 12212 246.002
B
TWO PHASE FLOW DO NOT POCKET TWO PHASE FLOW
2"-DM-246002-DAB

14"x10"
FROM V-24118 / V-24218 TO V-24601
2"

14"x10"
MIN

D
MIN

12"-P-246050-DJE(0.4)
7 10

CSO
10"
CSO

RICH AMINE G 06/13/11 ISSUED FOR PHA III


10"

ET 10
CSO

10"-P-246002-DJE(0.4) 50
12686 246.101 F 04/20/11 ISSUED FOR ESTIMATE
FROM V-44118 TWO PHASE FLOW 3" 246.033 3"
2"
3/4"

2" E 03/01/11 ISSUED FOR PHA II


2"

DM V
DAE DJE(0.4)

10"-P-246004-DJE(0.4)

D D 2"-P-246106-DJE(0.4) D 01/10/11 ISSUED FOR CLIENT REVIEW


D 13145
10"-P-246006-DJE(0.4) C 12/02/10 ISSUED FOR INTERNAL REVIEW
DAB DJE(0.4) 8 B ISSUED FOR PRELIMINARY REVIEW
2" DJE(0.4) DAB 2" 2"
V RS RS PI REV
ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT
DATE APP
20" 20" 004
RS RS ET 10
50
20" 20"
2" 2"
PT

FILE:\\F:\1025\DRAWINGS\CO2\246\246.001.pid MODEL DATE:6/14/2011 10:40:12 AM BY:bes29451


ET 10 E-24602B 6
2"

63 004
D
TT TI
246.033
2" 005
002 005

3/4" 3/4"
DM
12227 D

ET 10 1-1/2" LEAN AMINE


2"-DM-246001-DAB 16"-P-246054-DAB
63 12252

TO E-24604B
246.009
SHELL CANADA
QUEST CCS PROJECT
A

ET 10 LEAN AMINE PIPING AND INSTRUMENT DIAGRAM


50 8"-P-246085-DAE
246.011 12281
START-UP / MINIMUM FLOW QUEST CCS PROJECT
FROM P-24602A/B/C
UNIT 246 - REGENERATION/COMMON
LEAN / RICH AMINE EXCHANGER
ISSUED FOR HAZOP
SCALE: NONE

246.001
SHELL DWG NO.: REV.
246.0000.000.041.001 G
4 3 2 1
4 3 2 1

TO ATM

TO ATM

TO ATM
TO ATMOSPHERE TO ATMOSPHERE TO ATMOSPHERE V-24601
AT SAFE LOCATION AT SAFE LOCATION AT SAFE LOCATION
AMINE STRIPPER 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
SIZE: 6300 mm ID x 30400 mm T/T GENERAL NOTES & CONNECTION DETAILS.
DESIGN PR. & TEMP: 385 kPa-g @ 150 °C / FV @ 150 °C
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE

8"-VA-246003-PJB(0.4)

12"-VA-246001-PJB(0.4)
12"-VA-246002-PJB(0.4)
MATERIAL(VESSEL/INTERNALS): CS + 3 mm 304L SS CLAD / 316L SS
STATED.
BLOCKED BLOCKED BLOCKED INSULATION TYPE/THK: H / 50 mm 11
DISCHARGE DISCHARGE DISCHARGE TRIM: P-246123-DJB(0.4) (TOP) 3 . ANTI-FOAM IS ADDED INTERMITTENTLY BY THE OPERATOR BASED ON HIGH DP
6Q8 8T10 8T10 ACROSS THE TRAYED SECTION OF THE AMINE STRIPPER.
P-246124-DJB(0.4) (BTM)
SET@ SET@ SET@ TC SIGNAL 4 . TOP OF WEIR IN REBOILERS E-24603A/B TO BE AT SAME ELEVATION AS HLL IN
385 kPa-g 375 kPa-g 375 kPa-g TC AMINE STRIPPER.

DJB(0.4)
DJB(0.4)

DJB(0.4)
PJB(0.4)

PJB(0.4)

PJB(0.4)
12211 246.003
RV RV RV 013 5 . SYMMETRICAL PIPING TO/FROM E-24603A AND E-24603B.
N/A N/A N/A TO FFX-001B 6 . CV OF CONTROL VALVES PV-010A/B TO BE MINIMUM. CV AFFECTS RV-005 SIZING
005C 005B 005A
ET 10 ET 10 12"x10" ET 10 12"x10" FOR VAPOUR BLOWTHROUGH CASE.
D 7 . SYMMETRICAL PIPING ON INLET AND OUTLET OF CONTROL VALVE. D

10"x8"

10"x8"
8"x6"
1/2" WEEP HOLE 1/2" WEEP HOLE 1/2" WEEP HOLE 8 . PV-010A/B ARE 2x50% VALVES. SPARE VALVE TO BE MAINTAINED ON SITE.
PI PT TT 9 . PIPING FROM CONTROL VALVE TO VESSEL NOZZLE TO HAVE 1.5 mm CORROSION
3/4" 3/4" 3/4" ALLOWANCE.
B B B 013 013 013
10. SLUG FLOW DURING TURNDOWN.
11. ELECTRIC TRACE TO HLL (ET 10).

CSO
10"-P-246107-DJB(0.4)
CSO

3/4"
CSO
12. LOCATE RV-001 MINIMUM DISTANCE FROM PV-010A/B INLET.
1-1/2"
14"x10" OVERHEAD VAPOURS 13. TWO CHECK VALVES IN SERIES, ONE IN THE HORIZONTAL AND ONE IN THE VERTICAL
8"-P-246100-DJB(0.4) 14"x8" 10"-P-246100-DJB(0.4) 42"-P-246015-PJB(0.4)
12275 246.005 POSITION, SEPARATED BY AT LEAST 500 mm.
42" MIN FREE DRAINING 14. 316 STAINLESS STEEL INJECTION QUILL. OUTLET OF INJECTION QUILL TO BE
TO E-24601A/B
CENTERED IN PROCESS PIPE.
3 H V
PDI FC 15. 304SS PIPING FROM CONTROL VALVE TO V-24601 TO HAVE 1.5 mm CORROSION
ANTI-FOAM

8"
3/4"-KP-246001-PJE(0.4) 013 003 ALLOWANCE.
12283 246.014 L
FROM P-24606
BLOCKED DISCHARGE FT
3L4 14" FV 003 DETAIL "A"
SET@ 14"-P-246100-DJB(0.4)
DJB(0.4) PJB(0.4) 003 INJECTION QUILL
3500 kPa-g FREE DRAINING WATER REFLUX
ET 10 4"x2" 2" 4"x2" 4"x3" 4"x3"
RV V 38 4"-P-246026-PJB(0.4)
24" 246.006 12282
PI PT
3/4"

4" SP
001 MW MIN FO FROM P-24603A/B
24

3/4"
4"-P-246009-DJB(0.4) 011 011 002
D
FREE DRAINING
4"x3"

PC PHS 2" 14
CSO
010 010 2"
B 3/4" TI
DJE(0.4) PJE(0.4)

TT
21 010 010 FLOW
8
CSO

DJB(0.4)
DJE(0.4)

20"-P-246010-DJE(0.4) 3/4" 3/4" 2"x3/4" 2"


PV
010A 15 9 HOLDS:
20"x10" 20" 24"x20" 36" 36"x24"
FREE DRAINING

20"-P-246011-DJB(0.4)
CSC 13 6 FL(C) • NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
C 3/4" 7
TWO PHASE FLOW 36"x24" 36" 24"x20" C
DJB(0.4)

10
DJE(0.4)

DO NOT POCKET MW • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.


D
DJB(0.4) 36" • DETAILS FOR CHEMICAL INJECTION QUILL TO BE FINALIZED.
DJE(0.4)
DJB(0.4)
2"

8
DAB
MIN
4"-P-246008-DJE(0.4)

PT PV
15 10 7 20
010 3/4" 010B 20"x10" 20"
3/4" 20"-P-246013-DJB(0.4) TI
D TT
D 10" 10
FL(C) TWO PHASE FLOW 011 011
6 9 2"
3/4" DO NOT POCKET
3/4" 3/4"

D
20"-P-246012-DJE(0.4)

DJB(0.4)
14"x10"

14
2"

MP-001 1
RICH AMINE ET 10 DAB
14"-P-246007-DJE(0.4) 63 7 H
12212 246.001 PDI 24"
FROM E-24602A/B TWO PHASE FLOW SEE DETAIL "A" 012 MW
12 DO NOT POCKET 14"x10"
3/4"

D
REBOILER FEED H 2"-DM-246045-DAB 5 H REBOILER FEED
30" 30"
30"-P-246029-DJB(0.4) 30"-P-246035-DJB(0.4)
246.003 12213 75 75 12210 246.004
FREE DRAINING FREE DRAINING
TO E-24603A 5 TO E-24603B
PI
012
REBOILER VAPOUR RETURN 5 5 REBOILER VAPOUR RETURN
H 36" 36" H
36"-P-246034-DJB(0.4) 36"-P-246040-DJB(0.4)
12214 246.003 50 50 246.004 12288
FREE DRAINING FREE DRAINING
FROM E-24603A 2" FROM E-24603B
SWING
ELBOW
PT 3/4" 2"x3/4" 3/4"
HH 012 SET POINT
I 2" 246.030
2" 2"-GI-246003-ULB
020
V-24601 GI 12405 441.029
START-UP 12697
PP TO FC-441075
I B
002
LL GWR
LI I LT

3/4" 3/4"
002 001 002 SET POINT
L LL 12403 242.021
3/4"

3/4"

3/4" 2" 2" 2" 2" TO FC-242075 G 06/13/11 ISSUED FOR PHA III
V HHLL=7590 mm F 04/20/11 ISSUED FOR ESTIMATE
RECOVERED AMINE ET 10 2"
2"-P-246098-DAB 38
E 03/01/11 ISSUED FOR PHA II
12401 246.013 f(x)
NNF MAG SET POINT D 01/10/11 ISSUED FOR CLIENT REVIEW
FROM V-24605 H
HLL=6175 mm 4 LG LT LC LX
12206 241.021 C 12/02/10 ISSUED FOR INTERNAL REVIEW
11 001 001 001 001
TO FC-241075 B ISSUED FOR PRELIMINARY REVIEW
MW SPLIT ISSUED
REV DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT
REBOILER LIQUID RETURN H 5 5 H REBOILER LIQUID RETURN DATE APP
24" 24"
24"-P-246082-DJB(0.4) NLL=4175 mm 24"-P-246083-DJB(0.4)
12215 246.003 50 246.004 12207
FREE DRAINING FREE DRAINING
FROM E-24603A 2" 2" FROM E-24603B
MIN.
DJB(0.4)

2"

FILE:\\F:\1025\DRAWINGS\CO2\246\246.002.pid MODEL DATE:6/14/2011 10:40:14 AM BY:bes29451


3/4"

LLL=2175 mm
DAB

24"
3/4"

DJB(0.4)
D

DAB AMINE INVENTORY/MAKE-UP


MIN.

4" ET 10
2"x3/4"

SWING 3" 4"-P-246093-DAB


LLLL=475 mm 38 246.012 12696
ELBOW
2" 2" FROM P-24605/24604
246.029
3"-SL-246004-SAB 3"
SL SO
SHELL CANADA
D
3/4"

3/4"

12694 DJB(0.4) H
3/4"

N/A TT TI
DAB
ET 10 D ET 10 014
38
014 QUEST CCS PROJECT
A
1"-SL-246XXX-SAB

8600 mm

30" 1-1/2" ET 10 LEAN AMINE


30"x24" 24"-P-246041-DJB(0.4)
75 12182 246.007
TO P-24601A/B/C
6"

R
DJB(0.4)
DAB
246.029 3/4" PIPING AND INSTRUMENT DIAGRAM
1"-SCL-246010-SAB D
SCL T
12695 ISSUED FOR HAZOP QUEST CCS PROJECT
3/4"

2"-DM-246005-DAB
D UNIT 246 - REGENERATION/COMMON
AMINE STRIPPER
6"

ET 10 AMINE DRAIN
6"-DM-246005-DAB SCALE: NONE
50 13125 246.007
SHELL DWG NO.: REV.

246.002
TO V-24606 246.0000.000.041.002 G
4 3 2 1
4 3 2 1

E-24603A V-24603A
STRIPPER REBOILER STRIPPER REBOILER CONDENSATE POT 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
RATED DUTY: 50.4 MW (PER SHELL) GENERAL NOTES & CONNECTION DETAILS.
SIZE: 1500 mm ID x 4200 mm T/T
SURFACE AREA: 1755.5 m^2 (PER SHELL) DESIGN PR. & TEMP: 500 kPa-g @ 250 °C / FV @ 250 °C 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
TEMA TYPE: BKU MATERIAL(VESSEL/INTERNALS): CS + 3 mm CA STATED.
SHELL TUBE INSULATION TYPE/THK: H/ 3 . CONTROL VALVE BYPASS TO BE INSTALLED SO FREE DRAINING.
8
DESIGN PRESS: 385 kPa-g / FV 500 kPa-g / FV TRIM: SL-246030-SAB 4 . BOTTOM TAN LINE OF V-24603A TO BE SET 2920 mm BELOW BOTTOM TUBE SHEET OF
DESIGN TEMP: 150 °C / 150 °C 250 °C / 250 °C FFIC REBOILER.
MATERIAL: CS + 3 mm 304L SS CLAD 316L SS + 0.6 mm CA
001
INSULATION TYPE/THK: H/ NONE / 5 . ALL REBOILER PIPING TO BE SYMMETRICAL.
TRIM: P-246125-DJB(0.4) 6 . WEIR TO BE SET AT SAME ELEVATION AS HLL IN AMINE STRIPPER.
7 . ELECTRIC TRACE PIPE TO ELEVATION OF WEIR IN REBOILER
FC SIGNAL FLOW SET POINT 8 . ELECTRIC TRACE (ET 10).
FFX FFX FFX
246.001 246.004
D 12225
001A 001B 001C
12234 9 . HIGH HIGH AMINE STRIPPER LEVEL TO FORCE FX-005 INTO MANUAL WITH 0% D
FROM FC-001 TO FC-006 OUTPUT, CLOSING FV-005.
RATIO TRIM SPLIT 10 . STAGED CUTBACK SCHEME FOR REDUCTION OF LP STEAM FLOW TO REBOILERS
IN THE EVENT OF LOW UTILITY PLANT HEADER PRESSURE. FOR DETAILS. REFER
TO CONTROL NARRATIVE 246.1611.000.012.xxx.

SP 251 PI HOLDS:
H
FC 002 C
TC SIGNAL L
005 • NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
12211 246.002 L LL
• INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
FROM TC-013 STM HDR PRESSURE
I • NUMBER AND LOCATION OF STEAM TRAPS TO BE DETERMINED BASED ON
251.110 PIPING LAYOUT.
021
FROM PX-251022
LL

9 CB CB CB
10
REBOILER FEED 101 A 101 B 101 C
H
30"-P-246029-DJB(0.4) PC FX I
12213 246.002 75
FREE DRAINING 014 L 005 020
FROM V-24601
CUTBACK SIGNAL
SP LIMIT 13128 246.004
PT TO FX-006
REBOILER VAPOUR RETURN H
36"-P-246034-DJB(0.4) 014 FT
246.002 12214 50 FE
FREE DRAINING 005
TO V-24601 FV 005
V

3/4"
005

3/4"
24"x20" 24"x20" H LP STEAM
24"-SL-246009-SAB 20" 24"-SL-246009-SAB
50 246.029 12685
FC
1-1/2" FROM DISTRIBUTION

3/4"
TI TT
015 D N/A
015
C L
2" ET 10 C

1"-SL-246009-SAB
36"x30" 36"x30" 30"-P-246033-DJB(0.4)

TO ATM
3
TO ATMOSPHERE AT

2"-SL-246010-SAB
DO NOT POCKET
30"-P-246032-DJB(0.4) V FIRE 246.029
5 SAFE LOCATION 1"-SCL-246003-SAB
2J3 T SCL
2"

24" MW SET@ 12228


30" 30" 10" 500 kPa-g
RV
V

RS
010 4"x3" N/A
2" 4"-VA-246005-SAB
E-24603A 24"
7
N/A ET 10
ET 10

3"x2"
6 1/2" WEEP HOLE

3/4" PP
B

4"x2"

CSO
3"-SL-246005-SAB

3/4"
24" 10"
24"
2"

2" 24"
2"
RS

D
24"-P-246030-DJB(0.4) 24"-P-246031-DJB(0.4)

5 V
30"x24" 30"x24" 4

2"
10"
4"
2"

ET 10
FREE DRAINING
N/A
ET 10
2"

HLL=4200 mm
D

N/A
2"-P-246108-DJB(0.4)
V-24603A MAG B
LG LT LC LX
005 005 005
2920 mm

005
L
FREE DRAINING

G 06/13/11 ISSUED FOR PHA III


24" NLL=1020 mm F 04/20/11 ISSUED FOR ESTIMATE
MW E 03/01/11 ISSUED FOR PHA II
LC SIGNAL
REBOILER LIQUID RETURN D 01/10/11 ISSUED FOR CLIENT REVIEW
H LLL=250 mm 2" 13139 246.020
24"-P-246082-DJB(0.4) 10"-SCL-246001-SAB 12/02/10 ISSUED FOR INTERNAL REVIEW
246.002 12215
TO LV-005
C
FREE DRAINING 10" ISSUED FOR PRELIMINARY REVIEW
TO V-24601 B

3/4" ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT


4 REV
DATE APP

8" ET 10 CONDENSATE
8"-SCL-246002-SAB
50 12454 246.020
TWO PHASE FLOW TO E-24606

FILE:\\F:\1025\DRAWINGS\CO2\246\246.003.pid MODEL DATE:6/14/2011 10:40:16 AM BY:bes29451


2"

SHELL CANADA
QUEST CCS PROJECT
A

ISSUED FOR HAZOP PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT
UNIT 246 - REGENERATION/COMMON
STRIPPER REBOILER "A" AND CONDENSATE POT
SCALE: NONE
SHELL DWG NO.: REV.

246.003
246.0000.000.041.003 G
4 3 2 1
4 3 2 1

E-24603B V-24603B
STRIPPER REBOILER STRIPPER REBOILER CONDENSATE POT 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
RATED DUTY: 50.4 MW (PER SHELL) GENERAL NOTES & CONNECTION DETAILS.
SIZE: 1500 mm ID x 4200 mm T/T
SURFACE AREA: 1755.5 m^2 (PER SHELL) DESIGN PR. & TEMP: 500 kPa-g @ 250 °C / FV @ 250 °C 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
TEMA TYPE: BKU MATERIAL(VESSEL/INTERNALS): CS + 3 mm CA STATED.
SHELL TUBE INSULATION TYPE/THK: H / 8 3 . CONTROL VALVE BYPASS TO BE INSTALLED SO FREE DRAINING.
DESIGN PRESS: 385 kPa-g / FV 500 kPa-g / FV TRIM: SL-246031-SAB 4 . BOTTOM TAN LINE OF V-24603B TO BE SET 2920 mm BELOW BOTTOM TUBE SHEET
DESIGN TEMP: 150 °C / 150 °C 250 °C / 250 °C
OF REBOILER.
MATERIAL: CS + 3 mm 304L SS CLAD 316L SS + 0.6 mm CA
INSULATION TYPE/THK: H/ NONE / 5 . ALL REBOILER PIPING TO BE SYMMETRICAL.
TRIM: P-246126-DJB(0.4) 6 . WEIR TO BE SET AT SAME ELEVATION AS HLL IN AMINE STRIPPER.
7 . ELECTRIC TRACE PIPE TO ELEVATION OF WEIR IN REBOILER.
8 . ELECTRIC TRACE (ET 10).
D 9 . HIGH HIGH AMINE STRIPPER LEVEL TO FORCE FX-006 INTO MANUAL WITH 0% D
OUTPUT, CLOSING FV-006.
10. STAGED CUTBACK FOR REDUCTION OF LP STEAM FLOW TO REBOILERS IN THE
EVENT OF LOW UTILITY PLANT HEADER PRESSURE FOR DETAILS. REFER TO
CONTROL NARRATIVE 246.1611.000.012.xxx.

FLOW SET POINT H HOLDS:


SP FC
12234 246.003
006 • NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
FROM FFX-001C L
• INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
• NUMBER AND LOCATION OF STEAM TRAPS TO BE DETERMINED BASED ON PIPING
LAYOUT.

REBOILER FEED H
30"-P-246035-DJB(0.4)
12210 246.002 75
FREE DRAINING
FROM V-24601

REBOILER VAPOUR RETURN H


36"-P-246040-DJB(0.4) PC FX I
246.002 12288 50
FREE DRAINING 016 006 020
TO V-24601 L
10 CUTBACK SIGNAL
SP LIMIT
246.003 13128

PT FROM CB-101A/B/C
TI TT 1-1/2" 016 FT
016 016 006 FE
C L
V
FV
006
C

3/4"
006

3/4"
36"x30" 36"x30" 30"-P-246039-DJB(0.4) 24"x20" 24"x20" H LP STEAM
24"-SL-246002-SAB 20" 24"-SL-246002-SAB
50 246.029 12665
30"-P-246038-DJB(0.4) V FC FROM DISTRIBUTION

3/4"
5
2"

D N/A
24" MW
ET 10

1"-SL-246002-SAB
30" 30" 10" 2"

2" V

RS
E-24603B 3

2"-SL-246003-SAB
DO NOT POCKET
24" TO ATMOSPHERE AT 246.029
FIRE 1"-SCL-246006-SAB
6 N/A 2J3 SAFE LOCATION
7 T SCL
ET 10 SET@ 12400
500 kPa-g

3/4"
RV D
011 N/A
4"x3" 4"-VA-246006-SAB ET 10
PP

4"x2"
1/2" WEEP HOLE

3"x2"
24" 2" 24" 10"
24" 2"
3/4"
RS

3/4"
4 D B
24"-P-246036-DJB(0.4)
24"-P-246037-DJB(0.4)

CSO
5
30"x24" 30"x24" 3"-SL-246004-SAB
2"

ET 10
D

N/A FREE DRAINING


2"
2"

ET 10
D

N/A
2"-P-246109-DJB(0.4) B
V

2"
4"
FREE DRAINING

10"
G 06/13/11 ISSUED FOR PHA III

HLL=4200 mm F 04/20/11 ISSUED FOR ESTIMATE

E 03/01/11 ISSUED FOR PHA II


V-24603B
REBOILER LIQUID RETURN D 01/10/11 ISSUED FOR CLIENT REVIEW
H
24"-P-246083-DJB(0.4)
2920 mm

246.002 12207 50 C 12/02/10 ISSUED FOR INTERNAL REVIEW


LG LT LC LX
TO V-24601 B ISSUED FOR PRELIMINARY REVIEW
NLL=1020 mm 006 006 006 006
L ISSUED
REV DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT
DATE APP

24"
MW
LLL=250 mm
10" LC SIGNAL

FILE:\\F:\1025\DRAWINGS\CO2\246\246.004.pid MODEL DATE:6/14/2011 10:40:18 AM BY:bes29451


10"-SCL-246004-SAB 2"
13140 246.020
FREE DRAINING
TO LV-0006
3/4"

4
D

8" ET 10 CONDENSATE
50 8"-SCL-246005-SAB
246.020
SHELL CANADA
12680
TWO PHASE FLOW TO E-24606
2"

D
QUEST CCS PROJECT
A

PIPING AND INSTRUMENT DIAGRAM


ISSUED FOR HAZOP QUEST CCS PROJECT
UNIT 246 - REGENERATION/COMMON
STRIPPER REBOILER "B" AND CONDENSATE POT
SCALE: NONE

246.004
SHELL DWG NO.: REV.
246.0000.000.041.004 G
4 3 2 1
4 3 2 1

E-24601A
STRIPPER OVERHEAD CONDENSER 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
RATED DUTY: 26.60 MW (TOTAL) GENERAL NOTES & CONNECTION DETAILS.
SURFACE AREA: 2272.0 m^2 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
TEMA TYPE: BHU STATED.
SHELL TUBE
DESIGN PRESS: 385.00 kPa-g /FV 1100.00 kPa-g/ 3 . SYMMETRICAL PIPING.
DESIGN TEMP: 150 °C/150 °C 58 °C/
MATERIAL: CS + 3 mm 304L SS CLAD DUPLEX 2205 + 0.38 mm CA
INSULATION TYPE/THIK: PP/ NONE/
HEAT TRACE MEDIA/TEMP:
TRIM: P-246127-PJB(0.4) CWR-246030-UAB
P-246128-PJB(0.4) CWR-246031-UAB
D D

TW
018 V
N/A ET 10

2"
1-1/2" 246.025
30"-P-246016-PJB(0.4) 10"-CWR-246011-UAB 10"-CWR-246011-UAB
CWR
FREE DRAINING
12274

CSO

14"x10"
30"x28" 30"x28" 246.025
10"-CWR-246012-UAB
CWR
13147

N/A ET 10
V

CSO
RS

4"-CWR-246014-UAB
2"
28" 28" 14"
2"
V

E-24601A
C C
42"x30"

ET 10

ET 10
38
OVERHEAD VAPOURS 28" 28" 14"

2"
42"-P-246015-PJB(0.4)
246.002

RS
12275
3

FREE DRAINING D
FROM V-24601 30"x28" 30"x28"

NC

NC
42"x30"

4"

4"
14"x12" 12"-CWS-246029-UAB
TW
30"-P-246018-PJB(0.4) 017
FREE DRAINING TI

4"-CWS-246028-UAB
1-1/2"
30"-P-246017-PJB(0.4) 14"x10" 10"-CWR-246012-UAB 019
FREE DRAINING

30"x28" 30"x28"

V TT PP

RS
6" BACK 019

42"x30"
2"
28" 28" 14" FLUSH

3/4"
1-1/2" OVERHEAD VAPOUR/LIQUID
42"-P-246020-PJB(0.4)
12246 246.006

3
FREE DRAINING TWO PHASE FLOW
E-24601B TO V-24602

42"x30"
N/A
ET 10
28" 28" 14"
246.025
2"
12"-CWS-246029-UAB
CWS
RS

D
13146
30"x28" 30"x28"
10"-CWS-246030-UAB N/A ET 10
14"x10" 246.025
10"-CWS-246030-UAB
CWS B
12271
30"-P-246019-PJB(0.4)

6"
FREE DRAINING BACK
FLUSH

G 06/13/11 ISSUED FOR PHA III

F 04/20/11 ISSUED FOR ESTIMATE

E 03/01/11 ISSUED FOR PHA II

D 01/10/11 ISSUED FOR CLIENT REVIEW

C 12/02/10 ISSUED FOR INTERNAL REVIEW


B ISSUED FOR PRELIMINARY REVIEW

ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT


REV
DATE APP

FILE:\\F:\1025\DRAWINGS\CO2\246\246.005.pid MODEL DATE:6/14/2011 10:41:48 AM BY:bes29451


SHELL CANADA
QUEST CCS PROJECT
A

ISSUED FOR HAZOP


PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
UNIT 246 - REGENERATION/COMMON
STRIPPER OVERHEAD CONDENSER
SCALE: NONE

246.005
SHELL DWG NO.: REV.
246.0000.000.041.005 G
4 3 2 1
4 3 2 1

V-24602
STRIPPER REFLUX DRUM 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
SIZE: 3300 mm ID x 7300 mm T/T GENERAL NOTES & CONNECTION DETAILS.
DESIGN PR. & TEMP: 385 kPa-g @ 150 °C / FV @ 150 °C
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS
MATERIAL(VESSEL/INTERNALS): CS + 3 mm 304L SS CLAD / 316L SS
OTHERWISE STATED.
INSULATION TYPE/THK: H/ 6
TRIM: P-246129-PJB(0.4) 3 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012.
4 . MAKE-UP WATER REQUIREMENTS TO THE AMINE SYSTEM ARE NORMALLY SATISFIED
BY THE PURGE WATER FLOW FROM HMU 1 AND 2.
5 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE.
6 . ELECTRIC TRACE TO HLL (ET 10).
CO2 7 . ELECTRIC TRACE (ET 10).
36"-GC-246001-PJB(0.4) 8 . AUTO-START BY PUMP ON RUN FAILURE OF PRIMARY PUMP.
D 12368 247.001 D
FREE DRAINIING FREE DRAINIING
36" TO ATMOSPHERE TO V-24701
AT SAFE LOCATION HOLDS:
K.O. LIQUID
BLOWTHROUGH 2"-P-247003-PJB(0.4) • NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
247.003 13033
3K4 N/A TWO PHASE FLOW • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
SET@ FROM V-24703
385 kPa-g ET 10
K.O. LIQUID
RV 2"-P-247004-PJB(0.4)
247.004 13032
013 TWO PHASE FLOW
V FROM V-24704
4"-VA-246004-PJB(0.4)

4"

4"x3"
ET 10 3"x2" KO LIQUIDS
2"-P-247002-PJB(0.4)
38 247.002 12244
1/2" WEEP HOLE
10" TWO PHASE FLOW FROM V-24702
3/4"
B

CSO
3/4"
4"-P-246074-PJB(0.4)

MIN
OVERHEAD VAPOUR/LIQUID FREE DRAINING

PJE(0.4)
PJB(0.4)
42"-P-246020-PJB(0.4)
12246 246.005 4
TWO PHASE FLOW

3"
FREE DRAINING
FROM E-24601A/B 42"
ET 10 ET 10 PURGE WATER
3"-P-241113-PJB(0.4) 3" 3"-P-241076-PJE(0.4)
38 38 241.023 12636

PP FROM E-24129/24229
GWR
MIN
I LT V-24602 FC
003 011 008
LL

MIN
3/4"

2"
3/4" 2" 2" FT
C H
PJB(0.4)
FV 008
C
LI SAB
24" 008 WATER MAKE-UP
011 ET 10 2"x1" 1" 2"x1" 2"x1" 2"x1" 2"-SC-246020-SAB
MW MAG 38 246.021 12131
LG LT LC FC NNF
HLL=3075 mm FROM E-24607

3/4"
6
010 010 010B D
NLL=675 mm L
2" LC
LLL=400 mm 2" 010A
2" LLLL=300 mm FV
3/4" 3/4" 007
2" D 2"x1" 1" 2"x1"
D 2"-P-246027-PJB(0.4) FT FI
SO
MINIMUM FLOW FO 009 009 LV

3/4"
010
D PI FC
3"x2" 3"x2" ET 10 3"x1-1/2" 1-1/2" 3"x1-1/2" ET 10 WASTE WATER
015 007 38 38 3"-P-246028-PJB(0.4)
12653 246.027
FC TO WWTP 271

3/4"
3/4" 3/4"

3/4" 3/4"
D
4800 mm

PT FT SP
6" 6"-P-246021-PJB(0.4)
015 007 003
S-8
4"

ET 10

3/4"
D 3 5 ET 10 WATER REFLUX
50

4"x3" 4"x3" 4"-P-246026-PJB(0.4)


38 12282 246.002
TO V-24601

SEL
HS
109 ET 10
38 B
8
8
HOA R/S
HS I HIS HOA R/S
HS I HIS
007A 003 007
3/4" 3/4" 008A 003 008
3/4" V 3/4" G 06/13/11 ISSUED FOR PHA III
V V
V
F 04/20/11 ISSUED FOR ESTIMATE
2" 2" E 03/01/11 ISSUED FOR PHA II
I I
D 01/10/11 ISSUED FOR CLIENT REVIEW
MIN

MIN
C 12/02/10 ISSUED FOR INTERNAL REVIEW
PJB(0.4) DAB PJB(0.4) DAB
6"-P-246023-PJB(0.4)
6"-P-246022-PJB(0.4)

B ISSUED FOR PRELIMINARY REVIEW


4"

4"
ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT
REV
PP PP DATE APP

ET 10
38
PP 3/4" PP 3/4"
SP SP
004A 4"-P-246024-PJB(0.4) 004B 4"-P-246025-PJB(0.4)
3/4"

3/4"

FILE:\\F:\1025\DRAWINGS\CO2\246\246.006.pid MODEL DATE:6/14/2011 10:42:30 AM BY:bes29451


2"-DM-246008-DAB

2"-DM-246010-DAB
3/4 3/4
" PJB(0.4) " PJB(0.4)
3/4"

3/4"

D D
DAB DAB
3/4"

3/4"

D D P-24603B
P-24603A
D D
ET 10 ET 10
3/4"-DM-246007-DAB 38 3/4"-DM-246009-DAB
38
3/4"
D
SHELL CANADA
ET 10
QUEST CCS PROJECT
38
A
3/4"
D
246.033 R
2"-DM-246011-DAB
DM
P-24603A/B 8 12391
PIPING AND INSTRUMENT DIAGRAM

3/4"
STRIPPER REFLUX PUMPS
D QUEST CCS PROJECT
RATED FLOW: 50.3 m^3/hr
DIFF. PR.: 559 kPa
DRIVER: 15.0 kW UNIT 246 - REGENERATION/COMMON
CASING INTERNALS ISSUED FOR HAZOP
MATERIAL: 316 SS 316 SS STRIPPER REFLUX DRUM & REFLUX PUMPS
INSULATION TYPE/THK: / 7
TRIM: SCALE: NONE
SHELL DWG NO.: REV.

246.006
246.0000.000.041.006 G
4 3 2 1
4 3 2 1

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
3 . SUCTION PIPING TO BE AS SYMMETRICAL AS POSSIBLE.
4 . 3 x 50% PUMPS FOR TOTAL DESIGN FLOW RATE OF 1510.6 m3/h.
5 . AUTO-START LOGIC FOR P-24601A/B/C SHALL TAKE INTO CONSIDERATION
THE NUMBER OF LEAN AMINE CHARGE PUMPS COMMANDED TO RUN
SIMULTANEOUSLY. REFER TO DRAWING 246.011.
6 . ELECTRIC TRACE (ET 10).
7 . AUTO-START STAND-BY PUMP ON RUN FAILURE OF EITHER PRIMARY PUMP.
D 8 . VALVE AND SPACER TO BE ORIENTED IN THE HORIZONTAL PLANE. D

HOLDS:

• INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.


FI
010

FT
010
LEAN AMINE ET 10 14" ET 10 LEAN AMINE
24"-P-246041-DJB(0.4) 75 63 16"-P-246048-DJE(0.4)
12182 246.002 M 12230 246.001
FROM V-24601 16"x14" 16"x14" TO E-24602A/B

12"-P-246048-DJE(0.4)

C C
ET 10

3
63

DJB(0.4) DJB(0.4) DJB(0.4)


DJE(0.4) DJE(0.4) DJE(0.4)
8 8
8

MIN

MIN

MIN
2" 2" 2"
V V V

ET 10
ET 10
ET 10

50
50
50

12"-P-246047-DJE(0.4)
12"-P-246046-DJE(0.4)
12"-P-246045-DJE(0.4)
16"-P-246042-DJE(0.4)

16"-P-246043-DJE(0.4)

16"-P-246044-DJE(0.4)
DJE(0.4)

DJE(0.4)
DJE(0.4)

DAB

DAB
DAB

2" 2" 2"


MIN
MIN

MIN

MIN
MIN
MIN

PP
1"

1"

1"
PP PP PP
PP
SI PP SI SI
ET 10

2"-DM-246015-DAB

2"-DM-246019-DAB
ET 10
63

001 002 003


63

ET 10

2"-DM-246023-DAB
63
3/4" 3/4" LOCAL/ LOCAL/ 3/4" 3/4" LOCAL/
XL XL XL
3/4" 3/4"

3/4" 3/4"

3/4" 3/4"
SP REMOTE SP 3/4" 3/4" REMOTE SP REMOTE
001 002 003
005A 005B 005C
XA VFD XA VFD VFD XA
001
FAULT
002
FAULT FAULT
003
B
16"x12"

16"x12"

16"x12"
12"x8"
12"x8"

12"x8"
5 5 DJE(0.4) 5
2"

2"
DJE(0.4) DJE(0.4)
2"
3/4"-DM-246012-DAB 3/4"

3/4"-DM-246016-DAB 3/4"

3/4"-DM-246020-DAB 3/4"
DJE(0.4) DJE(0.4)

D
D

DJE(0.4)
D

DAB DAB DAB


DAB I DAB I DAB I
2"-DM-246013-DAB

2"-DM-246017-DAB

VFD I VFD I VFD I

2"-DM-246021-DAB
DJE(0.4) " DJE(0.4) "
DJE(0.4) 002 002 002
3/4
"
DAB 3/4 3/4 G 06/13/11 ISSUED FOR PHA III
DAB D DAB D
D 7 7 7
F 04/20/11 ISSUED FOR ESTIMATE

P-24601A I P-24601B I P-24601C I E 03/01/11 ISSUED FOR PHA II

001 001 001 D 01/10/11 ISSUED FOR CLIENT REVIEW


4 4 4
C 12/02/10 ISSUED FOR INTERNAL REVIEW
R/S R/S R/S B ISSUED FOR PRELIMINARY REVIEW
HIS HS HOA HIS HS HOA HIS HS HOA
ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT
REV
001 001A 002 002A 003 003A DATE APP
3/4"-DM-246014-DAB 3/4"-DM-246018-DAB 3/4"-DM-246022-DAB

FILE:\\F:\1025\DRAWINGS\CO2\246\246.007.pid MODEL DATE:6/14/2011 1:17:29 PM BY:bes29451


AMINE DRAIN
6"-DM-246006-DAB
246.013 13130

TO V-24606

SEL
HS
AMINE DRAIN
6"-DM-246005-DAB
104
SHELL CANADA
13125 246.002
FROM V-24601 VFD SET POINT QUEST CCS PROJECT
246.011 12904
A
FROM PC-041
4 7

P-24601A /B /C R

LEAN AMINE PUMPS


RATED FLOW: 755.3 m^3/hr
PIPING AND INSTRUMENT DIAGRAM
DIFF. PR.: 909 kPa QUEST CCS PROJECT
DRIVER: 261.0 kW (EACH)
ISSUED FOR HAZOP
CASING INTERNALS UNIT 246 - REGENERATION/COMMON
MATERIAL: 316 SS 316 SS
INSULATION TYPE/THK: H/ 6 LEAN AMINE PUMPS
TRIM: P-246132-DJE(0.4)
P-246133-DJE(0.4) SCALE: NONE
P-246134-DJE(0.4) SHELL DWG NO.: REV.

246.007
246.0000.000.041.007 G
4 3 2 1
4 3 2 1

E-24604A E-24605A
LEAN AMINE COOLER LEAN AMINE TRIM COOLER 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
RATED DUTY: 20.8 MW RATED DUTY: 15.5 MW GENERAL NOTES & CONNECTION DETAILS.
SURFACE AREA: 829.0 m^2 SURFACE AREA: 676.0 m^2 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
TEMA TYPE: BEU HOT COLD STATED.
SHELL TUBE DESIGN PRESS: 1500 kPa-g / HV 1155 kPa-g /
DESIGN PRESS: 1500 kPa-g / HV 1155 kPa-g / DESIGN TEMP: 105 °C / 150 °C 58 °C / 3 . PIPING BETWEEN TRAIN "A" AND TRAIN "B" TO BE AS SYMMETRICAL AS POSSIBLE.
DESIGN TEMP: 130 °C / 150 °C 58 °C / MATERIAL: PLATES: 316L SS / GRAPHITE 4 . LOCATE TT-027 MINIMUM 10 PIPE DIAMETERS DOWNSTREAM OF BYPASS MIXING
MATERIAL: CS + 3mm 304L SS CLAD DUPLEX 2205 + 0.38 mm CA FRAME: CS POINT.
INSULATION TYPE/THK: / / INSULATION TYPE/THK: / 5 / 5 . ELECTRIC TRACE (ET 10).
5
TRIM: P-246135-DAB CWR-246032-UAB TRIM: P-246136-DAB
FIRE TEMA TYPE: PLATE & FRAME
1-1/2G3 HOLDS:
SET@
D 1500 kPa-g • NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
D
RV V • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

3/4"
002 ET 10
3"-DM-246062-DAB TW
38 DM 029

3"x1-1/2"
246.033 V

ET 10

ET 10
N/A
CSO

N/A
2"
1-1/2"
12" 246.025
3/4" 12"-CWR-246001-UAB
B CWR
12957

16"x12"
CSO
3"-P-246053-DAB MIN.

CSO
3
LEAN AMINE ET 10
16"-P-246051-DAB

ET 10
246.001 63

38
12181

FROM E-24602A/B
V

RS

4"-CWR-246002-UAB
2"
16" 16"

E-24604A

NC
4"
4"-CWS-246019-UAB
16" 16"
2"

RS
D

C C
MIN.

16"x12"
12" 246.025
12"-CWS-246018-UAB
CWS
12958

ET 10
N/A
6"

ET 10
N/A
BACK FLUSH LEAN AMINE
16"-P-246105-DAB
16"-P-246057-DAB

246.009 12949

FROM E-24605B

ET 10
H

63
PP TI TC
026 027
L
TW
025
3/4" 3/4"

TT TT
ET 10 2" 2"
1-1/2" RS RS 026 027

24"x16"
63

4 LEAN AMINE
RS RS ET 10 1-1/2" 24"x16" 1-1/2"
63 24"-P-246059-DAB
12253 246.010

2" 2" TO FILTRATION/P-24602A/B/C


3
E-24605A D

2"

ET 10
50
2"-DM-246063-DAB
B
TV
027

12"x8"FC12"x8"
8"
G 06/13/11 ISSUED FOR PHA III

246.033

12596
DM
F 04/20/11 ISSUED FOR ESTIMATE
3/4"
D E 03/01/11 ISSUED FOR PHA II
TW D 01/10/11 ISSUED FOR CLIENT REVIEW

1-1/2" 028 12"-P-246104-DAB C 12/02/10 ISSUED FOR INTERNAL REVIEW

ET 10 12"x8" B ISSUED FOR PRELIMINARY REVIEW


8"-P-246052-DAB 8"-P-246055-DAB
50 3 ISSUED
REV DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT
12"x8" ET 10 LEAN AMINE DATE APP

50 246.009 12251
6"
BACK FLUSH FROM E-24604B
2"
V

FILE:\\F:\1025\DRAWINGS\CO2\246\246.008.pid MODEL DATE:6/14/2011 1:17:30 PM BY:bes29451


N/A

MIN.
10"
N/A ET 10
MIN.
CSO

ET 10
10"

ET 10 4"
ET 10 4"-CWR-246007-UAB 4"-CWS-246024-UAB ET 10
38
N/A N/A

SHELL CANADA
NC
10"-CWR-246006-UAB

10"-CWS-246023-UAB QUEST CCS PROJECT


A

R
246.025

246.025
CWR

CWS
12959

12960

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT
UNIT 246 - REGENERATION/COMMON
ISSUED FOR HAZOP
LEAN AMINE COOLING TRAIN "A"
SCALE: NONE
SHELL DWG NO.: REV.

246.008
246.0000.000.041.008 G
4 3 2 1
4 3 2 1

E-24604B E-24605B
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
LEAN AMINE COOLER LEAN AMINE TRIM COOLER GENERAL NOTES & CONNECTION DETAILS.
RATED DUTY: 20.8 MW RATED DUTY: 15.5 MW 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
SURFACE AREA: 829.0 m^2 SURFACE AREA: 676.0 m^2 STATED.
TEMA TYPE: BEU HOT COLD
SHELL TUBE DESIGN PRESS: 1500 kPa-g / HV 1155 kPa-g / 3 . PIPING BETWEEN TRAIN "A" AND TRAIN "B" TO BE AS SYMMETRICAL AS POSSIBLE.
DESIGN PRESS: 1500 kPa-g / HV 1155 kPa-g / DESIGN TEMP: 105 °C / 150 °C 58 °C / 4 . ELECTRIC TRACE (ET 10).
DESIGN TEMP: 130 °C / 150 °C 58 °C / MATERIAL: PLATES: 316L SS / GRAPHITE
MATERIAL: CS + 3 mm 304L SS CLAD DUPLEX 2205 + 0.38 mm CA FRAME: CS
INSULATION TYPE/THK: / 4 / INSULATION TYPE/THK: / 4 / HOLDS:
TRIM: P-246137-DAB CWR-246034-UAB TRIM: P-246138-DAB
TEMA TYPE: PLATE & FRAME
• NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

D FIRE D
1-1/2G3
SET@
1500 kPa-g
TW
RV V
039

3/4"
003 ET 10 V

ET 10
3"-DM-246064-DAB

ET 10
38 DM

N/A

N/A
2"
3"x1-1/2"
246.033 1-1/2" 12" 12"-CWR-246003-UAB
CSO CWR
LEAN AMINE 3 CSO 13026
ET 10 3/4"
8"-P-246055-DAB 50
246.008 12251 B
TO BYPASS MIN.

3"-P-246056-DAB

CSO

16"x12"

ET 10
3

38
LEAN AMINE ET 10
16"-P-246054-DAB 63
12252 246.001

4"-CWR-246004-UAB
FROM E-24602A/B
V

RS
16"

2"
16"

E-24604B

NC
4"
4"-CWS-246021-UAB
16"
2" 16"

RS
D
C 16"-P-246058-DAB C

MIN.

16"x12"

ET 10
N/A
12" 12"-CWS-246020-UAB
CWS
13027

ET 10
6"

N/A
BACK
FLUSH
PP

TW
035

3/4" 3/4"
ET 10 2" 2"
1-1/2" RS RS
63

3 LEAN AMINE
RS RS ET 10
63 16"-P-246110-DAB
12949 246.008
2" 2" TO FILTRATION /
P-24602A/B/C

2"

D
E-24605B

TW
1-1/2" 038 B

G 06/13/11 ISSUED FOR PHA III

F 04/20/11 ISSUED FOR ESTIMATE


V E 03/01/11 ISSUED FOR PHA II
N/A ET 10 N/A 2"

ET 10
D 01/10/11 ISSUED FOR CLIENT REVIEW

38
10"-CWR-246008-UAB 10"
CWR C 12/02/10 ISSUED FOR INTERNAL REVIEW
13028 B ISSUED FOR PRELIMINARY REVIEW
4"-CWR-246009-UAB

CSO ISSUED PEM CLIENT

2"-DM-246065-DAB
REV DESCRIPTION BY CKD PRS CS PDP MC APE
DATE APP
MIN.

FILE:\\F:\1025\DRAWINGS\CO2\246\246.009.pid MODEL DATE:6/14/2011 2:59:13 PM BY:bes29451


NC
4"

246.033
ET 10

12262
DM
38
4"-CWS-246026-UAB

SHELL CANADA
QUEST CCS PROJECT
MIN.
A
10"-CWS-246025-UAB 10"
CWS
13029
R
6"

N/A ET 10 N/A BACK


FLUSH
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
ISSUED FOR HAZOP UNIT 246 - REGENERATION/COMMON
LEAN AMINE COOLING TRAIN "B"
SCALE: NONE

246.009
SHELL DWG NO.: REV.
246.0000.000.041.009 G
4 3 2 1
4 3 2 1

V-24604 V-24608 V-24609


LEAN AMINE FILTER LEAN AMINE CARBON FILTER LEAN AMINE POST FILTER 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
SIZE: ID x F/T SIZE: 3200 mm ID x 6000 mmT/T SIZE: ID x F/T GENERAL NOTES & CONNECTION DETAILS.
RATED FLOW: 355 m^3/hr RATED FLOW: 71 m^3/hr RATED FLOW: 71 m^3/hr 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
DESIGN PR. &TEMP: 1500 kPa-g @ 90 °C / HV @ 150 °C DESIGN PR. &TEMP: 1500 kPa-g @ 90 °C / HV @ 150 °C DESIGN PR. &TEMP: 1500 kPa-g @ 90 °C / HV @ 150 °C STATED.
PRESSURE DROP (CLEAN/DIRTY): 35 kPa / 103 kPa PRESSURE DROP (CLEAN/DIRTY): 35 kPa / 70 kPa PRESSURE DROP (CLEAN/DIRTY): 35 kPa / 103 kPa
MATERIAL: CS + 3 mm CA + PWHT / 316L SS INTERNAL 3 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012.
MATERIAL: CS + 3 mm CA + PWHT / 316L SS INTERNAL MATERIAL: CS + 3 mm CA + PWHT / 316L SS INTERNAL
INSULATION TYPE/THK: / 5 INSULATION TYPE/THK: / 5 INSULATION TYPE/THK: / 4 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE.
TRIM: P-246139-DAB 5
TRIM: P-246140-DAB TRIM: P-246141-DAB 5 . ELECTRIC TRACE (ET 10).
START-UP AMINE PARTICLE RETENTION SIZE: 10 microns ABSOLUTE PARTICLE RETENTION SIZE: 10 microns ABSOLUTE 6 . MECHANICAL MINIMUM FLOW STOP TO BE PROVIDED.
4"-P-246088-DAB
12140 246.012
FROM P-24604 START-UP
O/C
HIS HOLDS:
D D
ET 10
040

38
• NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
• INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
HYI
FX
S 040
015

24"-P-246059-DAB NC FV A/S
6
015
MIN

LEAN AMINE FO FILTERED LEAN AMINE


ET 10 16" ET 10
75 75 24"-P-246059-DAB
12253 246.008 12235 246.011
FROM E-24605A/B 24"x16" FO 24"x16" TO P-24602A/B/C

3/4"
D 16" HZT HZI
3/4" HV 040 040
3/4" D 040
D FILTERED LEAN AMINE

3/4" 3/4"
3/4" 3/4"
SP ET 10
6"-P-246XXX-DAB 6"-P-246075-DAB 50
006 12142 246.012
FC TO TK-24601
S8
SHUT DOWN

2"
3 4

2"-DM-246030-DAB
ET 10
FV 6

50
016
1"-P-246064-DAB

FIRE
1D2 ET 10
10"x8" 10"x8" 10"-P-246066-DAB
SET@ 50
FC 1500 kPa-g
FO

3/4"
015 RV V 8"
L

10"x6"

246.033
020 D
3/4"

13136
DM
246.033
ET 10

2"-DM-246025-DAB FC FX
10"x8"
38

38 DM
016 016
2"x1"

ET 10 13134 FIRE

3/4" 3/4"
MIN

MIN

FT 1-1/2H3
2"-P-246065-DAB

CSO
1"

015 SP SET@
CSC

C 3/4"
B 007
1500 kPa-g C
10"x8"

3/4" RV V
D 3/4"

3/4"
021 ET 10 246.033 D
4
CSO

3 3"-DM-246027-DAB 38

S8
DM

2"x1-1/2"
13135

PP FT CSO
ET 10

3/4"
50

016

3/4" 3/4"
DAB DAB ET 10 B
SAB ULB N/A H
3/4"

RS

6"x4" 6"x4"
V

PDT PDC

CSO
6"-P-246068-DAB
3/4" 3/4"
2"x1"

3"

2"
10"-P-246063-DAB

035 035 1"

3/4"
ET 10 2"-P-246069-DAB
10"-P-246066-DAB
2"-GI-246013-ULB

50 D
PP 3/4" 3/4" CSC
PP
2"-P-246084-DAB
ET 10
38
3/4" 3/4"

3"

RS
V
246.030

13142
GI

MIN
3/4"

4"
D
V-24604

ET 10 DAB DAB 3"


N/A ULB SAB V-24608
2"-DM-246024-DAB

2"-GI-246014-ULB
ET 10

3/4" 3/4"
38

2"-SC-246015-SAB

B
H
PDT PDC
ET 10

H
38

PDC
246.030

036 036
12690
GI

037
SP 06/13/11 ISSUED FOR PHA III
24" 3/4" 3/4" PP
G
246.033

008
12387
DM

MW F 04/20/11 ISSUED FOR ESTIMATE


3
PDT E 03/01/11 ISSUED FOR PHA II

S8
3" 4 037 D 01/10/11 ISSUED FOR CLIENT REVIEW
V
C 12/02/10 ISSUED FOR INTERNAL REVIEW

3/4"
B ISSUED FOR PRELIMINARY REVIEW

3"
2"
ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT
REV
6"-P-246072-DAB DATE APP

PP

3/4" 3/4"
3/4"
2"-SC-246014-SAB

6"-P-246070-DAB

3/4" 3/4"
SP
MIN

FILE:\\F:\1025\DRAWINGS\CO2\246\246.010.pid MODEL DATE:6/14/2011 3:04:21 PM BY:bes29451


009
ET 10 3"

3/4"
50
4 3

S8
3"

V-24609
SHELL CANADA
ET 10
38
ET 10

3/4" 3/4"
38

12687
3"-DM-246026-DAB QUEST CCS PROJECT
MIN

DM
246.033 A
ET 10
MIN 2"-DM-246029-DAB 38
1"-P-246076-DAB
13141 2"x1" ET 10 R
2"-GI-246012-ULB
GI 38
246.030 PIPING AND INSTRUMENT DIAGRAM
3/4"

ULB DAB

246.033
D QUEST CCS PROJECT

12390
N/A ET 10

DM
DAB UNIT 246 - REGENERATION/COMMON
ET 10
2"-SC-246XXX-SAB 38 SAB ISSUED FOR HAZOP LEAN AMINE FILTRATION
246.034 ET 10 SCALE: NONE
2"-SC-246012-SAB 38
SC

246.010
SHELL DWG NO.: REV.
12462 246.0000.000.041.010 G
4 3 2 1
4 3 2 1

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
LEAN AMINE FLOW SIGNAL f(x) 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
PV STATED.
12981 241.021 UC 3 . CLOSES FV-020 IF NO LEAN AMINE CHARGE PUMPS ARE RUNNING.
FROM FC-241075 002 8
4 . 3 x 50% PUMPS FOR A TOTAL FLOW OF 1418 m3/h.
LEAN AMINE FLOW SIGNAL PV 5 . ANTI-FOAM IS ADDED INTERMITTENTLY BY THE OPERATOR ON HIGH DP ACROSS
12982 242.021 THE AMINE ABSORBERS. ON HIGH DP IN EITHER V-24118 OR V-24218, ANTI-FOAM WILL
SP
3 BE SENT TO BOTH ABSORBERS.
FROM FC-242075 I FC 6 . PUMP SUCTION PIPING TO BE AS SYMMETRICAL AS POSSIBLE.
LEAN AMINE FLOW SIGNAL
002 020 7 . AUTO-START LOGIC FOR P-24602A/B/C SHALL ALSO CONSIDER THE NEED TO
441.029 L
D 12983 RAMP UP AND/OR AUTOSTART P-24601A/B/C. REFER TO DRAWING 246.007. D
FROM FC-441075 FV 8 . UC-002 SHALL MONITOR LEAN AMINE FLOWS TO EACH HMU PLANT AND THE
DAE DAG 020 TOTAL LEAN AMINE FLOW INCLUDING THE MINIMUM FLOW RECYCLE. UC-002
LEAN AMINE ET 10 6" ET 10 WILL PROVIDE A SET POINT TO FC-020 BASED ON THE NUMBER OF RUNNING
8"-P-246085-DAE 50 50 8"-P-246XXX-DAG PUMPS AND WILL AUTOMATICALLY PREVENT EXCESSIVE PUMPING BY STOPPING
246.001 12281
ONE OF THE RUNNING PUMPS VIA I-002.
TO E-24602A/B START-UP / MINIMUM FLOW 8"x6" FO 8"x6"

3/4"
9 . ELECTRIC TRACE (ET 10).
D D

2"
DAG 10 . TWO CHECK VALVES IN SERIES, ONE IN THE HORIZONTAL AND ONE IN THE
DAB VERTICAL POSITION, SEPARATED BY AT LEAST 500 mm.

2"-DM-246057-DAB
PT I PI 11 . VALVE AND SPACER TO BE ORIENTED IN THE HORIZONTAL PLANE.
042 002 LL 042 12 . VALVES ARE FOR BATTERY LIMIT ISOLATION OF UNIT.
13 . 316 SS INJECTION QUILL AND 304 SS HEADER TEE. OUTLET OF INJECTION QUILL
FT TO BE CENTERED IN PROCESS PIPE.

3/4" 3/4"
020
LEAN AMINE DETAIL "A"
ET 10 24"x16" ET 10 INJECTION QUILL
24"-P-246080-DAG 16"-P-246080-DAG

12985
DM
75 63 12644 241.021
FILTERED LEAN AMINE ET 10 TO V-24118/V-24218
24"-P-246059-DAB 75
12235 246.010 SP
010
FROM E-24605A/B & 3/4"
FILTRATION 12 D 13 PJG(0.4)
VFD SET POINT 3/4" 3/4"
PC I PT DAG
246.007 12904
041 001 041
TO P-24601A/B//C L LL FLOW
I
002 MP-002 SEE DETAIL "A"
LL
ET 10 LEAN AMINE

13
63 14"-P-246081-DAG
24"x16" 24"x16" 12238 246.101
TO V-44118 HOLDS:
DAG
C PJG(0.4) C
• INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
3/4" MIN. • DETAILS FOR INJECTION QUILL TO BE FINALIZED.
D 5
ET 10 ANTI-FOAM • SAFETY SYSTEM PUMP TRIP REQUIREMENTS TO BE CONFIRMED DURING DETAILED
3/4"-KP-246003-PJG(0.4) ENGINEERING.
38 246.014 12239

FROM P-24606A/B
24"x18" 24"x18"
6

10 10

DAB DAB DAB


11 DAG 11 DAG 11 DAG 11
11 11
MIN

MIN

MIN
2" 2" 2"
ET 10

ET 10
ET 10
63

63
V V V

63
16"-P-246077-DAG 16"-P-246078-DAG 16"-P-246079-DAG

2" 2" 2"

18"-P-246062-DAG
18"-P-246061-DAG
18"-P-246060-DAG

MIN

MIN

MIN

MIN
MIN

MIN
1"

1"

1"
FO FO FO
106 107 108

2"-DM-246042-DAG
2"-DM-246034-DAG

PP PP PP

2"-DM-246038-DAG
3/4" 3/4" 3/4" 3/4" 3/4" 3/4" PP
PP PP
ET 10

ET 10
ET 10

63

63
63

3/4" 3/4"

3/4" 3/4"

3/4" 3/4"
SP SP
011A 011B
SP B
011C

E E E
18"x12"

18"x12"
18"x12"

16"x8"

16"x8"
16"x8"

2"
2"

2"
3/4"-DM-246031-DAG 3/4"

3/4"-DM-246035-DAG 3/4"

3/4"
D D

D
G 06/13/11 ISSUED FOR PHA III
I I I
2"-DM-246036-DAG
2"-DM-246032-DAG

F 04/20/11 ISSUED FOR ESTIMATE

3/4"-P-246039-DAG
"
"

"
3/4
3/4

3/4
03/01/11 ISSUED FOR PHA II

2"-DM-246040-DAG
D D E
D
D 01/10/11 ISSUED FOR CLIENT REVIEW

P-24602A 7
P-24602B 7 P-24602C 7 C 12/02/10 ISSUED FOR INTERNAL REVIEW

HOA HOA HOA B ISSUED FOR PRELIMINARY REVIEW


4 HS I I 4 HS I I I 4 HS I I
ISSUED DESCRIPTION BY CKD PRS CS MC PEM CLIENT
004A 002 001 005A 002 001 006A 002 001 REV
DATE
PDP APE
APP
3/4"-DM-246033-DAG 3/4"-DM-246037-DAG 3/4"-DM-246041-DAG
3/4" 3/4" 3/4"
D D D

HIS R/S HIS R/S HIS R/S


DAG

DAB DAG
DAB DAG

FILE:\\F:\1025\DRAWINGS\CO2\246\246.011.pid MODEL DATE:6/14/2011 1:17:35 PM BY:bes29451


004 005 006
DAB

2"-DM-246043-DAB 2" 3"x2"


3"-DM-246043-DAB

3/4"
D

HS
SEL
SHELL CANADA
107
QUEST CCS PROJECT
A
ISSUED FOR HAZOP
P-24602A /B /C4 R

LEAN AMINE CHARGE PUMPS


RATED FLOW: 709.0 m^3/hr (EACH) PIPING AND INSTRUMENT DIAGRAM
DIFF. PR.: 3603 kPa
DRIVER: 1119.0 kW (EACH) QUEST CCS PROJECT
CASING INTERNALS UNIT 246 - REGENERATION/COMMON
MATERIAL: 316 SS 316 SS
INSULATION TYPE/THK: / 9 LEAN AMINE CHARGE PUMPS
TRIM: P-246142-DAG
P-246143-DAG SCALE: NONE
P-246144-DAG

246.011
SHELL DWG NO.: REV.
246.0000.000.041.011 G

4 3 2 1
4 3 2 1

TK-24601 TK-24602 3
TO ATMOSPHERE CV FAILURE AMINE MAKE-UP TANK AMINE MAKE-UP TANK 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
2J3 SIZE: 5000 mm ID x 12600 mm HEIGHT SIZE: 5000 mm ID x 12600 mm HEIGHT
AT SAFE LOCATION GENERAL NOTES & CONNECTION DETAILS.
SET@ WORKING CAPACITY: 196 m^3 WORKING CAPACITY: 196 m^3
90 kPa-g 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
DESIGN PR. & TEMP.: 1 kPa-g @ -0.25 kPag @ 60°C DESIGN PR. & TEMP.: 1 kPa-g @ -0.25 kPag @ 60°C TO ATMOSPHERE AT
STATED.
RV MATERIAL (SHELL/COIL): LEAN DUPLEX 2101 + 0.4 mm CA / DUPLEX 2205 + 0.4 mm CA MATERIAL (SHELL/COIL): LEAN DUPLEX 2101 + 0.4 mm CA / DUPLEX 2205 + 0.4 mm CA SAFE LOCATION
INSULATION TYPE/THK: IH / SHELL __mm ROOF __mm INSULATION TYPE/THK: IH / SHELL __mm ROOF __mm 3 . PUMP WILL HAVE A WAREHOUSE SPARE.
046 TRIM: P-246148-DAB TRIM: P-24639039-DAB 4 . TRUCK CONNECTION NEAR TANK. LOCAL CONTAINMENT FOR TRUCK UNLOADING.
4"x3"
4"-VA-246010-ULB TEMPORARY / RENTAL TANKS TO BE PLACED ON PAVED, CURBED AREA BESIDE
H PC PC AMINE STORAGE FACILITY. PAVED AREA TO BE PART OF THE CAPTURE AREA
3/4" 048A 048B STORMWATER DRAINAGE FACILITIES.
5119160 5 . AMINE MAKE-UP TANK CONTAINS UNDILUTED AMINE.
HH

6"-VA-246011-ULB
? I LI 6 . START-UP PIPING REQUIRED FOR INITIAL AMINE FILL AND DILUTION WITH

CSO
006 015 L

2"-GI-246011-ULB 2"
CONDENSATE.

?
?
D D
PIT 7 . LEVEL INDICATION AT GRADE TO BE VISIBLE AT TRUCK UNLOADING LOCATION.
SET@
75 kPa-g 048 8 . FG-027 TO BE VISIBLE FROM VALVE. FLOW GAUGE AND VALVE TO BE AT GRADE
1-1/2" 4" PV

5119160
PV RADAR NEAR TANK.
PCV V 048B
048A 9 . ALL AMINE PUMPS ARE CONTAINED WITHIN CURBED CONTAINMENT AREA.

3/4"
3/4"
045 LT N/A

?
?
246.030 10. STEAM COIL AND ALL TANK APPURTENANCES LOCATED BELOW LLL.
2"-GI-246010-ULB 2"x1-1/2" 2"x1-1/2" 015 6"-P-246071-ULB 6" 6"x4" 6"x4" ET 10
GI 11. ELECTRIC TRACE (ET 10), PIPING,PUMPS & NOZZLES.
12145 ? FC ? ? FO 1/2" WEEP HOLE 12. RENTAL TANK CONNECTION.
? ? ?
13. TANK VENDOR TO SUPPLY PVSV.
XHIS O/C SET@ kPa(g) Vacuum LI SET@ kPa(g) Vacuum
kPa(g) Positive Press 14. PLATFORM BETWEEN ROOF AREAS OF EACH TANK.
005 kPa(g) Positive Press 016 A
PVSV 15. TANKS TO BE NO FURTHER THAN 2m APART, 24 NPS TIE LINE TO BE MINIMUM
LAH 13 LENGTH AND TANK NOZZLES TO BE LOCATED AS CLOSE TO GRADE AS POSSIBLE,
PVSV
13 7 016A 046 GAUGE NO POCKET.
047 GAUGE
HATCH LT I HATCH
8" 8"
I 6" 016 007
GWR 6"
006 HOLDS:
RECOVERED AMINE XYI 24" MW
ET 10 24" MW
2"-P-246099-DAB • STORAGE FACILITY TO BE VERTICAL TANK (API 650) OR HORIZONTAL DRUM
12139 246.013 38 005
NNF S (ASME SECT VIII). MECHANICAL TO ADVISE LEAST COST ALTERNATIVE.
H

3"
FROM V-24605 HS LHS LI
TK-24601 TK-24602 • NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
A/S 14 116 016 016 14
• INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
5063357

FO 5 HORN HORN 5
?

XZT TEST SILENCE


?
?

XV 005
005
FILTERED LEAN AMINE ET 10
6"-P-246075-DAB 6"
12142 246.010 63 H
FC TC
5163612 5156168
FROM V-24609 ? ? 041
MIN. 2 m L
4" 4" 5163612 HHLL=12000 mm HHLL=12000 mm
C-1 C-1

12 SP ET 10 4"-P-246092-DAB
5156168 5163612 019 N/A 24" HLL=11500 mm 24" HLL=11500 mm DAB SAB 4"-SC-246009-SAB 6
4"

2"

(TYPICAL OF 2) (TYPICAL OF 2)
?
?

C-1 C-1 MW MW MIN


C SP 5156168 ET 10 4" FG ET 10 CONDENSATE C
021 MAKE-UP AMINE H 2" 63 63 246.021 12125
TC TT NC 5163480 027
4 NLL=2600 mm NLL=2600 mm 4" ? START-UP FROM P-24608A/B
040 040 ? TT 5156168 C-1 8
L 2" C-1

C-2
041 1-1/2"

2"
1-1/2"

?
TV 2" TV
ET 10 8
LLL=1500 mm 2"-P-246111-DAB 63 LLL=1500 mm
040 041 2"-SL-246020-SAB
246.029 H 2"x1-1/2" 2"x1-1/2" ET 10 2" ET 10 2" ET 10 2"x1-1/2" 2"x1-1/2" H 246.029
2"-SL-246009-SAB 2" 24"-P-246112-DAB 2"
SL 25 38 38 25 SL
5115227

12144 ? FO ? 24" ? FO ? 13167


? ? 15 3" ? ?
3/4"

3/4"
LI LT
?

?
?
N/A ET 10 10 10 ET 10 N/A
D 017 017 ? D 2"-SCL-246007-SAB
246.029 ET 10 ET 10 ? ET 10 246.029
2"-SCL-246015-SAB 2" 2"
SCL 38 T ET 10 63 T SCL
? ? 3" 5156893 3" ?
6"
5115227

12143 38 38 ? 13168
3/4"

3/4"
? ? ? ?

?
?
ET 10 ?
?

D 0.75 M 0.75 M D
6" 6"
12 SP

BERM BERM
ET 10
6"-P-246086-DAB 2"-P-246091-DAB
63
4" 4" ET 10 START-UP AMINE
4"-P-246088-DAB
50 12140 246.010
NC 5163612 START-UP TO V-24604
5156168 C-1
5156168

SP
6"x3"

C-1
C-1

12
020 ISSUED FOR ESTIMATE
3/4" 2" ET 10 AMINE INVENTORY/MAKE-UP
V 50 4"-P-246093-DAB
5061864 12696 246.002
? NC START-UP TO V-24601
5163612

? FC 1-1/2"
C-1

C-1 FV

INTERMITTENT
025
L 025
B

ET 10
38
2"-P-246089-DAB 2"x1-1/2" 2"x1-1/2"

? FO 5063357 ?
C-1 C-1 C-1 C-1 2"-P-246090-DAB

C-1
2"
3/4"

?
C-1

C-1
07/11/11 ISSUED FOR PHA III
?
G
?

FO
110 3/4" ET 10 F 04/20/11 ISSUED FOR ESTIMATE
FT V
C-2

50
5063357
025
C-1 5061864 E 03/01/11 ISSUED FOR PHA II
? NC

5063357
2"
? D 01/10/11 ISSUED FOR CLIENT REVIEW
ET 10 C-1
ET 10

ET 10

ET 10

ET 10

C-1
2"-P-246091-DAB
38
38

38

50

50

C 12/02/10 ISSUED FOR INTERNAL REVIEW


HOA HOA ? B ISSUED FOR PRELIMINARY REVIEW
HS I HS I ?
I I
3/4"

ISSUED MC PEM CLIENT


C-1

009A 004 010A 005 REV DESCRIPTION BY CKD PRS CS PDP APE
?

DATE APP

2"-DM-246055-DAB
3/4"-DM-246049-DAB

3/4"-DM-246051-DAB
2"-DM-246050-DAB
4"-P-246088-DAB

3"-P-246087-DAB

PP R/S PP R/S
HIS HIS

FILE:\\F:\1025\DRAWINGS\CO2\246\246.012.pid MODEL DATE:7/8/2011 2:57:20 PM BY:ahm14887


009 010
3/4" PP SP 3/4" PP
SP
5061864

3/4"
5061864
3/4"

V
C-2

C-2
V
?

?
022A ? 022B ?
3/4"

3/4"
?

6"x4" 4"x3" C-2 2"x3" C-2


3"x2"
NC 3/4 3/4
" 5156893 "
5156168 P-24605
C-1
2"

P-24604 C-1
D

C- ? C- ?
?

C-1
SHELL CANADA
C-2
3/4"

3/4"

3/4"
C-1
NC

1
C-2
NC

1
D
?

3/4"-DM-246052-DAB 2"-DM-246053-DAB 3/4"-DM-246054-DAB


3/4"-DM-246046-DAB 3/4"-DM-246047-DAB 3/4"-DM-246048-DAB QUEST CCS PROJECT
246.023 246.023 ET 10
246.023 DM DM
2"-DM-246044-DAB 50
A
ET 10
2"-DM-246056-DAB 50 13175 13176
DM
13174
R

P-24604 P-24605
PIPING AND INSTRUMENT DIAGRAM
AMINE RE-INVENTORY PUMP 9 AMINE MAKE-UP PUMP 9
QUEST CCS PROJECT

246.033
60.0 m^3/hr RATED FLOW: RATED FLOW: 15.0 m^3/hr

12620
3

DM
758 kPa DIFF. PR.: DIFF. PR.: 300 kPa
12.6 kW DRIVER: DRIVER: 1.3 kW UNIT 246 - REGENERATION/COMMON
CASING INTERNALS CASING INTERNALS AMINE MAKE-UP TANK & PUMPS
MATERIAL: 316 SS 316 SS MATERIAL: 316 SS 316 SS
INSULATION TYPE/THK: / 11 INSULATION TYPE/THK: / 11
SCALE: NONE
TRIM: P-246149-DAB TRIM: P-246150-DAB

246.012
SHELL DWG NO.: REV.
246.0000.000.041.012 G
4 3 2 1
4 3 2 1

V-24606 V-24605
AMINE DRAIN DRUM DRAINED AMINE FILTER 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
SIZE: 2600 mm ID x 8100 mm T/T SIZE: ID x GENERAL NOTES & CONNECTION DETAILS.
DESIGN PR. & TEMP: 350 kPa-g @ 150 °C / HV @ 150 °C RATED FLOW: 25 m^3/hr 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
MATERIAL(VESSEL/INTERNALS): CS + 6 mm CA + PWHT / 316 SS + 0.4 mm CA DESIGN PR. &TEMP: 1050 kPa-g @ 150 °C / HV @ 150 °C STATED.
INSULATION TYPE/THK: H/ 6 PRESSURE DROP (CLEAN/DIRTY): 35 kPa / 150 kPa
3 . VACUUM TRUCK CONNECTION.
TRIM: P-246145-DAB MATERIAL: CS + 3 mm CA + PWHT / 316 SS INTERNAL
INSULATION TYPE/THK: / 4 . CHECKER PLATE ON TOP OF SUMP.
12
TRIM: P-246146-DAB 5 . PUMP WILL HAVE A WAREHOUSE SPARE.
PARTICLE RETENTION SIZE: 10 microns ABSOLUTE 6 . ELECTRIC TRACING TO HLL (ET 10).
7 . EXTEND BELOW LLL.
8 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE.
9 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012.
D 10. DISCHARGE PIPE FOR RELIEF VALVE TO BE DIRECTED INTO BOTTOM OF AMINE
D
FIRE
1D2 DRAIN DRUM SUMP. ENTRY PROCEDURES INTO SUMP ARE REQUIRED FOR
V RV
SET@ OPERATION / MAINTENANCE TO ENSURE THERE IS NO RELIEF OR OVERFILL OF

3/4"
ET 10 026 1050 kPa-g AMINE INTO THE SUMP.
38 2"-DM-246059-DAB
11. ACCESS HATCH.

2"x1"
2"-P-246099-DAB 12. ELECTRIC TRACE (ET 10).

ET 10
38
CSO 3/4" 13. VALVE STEM TO EXTEND ABOVE GRADE.
TO ATMOSPERE B RECOVERED AMINE
2" 14. PUMP P-24607 TO BE MANUALLY STARTED ON HIGH LEVEL ALARM.
AT SAFE 12139 246.012
LOCATION NNF

CSO
2" TO TK-24601 HOLDS:
V NC

2"-P-246095-DAB
• NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

2"
2"-P-246098-DAB
CSC 3" V • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
RECOVERED AMINE

3/4"
2"-P-246097-DAB
V-24605 ET 10 2"
3"-VA-246008-DAB 38 12401 246.002
TO V-24601

8"-VA-246009-DAB
VAPOUR BLOWTHROUGH
4M6 H
PDT PDI
PV SET@
350 kPa-g 052 052

NC
050B 6"-VA-246007-DAB

FREE DRAINING
RV 3"
3"x1-1/2" 1-1/2" 3"x1-1/2" 025

1/2" WEEP HOLE FO

3/4"

4"-P-246103-DAB
PC D 3/4"
050B B 2"-P-246096-DAB
H
PC

CSC
CSO

D
3"
050A

4"x3"
DAB
SAB 246.034
2"-SC-246013-SAB
SC
10
C 2"-DM-246058-DAB
ET 10
12463
C
38
FREE DRAINING

3/4"
PT
050 D

3/4"
SET@

ET 10

ET 10
38

38
100 kPa-g PV
PCV 050A
3/4"

N/A ET 10 ULB DAB


049
246.030 2"x1" ET 10
2"-GI-246007-ULB 1" 2"x1" 2"-P-246102-DAB
GI 38
FC

2"-P-246094-DAB
12461
3/4"

D 8

4"-P-246101-DAB
AMINE DRAINS R/S HOA

S8
ET 10 HIS I
6"-DM-246006-DAB HS 9
13130 246.007 50
HORN HORN 011 008 011A
FROM COLLECTION HEADER TEST SILENCE SP
H HH 013
HS LHS LI LI
KO LIQUIDS ET 10 PP
2"-DM-247002-PJB(0.4) 121 021 021 020 I
12626 247.001 38
NNF TWO PHASE FLOW 3/4"
FROM V-24701 D ET 10 WASTE WATER
SP 38 2"-WP-246003-DAB
12294 246.027
012A LAH
SO

3/4"
NNF
2"

4"x2" 2" TO WWTP 271


021A

3/4"
CSO

3 NC

SP I TI I
3"x2"

012B
4"x2" 019 045 008
2" L L
3
LHS
021A

SO
2"

HORN LIT TT LT
11
RS

SILENCE 021 045 020


36" 4 B
RS

RS

RS

RS

RS

RS
1m x 1m GWR GWR
6"-DM-246006-DAB HOLD 3" 2" MW 2" 2" 36"
2" 4" 2" 4"

AMINE DRAINS
13

ET 10 6" RS
12477 246.033 50 6" 6"
FREE DRAINING CSO 6"
FROM COLLECTION HEADER G 06/13/11 ISSUED FOR PHA III
3/4"

HHLL=2405 mm
F 04/20/11 ISSUED FOR ESTIMATE
RS

D 6
RS

HLL=2255 mm
E 03/01/11 ISSUED FOR PHA II
6"-DM-246060-DAB
D 01/10/11 ISSUED FOR CLIENT REVIEW
V-24606
13

AMINE DRAINS ET 10 6" C 12/02/10 ISSUED FOR INTERNAL REVIEW


13036 246.033 50 B ISSUED FOR PRELIMINARY REVIEW
FREE DRAINING CSO
FROM COLLECTION HEADER ISSUED PEM CLIENT
3/4"

REV DESCRIPTION BY CKD PRS CS PDP MC APE


DATE APP
D
13

AMINE DRAINS ET 10 6"


13037 246.033 50 LLL=200 mm
FREE DRAINING CSO
FROM COLLECTION HEADER
3/4"

7 7 7
D

FILE:\\F:\1025\DRAWINGS\CO2\246\246.013.pid MODEL DATE:6/14/2011 3:13:43 PM BY:bes29451


6"-DM-246061-DAB

P-24607

2"
S-24601 D
SHELL CANADA
QUEST CCS PROJECT
A

P-24607 5 ISSUED FOR HAZOP PIPING AND INSTRUMENT DIAGRAM


AMINE DRAIN PUMP
RATED FLOW: 25.0 m^3/hr QUEST CCS PROJECT
DIFF. PR.: 641 kPa
DRIVER: 7.5 kW UNIT 246 - REGENERATION/COMMON
CASING INTERNALS
MATERIAL: 316 SS 316 SS AMINE DRAIN DRUM
S-24601 INSULATION TYPE/THK: / 12 SCALE: NONE
AMINE DRAIN DRUM SUMP TRIM: P-246147-DAB

246.013
SHELL DWG NO.: REV.
246.0000.000.041.013 G
4 3 2 1
4 3 2 1

S- 02NULL
ANTI-FOAM INJECTION PACKAGE 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
3 . POSITIVE DISPLACEMENT PUMP WITH ADJUSTABLE STROKE.
4 . GRADUATED GLASS COLUMN FOR CONTINUOUS TOTE TANK LEVEL INDICATION
AND INJECTION PUMP CALIBRATION.
5 . SS TUBING TO PIPE CONNECTOR.
6 . VERTICAL ORIENTATION REQUIRED FOR ROTAMETER WITH INLET FLOW INTO
THE BOTTOM OF THE INSTRUMENT.
7 . WAREHOUSE SPARE PUMP TO BE PROVIDED AND STORED IN THE ANTI-FOAM
D INJECTION SHELTER. D
8 . ANTI-FOAM INJECTION PUMP TO AUTOMATICALLY STOP 5 MINUTES AFTER
BEING STARTED.

HOLDS:

• NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.


• INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

PI
055

OUTSIDE S- 02NULL
INSIDE
1"-VA-246017-PAB

VENDOR

SP
SP
1" HOSE

1" HOSE

017
016

SP
6
5 014A
ANTI-FOAM
1"-VA-246018-PAB

6" FILL CAP FI ET 10


3/4"-KP-246003-PJG(0.4)
2"x1"

38 12239 246.011
110
C 2" SET@ TO V-44118 C
SS TUBING PJG(0.4)
3500 kPa-g
INSTR. PIPING SP
RV 6 014B
1"-VA-246016-PAB

030 5
ET 10 ANTI-FOAM
PT FI 3/4"-KP-246005-PJG(0.4)
1000 L 38 12286 241.021
055 111
TOTE TANK TO V-24118/24218

CSC
(REMOVABLE) SS TUBING PJG(0.4)

1"
INSTR. PIPING SP

3/4" 3/4"
(BY SHELL)
6 015
VENDOR 5
2"x1" ET 10 ANTI-FOAM
2" 3/4" 3/4" FI 3/4"-KP-246001-PJE(0.4) 38 12283 246.002
112
TO V-24601

3/4"
N/A ET 10
3/4"-SS TUBING SS TUBING PJE(0.4)
PG D INSIDE OUTSIDE
INSTR. PIPING
2"

057
SP
D
2"x1" 018
1" HOSE

VENDOR

VENDOR
6" FILL CAP

3/4"-SS TUBING
1-1/2"x1"

HORN PULSATION
3/4"

2"
SILENCE DAMPENER
LHS 2"
023A 2" 2"x1"
LG
LAH
024 PP
4

023A HOA
1000 L HS
MAG
TOTE TANK
I LT LG 015A B
1-1/2"x1"

(OPERATING)
009 023 023
LL
3/4" 3/4"

I 7 8
010 2" 2"x3/4" 3/4" HOSE 3/4" 3/4" R/S
3/4"-SS TUBING I HS
I
2" 010 015
3/4"

G 06/13/11 ISSUED FOR PHA III


3/4"

3/4" I
D D F 04/20/11 ISSUED FOR ESTIMATE
H D 009
LHS LI P-24606
3/4"

2"

3 E 03/01/11 ISSUED FOR PHA II


023 023 D
L D 01/10/11 ISSUED FOR CLIENT REVIEW
HORN
C 12/02/10 ISSUED FOR INTERNAL REVIEW
SILENCE
B ISSUED FOR PRELIMINARY REVIEW
HS REV
ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT
DATE APP
023
HORN
TEST

FILE:\\F:\1025\DRAWINGS\CO2\246\246.014.pid MODEL DATE:6/14/2011 1:17:40 PM BY:bes29451


CURB CURB

SHELL CANADA
QUEST CCS PROJECT
A

7 R

P-24606 3 ISSUED FOR HAZOP PIPING AND INSTRUMENT DIAGRAM


ANTI-FOAM INJECTION PUMP QUEST CCS PROJECT
RATED FLOW: 160 L/hr
DIFF. PR.: 3850 kPa UNIT 246 - REGENERATION/COMMON
DRIVER: 0.75 kW
CASING INTERNALS ANTI-FOAM INJECTION PACKAGE
MATERIAL: 316 SS 316 SS
INSULATION TYPE/THK: NONE / SCALE: NONE
TRIM:

246.014
SHELL DWG NO.: REV.
246.0000.000.041.014 G
4 3 2 1
4 3 2 1

V-24607 E-24606A /B
CONDENSATE FLASH DRUM LP COND. / DEMIN WATER EXCHANGER 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
SIZE: 3000 mm ID x 6300 mm T/T RATED DUTY: 13.5 MW (TOTAL) GENERAL NOTES & CONNECTION DETAILS.
DESIGN PR. & TEMP: 500 kPa-g @ 150 °C / FV @ 150 °C SURFACE AREA:
HOT COLD 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
MATERIAL(VESSEL/INTERNALS): CS + 3 mm CA
5 DESIGN PRESS: 1150 kPa-g / FV 1450 kPa-g / HV STATED.
INSULATION TYPE/THK: IH /
TRIM: SCL-246XXX-SAG DESIGN TEMP: 150 °C / 150 °C 125 °C / 125 °C 3 . HP CONDENSATE AND FLASHING LP CONDENSATE LINES TO ENTER V-24607
MATERIAL: PLATES: 304 SS BELOW LLL.
FRAME: CS 4 . START-UP PIPING REQUIRED FOR INITIAL AMINE FILL AND DILUTION WITH
INSULATION TYPE/THK: / / 5 CONDENSATE.
TRIM: SCL-246030-SAB 5 . ELECTRIC TRACE TO HHLL (ET 10) AND EXCHANGERS.
WI-246020-UJB(0.4)
6 . REQUIRE HEIGHT TO BE AS LOW AS POSSIBLE (MINIMUM 2.6m) FOR PROCESS
CONDENSATE ET 10 HYDRAULICS.
8"-SCL-246002-SAB 8"
12454 246.003 100
D 5156140
7 . VESSEL SUPPORTED BY MODULE STRUCTURE AND IS LOCATED ABOVE D
FROM E-24603A / V-24603A EXCHANGERS E-24606A/B.
C-2

CONDENSATE ET 10 ET 10 HOT DEMIN WATER HOLDS:


8"-SCL-246005-SAB 8" 6" 6"-WI-246007-UJB(0.4)
12680 246.004 100 75 12681 246.101
5156140 5242525 • NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

5242525
FROM E-24603B / V-24603B C-2 C-2 TO V-25102
• INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

CSO

C-2
6"
• RELIEF LINE (INLET AND OUTLET) SIZING.
1-1/2" 1-1/2" 1-1/2" 1-1/2"
D D D D
? ? ? ?
C-2 C-2 C-2 C-2
TW TW TW TW
055 1-1/2" 1-1/2" 057 051 1-1/2" 1-1/2" 054

6"-WI-246011-UJB(0.4)

E-24606B E-24606A

1-1/2" TW 1-1/2" TW
TW 056 052
053 1-1/2" 1-1/2" 1-1/2" 1-1/2"
D D D D
? ? ? ?
1-1/2" C-2 C-2 C-2 C-2
DEMIN WATER ET 10
6"-WI-246006-UJB(0.4) 6"
12270 246.023 50
5245480
FROM P-24610A/B C-2
ET 10 6"
50 6"-WI-246010-UJB(0.4)
CSO
C 5245480 C
13139 246.003 C-2
FROM LX-005 4" 4" LV
LV

6"x4"

6"x4"
006 005

FC
FC
13140 246.004
FROM LX-006

6"x4"

6"x4"
TO ATMOSPHERE TO ATMOSPHERE
AT SAFE LOCATION AT SAFE LOCATION

5156140

5156140
CV FAILURE

6"

6"
?

?
2J3 12"-VA-246020-SAB
4"-VA-246019-ULB SET@
90 kPa-g

8"x6"
FO 12"x10"

RV SPLIT
10"

4"x3" 034 H
PC
C-1

C-1 061 TO ATMOSPHERE


CV FAILURE
AT SAFE LOCATION
12" 12"x10"

3/4" PV 3L4
5119160 061B SET@
5156140

500 kPa-g ET 10 ET 10 CONDENSATE


C-2
C-1

6"-SC-246XXX-SAB 6"-SC-246011-SAB
6"-VA-246015-SAB 75 75 246.027 12126
RV
START-UP
CSO

6"x4" FROM TK-25101


C-1

033
2"

ET 10
?

88

4"x3"

SET@ 1/2" WEEP HOLE 4


2"-GI-246006-ULB

C-1
75 kPa-g PT 3/4"
1-1/2" 061 5115277 3/4" B
PCV PV
C-2 4" 5115227
5119160

060 061A V

ET 10
ULB SAB C-2

75
3/4"

C-2

CSO MINIMUM FLOW SIGNAL


246.030 2"x1-1/2" 2"x1-1/2" 2" 5156140 TC H TX FC
ISSUED FOR ESTIMATE
2"-GI-246005-ULB 4"-VA-246014-SAB
GI C-1 246.021 12130

8"-SC-246001-SAB
12664 ? C-1 FC 5070551 5156862 050 050 030
L FROM FT-030
C-2 C-1 C-2 C-1
B
C-1
2"
?

12"
10"
PP 3" TV
050
8" ET 10 4"x3" 4"x3" ET 10 RECYCLED CONDENSATE G 07/11/11 ISSUED FOR PHA III
8"-SC-246016-SAB 8"x4" 4"-SC-246016-SAB
75 50 246.021 12127
F 04/20/11 ISSUED FOR ESTIMATE
5156140 5156140 FO 5156140

5115227
FROM E-24607

3/4"
C-1 C-1 C-1 C-1 E 03/01/11 ISSUED FOR PHA II

C-2
5115277

D 01/10/11 ISSUED FOR CLIENT REVIEW


3/4"

C-3

C 12/02/10 ISSUED FOR INTERNAL REVIEW


B ISSUED FOR PRELIMINARY REVIEW
2"
ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT
REV
5158143 DATE APP
V-24607 2" C-2
5158143
HHLL=3800 mm C-2
MAG LEVEL SIGNAL

FILE:\\F:\1025\DRAWINGS\CO2\246\246.020.pid MODEL DATE:7/10/2011 9:29:49 PM BY:muk22296


HLL=2900 mm LG LT
12129 246.021
025 025
TO LC-025
24"
MW
5 ET 10 HP CONDENSATE
3 LLL=1150 mm 2" 2"-SCH-248002-SAG
LP CONDENSATE ET 10 38 248.002 12427
3"-SCL-246012-SAB 3" 5158143
12457 246.029 38 TWO PHASE FLOW FROM V-24805
FROM COLLECTION
5156863
C-1
LLLL=250 mm
2" C-1
5158143 3
SHELL CANADA
2" C-1 QUEST CCS PROJECT
5115277

5158143
3/4"

C-3

C-2
D
A
TT
7
050
5300 mm

6 1-1/2"
SLOPE RECOVERED CONDENSATE
ET 10
10"-SC-246002-SAB PIPING AND INSTRUMENT DIAGRAM
88 12128 246.021
TO P-24608A/B
QUEST CCS PROJECT
UNIT 246 - REGENERATION/COMMON
CONDENSATE RECOVERY EXCHANGER & FLASH DRUM
SCALE: NONE

246.020
SHELL DWG NO.: REV.
246.0000.000.041.020 G
4 3 2 1
4 3 2 1

E-24607A /B
CONDENSATE COOLER 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
RATED DUTY: 0.7 MW (TOTAL)
GENERAL NOTES & CONNECTION DETAILS.
SURFACE AREA: TBD
TEMA TYPE: BEU 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
SHELL TUBE STATED.
DESIGN PRESS: 1200 kPa-g / FV 1200 kPa-g / 3 . 2x100% PUMPS FOR TOTAL FLOW RATE OF 183 m3/h.
DESIGN TEMP: 150 °C / 150 °C / 58 °C 4 . START-UP PIPING REQUIRED FOR INITIAL AMINE FILL AND DILUTION WITH
MATERIAL: CONDENSATE.
INSULATION TYPE/THK: / 5 / 5 5 . ELECTRIC TRACE (ET 10).
TRIM: SC-246040-SAB
CWR-246035-UAB
RECYCLED CONDENSATE WATER MAKE-UP HOLDS:
ET 10 ET 10
4"-SC-246016-SAB 38 38 2"-SC-246020-SAB
246.020 12127 12131 246.006
D NNF • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING. D
TO V-24607 TO V-24602

ET 10 COOLED CONDENSATE
2"-SC-246017-SAB
38 12123 246.022
TO P-24609A/B

5156140
BACK

C-2
FLUSH

5115273
3/4"

C-2
3"
D
246.025

6"x4"
5115227 6"x4" ET 10
H C-2 50 6"-CWS-246031-UAB
TI TT CWS
5307521 12120
062 062 1-1/2" C-2

6"x4"

RS
E-24607B

E-24607A

RS
TW
064
C C

6"x4"
1-1/2"
6"x4" ET 10 246.025
6"-CWR-246014-UAB
50 CWR
TW CSO

5115273
12119

3/4"

C-2
061 1-1/2" 5307521
D C-2

6"x4"
3/4"
D
5115227
C-2 LEVEL SIGNAL
H

5156140
LC I

C-2
246.020 12129
025 011
L LL FROM LT-025

4"-SC-246007-SAB
LV
025 RECOVERED CLEAN
ET 10 CONDENSATE
6" 6" 6" 6"-SC-246008-SAB
50 12654 246.027
5156140 FC 5156140

5115227
TO TK-25101

3/4"

C-2
C-1 C-1 C-1

5156140
C-2
NC
D

4"
ET 10 FLUSHING CONDENSATE
PI 2"-SC-246010-SAB
MINIMUM FLOW SIGNAL 38 12579 246.034
FT 065
C-2
246.020 12130 L TO DISTRIBUTION
030
TO FC-030 ISSUED FOR ESTIMATE

ET 10 CONDENSATE
3/4" PT I START-UP
38
4"-SC-246009-SAB
12125 246.012 B
? 065 012
LL TO TK-24601 / Tk-24602
C-2
4

G 07/11/11 ISSUED FOR PHA III

F 04/20/11 ISSUED FOR ESTIMATE

E 03/01/11 ISSUED FOR PHA II


HOA HOA
HS HS D 01/10/11 ISSUED FOR CLIENT REVIEW
5156140

5156140
017A 018A C 12/02/10 ISSUED FOR INTERNAL REVIEW
C-1

C-1
B ISSUED FOR PRELIMINARY REVIEW

ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT


REV
R/S SEL DATE APP
HIS I HS I
I
017 012 119 012

FILE:\\F:\1025\DRAWINGS\CO2\246\246.021.pid MODEL DATE:7/10/2011 9:38:48 PM BY:muk22296


3/4" 3/4"
I D R/S D
5115227 HIS 5115227
C-1 C-1
ET 10

018
50

5163480

5163480
C-1

C-1
PP PP
6"-SC-246005-SAB

6"-SC-246006-SAB
3/4" PP 3/4" PP
SP ?
C-1
V
SP ?
C-1
SHELL CANADA
5115227

V 023A 023B
3/4"

C-1

3/4"
C-1

C-1
3/4"

?
C-1

RECOVERED CONDENSATE ET 10 10"x8"


QUEST CCS PROJECT
10"-SC-246002-SAB 8"-SC-246003-SAB 8"-SC-246004-SAB
12128 246.020 50
3/4 3/4 A
5115227

5156140 5156140
5115227

5115227

FROM V-24607 " "


3/4"

C-1

C-1
3/4"
C-1

5115227

5115227

C-1 C-1
3"

D D
3/4"

3/4"
C-1

C-1

D D P-24608A 5115227 D P-24608B 5115227


D C-1 D C-1 R

P-24608A /B 3
RECOVERED CLEAN CONDENSATE PUMP PIPING AND INSTRUMENT DIAGRAM
RATED FLOW: 183.0 m^3/hr QUEST CCS PROJECT
DIFF. PR.: 602 kPa
DRIVER: 30.5 kW UNIT 246 - REGENERATION/COMMON
CASING INTERNALS
MATERIAL: CS CS CONDENSATE RECOVERY PUMPS & COOLER
INSULATION TYPE/THK: / 5
TRIM: SC-246041-SAB SCALE: NONE

246.021
SC-246042-SAB SHELL DWG NO.: REV.
246.0000.000.041.021 G
4 3 2 1
4 3 2 1

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
3 . 2x100% PUMPS. ONE OPERATING, ONE SPARE.
4 . ELECTRIC TRACE (ET 10).
5 . TOTAL WASH WATER MAKE-UP FLOW TO V-24119 AND V-24219.

D D

FLOW SIGNAL
241.022 13030

FROM FC-241076

FI I FX
5
076 018 076
L LL

FLOW SIGNAL
242.022 13031

FROM FC-242076

ET 10 WASH WATER
2"-SCH-246003-SAG
38 12133 241.022
TO V-24119 / V-24219

3/4" PT I PI
? 070 014 070
C C-2
LL L C

HOA HOA
HS HS
020A 021A

I I
018 018
R/S SEL R/S
HIS I I HS I I HIS
020 014 011 122 011 014 021

?
?
C-1

C-1
I 3/4" I 3/4"
D D
? ?
C-1 C-1
5063246

5063246
C-1
C-1
2"-SCH-246001-SAG

2"-SCH-246002-SAG
PP PP
3/4" 3/4" ISSUED FOR ESTIMATE
PP PP
ET 10
38

? ?
V C-1 V C-1
B
3/4"

3/4"

3/4"
C-1

C-1

C-1

3/4"

C-1
?
?

?
COOLED CONDENSATE ET 10
2"-SC-246017-SAB 2"-SC-246018-SAG 2"-SC-246019-SAG
12123 246.021 38
3/4 3/4
FROM E-24607 ? " ? "
3/4"

3/4"
C-1

D D

C-1
C-1 C-1

?
?

P-24609A 5115277 P-24609B 5115277


?

C-1?
SAB SAG
C-1

D D C-1 SAB SAG D D C-1 G 07/11/11 ISSURD FOR PHA III

F 04/20/11 ISSUED FOR ESTIMATE

E 03/01/11 ISSUED FOR PHA II

D 01/10/11 ISSUED FOR CLIENT REVIEW

C 12/02/10 ISSUED FOR INTERNAL REVIEW


B ISSUED FOR PRELIMINARY REVIEW

ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT


REV
DATE APP

FILE:\\F:\1025\DRAWINGS\CO2\246\246.022.pid MODEL DATE:7/4/2011 1:16:19 PM BY:ahm14887


SHELL CANADA
QUEST CCS PROJECT
A

P-24609A /B 3

WATER MAKE-UP PUMPS PIPING AND INSTRUMENT DIAGRAM


RATED FLOW: 9.9 m^3/hr QUEST CCS PROJECT
DIFF. PR.: 2741 kPa
DRIVER: 7.5 kW UNIT 246 - REGENERATION/COMMON
CASING INTERNALS
MATERIAL: CS CS WASH WATER MAKE-UP PUMPS
INSULATION TYPE/THK: / 4
TRIM: SCH-246XXX-SAG SCALE: NONE
SCH-246XXX-SAG

246.022
SHELL DWG NO.: REV.
246.0000.000.041.022 G
4 3 2 1
4 3 2 1

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE STATED.
3 . 2x50% PUMPS FOR TOTAL DESIGN FLOW RATE OF 185 m3/h.
4 . TRIP ONE PUMP ON HIGH LEVEL(3234 mm) AND BOTH PUMPS ON HIGH HIGH LEVEL
(4801 mm) IN V-25102. REFER TO P&ID 251.0000.000.041.103.
5 . ELECTRIC TRACE (ET 10).
6 . INTERLOCK I-015 TO FORCE HV-027 OPEN WHEN BOTH DEMIN WATER SUPPLY
PUMPS ARE STOPPED.

HOLDS:
D D
• NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
• INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

ET 10 DEMIN WATER
50 6"-WI-246006-UJB(0.4)
12270 246.020
TO E-24606

BLOCKED DISCHARGE
3L4
FT

C-2
SET@
035 1450 kPa-g
RV
032 4"x3"
SET POINT 4"-WI-246009-UJB(0.4)
SP H C-1
FC
251.103
035
FROM LC-251001D L 3/4"
PI B
O/C 5134289
I HIS 075
6 L C-2

4"x3"
ET 10
015 027
C C

50

4"-WI-246008-UJB(0.4)
HV TO GRADE
PT
027
075
ET 10 6"
50 6"-WI-246021-UJB(0.4)
5242525 FO 5242525 5248450

5242525
C-1 C-1
3/4"
C-1

C-1
C-1

CSO
?

3/4"

C-2

C-1
4"
?
D
6"x4" 6"x4"

LOCAL/ VFD 5242525 LOCAL/ VFD

5242525
REMOTE FAULT REMOTE FAULT
CSO

CSO
HOA
C-1
HOA

C-1
HS SI XL XA HS SI XL XA
025A 025 025 025 026A 026 026 026

3/4" 3/4"
D D
ET 10

? ?
50

R/S R/S
HIS I C-2 HIS I C-2
5248450

5248450
VFD I VFD I
C-1

C-1
025 015 026 015

4 4 ISSUED FOR ESTIMATE

4"-WI-246005-UJB(0.4)
4"-WI-246004-UJB(0.4)

PP PP
3/4" PP 3/4" PP B
? ?
C-1 C-1

3/4"
C-1

C-1
3/4"

?
?

DEMIN WATER ET 10
6"-WI-246001-UJB(0.4) 50 6"-WI-246002-UJB(0.4) 6"-WI-246003-UJB(0.4)
12137 246.101
5242525 3/4 5242525 3/4
FROM FV-251001 " " G 07/11/11 ISSUED FOR PHA III
3/4"

3/4"
C-1 C-1

C-1
5134289

5134289
D D
C-1

?
3/4"

3/4"

C-1
?

P-24610A 5134289 P-24610B 5134289 F 04/20/11 ISSUED FOR ESTIMATE


C-1

D C-1 D C-1
D D E 03/01/11 ISSUED FOR PHA II

D 01/10/11 ISSUED FOR CLIENT REVIEW

C 12/02/10 ISSUED FOR INTERNAL REVIEW


B ISSUED FOR PRELIMINARY REVIEW

ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT


REV
DATE APP

FILE:\\F:\1025\DRAWINGS\CO2\246\246.023.pid MODEL DATE:7/6/2011 10:42:58 PM BY:muk22296


SHELL CANADA
QUEST CCS PROJECT
A

P-24610A /B 3
PIPING AND INSTRUMENT DIAGRAM
DEMIN WATER SUPPLY PUMPS
RATED FLOW: 92.5 m^3/hr QUEST CCS PROJECT
DIFF. PR.: 503 kPa
DRIVER: 26.0 kW UNIT 246 - REGENERATION/COMMON
CASING INTERNALS
MATERIAL: 316 SS 316 SS DEMIN WATER PUMPS
INSULATION TYPE/THK: / 5
TRIM: WI-246031-UJB(0.4) SCALE: NONE

246.023
WI-246032-UJB(0.4) SHELL DWG NO.: REV.
246.0000.000.041.023 G
4 3 2 1
4 3 2 1

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
3 . 2x50% PUMPS FOR TOTAL DESIGN FLOW RATE OF 6236 m3/h. HOLD
4 . DESIGN CONDITIONS ARE 1200 kPag @ 58 °C AND ARE SUBJECT
TO CHANGE BASED ON COOLING WATER BOOSTER PUMP DATA (P-24611).
5 . ELECTRIC TRACE (ET 10) PUMPS AND INDIVIDUAL SUCTION & DISCHARGE PIPING
WITHIN BLOCK VALVES.
6 . HIGH POINT VENT. HOLD
7 . PROVIDE 30NPS FLANGES TO ALLOW PROVISION OF 3RD FUTURE PUMP. HOLD
D 8 . IF POSSIBLE, LEAVE SPACE IN PLOT PLAN FOR FUTURE 3RD CW PUMP. HOLD D

HOLDS:

• INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.


• PUMP SIZING TO BE CONFIRMED PENDING SHELL COOLING WATER SURVEY &
FINAL HEAT EXCHANGER COOLING WATER FLOWRATES.
• DESIGN CONDITIONS TO BE CONFIRMED.
• PUMP SELECTION, SIZING, TYPE, NUMBER AND LAYOUT FOR COOLING WATER
PUMPS.
• TOTAL REQUIRED FLOW WILL NOT CHANGE.

7
O/C COOLING WATER SUPPLY
I XHIS 30"-CWS-246007-UAB
12135 246.025
XYI 016 006 HOLD
TO DISTRIBUTION
006 4
s
A/S XZT 7
F 006

XV
006 ET 10 N/A
24" 24"
24"-CWS-246002-UAB
FO 5280764 30"x24"
C C-1 C-1 C
TW
D
UG AG 070 5115273
C-1
COOLING WATER SUPPLY 1-1/2"
30"-CWS-282015-UAB 30"-CWS-246001-UAB
282.001 7
FROM HEADER
5307853

4
24"

C-1

800 kPag UAB 1200 kPag UAB


DESIGN PRESSURE DESIGN PRESSURE
ET 10 HOLD
N/A 4 N/A

5307853
30"-CWS-246001-UAB 30"-CWS-246001-UAB

C-1
ET 10
N/A
5307853
C-1

ET 10
24"-CWS-246006-UAB 3/4"
D
3/4" 5115273
24"-CWS-246005-UAB D C-2

5280764
5115273

C-1
C-2
5280764
C-1

PP 3/4"
PP 3/4"
?
PP ? PP C-1
C-1

ET 10
ET 10

88
88

6 6
30"-CWS-246003-UAB SP 30"-CWS-246004-UAB SP
2" 2"

5115273
C-1

5115273

024B
3/4"

3/4"

C-1
024A 6 HOA 6 HOA

?
?

C-1
C-1

JSLL

2"
JSLL HS HS
2"

5115273 5115273
ET 10 C-1 ET 10 C-1 031
030 030A 031A ISSUED FOR ESTIMATE
88 88
5307853 5307853

5115273
5115273
3/4"

C-1 3/4"

C-1
C-1

C-1 C-1
5115273

5115273
3/4"

3/4"
N/A ET 10
C-1

D N/A ET 10
D I D I
I I B
" 016 " 016
3/4 3/4
D D
5115273 5115273
C-1 C-1
P-24611A R/S P-24611B R/S
HIS HIS
G 07/11/11 ISSUED FOR PHA III
030 031
F 04/20/11 ISSUED FOR ESTIMATE

E 03/01/11 ISSUED FOR PHA II

D 01/10/11 ISSUED FOR CLIENT REVIEW

C 12/02/10 ISSUED FOR INTERNAL REVIEW


B ISSUED FOR PRELIMINARY REVIEW

ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT


REV
DATE APP

FILE:\\F:\1025\DRAWINGS\CO2\246\246.024.pid MODEL DATE:7/6/2011 10:49:25 PM BY:muk22296


SHELL CANADA
QUEST CCS PROJECT
A

R
HOLD
P-24611A/B 3
PIPING AND INSTRUMENT DIAGRAM
COOLING WATER BOOSTER PUMP
RATED FLOW: 3118.0 m^3/hr QUEST CCS PROJECT
DIFF. PR.: 260 kPa
DRIVER: 225.0 kW UNIT 246 - REGENERATION/COMMON
CASING INTERNALS
MATERIAL: CS CS
COOLING WATER BOOSTER PUMPS
INSULATION TYPE/THK: / 5 SCALE: NONE
TRIM: CWS-246036-UAB

246.024
CWS-246037-UAB SHELL DWG NO.: REV.
246.0000.000.041.024 G
4 3 2 1
4 3 2 1

4" ET 10
50 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
5156140 GENERAL NOTES & CONNECTION DETAILS.
C-3

6"x4"
6"x4"
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
247.005 ET 10 3 . DESIGN CONDITIONS ARE 1200 kPa-g @ 58 °C FOR ABOVE GROUND PIPING. DESIGN
6"-CWR-247006-UAB CONDITIONS ARE SUBJECT TO CHANGE BASED ON COOLING WATER BOOSTER PUMP
E-24705 CWR 63
(P-24611).
COMPRESSOR 12351
5TH STAGE
247.005 ET 10 HOLDS:

12"x6"
12"x6"
COOLER 6"-CWS-246015-UAB ET 10 ET 10
CWS 63
N/A N/A
12352 • NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

10"x6"
10"x6"
ET 10 ET 10 • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
D N/A N/A • ELECTRIC HEAT TRACING AND INSULATION REQUIREMENTS WILL BE EVALUATED
D
C-24701 BASED ON COMPRESSOR INTERSTAGE COOLER LOCATION.
LUBE OIL N/A N/A • CW DESIGN CONDITIONS TO BE CONFIRMED WHEN P-24611A/B IS FINALIZED.

10"x6"

10"x6"
COOLING ET 10
247.003 ET 10 • CW LINE SIZES TO BE CONFIRMED WHEN EXCHANGER CW FLOWS ARE FINALIZED.
ET 10
6"-CWR-247004-UAB
CWR 63

CWR
E-24703

CWS
12894

12895
COMPRESSOR 12321
3RD STAGE
247.003 ET 10
COOLER 6"-CWS-246013-UAB
CWS 63
12322

16"x12"
16"x12"
HOLD

HOLD
247.004 ET 10
6"-CWR-247005-UAB
E-24704 CWR 63

2"-CWS-246012-UAB

2"-CWR-247003-UAB
COMPRESSOR 12344
4TH STAGE
247.004 ET 10
COOLER 6"-CWS-246014-UAB
CWS 63
12345

10"x6"

10"x6"
246.021 ET 10 ET 10
ET 10
63 6"-CWR-246014-UAB N/A N/A
CWR
12119 E-24607
? CONDENSATE
4"

ET 10 C-3 246.021 COOLER


6"-CWS-246031-UAB N/A N/A

10"x6"

10"x6"
63 CWS ET 10 ET 10
12120
ET 10
38

ET 10 246.028
2"-CWS-246032-UAB
38 CWS
C 12434
LCP-XXX ET 10 C
CONDENSATE 38
RECOVERY
ET 10 246.028
2"-CWR-246015-UAB SAMPLING
38 CWR
12433
247.002 ET 10
6"-CWR-247002-UAB
E-24702 CWR 63
COMPRESSOR 12300
E-24601A E-24601B 2ND STAGE
E-24604A/B E-24605A E-24605B 247.002 ET 10
STRIPPER STRIPPER COOLER 6"-CWS-246011-UAB
LEAN AMINE LEAN AMINE LEAN AMINE CWS 63
OVERHEAD OVERHEAD
COOLER TRIM COOLER TRIM COOLER 12311
CONDENSER CONDENSER
246.008

246.008

246.009
246.005

246.005

246.009
246.008
246.009

246.009

246.005

246.005

246.008

CWR

CWS

CWS
CWR

CWR

CWR

CWR

CWR
CWS

CWS

CWS

CWS

12274

12271

13047
12957

13048

12896

13049

13147

13146

12899

12898

13046
247.001 ET 10
6"-CWR-247001-UAB
12"-CWS-246018-UAB

63
12"-CWR-246001-UAB

12"-CWR-246011-UAB

12"-CWS-246029-UAB

CWR
12"-CWR-246003-UAB

12"-CWR-246012-UAB
12"-CWS-246020-UAB

10"-CWR-246006-UAB

12"-CWS-246030-UAB
10"-CWS-246023-UAB

10"-CWS-246008-UAB

10"-CWS-246025-UAB
E-24701
COMPRESSOR 12364
1ST STAGE
247.001 ET 10
COOLER 6"-CWS-246010-UAB
CWS 63
12363

248.001 ET 10
3"-CWR-248001-UAB
CWR 50
18"x12"

18"x12"

18"x12"

18"x12"

E-24701 12918 ISSUED FOR ESTIMATE


TEG COOLER
248.001 ET 10
3"-CWS-246009-UAB
CWS 50

PIPING
12919
B

INST
pH
2" H
AE AIT AI
? 001 001 001
L
C-2

G 07/11/11 ISSUED FOR PHA III

F 04/20/11 ISSUED FOR ESTIMATE


ET 10 18"x6" 24"x18" 30"x24" 30"x16"
30"-CWS-246016-UAB 16"-CWS-246008-UAB E 03/01/11 ISSUED FOR PHA II
63
D 01/10/11 ISSUED FOR CLIENT REVIEW
ET 10 N/A C 12/02/10 ISSUED FOR INTERNAL REVIEW
B ISSUED FOR PRELIMINARY REVIEW

ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT


REV
18"x6" 24"x18" 30"x24" 30"x16" DATE APP
ET 10
30"-CWR-246016-UAB 16"-CWR-246017-UAB
63

ET 10 N/A
TW

FILE:\\F:\1025\DRAWINGS\CO2\246\246.025.pid MODEL DATE:7/6/2011 11:03:09 PM BY:muk22296


075
UG AG
COOLING WATER RETURN 282 246 3
30"-CWR-282015-UAB
282.001
TO UTILITY/COGEN CWS 3/4"
S-1

COOLING WATER SUPPLY


30"-CWS-246007-UAB
SHELL CANADA
12135 246.024
FROM P-24611A/B
QUEST CCS PROJECT
A

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT
UNIT 246 - REGENERATION/COMMON
COOLING WATER DISTRIBUTION
SCALE: NONE

246.025
SHELL DWG NO.: REV.
246.0000.000.041.025 G
4 3 2 1
4 3 2 1

S-24603
CO2 VENT STACK
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
SIZE: TIP- 500 mm DIA x 2440 mm H GENERAL NOTES & CONNECTION DETAILS.
RISER- 600 mm DIA x 3000 mm H
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
BASE- 900 mm DIA x 13830 mm H
STATED.
BOOT- 250 mm DIA x 500 mm H
3 . VENT STOCK FLOW MEASUREMENT REQUIRED TO EVALUATE UNIT CAPACITY DURING
DESIGN: 100°C/50 kPag
INITIAL START-UP, AS PROPOSED TO THE GOVERMENT OF ALBERTA. TO BE LOCATED
MATERIAL: VENT- 304 SS
NEAR GRADE.
DERRICK- CS
INSULATION/THK: 6 4 . COSTING BASED ON FLOW MEASUREMENT REQUIRED FOR REGULATORY (CEMS).
MDMT: -80°C 5 . INSULATION AND EHT TO HLL.
TRIM: VA-246030-PJB(C) 6 . INSULATION AND EHT (ET10) TO 1000mm ABOVE BOTTOM TAN LINE OF 900 mm DIA
VENT BASE.
D 7 . INTERNAL 12 MPS PROJECTION WITH 45° LR ELBOW. PROVIDE 13 mm WEEP HOLE D
AT LOW POINT MINIMUM DISTANCE TO NOZZLE.
8 . ROUTE DRAIN LINE TO NEAREST POSWS MANHOLE.

HOLDS:

• INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.


• PRELIMINARY DESIGN IS FOR VENT AT HIGH POINT STRUCTURE.
• VENT SIZE LINE REQUIREMENTS FROM PIPELINE.
• VENT STACK DISPERSION MODELLING.

C C

FE
3
080B
2"

TI TT 2"
080 080

AP 4"
4
005 S-24603
2"
4 3

FE FT FQI
080A 080 080

VENT GAS 8"


8"x6"
6"-VA-247009-PJB(C)
13011 246.032 ISSUED FOR ESTIMATE
FREE DRAINING 7 DERRICK SUPPORT
STRUCTURE B
VENT GAS
24"-VA-247001-PJB(0.4)
12474 246.032
FREE DRAINING 24"
6" MW

? G 07/11/11 ISSUED FOR PHA III


PJB(C)
PJB(0.4)

?
F 04/20/11 ISSUED FOR ESTIMATE
H E 03/01/11 ISSUED FOR PHA II
3" LIT LI
6
C-2 030 030 D 01/10/11 ISSUED FOR CLIENT REVIEW
? C 12/02/10 ISSUED FOR INTERNAL REVIEW
2" ET 10
50 2"-WP-246004-PJB
B ISSUED FOR PRELIMINARY REVIEW
NC
ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT
? REV
DATE APP
C-1
PJB
PJB(C)

FILE:\\F:\1025\DRAWINGS\CO2\246\246.026.pid MODEL DATE:7/6/2011 11:09:45 PM BY:muk22296


8

POSWS

SHELL CANADA
QUEST CCS PROJECT
A

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT
UNIT 246 - REGENERATION/COMMON
CO2 VENT STACK
SCALE: NONE

246.026
SHELL DWG NO.: REV.
246.0000.000.041.026 G
4 3 2 1
4 3 2 1

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
3 . CONNECTION FOR UTILITY WATER TO QUENCH POC IF REQUIRED BY WWTU.
4 . START-UP PIPING REQUIRED FOR INITIAL AMINE FILL AND DILUTION WITH
CONDENSATE.

HOLDS:

• INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.


D D

4
FI
ET 10 CONDENSATE
085 6"-SC-246011-SAB
50 12126 246.020
START-UP TO V-24607

FT
085

5156140
NC

?
RECOVERED CLEAN RECOVERED CLEAN
C CONDENSATE
6"-SC-246008-SAB
ET 10 ET 10
6"-SC-246008-SAB
CONDENSATE C
12654 246.021 50 50 12615 246.101
PROM P-24608A/B C-2 TO TK-25101

AP 2" PIPING
003 INSTR.

ET 10 FROM P-24603A/B
38 3"-P-246026-PJB(0.4)
246.006 12653

WASTE WATER

4"x3" ET 10 WASTE WATER


4"-WP-246002-PJB(0.4)
38 12614 246.101
HOLD TO WWTP 271

3/4"

C-1

C-2
2"
MIN

?
C-2
?
3

5097550
PJB(0.4)

C-2

S-1
DAB
SP
025 WASTE WATER
ET 10
38 2"-WP-246003-DAB
246.013 12294
NNF FROM P-24607 ISSUED FOR ESTIMATE

RECOVERED CLEAN
OUTDOOR TUBING INDOOR TUBING CONDENSATE
PP G 07/11/11 ISSUED FOR PHA III
ET 10 PP 25
25 12430 246.028 F 04/20/11 ISSUED FOR ESTIMATE
316 SS TUBING
TO AE-003 E 03/01/11 ISSUED FOR PHA II

D 01/10/11 ISSUED FOR CLIENT REVIEW

C 12/02/10 ISSUED FOR INTERNAL REVIEW


B ISSUED FOR PRELIMINARY REVIEW
ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT
REV
DATE APP

FILE:\\F:\1025\DRAWINGS\CO2\246\246.027.pid MODEL DATE:7/4/2011 3:00:46 PM BY:ahm14887


SHELL CANADA
QUEST CCS PROJECT
A

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT
UNIT 246 - REGENERATION/COMMON
RECOVERED CLEAN CONDENSATE & WW COLLECTION
SCALE: NONE

246.027
SHELL DWG NO.: REV.
246.0000.000.041.027 G
4 3 2 1
4 3 2 1

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
RECOVERED CLEAN 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE STATED.
CONDENSATE PP 3 . SELF CONTAINED MECHANICAL THERMAL SHUT OFF VALVE.
12430 246.027 25
316 SS TUBING ? 4. INSTRUMENT SYMBOL DENOTES REAGENT ADDITION AND CONDITIONING.
FROM P-24608A/B RC
?

5 . FOR CONTAMINATED CONDENSATE SWITCHING VALVES. REFER TO DRAWING


FLUOR 251.0000.000.041.XXX.
VENDOR

D HOLDS: D
TO SINK (TYP.)
• NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
NC
• INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

VENDOR
FLUOR
• VENDOR PACKAGE DETAILS TO BE CONFIRMED.
V • ANALYZER INDICATION DESTINATION DRAWING NUMBERS TO BE CONFIRMED.

5115273
INDOOR OUTDOOR

1"

?
ET 10 246.025
38 2"-CWR-246015-UAB
CWR
12433

TO SINK (TYP.)

VENDOR
FLUOR
V

5115273
INDOOR OUTDOOR

1"

?
ET 10 246.025
38 2"-CWS-246032-UAB
CWS
12434

3
SET@
69 kPa-g TCV
090 SET@
PCV
085 79 kPa-g
RV
035
C C

TG
091
PG
086
092

091

093
FI

FI

FI

ISSUED FOR ESTIMATE

pH
AIT AE
RC 4 B
002 002

HOLD

CC
CC H ANALYZER INDICATION G 07/11/11 ISSUED FOR PHA III
TO SINK (TYP.) AE AIT AI
251.XXX F 04/20/11 ISSUED FOR ESTIMATE
003 003 003
TO UNIT 251 E 03/01/11 ISSUED FOR PHA II

D 01/10/11 ISSUED FOR CLIENT REVIEW

PCV HH
C 12/02/10 ISSUED FOR INTERNAL REVIEW
I
087 5 B ISSUED FOR PRELIMINARY REVIEW
TO SINK (TYP.) 017 LL
SET@ REV
ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT
61 kPa-g DATE APP

pH ANALYZER INDICATION
AI
251.XXX
002
L TO UNIT 251

FILE:\\F:\1025\DRAWINGS\CO2\246\246.028.pid MODEL DATE:7/4/2011 1:28:28 PM BY:ahm14887


GRAB SAMPLE

SAMPLE SINK
SHELL CANADA
QUEST CCS PROJECT
A
VENDOR
FLUOR 1"-DO-246XXX-SAB R

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT
GRADE UNIT 246 - REGENERATION/COMMON
CONDENSATE RECOVERY SAMPLING SYSTEM,LCP-XXX
SCALE: NONE

246.028
SHELL DWG NO.: REV.
246.0000.000.041.028 G
4 3 2 1
4 3 2 1

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
3 . DEP 31.38.01.11 PIPING DESIGN GENERAL REQUIREMENTS SECTION 5.8 AND
LP STEAM FIGURE 18-2 TO 18-5 FOR UTILITY STATION DETAILS.
36"-SL-246001-SAB 4 . PIPING HEADER BRANCH CONNECTIONS SHALL BE MADE ON TOP OF PIPE AND
12438 246.101
BE VALVED.
FROM HEADER

50
H
D D
2"x1" ET 10
38
U/S #2

2"x1" H
2"-SL-246002-SAB
38

3"x2"
LP STEAM H
24"-SL-246002-SAB
246.004 12665 38
36"x24"
TO E-24603B 2"-SL-246018-SAB 2"x1"

3"-SCL-246009-SAB

U/S #9
H 38
H 50 2"-SCL-246019-SAB 2"x1"
36"x24"

LP STEAM H
24"-SL-246009-SAB
246.003 12685 50

38
H
TO E-24603A

CONDENSATE ET 10 H LP STEAM
1"-SCL-246010-SAB 2"-SL-246015-SAB
12695 246.002 38 38 12610 247.011

3"x2"

3"x2"
FROM V-24601 TO E-24709A/B
36"x10"

H LP STEAM
2"-SL-246016-SAB
38 12449 247.012
STEAM OUT H TO E-24709C/D
3"-SL-246004-SAB
246.002 12694 50
C TO V-24601 C
10"x8"

ET 10 CONDENSATE
2"-SCL-247008-SAB
38 247.012 12456

FROM E-24709C/D
ET 10

CONDENSATE
38
50
H

ET 10
38 2"-SCL-247005-SAB
247.011 12611

2"x1" H FROM E-24709A/B


2"-SL-246006-SAB
38
U/S #3

2"x1" ET 10
2"-SCL-246011-SAB 38

LP CONDENSATE ET 10
3"-SCL-246012-SAB 38
246.020 12457

TO V-24607 H 2"x1"
2"-SL-246014-SAB
38
H

U/S #8
2"x1"
2"-SL-246007-SAB
38 ET 10 2"x1"
2"-SCL-246018-SAB
U/S #4

38
2"x1" 2"-SCL-246013-SAB ET 10
38

ET 10
38
ISSUED FOR ESTIMATE

8"x3" H

ET 10
50 B
3"-SL-246014-SAB
ET 10

ET 10

ET 10

ET 10
38

38

38

38

38

38
38
38

38
H

H
H
H

H
2"-SL-246020-SAB
G 07/11/11 ISSUED FOR PHA III

U/S #10
2"-SCL-246016-SAB
2"-SL-246010-SAB

2"-SL-246013-SAB

2"-SCL-246017-SAB
2"-SL-246008-SAB

2"-SCL-246014-SAB

F 04/20/11 ISSUED FOR ESTIMATE


ET 10 E 03/01/11 ISSUED FOR PHA II
2"-SCL-246022-SAB

50
H
D 01/10/11 ISSUED FOR CLIENT REVIEW

C 12/02/10 ISSUED FOR INTERNAL REVIEW


B ISSUED FOR PRELIMINARY REVIEW
2"-SL-246021-SAB
2"x1"
2"x1"
2"x1"

2"x1"

2"x1"

2"x1"

ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT


REV
DATE APP
50
H

U/S #11
U/S #5 U/S #6 U/S #7 ET 10
2"-SCL-246023-SAB

FILE:\\F:\1025\DRAWINGS\CO2\246\246.029.pid MODEL DATE:7/10/2011 9:41:04 PM BY:muk22296


2"-SL-246022-SAB

U/S #12
ET 10
2"-SCL-246024-SAB
SHELL CANADA
2"-SCL-247002-SAB
2"-SCL-246015-SAB
3"-SL-246009-SAB

2"-SL-246011-SAB

QUEST CCS PROJECT


A

R
TO E-24708A/B
LP STEAM

LP STEAM
TO TK-24601

PIPING AND INSTRUMENT DIAGRAM


12884

12447
246.012

247.007

QUEST CCS PROJECT


FROM E-24708A/B

UNIT 246 - REGENERATION/COMMON


FROM TK-24601
CONDENSATE
246.012

247.007

CONDENSATE

LP STEAM DISTRIBUTION AND COND. COLLECTION


12661

12455

SCALE: NONE

246.029
SHELL DWG NO.: REV.
246.0000.000.041.029 G

4 3 2 1
4 3 2 1

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


5 GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY"246' UNLESS OTHERWISE STATED.

? 5178780
3 . DEP 31.38.01.11 PIPING DESIGN GENERAL REQUIREMENTS SECTION 5.8 AND

C-2 C-2
3"
FIGURE 18-2 TO 18-5 FOR UTILITY STATIONDETAILS.
INSTRUMENT AIR 4 . PIPING HEADER BRANCH CONNECTIONS SHALL BE MADE ON TOP OF PIPE AND
3"-AI-246001-ULB 2" BE VALVED.
12459 246.101
? 5 . CONNECTION FOR TEMPORARY SUPPLY.
FROM HEADER ?

2"-AI-246001-ULB
D D
5

C-2 C-2
2"

? ?
UTILITY AIR
2"-AU-246001-ULB
12458 246.101
FROM HEADER

FI 2"
094
?
?

5
FT
094

C-2 C-2
2"

? ?
NITROGEN
2"-GI-246001-ULB
12460 246.101
FROM HEADER

2"
1"-GI-246002-ULB
?
U/S #2

1"-AU-246002-ULB

C C
NITROGEN
2"-GI-246003-ULB 2" 1"-AU-246009-ULB
246.002 12697
?
TO V-24601 ?

U/S #9
1"-GI-246004-ULB 1"-GI-246022-ULB
U/S #3

2" 2"
1"-AU-246003-ULB
? ?
? ? 1"-AU-246008-ULB
NITROGEN

U/S #8
2"-GI-246005-ULB
246.020 12664

TO V-24607
1"-GI-246021-ULB

2"

2"
?
?

?
?
NITROGEN
2"-GI-246007-ULB
246.013 12461

TO V-24606 NITROGEN
2"-GI-246020-ULB
12808 247.001
TO V-24701
1"-GI-246008-ULB
ISSUED FOR ESTIMATE
U/S #4

NITROGEN
1"-AU-246004-ULB 2"-GI-246019-ULB
12995 247.010 B
TO E-24707

G 07/11/11 ISSUED FOR PHA III

F 04/20/11 ISSUED FOR ESTIMATE

E 03/01/11 ISSUED FOR PHA II

D 01/10/11 ISSUED FOR CLIENT REVIEW

C 12/02/10 ISSUED FOR INTERNAL REVIEW


NITROGEN B ISSUED FOR PRELIMINARY REVIEW
2"-GI-246018-ULB
12425 248.002 ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT
REV
DATE APP
TO V-24806

1"-AU-246010-ULB

FILE:\\F:\1025\DRAWINGS\CO2\246\246.030.pid MODEL DATE:7/10/2011 9:44:03 PM BY:muk22296


U/S #10
1"-AU-246005-ULB

1"-AU-246007-ULB
1"-AU-246006-ULB
1"-GI-246009-ULB

1"-GI-246016-ULB

1"-GI-246017-ULB

2"-AU-246013-ULB

2"-GI-246026-ULB
NITROGEN
2"-GI-246013-ULB 1"-GI-246023-ULB
246.010 13142

NITROGEN
2"-GI-246010-ULB 1"-AU-246011-ULB
246.012 12729
U/S #5 U/S #6 U/S #7 SHELL CANADA

U/S #11
NITROGEN QUEST CCS PROJECT
2"-GI-246014-ULB 1"-GI-246024-ULB
246.010 13159
A

NITROGEN
R
2"-GI-246012-ULB 1"-AU-246012-ULB
246.010 13141

PIPING AND INSTRUMENT DIAGRAM

U/S #12
QUEST CCS PROJECT
1"-GI-246025-ULB
UNIT 246 - REGENERATION/COMMON
INST. AIR, UTILITY AIR & NITROGEN DISTRIBUTION
SCALE: NONE

246.030
SHELL DWG NO.: REV.
246.0000.000.041.030 G
4 3 2 1
4 3 2 1

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
3 . STANDALONE SAFETY SHOWER WITH INTEGRAL DELUGE TANK. ALARMED FOR LOW
LEVEL.
4 . DEP 31.38.01.11 PIPING DESIGN GENERAL REQUIREMENTS SECTION 5.8 AND FIGURE
18-2 TO 18-5 FOR UTILITY STATION DETAILS.
5 . PIPING HEADER BRANCH CONNECTIONS SHALL BE MADE ON TOP OF PIPE AND BE
SP VALVED.
SP
026 027
D 3 3 D
HOLDS:

• INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.


• SOURCE OF POTABLE WATER.
FAH FSH FAH FSH • NUMBER AND LOCATIONS OF EYEWASH STATIONS & SAFETY SHOWERS TO BE
095 095 096 096 DETERMINED.

LAL LSL LAL LSL


095 095 096 096

UA UA
UA UA

UTILITY WATER ET 10
2"-WU-246001-UAB 38
12470 246.101
FROM HEADER

ANTI-FOAM INJECTION AREA/ COMPRESSION AREA/


AMINE REGENERATION AREA TEG DEHYDRATION AREA

C C

1"-WU-246003-UAB
U/S #2

U/S #9

1"-WU-246010-UAB
1"-WU-246004-UAB
U/S #3

2"x1"
1"-WU-246005-UAB 1"-WU-246009-UAB
U/S #4 U/S #8
ISSUED FOR ESTIMATE

G 07/11/11 ISSUED FOR PHA III

F 04/20/11 ISSUED FOR ESTIMATE

E 03/01/11 ISSUED FOR PHA II

D 01/10/11 ISSUED FOR CLIENT REVIEW

C 12/02/10 ISSUED FOR INTERNAL REVIEW


B ISSUED FOR PRELIMINARY REVIEW

ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT


REV
DATE APP

FILE:\\F:\1025\DRAWINGS\CO2\246\246.031.pid MODEL DATE:7/7/2011 12:51:28 AM BY:muk22296


1"-WU-246008-UAB
1"-WU-246006-UAB

1"-WU-246007-UAB

1"-WU-246011-UAB
U/S #10

SHELL CANADA
QUEST CCS PROJECT
1"-WU-246012-UAB
U/S #11
U/S #5 U/S #6 U/S #7
A

1"-WU-246013-UAB PIPING AND INSTRUMENT DIAGRAM


U/S #12
QUEST CCS PROJECT
UNIT 246 - REGENERATION/COMMON
UTILITY WATER & SAFETY SHOWERS
SCALE: NONE

246.031
SHELL DWG NO.: REV.
246.0000.000.041.031 G

4 3 2 1
4 3 2 1

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
3 . LOW POINTS + DRAINS REQUIRE EHT AND INSULATION.

D D

CO2 RELIEF / VENT


20"-VA-247002-PJB(0.4)
12809 247.001
DO NOT POCKET
FROM RV-247013 3

C C

CO2 VENT VENT GAS


24"-VA-247001-PJB(0.4) 24"-VA-247001-PJB(0.4)
12471 247.001 12474 246.026
DO NOT POCKET FREE DRAINING
FROM PV-247001 3 3 TO S-24603

CO2 VENT GAS


6"-VA-247009-PJB(C) 6"-VA-247009-PJB(C)
12327 247.010 13011 246.026
FREE DRAINING
FROM RV-247012 & PIPELINE 3 TO S-24603
VENT

ISSUED FOR ESTIMATE

G 07/11/11 ISSUED FOR PHA III

F 04/20/11 ISSUED FOR ESTIMATE

E 03/01/11 ISSUED FOR PHA II

D 01/10/11 ISSUED FOR CLIENT REVIEW

C 12/02/10 ISSUED FOR INTERNAL REVIEW


B ISSUED FOR PRELIMINARY REVIEW

ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT


REV
DATE APP

FILE:\\F:\1025\DRAWINGS\CO2\246\246.032.pid MODEL DATE:7/4/2011 5:33:19 PM BY:ahm14887


SHELL CANADA
QUEST CCS PROJECT
A

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT
UNIT 246 - REGENERATION/COMMON
VENT GAS COLLECTION
SCALE: NONE

246.032
SHELL DWG NO.: REV.
246.0000.000.041.032 G

4 3 2 1
4 3 2 1

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
FROM P-24603A/B 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE STATED.
246.006 ET 10
2"-DM-246011-DAB 50
DM
12391

FROM E-24605A
246.008 ET 10
2"-DM-246063-DAB
DM 50
12596

D FROM P-24605B D
246.009 ET 10
2"-DM-246065-DAB 50
DM
12262

ET 10 AMINE DRAINS
6"-DM-246061-DAB
FROM FV-246020 75 13037 246.013
246.011 ET 10 FREE DRAINING TO V-24606
2"-DM-246057-DAB 50
DM
13152

FROM P-24602A/B/C
246.011 ET 10
2"-DM-246043-DAB 50
DM
13151

ET 10 AMINE DRAINS
75 6"-DM-246060-DAB
13036 246.013
FREE DRAINING TO V-24606

C C

FROM E-24602A
246.001 ET 10
2"-DM-246004-DAB 50
DM
13144

FROM E-24602B
246.001 ET 10
2"-DM-246001-DAB
DM 50
12227

FROM V-24608
246.010 ET 10
2"-DM-246026-DAB
DM 50
12687

FROM V-24604
246.010 ET 10
2"-DM-246024-DAB 50
DM
12387

FROM V-24609
246.010 ET 10
2"-DM-246029-DAB
DM 50
12390

FROM HV-246040
246.010 ET 10
2"-DM-246030-DAB 50
DM ISSUED FOR ESTIMATE
13136

FROM P-24605
246.012
DM
2"-DM-246055-DAB B
13155

FROM P-24605
246.012
2"-DM-246XXX-DAB
DM
12620 G 07/11/11 ISSUED FOR PHA III
FROM P-24604 F 04/20/11 ISSUED FOR ESTIMATE
246.012
2"-DM-246056-DAB E 03/01/11 ISSUED FOR PHA II
DM
13153 D 01/10/11 ISSUED FOR CLIENT REVIEW

C 12/02/10 ISSUED FOR INTERNAL REVIEW


FROM P-24604
246.012 B ISSUED FOR PRELIMINARY REVIEW
2"-DM-246050-DAB
DM ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT
REV
13154 DATE APP

ET 10 AMINE DRAINS
6"-DM-246006-DAB
75 12477 246.013
FREE DRAINING TO V-24606

FILE:\\F:\1025\DRAWINGS\CO2\246\246.033.pid MODEL DATE:7/7/2011 4:25:02 PM BY:ahm14887


SHELL CANADA
FROM RV-246020 FROM RV-246003
246.010 246.009 QUEST CCS PROJECT
2"-DM-246025-DAB 2"-DM-246064-DAB
DM DM
13134 13150
A

R
FROM RV-246021 FROM RV-246002
246.010 246.008 PIPING AND INSTRUMENT DIAGRAM
2"-DM-246022-DAB 2"-DM-246062-DAB
DM DM
12240 13132 QUEST CCS PROJECT
UNIT 246 - REGENERATION/COMMON
AMINE DRAIN SYSTEM
SCALE: NONE

246.033
SHELL DWG NO.: REV.
246.0000.000.041.033 G
4 3 2 1
4 3 2 1

1. SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.

D D

FLUSHING CONDENSATE
2"-SC-246012-SAB
12462 246.010
C TO V-24604/V-24608/V-24609 C

CONDENSATE ET 10
2"-SC-246010-SAB
12579 246.021 38
FROM P-24608A/B

FLUSHING CONDENSATE
2"-SC-246013-SAB
12463 246.013
TO V-24605

ISSUED FOR ESTIMATE

G 07/11/11 ISSUED FOR PHA III

F 04/20/11 ISSUED FOR ESTIMATE

E 03/01/11 ISSUED FOR PHA II

D 01/10/11 ISSUED FOR CLIENT REVIEW

C 12/02/10 ISSUED FOR INTERNAL REVIEW


B ISSUED FOR PRELIMINARY REVIEW

ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT


REV
DATE APP

FILE:\\F:\1025\DRAWINGS\CO2\246\246.034.pid MODEL DATE:7/4/2011 1:27:35 PM BY:ahm14887


SHELL CANADA
QUEST CCS PROJECT
A

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT
UNIT 246 - REGENERATION/COMMON
FLUSHING CONDENSATE
SCALE: NONE

246.034
SHELL DWG NO.: REV.
246.0000.000.041.034 G

4 3 2 1
4 3 2 1

1. SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2. ELECTRIC TRACE 10°C.

D D

MH-246004 MH-246003

AMINE STRIPPING CATCHMENT

C C
R/S
HS I HS

PP
P-246012 H H
LT I LI
STORMWATER ET 10
2"-WW-246001-UAB
240.031 L L
TO HMU1/2 MH-006
MH-246002 MH-246005
3/4"

MH-246001 AMINE PUMP CATCHMENT TEG/DEHYDRATION CATCHMENT

ISSUED FOR ESTIMATE

MH-246006

G 07/11/11 ISSUED FOR PHA III


ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT
REV
DATE APP

AMINE STORAGE CATCHMENT

FILE:\\F:\1025\DRAWINGS\CO2\246\246.035.pid MODEL DATE:7/10/2011 9:57:36 PM BY:muk22296


SHELL CANADA
QUEST CCS PROJECT
A

P-246012 R

STORM WATER PUMP


RATED FLOW: 10.00 m^3/hr PIPING AND INSTRUMENT DIAGRAM
DIFF. PR.: 112.00 kPa
QUEST CCS PROJECT
DRIVER: 0.30 kW @
INSULATION TYPE/THK: / UNIT 246 - REGENERATION/COMMON
HEAT TRACE MEDIA/TEMP: 2.
CASING INTERNALS STORMWATER DRAINAGE & POTENTIALLY OILY SWS
MATERIAL:
TRIM: SCALE: NONE

246.035
SHELL DWG NO.: REV.
246.0000.000.041.035 G
4 3 2 1
C
D

285
246
DEMIN WATER ET 10 ET 10 DEMIN WATER
6"-WI-246001-UJB(0.4) 6" 6"-WI-285002-UJB(0.4)
246.023 12137 50 50 285.217
4

5242525

4
TO P-24610A/B C-1 FROM HEADER

2"
?
C-2
D
NITROGEN NITROGEN
2"-GI-246001-ULB 2" 2"-GI-285068-ULB
246.030 12460 285.217
?
TO DISTRIBUTION FROM HEADER

?
C-1

C-2
3/4"
?
2"

C-3

D
WASTE WATER ET 10 ET 10 WASTE WATER
4"-WP-246002-PJB(0.4) 4" 4"-WP-285034-PJB(0.4)
12614 246.027 38 38 285.217
5242525
FROM P-24608A/B C-1 TO WWTP 271

?
3/4"

C-2
D
INSTRUMENT AIR INSTRUMENT AIR

2"-GI-285069-ULB
3"-AI-246001-ULB 3" 3"-AI-285150-ULB
246.030 12459 285.217
5178780
TO DISTRIBUTION FROM HEADER

?
C-1

C-2
3/4"
D
U/S #1
UTILITY WATER ET 10 ET 10 UTILITY WATER
2"-WU-246001-UAB 2" 2"-WU-285041-UAB
246.031 12470 38 38 285.217
?
TO DISTRIBUTION C-1 FROM HEADER

?
3/4"

C-2
D
?
2"

C-3
UTILITY AIR UTILITY AIR
2"-AU-285149-ULB

2"-AU-246001-ULB 2" 2"-AU-285148-ULB


246.030 12458 285.217
?
TO DISTRIBUTION FROM HEADER

?
C-1

C-2
3/4"
D
LP STEAM H H LP STEAM
36"-SL-246001-SAB 36"-SL-285145-SAB
246.029 12438 50 50 285.217
TO DISTRIBUTION FROM HEADER
?
C-3
H
ET 10

LOW TEMP HP STEAM H H LOW TEMP HP STEAM


2"

3
3

2"-SS-248001-SAG 2" 2"-SS-285058-SAG


248.002 12545 50 50 285.217
? ?
TO E-24802 FROM HEADER
?
?

C-1 C-1
?
?
1"
H

248
285
?
3/4" 3/4"

3/4" 3/4"
ET 10

? ?
5115277

? ?
?
1"

C-3

38
38

ET 10
ET 10

T
T

SAG SAB

3/4" 3/4"
D
D

5115227 5115227
C-3 C-3
1"-SCL-285002-SAB

?
?
?
?

2"x1" ET 10 LP CONDENSATE
1"-SCL-285003-SAB 2"-SCL-285001-SAB
38 285.217
FROM HEADER TRAPS
246
285

RECOVERED CLEAN RECOVERED CLEAN


CONDENSATE ET 10 ET 10 CONDENSATE
6"-SC-246008-SAB 6" 6"-SC-285210-SAB
12615 246.027 50 50 285.217
5156140
FROM P-24608A/B C-1 TO TK-25101
?
2"

C-2
D

HOT DEMIN WATER ET 10 ET 10 HOT DEMIN WATER


6"-WI-246007-UJB(0.4) 6" 6"-WI-285003-UJB(0.4)
12681 246.020 50 50 285.217
5242525
FROM E-24606 C-1 TO TK-25102
?
2"

C-2
D

RICH AMINE ET 10 ET 10 RICH AMINE


10"-P-246002-DJE(0.4) 10"-P-285156-DJE(0.4)
246.001 12686 50 50 285.217

2
2

TO E-24602A/B FROM V-44118

LEAN AMINE ET 10 ET 10 LEAN AMINE


14"-P-246081-DAG 14"-P-285155-DAG
12238 246.011 75 63 285.217
FROM P-24602A/B/C TO V-44118
3

B
E

C
D
G

REV
DATE
ISSUED
12/02/10
01/10/11
03/01/11
04/20/11
07/11/11
HOLDS:

SCALE: NONE
NOTED.

SHELL DWG NO.:


ISSUED FOR PHA II

1
ISSUED FOR PHA III
1

ISSUED FOR ESTIMATE

DESCRIPTION
ISSUED FOR CLIENT REVIEW

ISSUED FOR INTERNAL REVIEW


ISSUED FOR PRELIMINARY REVIEW
• VENT LINE SIZING FROM PIPELINE.

BY
GENERAL NOTES & CONNECTION DETAILS.

CKD

246.0000.000.041.101
PRS
CS

QUEST CCS PROJECT


ISSUED FOR ESTIMATE

NORTH BATTERY LIMITS


UNIT 246. ALL LINES ARE DEDICATED TO SERVICING UNIT 246.

PDP

R
QUEST CCS PROJECT
MC

SHELL CANADA

UNIT 246 - REGENERATION/COMMON


PIPING AND INSTRUMENT DIAGRAM
APE
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION

2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE

REV.
G
3 . BATTERY LIMIT ACCESS IS ON NORTH SIDE OF 9TH AVE, ACROSS THE ROAD FROM

APP
PEM CLIENT

246.101
A
B
C
D

FILE:\\F:\1025\DRAWINGS\CO2\246\246.101.pid MODEL DATE:7/7/2011 11:16:46 AM BY:ahm14887


4 3 2 1

V-24701 E-24701
COMPRESSOR SUCTION KO DRUM COMPRESSOR 1st STAGE COOLER 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
SIZE: 3500 mm ID x 3500 mm T/T RATED DUTY: 2.5 MW GENERAL NOTES & CONNECTION DETAILS.
DESIGN PR. & TEMP: 385 kPa-g @ 150 °C / FV @ 150 °C SURFACE AREA: 317.0 m^2 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE
MATERIAL(VESSEL/INTERNALS): CS + 3 mm 304L SS CLAD/ 316L SS TEMA TYPE: BXU STATED.
INSULATION TYPE/THK: H/ SHELL TUBE
TRIM: GC-247070-PJB(0.4) DESIGN PRESS: 385 kPa-g / HV 1200 kPa-g / 3 . DRIVER POWER AND DIFFERENTIAL PRESSURE DEPICTED ARE THE TOTAL FOR
DESIGN TEMP: 130 °C / 150 °C 58 °C / THE COMPRESSOR.
MATERIAL: CS + 3 mm 304L SS CLAD DUPLEX 2205 + 0.38 mm CA 4 . ELECTRIC TRACE TO HLL (ET 10).
INSULATION TYPE/THK: H/ / 5 . VALVE TO BE LOCATED AT SAFE ACCESSIBLE LOCATION.
TRIM: GC-247072-PJB(0.4) CWR-247010-UAB
6 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE.
POWER 7 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012.

ET 10
FAILURE 8 . MAXIMIZE LENGTH OF PIPING THAT FREE DRAINS TO KO DRUM.
V

N/A
RV
D 8T10 D

3/4"

C-1
CO2 RELIEF / VENT UC SIGNAL 9 . THE ADDITION AL INSTRUMENTS ARE REQUIRED FOR ON-SITE COMPRESSOR

?
013A SET@

10"-VA-247012-PJB(0.4)
20" 20"x18" 18"x10" UC PERFORMANCE TESTING (PTC-10).
20"-VA-247002-PJB(0.4) 385 kPa-g
246.032 12809 12578 247.010
FREE DRAINING C-1 001B 10. GTAW ROOT PASS WELD IS MANDATORY ON THIS LINE.

10"x8"
CSO
TO S-24603 ? TO UV-003
POWER H H H H MASS FLOW LIMITER

18"-VA-247013-PJB(0.4)
C-1 FAILURE PDI TI PI PI TI
UY
8T10 029 002 003 021 057 HOLDS:
L L 001B

10"-GC-247032-PJB(0.4)
SET@
385 kPa-g
• NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

ET 10
(V) UC SIGNAL

N/A
RV • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
UC
013B N/A 12571 247.010 • THE NEED TO TRIP THE COMPRESSOR ON EXCESSIVE SURGE CYCLE WILL BE

5242525
18"x10" 001A

CSC

C-1
ET 10 DETERMINED IN DETAILED ENGINEERING.

10"
5 TO UV-001
C-1

10"x8"
V TT SIGNAL
SURGE H AUTO/MAN
UQI HC

3/4"
247.010

C-1
COUNTER 12331

?
12"x10" 12" ET 10
001 022 FROM TT-057
75
CSO PT SIGNAL
?
C-1 12"-GC-247003-PJB(0.4) 247.010 12569

FROM PT-021
ET 10
N/A
246.030 ANTI SURGE SPILL BACK
2"-GI-246020-ULB 24"-GC-247045-PJB(0.4)
GI 247.010 12326
12808 FREE DRAINING DO NOT POCKET
FROM C-24701H

ANALYZER FAST LOOP


3/4" TUBING (FAST LOOP)
247.009 13165
CO2 VENT FROM AX-001
24"-VA-247001-PJB(0.4) PC PC
246.032 12471
NNF FREE DRAINING 034 023
TO S-24603 HH
E PERFORMANCE
001 CONTROLLER
C 3/4" C
PP PT
? 246.025
C-1 TT 034 6" ET 10
TTE 6"-CWR-247001-UAB
50 CWR
001 002 SP CSO 12364

3/4"
1-1/2"

C-2
PV TW 5307521

?
001

3/4"

3/4"
C-2

C-2
C-2

?
2"
001 ET 40 N/A 1-1/2" 1-1/2"
052
N/A N/A ET 40 OUTSIDE INSIDE
36" ?
C-2

ET 10 ET 10 88
NC
2"
FO
C-1

24" 30"x24" 30"x24" 24" C-2


T.S.
24"

10

30"-GC-247005-PJB(0.4)
5242526

36"-GC-247004-PJB(0.4) V

?
RS

C-2
FREE DRAINING
C-1

ET 10

2"
2"-GC-247002-PJB(0.4)
38

SP PC PT 3/4" 8
002 001 001 ULB

DO NOT POCKET
5097550

? V
C-2
2"

C-2 PJB(0.4)
ET 10

C-3
3"
?
75

6 3/4" 36"
E-24701
S-4

V HH
5134289 3" E
24"-GC-247001-PJB(0.4)

7 C-2
001

PP
LL
DO NOT POCKET

24"
3/4"

2"
24"

5115273
C-2
TI

RS
5134289 PTE 3/4" 003 30"x24" 30"x24" D
C-2
C-2
NC
2"

ET 10 002
NNF

? OUTSIDE
3/4"

ET 10
C-1
?

N/A C-2 INSIDE


CO2 N/A 36" 4"
36"-GC-246001-PJB(0.4) 36" TT 1-1/2"
BACK FLUSH
12368 246.006 5156140
DO NOT POCKET ? MIN 003
FROM V-24602 N/A C-2

5307521
C-1

C-2
6"
H GWR PI ISSUED FOR ESTIMATE
5242893

5 HH ET 10 246.025
C-2
3"

LTE E 004 9 6"-CWS-246010-UAB


63 CWS
002 001 12363
3/4" V-24701 1-1/2" TI
TT B
C-2
3/4"

5134289 PT 059 059


?

FLASHED CO2 H C-2 2" H CO2


3"-GC-248004-PJB(0.4) 2" 3/4" 004 30"-GC-247006-PJB(0.4)
12367 248.003 25 38 12305 247.002
DO NOT POCKET ? HHLL=800 mm ? 5134289 3/4" FREE DRAINING TWO PHASE FLOW
FROM V-24803 START/STOP TO V-24702
C-2 C-2 C-2 9
3" HIS ?
HLL=700 mm C-2
GAP MAG
H 001 3/4" 3/4" PI
G 07/11/11 ISSUED FOR PHA III
PT (V) PT
LC LT LG 4 PV
003 024 024 F 04/20/11 ISSUED FOR ESTIMATE
001 001 001 ? 023 ?
L 24" C-2 C-2 E 03/01/11 ISSUED FOR PHA II
C-2
MW ? D 01/10/11 ISSUED FOR CLIENT REVIEW
I PDT (V)
3/4" (V) C 12/02/10 ISSUED FOR INTERNAL REVIEW
2" 2" 001 029 3/4" RS PZTE E
ON/OFF

B ISSUED FOR PRELIMINARY REVIEW


? 023 001

RS
? LLL=250 mm ? L
C-2
3/4"

5134289
C-2

C-2 ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT


C-2
?

REV
3/4"

DATE APP
C-2

3" E
I
001
LV 3"-DM-247001-PJB(0.4)
MCC
001 1-1/2"
KO LIQUIDS ET 10 2"x1-1/2" 2"x1-1/2" 3"x2"
2" 2" 2" 3"

FILE:\\F:\1025\DRAWINGS\CO2\247\247.001.pid MODEL DATE:7/7/2011 4:33:20 AM BY:muk22296


2"-DM-247002-PJB(0.4)
246.013 12626 38 HSE
MIN

TWO PHASE FLOW NNF 5097550 ? FC ?


C-2

3/4"

3/4"
C-1

C-1
3"

TO V-24606 001 C-24701A


3/4"

C-1 C-1
5134289

C-2 C-1
?

D
C-2

D EMERGENCY STOP

SHELL CANADA
OUTSIDE INSIDE CASING DRAIN QUEST CCS PROJECT
3"-WP-247001-PJB(0.4)
247.002 13160
A
FROM C-24701B/C/D

TO GRADE AT R
SAFE LOCATION

C-24701A PIPING AND INSTRUMENT DIAGRAM


CO2 COMPRESSOR 1st STAGE QUEST CCS PROJECT
RATED CAPACITY: 79877 Nm^3/hr
DIFF. PR.: 9163 kPa 3 UNIT 247 - COMPRESSION
DRIVER : 16500 kW CO2 COMPRESSOR 1ST STAGE
MATERIAL : 304 SS
INSULATION TYPE/THK: PP / SCALE: NONE
TRIM: GC-247071-PJB(0.4)

247.001
SHELL DWG NO.: REV.
247.0000.000.041.001 G
4 3 2 1
4 3 2 1
V-24702 E-24702
COMPRESSOR 2nd STAGE KO DRUM COMPRESSOR 2nd STAGE COOLER 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
SIZE: 3000 mm ID x 3100 mm T/T RATED DUTY: 3.1 MW GENERAL NOTES & CONNECTION DETAILS.
DESIGN PR. & TEMP: 385 kPa-g @ 115 °C / HV @ 150 °C SURFACE AREA: 507.0 m^2
TEMA TYPE: BJU 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE
MATERIAL(VESSEL/INTERNALS): CS + 3 mm 304L SS CLAD/ 316L SS
SHELL TUBE STATED.
INSULATION TYPE/THK: H/
TRIM: GC-247073-PJB(0.4) DESIGN PRESS: 530 kPa-g / HV 1200 kPa-g / 3 . DRIVER POWER AND DIFFERENTIAL PRESSURE DEPICTED ARE THE TOTAL FOR
DESIGN TEMP: 130 °C / 150 °C 58 °C / THE COMPRESSOR.
MATERIAL: CS + 3 mm 304L SS CLAD DUPLEX 2205 + 0.38 mm CA 4 . ELECTRIC TRACE TO HLL (ET 10).
INSULATION TYPE/THK: PP / / 5 . MAXIMIZE LENGTH OF PIPING THAT FREE DRAINS TO KO DRUM.
TRIM: GC-247075-PJB(0.4) CWR-247011-UAB
6 . GTAW ROOT PASS WELD IS MANDATORY ON THIS LINE.

D D

HOLDS:

ET 10 246.025
6"-CWR-247002-UAB • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
50 CWR
12300

5307521
CSO
C-2
6"
TW
053 1-1/2"

2"

?
C-2

26"x24"
V V

RS

C-2
?
C-2
2"

2"
?
26"

E-24702
HH H

24"-GC-247008-PJB(0.4)
E TI
001 005 20"

2"
20"
C C

24"x20"

24"x20"

?
C-2
RS
D

TTE TT
004 005 4"
OUTSIDE INSIDE BACK FLUSH
1-1/2" 1-1/2" 5156140
ET 45 N/A C-2
ET 45

5307521
30" 30"-GC-247007-PJB(0.4)

C-2
88

6"
ET 10 246.025
6 6"-CWS-246011-UAB
FREE DRAINING

50 CWS

PP
12311
5 PP 3/4"

? H CO2
V C-2 TI OUTSIDE 24"-GC-247009-PJB(0.4)
5242893

38 12310 247.003
TWO PHASE FLOW
C-3

006 INSIDE
3"

FREE DRAINING
30" TO V-24703

T.S.
3"
SP 1-1/2"
TT
004
006

PI
006
PI
CO2 H
30"-GC-247006-PJB(0.4) 005

DO NOT POCKET
12305 247.001 38
TWO PHASE FLOW FREE DRAINING PT
FROM E-24701 30" 006
GWR PT 3/4" 3/4"
HH
LTE E 005 ? ? ISSUED FOR ESTIMATE
V-24702 004 001 C-2 C-2
5134289

B
C-2
3/4"

2" 2" 3/4"

RS
? HHLL=800 mm ? 5134289
C-2

RS
C-2 C-2
GAP HLL=700 mm 3"
MAG 4
H G 07/11/11 ISSUED FOR PHA III
LC LT LG
F 04/20/11 ISSUED FOR ESTIMATE
003 003 003
L 24" E 03/01/11 ISSUED FOR PHA II
MW
D 01/10/11 ISSUED FOR CLIENT REVIEW

LLL=250 mm C-24701B C 12/02/10 ISSUED FOR INTERNAL REVIEW


ON/OFF

3/4"

3/4"
C-1

C-1
?

? B ISSUED FOR PRELIMINARY REVIEW


2" 2"
ISSUED PEM CLIENT
? 3" ? REV DESCRIPTION BY CKD PRS CS PDP MC APE
5134289

DATE
3/4"

APP
C-2

5134289

C-2 C-2
3/4"

C-2

LV
3"-P-247002-PJB(0.4)
003
KO LIQUIDS ET 10 3"x2"
2"-P-247002-PJB(0.4) 2" 2" 2" 3"
MIN

FILE:\\F:\1025\DRAWINGS\CO2\247\247.002.pid MODEL DATE:7/7/2011 3:55:35 AM BY:muk22296


246.006 12244 38
TWO PHASE FLOW ? FC ?
5134289

C-2
3"

TO V-24602
5242893
3/4"

C-2

C-1 C-1 C-1


D D

SHELL CANADA
CASING DRAIN CASING DRAIN QUEST CCS PROJECT
3"-WP-247001-PJB(0.4) 3"-WP-247001-PJB(0.4)
247.001 13160 247.003 12304

TO SAFE LOCATION FROM C-24701C/D A

C-24701B PIPING AND INSTRUMENT DIAGRAM


CO2 COMPRESSOR 2nd STAGE QUEST CCS PROJECT
RATED CAPACITY: 79877 Nm^3/hr
DIFF. PR.: 9163 kPa
3
UNIT 247 - COMPRESSION
DRIVER : 16500 kW
MATERIAL : 304 SS CO2 COMPRESSOR 2ND STAGE
INSULATION TYPE/THK: PP /
TRIM: GC-247074-PJB(0.4) SCALE: NONE

247.002
SHELL DWG NO.: REV.
247.0000.000.041.002 G
4 3 2 1
4 3 2 1

V-24703 E-24703
COMPRESSOR 3rd STAGE KO DRUM COMPRESSOR 3rd STAGE COOLER 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
SIZE: 2600 mm ID x 2700 mm T/T RATED DUTY: 3.0 MW GENERAL NOTES & CONNECTION DETAILS.
DESIGN PR. & TEMP: 530 kPa-g @ 100 °C / HV @ 150 °C SURFACE AREA: 425.0 m^2 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE
MATERIAL(VESSEL/INTERNALS): CS + 3 mm 304L SS CLAD / 316L SS TEMA TYPE: BEU STATED.
INSULATION TYPE/THK: H/ SHELL TUBE
DESIGN PRESS: 1200 kPa-g / HV 1200 kPa-g / 3 . DRIVER POWER AND DIFFERENTIAL PRESSURE DEPICTED ARE THE TOTAL FOR
TRIM: GC-247076-PJB(0.4)
DESIGN TEMP: 130 °C / 150 °C 58 °C / THE COMPRESSOR.
MATERIAL: CS + 3 mm 304 L SS CLAD DUPLEX 2205 + 0.38 mm CA 4 . ELECTRIC TRACE TO HLL (ET 10).
INSULATION TYPE/THK: PP / / 5 . MAXIMIZE LENGTH OF PIPING THAT FREE DRAINS TO KO DRUM.
TRIM: GC-247078-PJB(0.4) CWR-247012-UAB 6 . GTAW ROOT PASS WELD IS MANDATORY ON THIS LINE.

D HOLDS: D
• NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
• INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

ET 10 246.025
6"-CWR-247004-UAB
50 CWR
12321

5307521
CSO

C-2
6"
HH H
E TI TW
001 008 054 1-1/2"

2"
TTE

20"-GC-247012-PJB(0.4)
TO ATMOSPHERE TT

22"x20"
?
AT SAFE LOCATION 007 008 C-2
OUTSIDE INSIDE
ET 45 N/A
FIRE 24" ET 45 1-1/2" 1-1/2"
1D2 24"-GC-247011-PJB(0.4) V V

C-2
88

RS
SET@

?
C-2
C C

2"

2"
530 kPa-g 6 22"

FREE DRAINING
N/A RV
ET 10 TI
ET 10 2"-VA-247004-PJB(0.4) 004
38 5
009

PP
C-1
2"x1"

1/2" WEEP HOLE V E-24703

C-3
?
OUTSIDE
2"
3/4" 24"
V PP 3/4" TT INSIDE
5134289 2" 009
C-1 ? 1-1/2"

2"
22"

C-2
C-2

?
CSO

RS
C-1
2"

22"x20"
PI
008 BACK 4"

T.S.
ET 10 2" FLUSH
2"-GC-247010-PJB(0.4) SP
38 5156140

5307521
006 C-2

C-2
6"
PT
CO2

FREE DRAINING
H 3/4" ET 10 246.025
24"-GC-247009-PJB(0.4) PI PT 008 6"-CWS-246013-UAB
12310 247.002 38 50 CWS
TWO PHASE FLOW FREE DRAINING 007 007 ?
FROM E-24702 12322
24" 3/4"

DO NOT POCKET
C-2
GWR HH ?
LTE E C-2
V-24703 006 001
CO2
5134289

H
20"-GC-247013-PJB(0.4)
C-2
3/4"

12320 247.004
2" 2" 3/4" TWO PHASE FLOW
HHLL=800 mm TO V-24704

RS
? ? 5134289
C-2 HLL=700 mm C-2 C-2

RS
3" ISSUED FOR ESTIMATE
GAP
MAG 4
H
LC LT LG
005 005 005 24"
L MW B
C-24701C
2"
2"
LLL=250 mm ?
ON/OFF

3/4"

3/4"
C-1

C-1
? C-2
5134289

?
3/4"

C-2

C-2
G 07/11/11 ISSUED FOR PHA III
3"
5134289
3/4"

C-2

F 04/20/11 ISSUED FOR ESTIMATE


LV
005 E 03/01/11 ISSUED FOR PHA II

KO LIQUIDS D 01/10/11 ISSUED FOR CLIENT REVIEW


ET 10 2" 2" 2" 2"
2"-P-247003-PJB(0.4)
MIN

246.006 13033 38 C 12/02/10 ISSUED FOR INTERNAL REVIEW


TWO PHASE FLOW ? FC ?
5134289

B ISSUED FOR PRELIMINARY REVIEW


2"

TO V-24602
3/4"

C-2

C-1 C-1 C-1


?

ISSUED PEM CLIENT


D D REV
DATE
DESCRIPTION BY CKD PRS CS PDP MC APE
APP
C-2

FILE:\\F:\1025\DRAWINGS\CO2\247\247.003.pid MODEL DATE:7/7/2011 3:27:13 PM BY:ahm14887


CASING DRAIN CASING DRAIN
3"-WP-247001-PJB(0.4) 3"-WP-247001-PJB(0.4)
247.002 12304 247.004 13161

TO SAFE LOCATION FROM C-24701D

SHELL CANADA
QUEST CCS PROJECT
A

C-24701C PIPING AND INSTRUMENT DIAGRAM


CO2 COMPRESSOR 3rd STAGE QUEST CCS PROJECT
RATED CAPACITY: 79877 Nm^3/hr
DIFF. PR.: 9163 kPa 3 UNIT 247 - COMPRESSION
DRIVER : 16500 kW
MATERIAL : 304 SS CO2 COMPRESSOR 3RD STAGE
INSULATION TYPE/THK: PP /
TRIM: GC-247077-PJB(0.4) SCALE: NONE

247.003
SHELL DWG NO.: REV.
247.0000.000.041.003 G
4 3 2 1
4 3 2 1

V-24704 E-24704
COMPRESSOR 4th STAGE KO DRUM COMPRESSOR 4th STAGE COOLER 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
SIZE: 2300 mm ID x 3400 mm T/T RATED DUTY: 2.9 MW GENERAL NOTES & CONNECTION DETAILS.
DESIGN PR. & TEMP: 1200 kPa-g @ 110 °C / HV @ 150 °C SURFACE AREA: 343.0 m^2
TEMA TYPE: BEU 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE
MATERIAL(VESSEL/INTERNALS): CS + 3 mm 304L SS CLAD / 316L SS
SHELL TUBE STATED.
INSULATION TYPE/THK: H/
TRIM: GC-247079-PJB(0.4) DESIGN PRESS: 2200 kPa-g / HV 1700 kPa-g / 3 . DRIVER POWER AND DIFFERENTIAL PRESSURE DEPICTED ARE THE TOTAL FOR
DESIGN TEMP: 130 °C / 150 °C 58 °C / THE COMPRESSOR.
MATERIAL: CS + 3 mm 304L SS CLAD DUPLEX 2205 + 0.38 mm CA 4 . ELECTRIC TRACE TO HLL (ET 10).
INSULATION TYPE/THK: PP / / 5 . MAXIMIZE LENGTH OF PIPING THAT FREE DRAINS TO KO DRUM.
TRIM: GC-247081-PJE(0.4) CWR-247013-UAB
6 . GTAW ROOT PASS WELD IS MANDATORY ON THIS LINE.

HOLDS:
D D
• NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
• INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

ET 10 246.025
6"-CWR-247005-UAB
50 CWR
12344

5307521
CSO

C-2
6"
TW
055 1-1/2"
2"
?

18"x16"
C-2

V V

C-2
RS

?
?
C-2
16"-GC-247016-PJE(0.4)

2"

2"
18"

E-24704
HH H
E TI
TO ATMOSPHERE 001 011
C C

2"
AT SAFE LOCATION 18"

C-2
?
RS
CONTROL VALVE
D

18"x16"
FAILURE
3L4 OUTSIDE BACK 4"
SET@ TTE TT
INSIDE FLUSH
1200 kPa-g

5307521
010 011 5156140
OUTSIDE INSIDE C-2

C-2
6"
RV
N/A ET 45 N/A 1-1/2" ET 10 246.025

PP
ET 10 6"x4" 006 ET 45 1-1/2" 6"-CWS-246014-UAB
6"-VA-247005-PJB(0.4) 20"-GC-247015-PJB(0.4) 50 CWS
ET 10 50 88
12345
1/2" WEEP HOLE C-1
3/4" 6 TI
FREE DRAINING

V
5134289 012
C-1 PP 3/4"
5
5242893

?
CSO

C-1

CO2
3"

V C-2 H
TT 16"-GC-247017-PJE(0.4)
12348 247.005
C-3

012 TWO PHASE FLOW


2"

FREE DRAINING
?
3"-GC-247014-PJB(0.4)

SP 1-1/2"
20" TO V-24705

T.S.
007
10"
PI
010

ET 10 3"
38

DO NOT POCKET
PT
PI 010
CO2 H
20"-GC-247013-PJB(0.4) 009
12320 247.003
TWO PHASE FLOW FREE DRAINING

3/4" 3/4"
FROM E-24703 20"

C-2
?
PT 3/4" ISSUED FOR ESTIMATE
2" 009
HH ?
LTE E C-2
008 001
V-24704 GWR B
5134289
C-2
3/4"

2" 2" 3/4"

RS
HHLL=800 mm ? 5134289 PJB(0.4)
?
C-2

RS
C-2 C-2 PJE(0.4)
GAP HLL=700 mm 3"
MAG G 07/11/11 ISSUED FOR PHA III
H
LC LT LG F 04/20/11 ISSUED FOR ESTIMATE
007 007 007 24"
L E 03/01/11 ISSUED FOR PHA II
MW
4 C-24701D D 01/10/11 ISSUED FOR CLIENT REVIEW
2" ET 10 KO LIQUIDS
2"-P-247006-PJB(0.4)
38 247.005 12346 C 12/02/10 ISSUED FOR INTERNAL REVIEW
ON/OFF

2" LLL=250 mm ? ? ?
3/4"

3/4"

C-2 FROM V-24705 B ISSUED FOR PRELIMINARY REVIEW


C-1 C-1 PJE(0.4)
?
5134289
3/4"

C-2

PJB(0.4) ISSUED PEM CLIENT


C-2 REV
DATE
DESCRIPTION BY CKD PRS CS PDP MC APE
APP
3"
5134289
3/4"

C-2

LV KO LIQUID
ET 10
007 2"-P-247010-PJB(0.4)
1-1/2" 38 247.009 12372
KO LIQUIDS ET 10 2"x1-1/2" 2" TWO PHASE FLOW FROM V-24707
2" 2"

FILE:\\F:\1025\DRAWINGS\CO2\247\247.004.pid MODEL DATE:7/7/2011 3:08:44 AM BY:muk22296


2"-P-247004-PJB(0.4)
MIN

246.006 13032 38
TWO PHASE FLOW ? 2"x1-1/2" FC ?
5134289

C-2
2"

TO V-24602
3/4"

C-2

C-1 C-1 C-1


?

D D
ET 10 KO LIQUID
38 2"-P-247005-PJB(0.4)
247.006 12353
TWO PHASE FLOW FROM V-24706

SHELL CANADA
CASING DRAIN QUEST CCS PROJECT
3"-WP-247001-PJB(0.4)
247.003 13161
A
TO SAFE LOCATION

C-24701D PIPING AND INSTRUMENT DIAGRAM


CO2 COMPRESSOR 4th STAGE QUEST CCS PROJECT
RATED CAPACITY: 79877 Nm^3/hr
DIFF. PR.: 9163 kPa 3 UNIT 247 - COMPRESSION
DRIVER : 16500 kW
MATERIAL : 304 SS CO2 COMPRESSOR 4TH STAGE
INSULATION TYPE/THK: PP /
TRIM: GC-247080-PJE(0.4) SCALE: NONE

247.004
SHELL DWG NO.: REV.
247.0000.000.041.004 G
4 3 2 1
4 3 2 1

V-24705 E-24705
COMPRESSOR 5th STAGE KO DRUM COMPRESSOR 5th STAGE COOLER 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
SIZE: 2000 mm ID x 2200 mm T/T RATED DUTY: 3.0 MW GENERAL NOTES & CONNECTION DETAILS.
DESIGN PR. & TEMP: 2200 kPa-g @ 100 °C / HV @ 150 °C SURFACE AREA: 281.0 m^2
TEMA TYPE: BEU 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE
MATERIAL(VESSEL/INTERNALS): CS + 3 mm 304L SS CLAD / 316L SS
SHELL TUBE STATED.
INSULATION TYPE/THK: H/
TRIM: GC-247082-PJE(0.4) DESIGN PRESS: 4200 kPa-g / HV 3300 kPa-g / 3 . DRIVER POWER AND DIFFERENTIAL PRESSURE DEPICTED ARE THE TOTAL FOR
DESIGN TEMP: 130 °C / 150 °C 58 °C / THE COMPRESSOR.
MATERIAL: CS + 3 mm 304L SS CLAD DUPLEX 2205 + 0.38 mm CA 4 . ELECTRIC TRACE TO HLL (ET 25).
INSULATION TYPE/THK: PP / / 5 . MAXIMIZE LENGH OF PIPING THAT FREE DRAINS TO KO DRUM.
TRIM: GC-247084-PJG(0.4) CWR-247014-PJE(0.4)
6 . GTAW ROOT PASS WELD IS MANDATORY ON THIS LINE.

D HOLDS: D
• NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
• INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

ET 10 246.025
50 6"-CWR-247006-UAB
CWR
12351

5307521
CSO

C-2
6"
TW 1-1/2"
056
2"
?
C-2

14"-GC-247020-PJG(0.4)
UAB
V

RS
PJE(0.4)

C-2
?
2"
14"

TO ATMOSPHERE
AT SAFE LOCATION E-24705

PP
HH H
E TI
FIRE 001 014
C C

2"
1D2

C-2
14" PJE(0.4)

?
RS
SET@ D
2200 kPa-g UAB
TI OUTSIDE BACK 4"
RV TTE TT FLUSH
N/A 015 INSIDE
ET 10 008 013 014 5156140

5307521
ET 10 2"-VA-247006-PJB(0.4) C-1 C-2
38 OUTSIDE INSIDE

C-2
6"
ET 45 N/A
2"x1"

1/2" WEEP HOLE ET 45 1-1/2" 1-1/2" ET 10 246.025


PJB(0.4) ET 10 16"-GC-247019-PJE(0.4) TT 6"-CWS-246015-UAB
75 50 CWS
PJE(0.4) ET 25 3/4" 015
1-1/2" 12352
V

6
5134289
FREE DRAINING

C-1
CSO

C-1

5
2"

PI
?

H CO2
V 013 14"-GC-247021-PJG(0.4)
12350 247.006
C-3
2"

FREE DRAINING TWO PHASE FLOW


?
2"-GC-247018-PJE(0.4)

3/4" TO V-24706
16" PP
10" ?
C-2 PT
013
SP.

T.S.
ET 25 2" 008

3/4" 3/4"
38

C-2
?
DO NOT POCKET
CO2 H
16"-GC-247017-PJE(0.4) PI
12348 247.004
TWO PHASE FLOW FREE DRAINING 012
FROM E-24704 16"
GWR ISSUED FOR ESTIMATE
HH 3/4" 3/4"
LTE E PT
010 001 012 ?
V-24705
5134289

C-2
B
C-2
3/4"

3/4"
C-2
3/4"

C-2

?
?

2" 2" 2" 2" 3/4"

RS
? ? HHLL=800 mm ? ? 5134289 PJE(0.4)
C-2 C-2 C-2 C-2 C-2 C-24701E

RS
PJG(0.4)
3"
GAP HLL=700 mm
MAG G 07/11/11 ISSUED FOR PHA III
H
LC LT LG 4 F 04/20/11 ISSUED FOR ESTIMATE
009 009 009
L 24" E 03/01/11 ISSUED FOR PHA II
MW D 01/10/11 ISSUED FOR CLIENT REVIEW

C 12/02/10 ISSUED FOR INTERNAL REVIEW


2" 2" LLL=250 mm 2" 2"
? ? B ISSUED FOR PRELIMINARY REVIEW
ON/OFF

3/4"

3/4"

? ? ? ? C-1 C-1 PJG(0.4)


3/4"
5134289

C-2
3/4"

3/4"

ISSUED PEM CLIENT


C-2

C-2 C-2 C-2 PJB(0.4) REV DESCRIPTION BY CKD PRS CS PDP MC APE
?

3" DATE APP


C-2 C-2
?

5134289
PJB(0.4)
PJE(0.4)

3/4"

C-2
ET 25
ET 10

LV
2"-P-247006-PJB(0.4) 2"-P-247007-PJE(0.4)
009
KO LIQUIDS ET 10 1-1/2" ET 25
2" 2" 2"

FILE:\\F:\1025\DRAWINGS\CO2\247\247.005.pid MODEL DATE:7/7/2011 2:39:48 AM BY:muk22296


MIN

247.004 12346 38 38
TWO PHASE FLOW ? FC 2"x1-1/2" ?
C-2
5134289

2"x1-1/2"
2"

TO V-24704
3/4"

C-1 C-1 C-1


C-2

D D

OUTSIDE INSIDE CASING DRAIN


3"-WP-247002-PJB(0.4)
247.006 13163

FROM C-24701F/G/H SHELL CANADA


QUEST CCS PROJECT
TO GRADE AT A
SAFE LOCATION

C-24701E PIPING AND INSTRUMENT DIAGRAM


CO2 COMPRESSOR 5th STAGE QUEST CCS PROJECT
RATED CAPACITY: 79877 Nm^3/hr
DIFF. PR.: 9163 kPa 3
UNIT 247 - COMPRESSION
DRIVER : 16500 kW
MATERIAL : 304 SS CO2 COMPRESSOR 5TH STAGE
INSULATION TYPE/THK: PP /
TRIM: GC-247083-PJG(0.4) SCALE: NONE

247.005
SHELL DWG NO.: REV.
247.0000.000.041.005 G
4 3 2 1
4 3 2 1

V-24706
COMPRESSOR 6th STAGE KO DRUM 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
SIZE: 1700 mm ID x 2000 mm T/T GENERAL NOTES & CONNECTION DETAILS.
DESIGN PR. & TEMP: 4200 kPa-g @ 105 °C / HV @ 150 °C
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE
MATERIAL(VESSEL/INTERNALS): CS + 3 mm 304L SS CLAD / 316L SS
STATED.
INSULATION TYPE/THK: H/
TRIM: GC-247085-PJG(0.4) 3 . DRIVER POWER AND DIFFERENTIAL PRESSURE DEPICTED ARE THE TOTAL FOR
THE COMPRESSOR.
4 . ELECTRIC TRACE TO HLL (ET 25).
5 . MAXIMIZE LENGTH OF PIPING THAT FREE DRAINS TO KO DRUM.
6 . GTAW ROOT PASS WELD IS MANDATORY ON THIS LINE.

D D
HOLDS:

• NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.


• INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

PI
HH H 016
E TI
001 017

TO ATMOSPHERE AT PT
SAFE LOCATION FIRE 016
1D2
SET@ TTE TT

3/4" 3/4"
4200 kPa-g 016 017

C-2
?
RV OUTSIDE INSIDE
N/A ET 45 N/A CO2
ET 10 010 ET 45 1-1/2" 1-1/2" PP
ET 10 2"-VA-247007-PJB(0.4) 14"-GC-247023-PJG(0.4) 12"-GC-247024-PJG(0.4)
38 C-1 75 12313 247.007
1/2" WEEP HOLE
2"x1"
6 TO E-24706
PJB(0.4) ET 10 INSIDE OUTSIDE

FREE DRAINING
PJG(0.4) ET 25
3/4" PP 3/4" 3/4"
5
V
5134289 ?
C-1 V ?
CSO
C-1
2"-GC-247022-PJG(0.4) 2"

C-3
?

2"

PP
?
C SP C
14"

T.S.
009
10"

TI
ET 25 2" 018
38

CO2 H 3/4" 3/4" 1-1/2"


14"-GC-247021-PJG(0.4) PI PT TT
12350 247.005
TWO PHASE FLOW FREE DRAINING 015 015 ? 018
FROM E-24705 14" C-2
GWR
HH

DO NOT POCKET
LTE E
012 001
V-24706
5134289

5134289

5134289
C-2
3/4"

C-2
3/4"

3/4"

C-2

2" 2" 2" 2" 3/4"


? ? HHLL=800 mm ? ? 5134289
C-2 C-2 C-2 C-2 C-2
GAP
MAG HLL=700 mm
H
LC LT LG 4

RS
011 011 011
L

RS
24"
MW
2" 2" 2" 2"
LLL=250 mm ISSUED FOR ESTIMATE
? ? ? ?
5134289

3/4"
5134289

5134289
3/4"

C-2

3/4"

C-2
C-2

C-2 C-2 C-2


ON/OFF

C-2

C-24701F
5134289

B
3/4"

C-2
PJG(0.4)
PJB(0.4)

? ?

3/4"
3/4"
ET 10

ET 25

LV C-1 C-1 PJG(0.4)


2"-P-247005-PJB(0.4) 011 2"-P-247009-PJG(0.4) PJB(0.4)
KO LIQUID ET 10 2"x1" 1" 2"x1" ET 25
2" 2" 2"
MIN

247.004 12353 38 38
TWO PHASE ? FC ?
5134289

2"

TO V-24704 07/11/11 ISSUED FOR PHA III


3/4"

C-1 G
C-1 C-1
C-2
C-2

FLOW
?

D D F 04/20/11 ISSUED FOR ESTIMATE

E 03/01/11 ISSUED FOR PHA II

D 01/10/11 ISSUED FOR CLIENT REVIEW

C 12/02/10 ISSUED FOR INTERNAL REVIEW


B ISSUED FOR PRELIMARY REVIEW
ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT
REV
DATE APP

CASING DRAIN CASING DRAIN


3"-WP-247002-PJB(0.4) 3"-WP-247002-PJB(0.4)
247.005 13163 247.009 13162

TO SAFE LOCATION FROM C-24701G/H

FILE:\\F:\1025\DRAWINGS\CO2\247\247.006.pid MODEL DATE:7/7/2011 2:57:25 PM BY:ahm14887


SHELL CANADA
QUEST CCS PROJECT
A

C-24701F PIPING AND INSTRUMENT DIAGRAM


CO2 COMPRESSOR 6th STAGE QUEST CCS PROJECT
RATED CAPACITY: 79877 Nm^3/hr
DIFF. PR.: 9163 kPa 3 UNIT 247 - COMPRESSION
DRIVER : 16500 kW
MATERIAL : 304 SS CO2 COMPRESSOR 6TH STAGE
INSULATION TYPE/THK: PP /
TRIM: GC-247086-PJG(0.4) SCALE: NONE

247.006
SHELL DWG NO.: REV.
247.0000.000.041.006 G
4 3 2 1
4 3 2 1

E-24706 E-24708A /B
COMPRESSOR 6th STAGE COOLER COMPRESSOR 6th STAGE COOLER SPACE HEATERS 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
RATED DUTY: 3.9 MW RATED DUTY: GENERAL NOTES & CONNECTION DETAILS.
SURFACE AREA [FINNED]: 9596.0 m^2 TYPE: 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE
TUBE DESIGN PR. & TEMP: 6500 kPa-g @ 130 °C / HV @ 150 °C MATERIAL: 304 SS STATED.
TUBE MATERIAL: 304L SS + 0.38 mm CA TRIM: (A) SCL-247020-SAB
3 . SWITCH LOCATED AT PLATFORM LEVEL.
DRIVER & Nos.: 22.0 kW & 2 (B) SCL-247021-SAB
WINTERIZATION: TYPE 3, MODE C 4 . MINIMUM VFD SETTING IS 30% SPEED.
INSULATION TYPE/THK: /
TRIM: GC-247087-PJG(0.4)

HOLDS:
• NUMBER OF BAYS, CONNECTIONS AND CONNECTION SIZES TO BE CONFIRMED
D CO2 DURING DETAILED ENGINEERING. D
PP
12"-GC-247024-PJG(0.4)
12313 247.006
FROM C-24701F

(V)
TV
021B

TX C-1
021B
FC

E-24706
(V) 8"
TV 8"
021A
TX C-1 8" 8"
021A
FO 1-1/2" 1-1/2"
TW TW
042 043 PP

3/4" 3/4"

C-2
?
H CO2
12"-GC-247031-PJG(0.4)
12314 247.009
MIN 10D FREE DRAINING TWO PHASE FLOW TO V-24707
1-1/2"
C C
FAN NO. 1 FAN NO. 2 TT
019

H
E TC
001 019
2" L
E TI TT AVG RTD SENSOR (V)
001 021A 021A

TC TX TI TT AVG RTD SENSOR (V) 2"


4
021 021 021B 021B
L
4 VFD I I VFD
5115227

V
ET 10

3/4"

C-2
H

LP STEAM H
2"-SL-246011-SAB
12447 246.029
FROM HEADER ?
(V)

FREE DRAINING
(V) C-2 SI XL XA XA XL SI
TV
TV 001 002 002 003 003 002
C-2

021D
?

021C
LOCAL/ FAULT FAULT LOCAL/
5115227

V
TX C-1 REMOTE REMOTE C-1 TX
3/4"

C-2

021C 021D
FC -SL-247001-SAB FC

FREE DRAINING
-SL-247002-SAB

ISSUED FOR ESTIMATE B


-SL-247003-SAB

R/S R/S
E-24708A HS HS E-24708B 11 Jul 2011
004 005

3 3
G 07/11/11 ISSUED FOR PHA III
MANUAL MANUAL

-SL-247004-SAB
T F 04/20/11 ISSUED FOR ESTIMATE
? ?
5115227
3/4"

C-2 C-2 E 03/01/11 ISSUED FOR PHA II


C-2

D D 01/10/11 ISSUED FOR CLIENT REVIEW

C 12/02/10 ISSUED FOR INTERNAL REVIEW


R/S R/S
HIS I I HIS B ISSUED FOR PRELIMINARY REVIEW
002 001 001 003
ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT
REV
DATE APP
-SCL-247001-SAB

HOA HOA
HS HS
002A 003A

FILE:\\F:\1025\DRAWINGS\CO2\247\247.007.pid MODEL DATE:7/7/2011 2:24:26 PM BY:ahm14887


CONDENSATE ET 10
2"-SCL-247002-SAB 38
246.029 12455 T
TWO PHASE FLOW ? ?
5115227
3/4"

TO HEADER
C-2

C-2 C-2
D
SHELL CANADA
QUEST CCS PROJECT
A

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT
UNIT 247 - COMPRESSION
COMPRESSOR 6TH STAGE COOLER
SCALE: NONE

247.007
SHELL DWG NO.: REV.
247.0000.000.041.007 G

4 3 2 1
4 3 2 1

V-24707 V-24708
TEG INLET SCRUBBER COMPRESSOR 7th STAGE KO DRUM 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
SIZE: 900 mm ID x 3400 mm T/T SIZE: 900 mm ID x 3400 mm T/T GENERAL NOTES & CONNECTION DETAILS.
DESIGN PR. & TEMP: 6500 kPa-g @ 105 °C /HV @ 150°C DESIGN PR. & TEMP: 6500 kPa-g @ 105 °C/HV @ 150°C 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE
MATERIAL(VESSEL/INTERNALS): CS + 3 mm 304L SS CLAD / 316L SS MATERIAL(VESSEL/INTERNALS): CS + 3 mm 304L SS CLAD / 316L SS STATED.
INSULATION TYPE/THK: H/ INSULATION TYPE/THK: H /
TRIM: GC-247089-PJG(0.4) 3 . DRIVER POWER AND DIFFERENTIAL PRESSURE DEPICTED ARE THE TOTAL FOR
TRIM: GC-247090-PJG(0.4)
THE COMPRESSOR.
4 . ELASTOMERS SHALL NOT BE USED FOR DENSE PHASE CO2 SERVICE.
5 . ELECTRIC TRACE TO HLL (ET 25).
6 . DEHYDRATION UNIT BYPASS.
7 . SAMPLE TAKE-OFF POINT TO BE ACCESSIBLE.
8 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012.
D 9 . VALVES ARE FOR BATTERY LIMIT ISOLATION OF UNIT. D
V V 10. SAMPLE PROBE INCLUDES A DOUBLE BLOCK AND BLEED VALVE ASSEMBLY.

5134289

5134289
9

C-3
3/4"
3/4"

C-3
CO2 11. MAXIMIZE LENGTH OF PIPING THAT FREE DRAINS TO KO DRUM.
12" 12" H
12"-GC-247038-PJG(0.4) 12. THE FLOW MEASUREMENTS AND ADDITIONAL INSTRUMENTS ARE REQUIRED FOR
75 12376 248.001
H CSO CSO ON-SITE COMPRESSOR PERFORMANCE TESTING (PTC-10).
DO NOT POCKET TO V-24801
ET 25 5242964 5242964 13. GTAW ROOT PASS WELD IS MANDATORY ON THIS LINE.

H
ET 25
C-1 C-1

5242963
CSC
10"
6

C-1
HOLDS:

5134289
9 • NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

C-3
3/4"
CO2 • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
12" 12" 12"-GC-248001-PJG(0.4)
248.001 12375 • FACILITIES ARE TO BE DETERMINED FOR CLEANING AND WATER PURGE FROM THE
NO NO COMPRESSOR PIPING DOWNSTREAM OF THE WATER ANALYZER (IN ORDER TO
5242964 5242964 FROM V-24801 PREVENT CONTAMINATION OF THE PIPELINE DURING COMMISSIONING AND

ET 25
N/A

ET 25
N/A
C-1 C-1 H START-UP).
AI AI
001A 001B
L

AT AT
001A 001B
H2O CO2 PURITY
TO ATMOSPHERE AT
SAFE LOCATION TO ATMOSPHERE AT TO ATMOSPHERE AT
AE SAFE LOCATION AE SAFE LOCATION
001A 001B

ANALYZER FAST LOOP


3/4" TUBING (FAST LOOP) AX
247.001 13165
001
TO C-24701A SUCTION FIRE
2"-VA-247008-PJB(0.4) RV 1D2
C N/A
SET@ HH H
C
ET 10 ET 10 011 E TI
6500 kPa-g
38 001 026
C-1

2"x1"
1/2" WEEP HOLE PJB(0.4) ET 10
PJG(0.4) ET 25
TTE TT AP 10 4
3/4"
V 025 026 001 CO2
5134289 10"-GC-247041-PJL(C)
C-1 12325 247.010
ET 45 N/A
ET 45 1-1/2" 1-1/2" 2" TO C-24701H
FI FT FI FT 12"-GC-247040-PJG(0.4) OUTSIDE INSIDE 13
12 12 75
005 005 006 006
13

FREE DRAINING

PP
CSO
C-1
2"

?
11 TO ATMOSPHERE AT
SAFE LOCATION SP

2"-GC-247039-PJG(0.4)
005
7

V V 8 3/4" 3/4"
RS

RS
S-4A
C-3

C-3

DO NOT POCKET
2"

2"
?

?
?
12" 12" 1/2" WEEP HOLE C-1 1-1/2" TT TI
10" 12
10" 060 060

3/4" 3/4" 1-1/2"

ET 25
PP TT TI

38
? 027 027
H HH
LI E C-2
017 001
2" SP 3/4" 3/4" PT PI B

T.S.
E 010 12 ISSUED FOR ESTIMATE
? 026 026
CO2 H
12"-GC-247031-PJG(0.4) 003 12" 11 Jul 2011
GWR LL GWR C-2
12314 247.007
TWO PHASE FLOW FREE DRAINING LT LTE
FROM E-24706 12" 3/4" 3/4" 3/4" 3/4"
017 016 PI PT PT PI
V-24707 V-24708 018 018 019 019
?

5134289
5134289

?
5134289

5134289

5134289

G 07/11/11 ISSUED FOR PHA III

5134289
3/4"

C-2

C-2

C-2
C-2

3/4"

C-2
3/4"

3/4"
3/4"

C-2

3/4"
C-2

C-2
2" 2" HLL=800 mm 2" 2" 3/4" 3/4" 2" 2" HHLL=800 mm 2" 2"
F 04/20/11 ISSUED FOR ESTIMATE

E 03/01/11 ISSUED FOR PHA II


? ? ? ? ? 5134289 ? ? ? ?

RS
C-2 C-2 C-2 C-2 C-2 C-2 C-2 C-2 HLL=700 mm C-2 C-2 PJG(0.4) D 01/10/11 ISSUED FOR CLIENT REVIEW
PJL(C)
GAP 5 5 C 12/02/10 ISSUED FOR INTERNAL REVIEW
MAG
H 3" GAP
LC LT LG MAG B ISSUED FOR PRELIMINARY REVIEW
24" 24" H
013 013 013 LG LT LC ISSUED
L MW MW REV DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT
015 015 015 DATE APP
L
2" 2" 2" 2" 2" 2" E
C-24701G
LLL=250 mm 5134289
? 003
5134289

? ? ? ? ?
5134289

4
5134289
5134289

5134289

C-2
C-2
3/4"

3/4"
3/4"

3/4"
C-2

C-2
C-2

C-2 C-2 C-2 C-2 C-2 C-2 ? ?


3/4"

LLL=250 mm
5134289
C-2

ON/OFF

3/4"

3/4"
3/4"
ON/OFF

LYE C-1 C-1 PJL(C)


C-2
3/4"

FILE:\\F:\1025\DRAWINGS\CO2\247\247.009.pid MODEL DATE:7/7/2011 2:13:03 AM BY:muk22296


2" 2" 2"
015 PJB(0.4)
SO 3" s LZTE
? ?
C-2 C-2 ? 015
5134289

C-2
C-2
3/4"

PJB(0.4) PJG(0.4)
LV 2"-P-247011-PJG(0.4) 2"-KP-247001-PJG(0.4) 2"-KP-247002-PJB(0.4)
ET 10 ET 25
KO LIQUID 013 KO TEG
ET 10 2" 1" 2" ET 25 2" ET 25 2" 1" 2" ET 10
2"-P-247010-PJB(0.4)
MIN

MIN

247.004 12372 38 38 38 38 12373 248.003


FC ? ? ? SHELL CANADA
5134289

TWO PHASE FLOW ? 2"x1" 2"x1" 2"x1" FC 2"x1" TWO PHASE FLOW TO V-24803
5134289

5134289
2"

2"

TO V-24704
3/4"
C-2

C-2
3/4"

3/4"
C-1 C-1 C-1

C-2
C-1 C-1
C-2

C-2

C-1 NNF
?

D D D D LV
ET 25 ET 10 QUEST CCS PROJECT
015 PJG(0.4) PJB(0.4)
A

CASING DRAIN CASING DRAIN


R
3"-WP-247002-PJB(0.4) 3"-WP-247002-PJB(0.4)
247.006 13162 247.010 13166

TO SAFE LOCATION C-24701G FROM C-24701H PIPING AND INSTRUMENT DIAGRAM


CO2 COMPRESSOR 7th STAGE QUEST CCS PROJECT
RATED CAPACITY: 79877 Nm^3/hr
DIFF. PR.: 9163 kPa 3 UNIT 247 - COMPRESSION
DRIVER : 16500 kW
MATERIAL : 304 SS
TEG INLET SCRUBBER & CO2 COMP. 7TH STAGE
INSULATION TYPE/THK: PP /
SCALE: NONE
TRIM: GC-247091-PJL(C)

247.009
SHELL DWG NO.: REV.
247.0000.000.041.009 G
4 3 2 1
4 3 2 1

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


CO2 VENT GENERAL NOTES & CONNECTION DETAILS.
6"-VA-247010-PJB(C) 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE
247.014 13039
DO NOT POCKET STATED.
FROM BATTERY LIMIT 3 . DRIVER POWER AND DIFFERENTIAL PRESSURE DEPICTED ARE THE TOTAL FOR
PIPIELINE THE COMPRESSOR.
N/A ET 120 BLOCKED DISCHARGE
PJB(C) PJL(C) 3K6 4 . ELASTOMERS SHALL NOT BE USED FOR DENSE PHASE CO2 SERVICE.
SET@ 5 . TWO CHECK VALVES IN SERIES SEPARATED BY AT LEAST 500MM.
14790 kPa-g
6 . NON-SLAM CHECK VALVE.
V P
RV 7 . START-UP BYPASS VALVE TO BE LOCATED AT PIPING HIGH POINT WITH PIPING

3/4"

C-1
CO2 RELIEF / VENT

?
012 FREE DRAINING INTO THE MAIN PIPING.
6"-VA-247009-PJB(C) 6"
246.032 12327 8 . VALVE TO BE LOCATED AT SAFE ACCESSIBLE LOCATION.
D FREE DRAINING ? C-1 D

4"x3"
TO S-24603 9 . ANTI-SURGE SPILLBACK VALVE UV-247001 TO BE LOCATED AT PIPING HIGH
C-1 POINT WITH PIPING FREE DRAINING INTO THE MAIN PIPING.
UYE UV
3/4" 10. GTAW ROOT PASS WELD IS MANDATORY ON THIS LINE.
003 003
V
5136407

C-1
FO
C-1 HOLDS:
E FO

5349470
001 • NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

CSO
C-1
4"
• INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
2"

?
C-1
UC SIGNAL
PX
12578 247.001
034
FROM UC-001B

E
002

E
001
L

UYE
S
C UC SIGNAL 001 UZTE C
12571 247.001 001
FO
FROM UC-001A MIN

ANTI SURGE SPILL BACK 8" ET 120


24"-GC-247045-PJB(0.4) E
247.001 12326 75
DO NOT POCKET FREE DRAINING 24"x8" C-1 FO FREE DRAINING 002

ET 120
TO V-24701 PJB(0.4) PJL(C)

75
V

5119160
UV
N/A ET 120 9

3/4"

C-2
001 HH PC 246.030
E 2" 2"
022 2"-GI-246019-ULB
001 GI
E ? NC 12995
C-2 ?

C-2 C-2
001 L

2" 2"

? ?
C-2
PT SIGNAL VISIBLE

4"-GC-247046-PJL(C)
8"-GC-247044-PJL(C)
PT PTE XYE PG
247.001 12569 PT
021 020 6 6 001 028 8
TO UC-001A/B
022 V s

5136407
4 4 7

C-3
SP A/S 6"

3/4"
SP XZTE

3/4" 3/4"
3/4" 3/4"

3/4" 3/4"

3/4" 3/4"
003A

C-2
003B XV FO 001

?
C-2

C-2

C-2
5343525

?
?

C-3
C-1

?
001

3/4"
5 10" CO2
10" 10" 10" PP
10"-GC-247043-PJL(C) 12332 247.011
5351323 5351323 FC C-1 5349475
MIN C-1 C-1 INSIDE OUTSIDE C-1 TO E-24707A/B
ET 120 PP
ET 120
100

TT SIGNAL
TT 1-1/2"
247.001 12331
057
TO UC-001A/B
B
ISSUED FOR ESTIMATE
4 11 Jul 2011
CO2 PP
10"-GC-247041-PJL(C)
12325 247.009
FROM C-24701G G 07/11/11 ISSUED FOR PHA III
10
F 04/20/11 ISSUED FOR ESTIMATE
DO NOT POCKET

E 03/01/11 ISSUED FOR PHA II


10"-GC-247042-PJL(C)

D 01/10/11 ISSUED FOR CLIENT REVIEW

4 C 12/02/10 ISSUED FOR INTERNAL REVIEW

1-1/2" HH B ISSUED FOR PRELIMINARY REVIEW


TTE E
ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT
029 001 REV
DATE APP
RS

FILE:\\F:\1025\DRAWINGS\CO2\247\247.010.pid MODEL DATE:7/7/2011 2:20:07 PM BY:ahm14887


ET 120
PP

C-24701H
4
? ?
SHELL CANADA
3/4"
3/4"

C-1 C-1 PJL(C)


PJB(0.4)
QUEST CCS PROJECT

CASING DRAIN
A
3"-WP-247002-PJB(0.4)
247.009 13166

TO SAFE LOCATION R

C-24701H PIPING AND INSTRUMENT DIAGRAM


CO2 COMPRESSOR 8th STAGE QUEST CCS PROJECT
RATED CAPACITY: 79877 Nm^3/hr
DIFF. PR.: 9163 kPa 3 UNIT 247 - COMPRESSION
DRIVER : 16500 kW
MATERIAL : 304 SS CO2 COMPRESSOR 8TH STAGE
INSULATION TYPE/THK: PP /
TRIM: SCALE: NONE
GC-247092-PJL(C)
SHELL DWG NO.: REV.

247.010
247.0000.000.041.010 G
4 3 2 1
4 3 2 1

E-24707A 6 E-24709A /B
CO2 COMPRESSOR AFTERCOOLER CO2 COMPRESSOR AFTERCOOLER SPACE HEATERS 1. SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
RATED DUTY: 10.3 MW 3 RATED DUTY: GENERAL NOTES & CONNECTION DETAILS.
SURFACE AREA [FINNED]: 1385.0 m^2 TYPE:
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE
TUBE DESIGN PR. & TEMP: 14790 kPa-g @ 175 °C MATERIAL: 304 SS
STATED.
TUBE MATERIAL: 304L SS + 0.38 mm CA TRIM: (A) SCL-247025-SAB
DRIVER & Nos.: 22.0 kW & 2 (B) SCL-247024-SAB 3 . COOLER DUTY DEPICTED IS THE TOTAL FOR ALL BAYS.
WINTERIZATION: TYPE 3, MODE C 4 . SWITCH LOCATED AT PLATFORM LEVEL.
INSULATION TYPE/THK: / 5 . MINIMUM VFD SETTING IS 30% SPEED.
TRIM: GC-247093-PJL(C)
6 . ELASTOMERS SHALL NOT BE USED FOR DENSE PHASE CO2 SERVICE.
6
CO2 PP PP CO2
10"-GC-247043-PJL(C) 10"-GC-247043-PJL(C) HOLDS:
12332 247.010 12558 247.012
D D
FROM C-24701H TO E-24707B • NUMBER OF BAYS, CONNECTIONS AND CONNECTION SIZES TO BE CONFIRMED
DURING DETAILED ENGINEERING.

(V)
TV
032B
TX C-1
032B
FC

(V) 6" E-24707A


6"
TV
032A BAY A
TX C-1 6" 6"
032A
FO
1-1/2" TW TW 1-1/2"
046 047
PP

3/4" 3/4"

C-2
?
6
CO2
6"-GC-247055-PJL(C)
12556 247.014
MIN 10D TO CO2 METERING STATION

1-1/2"
C C
FAN NO. 1 FAN NO. 2
TT
030

E TI TT AVG RTD SENSOR (V) 2"


001 032A 032A

H TC SIGNAL
TC SP
247.014 12557
030
2" L FROM TC-031
TC TX TI TT AVG RTD SENSOR (V)
5
032 032 032B 032B
L
ET 10

5115227

V 5 VFD I I VFD
C-2
3/4"

E
H

LP STEAM H
2"-SL-246015-SAB 001
12610 246.029
?
FROM HEADER C-2

FREE DRAINING
(V) SI XL XA XA XL SI (V)
TV TV
C-2

005 006 006 007 007 006


?

032C 032D
LOCAL/ FAULT FAULT LOCAL/
5115227

TX V REMOTE REMOTE TX
C-1 C-1
C-2
3/4"

032C 032D
FC -SL-247009-SAB 2"-SL-247010-SAB FC

FREE DRAINING

R/S R/S ISSUED FOR ESTIMATE B


E-24709A HS HS E-24709B
-SL-247011-SAB

11 Jul 2011
012 013

4 4
G 07/11/11 ISSUED FOR PHA III
MANUAL MANUAL
F 04/20/11 ISSUED FOR ESTIMATE

E 03/01/11 ISSUED FOR PHA II


T
? ? D 01/10/11 ISSUED FOR CLIENT REVIEW
5115227
3/4"

C-2

C-2 C-2
R/S R/S C 12/02/10 ISSUED FOR INTERNAL REVIEW
D HIS I I HIS
B ISSUED FOR PRELIMINARY REVIEW
010 001 001 011
2"-SCL-247006-SAB

ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT


REV
DATE APP

HOA HOA
HS HS
010A 011A

FILE:\\F:\1025\DRAWINGS\CO2\247\247.011.pid MODEL DATE:7/7/2011 1:54:46 PM BY:ahm14887


CONDENSATE ET 10
2"-SCL-247005-SAB -SL-247012-SAB
246.029 12611 38 T
TWO PHASE FLOW ? ?
5115227

TO HEADER
3/4"

C-2 C-2
C-2

D
SHELL CANADA
QUEST CCS PROJECT
A

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT
UNIT 247 - COMPRESSION
CO2 COMPRESSOR AFTERCOOLER-BAY A
SCALE: NONE

247.011
SHELL DWG NO.: REV.
247.0000.000.041.011 G
4 3 2 1
4 3 2 1

E-24707B 6 E-24709C /D
CO2 COMPRESSOR AFTERCOOLER CO2 COMPRESSOR AFTERCOOLER SPACE HEATERS 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
RATED DUTY: 10.3 MW 3 RATED DUTY: GENERAL NOTES & CONNECTION DETAILS.
SURFACE AREA [FINNED]: 1385.0 m^2 TYPE:
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE
TUBE DESIGN PR. & TEMP: 14790 kPa-g @ 175 °C MATERIAL: 304 SS
STATED.
TUBE MATERIAL: 304L SS + 0.38 mm CA TRIM: (C) SCL-247026-SAB
DRIVER & Nos.: 22.0 kW & 2 (D) SCL-247027-SAB 3 . COOLER DUTY DEPICTED IS THE TOTAL FOR ALL BAYS.
WINTERIZATION: TYPE 3, MODE C 4 . SWITCH LOCATED AT PLATFORM LEVEL.
INSULATION TYPE/THK: / 5 . MINIMUM VFD SETTING IS 30% SPEED.
TRIM: GC-247094-PJL(C)
6 . ELASTOMERS SHALL NOT BE USED FOR DENSE PHASE CO2 SERVICE.
6
CO2 PP
10"-GC-247043-PJL(C) HOLDS:
12558 247.011
D • NUMBER OF BAYS, CONNECTIONS AND CONNECTION SIZES TO BE CONFIRMED
D
FROM C-24701H
DURING DETAILED ENGINEERING.

(V)
TV
035B

TX C-1
035B
FC

E-24707B
(V) 6" 6"
TV
035A BAY B
TX C-1 6" 6"
035A
FO
1-1/2" TW TW 1-1/2"
048 049

6
CO2
6"-GC-247058-PJL(C)
12560 247.014
MIN 10D
TO CO2 METERING STATION

C 1-1/2" C
FAN NO. 1 FAN NO. 2 TT
033

E TI TT AVG RTD SENSOR (V) 2"


001 035A 035A

H TC SIGNAL
TC SP
247.014 12561
033
2" L FROM TC-031
TC TX TI TT AVG RTD SENSOR (V)
5
035 035 035B 035B
L
5 VFD I I VFD
E
ET 10

5115227

V
3/4"

001
C-2
H

LP STEAM H
2"-SL-246016-SAB
12449 246.029 38
?

FREE DRAINING
FROM HEADER C-2 SI XL XA XA XL SI (V)
(V) TV
TV 007 008 008 009 009 008
035D
C-2
?

035C LOCAL/ FAULT FAULT LOCAL/


5115227

TX V REMOTE REMOTE TX
C-1 C-1
3/4"

C-2

035C 035D
FC -SL-247013-SAB FC

FREE DRAINING -SL-247014-SAB

B
-SL-247015-SAB

R/S R/S ISSUED FOR ESTIMATE


E-24709C HS HS E-24709D
016 017 11 Jul 2011

4 4
G 07/11/11 ISSUED FOR PHA III
MANUAL MANUAL
T
F 04/20/11 ISSUED FOR ESTIMATE
? ?
5115227
3/4"

C-2

C-2 C-2 E 03/01/11 ISSUED FOR PHA II


D D 01/10/11 ISSUED FOR CLIENT REVIEW

R/S R/S C 12/02/10 ISSUED FOR INTERNAL REVIEW


HIS I I HIS
B ISSUED FOR PRELIMINARY REVIEW
014 001 001 015
ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT
REV

-SL-247016-SAB
DATE APP
-SCL-247007-SAB

HOA HOA
HS HS
014A 015A

FILE:\\F:\1025\DRAWINGS\CO2\247\247.012.pid MODEL DATE:7/7/2011 5:52:42 AM BY:muk22296


CONDENSATE ET 10
2"-SCL-247008-SAB 38
246.029 12456 T
? ?
5115227

TO HEADER TWO PHASE FLOW


3/4"

C-2

C-2 C-2
D
SHELL CANADA
QUEST CCS PROJECT
A

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT
UNIT 247 - COMPRESSION
CO2 COMPRESSOR AFTERCOOLER-BAY B
SCALE: NONE

247.012
SHELL DWG NO.: REV.
247.0000.000.041.012 G
4 3 2 1
4 3 2 1

1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION


GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE
STATED.
3 . ELASTOMERS SHALL NOT BE USED FOR DENSE PHASE CO2 SERVICE.
4 . CONNECTIONS FOR METER PROVING AT SAFE ACCESSIBLE LOCATION.
5 . SCOPE BREAK WITH PIPELINE FACILITIES.
6 . CHECK VALVE TO REDUCE CONSEQUENCES OF POTENTIAL AIR COOLER TUBE
RUPTURE.
7 . VALVES ARE FOR BATTERY LIMIT ISOLATION OF UNIT.
8 . VALVE TO BE LOCATED AT SAFE ACCESSIBLE LOCATION.
D D
HOLDS:

• INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

CO2 VENT
6"-VA-247010-PJB(C)
247.010 13039
DO NOT POCKET
TO S-24603

TC SIGNAL
247.011 12557
PJB(C)
TO TC-030

C-1
PJL(C)

C-1
NC
3"

6"

?
?
8
TV

6"x3"
058
TC SIGNAL

C-1

C-1
NC

FC
3"
247.012 12561

?
TO TC-033 3"

C C

C-1
NC
3"

?
3
PI FQI
CO2
6"-GC-247055-PJL(C) 025 004
12556 247.011
FROM E-24707A

3"-GC-247027-PJL(C)
H HH
TC E PT FI TC
3 4 4
CO2 031 L 002 025 004 058
5

5349470

5349470
6"-GC-247058-PJL(C) V

5136407
247.012

NC
C-1
NC

C-1
12560

4"

4"

C-3
3/4"
FROM E-24707B 3/4" 3/4"
V V
TT TTE 5136407 5136407 FT TT

3/4" 3/4"

5349470
C-1 C-1

5349470
5349470
031 041 004 058

C-2

C-1
NC
7 7

C-1
NC

C-3
3"
C-1
NC
4"

4"

?
3/4"
1-1/2" 1-1/2" 6 CO2
8" 8"x4" 8"x4" 1-1/2" 8" 8"
12993
MIN 10D FP 5351323 5349475 MIN
5349475 5349475 TO PIPELINE
MIN 5D C-1 C-1 C-1
C-1
8"-GC-247059-PJL(C) PJL(C)

ISSUED FOR ESTIMATE B


11 Jul 2011

G 07/11/11 ISSUED FOR PHA III

F 04/20/11 ISSUED FOR ESTIMATE

E 03/01/11 ISSUED FOR PHA II

D 01/10/11 ISSUED FOR CLIENT REVIEW

C 12/02/10 ISSUED FOR INTERNAL REVIEW


B ISSUED FOR PRELIMINARY REVIEW
ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT
REV
DATE APP

FILE:\\F:\1025\DRAWINGS\CO2\247\247.014.pid MODEL DATE:7/7/2011 11:21:54 AM BY:ahm14887


SHELL CANADA
QUEST CCS PROJECT
A

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT
UNIT 247 - COMPRESSION
CO2 METERING STATION
SCALE: NONE

247.014
SHELL DWG NO.: REV.
247.0000.000.041.014 G
4 3 2 1
4 3 2 1
TO ATMOSPHERE
AT SAFE LOCATION
FIRE V-24801 E-24804A /B /C /D /E
1E2
SET@ TEG ABSORBER LEAN TEG COOLER 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION

PJG(0.4)
6500 kPa-g

PJB(0.4)
SIZE: 1400 mm ID x 9700 mm T/T RATED DUTY: 190 kW GENERAL NOTES & CONNECTION DETAILS.

ET 10

ET 25
DESIGN PR. & TEMP: 6500 kPa-g @ 105 °C / HV @ 150 °C SURFACE AREA: 74.0 m^2
RV 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "248" UNLESS OTHERWISE
MATERIAL(VESSEL/INTERNALS): CS + 3 mm 304L SS CLAD / 316L SS TEMA TYPE: DOUBLE PIPE
N/A 004 SHELL TUBE STATED.
ET 10 3"x2" INSULATION TYPE/THK: H/
ET 10 3"-VA-248002-PJB(0.4) 38 DESIGN PRESS: 7200 kPa-g / HV 1200 kPa-g / 3 . TWO CHECK VALVES IN SERIES, ONE IN THE HORIZONTAL AND ONE IN THE VERTICAL
C-1 TRIM: GC-248010-PJG(0.4)
DESIGN TEMP: 210 °C / 150 °C 58 °C / POSITION, SEPARATED BY AT LEAST 500 MM.

2"x1"
1/2" WEEP HOLE ET 10 MATERIAL: CS CS 4 . ELECTRIC TRACE TO HLL (ET10).
PJB(0.4) INSULATION TYPE/THK: / /
3/4" 5 . FT-003 TO BE INSTALLED VERTICALLY WITH FLOW UPWARD.

CSC CSC

C-1 C-1
PJG(0.4)

2" 2"
TRIM: KP-248025-PAN CWR-248002-UAB

? ?
V
ET 25 5134289 6 . SAMPLE TAKE-OFF POINT TO BE ACCESSIBLE.
C-1 7 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012.

CSO

C-1
2"

?
D TV LEAN TEG
D
ET 10
010 38 2"-KP-248016-PAN
248.004 12616 HOLDS:

ET 25
ET 10 FROM P-24801A/B

38
2" 2"x1" 1" 2"x1" 2"
38 • NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
? FC C-1

3/4"

3/4"
C-2
C-1 • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
?

2"-GC-248002-PJG(0.4)
C-1

?
?
D D
C-2 TW
011
3"-CWR-248001-UAB
2"
1-1/2"
2" 3"x2" 6"x3" 6"x3" 3" ET 10 246.025
ET 25 RS
CO2 38 CWR
12"-GC-248001-PJG(0.4) N/A CSO

5115273
12918

2"-KP-248024-PAN

3/4"

C-2
247.009 12375 5156863
TO V-24708 V C-2
2" RS

C-3
2"
?
12"
H
2" TC 2"
010 E-24804A

ET 10
38
2"

5134289
3/4"

C-2
TT FI 2" RS
3" 3" 3" 010 003
L
5242963 5242963
C-2 C-2 3 1-1/2"
24" 2" 2" 2" 6"x2" 6"x2" FT 2" RS
MW 003
5063244 5063244
C-2 C-2
2"
5
E-24804B

ET 10
38
C 2" C
2" RS

2" RS

ET 10
38
2"
E-24804C

ET 10
38
2"
2" RS
H
PDI PDT
002 002

2" RS

2"
E-24804D

ET 10
38
2"
2" RS
TO ATMOSPHERE
AT SAFE LOCATION

2" RS 3"x2" ET 10 246.025


3" 3"-CWS-246009-UAB
38 CWS
5156863 12919

C-2
2"
?
C-2
2"
6 7 E-24804E BACK
B
N/A FLUSH ISSUED FOR ESTIMATE
3/4"-VA-248001-PJG(0.4) ET 25
38
ET 25 V-24801 2"-KP-248021-PAN 11 Jul 2011
S-4A
1/2" WEEP HOLE
ET 25 SP 3" 3" 3"
H 001 G 07/11/11 ISSUED FOR PHA III
5242963
3/4"

5242963
5134289
C-2
3/4"

C-2 C-2
C-1

F 04/20/11 ISSUED FOR ESTIMATE


?

CO2 H
12"-GC-247038-PJG(0.4) E 03/01/11 ISSUED FOR PHA II
12376 247.009 38
DO NOT POCKET D 01/10/11 ISSUED FOR CLIENT REVIEW
FROM V-24707 GWR 12"
E LTE
5134289

5134289

HHLL=1450 mm
5134289

C 12/02/10 ISSUED FOR INTERNAL REVIEW


C-2
3/4"

C-2
3/4"

3/4"
C-2

003 001
LL 3/4" HLL=1050 mm B ISSUED FOR PRELIMINARY REVIEW
2" 2" 2" 2"
ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT
5134289 ? ? NLL=880 mm ? ? REV
DATE APP
C-2 C-2 C-2 C-2 C-2 MAG
LLL=700 mm H
24" LG LT LC
LLLL=300 mm 4
MW 002 002 002
L
2" 2"
2" 2"

FILE:\\F:\1025\DRAWINGS\CO2\248\248.001.pid MODEL DATE:7/7/2011 5:14:08 AM BY:muk22296


? ?
5134289

? ?
C-2

5134289

C-2
5134289
3/4"

C-2
3/4"

3/4"

C-2
5134289

2" C-2
C-2
C-2
3/4"
C-2

SO
?
C-2
LYE
002
E
003
S SHELL CANADA
LV QUEST CCS PROJECT
MIN

002
RICH TEG
A
3" 3"-KP-248001-PJG(0.4) 3"x1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 3"x1-1/2" ET 10
38 3"-KP-248002-PJG(0.4)
12379 248.002
? ? FC ? ? TWO PHASE FLOW
5134289
5134289
5134289

TO E-24801
3/4"
C-2

C-2

R
3/4"

C-2
2"

C-1 C-1 C-1 C-1 C-1


?

3/4"

C-2

D D D D
PIPING AND INSTRUMENT DIAGRAM
1-1/2" ET 10
38 QUEST CCS PROJECT
CSC
5096787 UNIT 248 - DEHYDRATION
C-1
TEG ABSORBER
SCALE: NONE

248.001
SHELL DWG NO.: REV.
248.0000.000.041.001 G
4 3 2 1
4 3 2 1

V-24805 V-24802 V-24806 S-24801 E-24801 E-24802


TEG STRIPPER REBOILER CONDENSATE POT TEG STRIPPER TEG SURGE DRUM TEG REGENERATION PACKAGE TEG STRIPPER CONDENSER TEG STRIPPER REBOILER 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
SIZE: 600 mm ID x 1800 mm T/T SIZE (COLUMN): 500 mm ID x 3500 mm T/T SIZE: 1300 mm ID x 3900 mm T/T RATED DUTY: 92 kW RATED DUTY: 396 kW GENERAL NOTES & CONNECTION DETAILS.
DESIGN PR. & TEMP: 5170 kPa-g @ 415 °C/ FV @ 415°C SIZE (STRIPPER): 400 mm ID x 2400 mm T/T DESIGN PR. & TEMP: 350 kPa-g @ 230 °C / HV @ 150° C SURFACE AREA: SURFACE AREA:
DESIGN PRESS. & TEMP.: 350 kPa-g @ 230 °C / 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "248" UNLESS OTHERWISE
MATERIAL(VESSEL/INTERNALS): CS +3 mm CA MATERIAL(VESSEL/INTERNALS): CS + 3 mm 316L SS CLAD TEMA TYPE: TEMA TYPE:
MATERIAL (COLUMN / INTERNAL): CS + 3 mm 316L SS CLAD / 316L SS STATED.
INSULATION TYPE/THK: H/ INSULATION TYPE/THK: H/ SHELL TUBE SHELL TUBE
TRIM: SCH-248005-SAG MATERIAL (STRIPPER): 316L SS + 3 mm CA TRIM: KP-248027-PJB(0.4) DESIGN PRESS: 1400 kPa-g / FV 350 kPa-g / HV 3 . CONDENSATE LINES SHOULD BE SUPPORTED FOR VIBRATING SLUGGING SERVICE.
DESIGN PRESS: 350 kPa-g / HV 5170 kPa-g / FV
INSULATION TYPE/THK: H DESIGN TEMP: 105°C / 105°C 230°C / 150°C 4 . ELECTRIC TRACE TO HLL (ET 10).
DESIGN TEMP: 230°C / 150°C 415°C / 415°C
TRIM: KP-248026-PJB(0.4) MATERIAL: CS + 3 mm 316 CLAD 316L SS + 0.38 mm CA MATERIAL: CS + 3 mm 316 CLAD 316L SS 5 . FT-001 TO BE INSTALLED VERTICALLY WITH FLOW UPWARD.
INSULATION TYPE / THK: H INSULATION TYPE / THK: H 6 . 316/316L STAINLESS STEEL PIPING COMPONENTS ARE REQUIRED FOR THIS LINE.
TRIM: KP-248028-PJB(0.4) TRIM: KP-248029-PJB(0.4) SCH-248006-SAG
TV
PJG(0.4) PJB(0.4)
002B 1-1/2"
3"x1-1/2" 1-1/2" 1-1/2" 3"x1-1/2" 3"-KP-248004-PJB(0.4)
D ? FO ? TWO PHASE FLOW HOLDS: D

5134289
3/4"

C-2
C-1 C-1 C-1
D TO ATMOSPHERE • NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
AT SAFE LOCATION • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

ET 10

ET 10
38

38
ET 10
6

38
3"-KP-248003-PJG(0.4)
8"-VA-248003-PJB(0.4)

8"
TV
002A PJG(0.4) PJB(0.4)
RICH TEG ET 10 3"x1-1/2" 1-1/2" 3"
3"-KP-248002-PJG(0.4) 1-1/2" 1-1/2" 3"x1-1/2" E-24801
12379 248.001 38
TWO PHASE FLOW ? FO ?

5134289
3/4"
FROM V-24801

C-2
C-1 C-1 C-1
D
ET 10 RICH TEG
38 3"-KP-248005-PJB(0.4)
12380 248.003
TWO PHASE FLOW
3" TO V-24803

H
TC TT 2"
002 002
L
8"
HH

FI
V-24802 RICH TEG
4"x3" ET 10
E 38 3"-KP-248023-PJB(0.4)
004 248.003 12385
002 4" MIN. 10D TWO PHASE FLOW
FROM E-24803
C TC
H C
8"
001 L
TYE HH
FT s
001
004 TV V
001

C-3
2"

?
LOW TEMP HP STEAM 1" S-24801
H 2"x1" 10"
2"-SS-248001-SAG 2"
12545 246.101 50
? FC 2"
2"x1" H
5115277

FROM HEADER ?
3/4"

C-1 C-1
C-2

5134289
C-1 ET 10

C-2
3/4"
D
1" 2"
2"
CSC ?
5062543 C-2
2"-SS-248002-SAG

C-1 LG
E-24802 008
MAG
2"
2"
?

5134289
C-2

3/4"

C-2
2"
2"-VA-248004-SAB

TO ATMOSPHERE
AT SAFE LOCATION H
FIRE PI
1D2 HH H
E PTE PT PI
C-2
TT 008
2"
?

SET@ 002 004 016 016


ET 10

ET 10

5170 kPa-g D 001


38

38

FC
RV
001

C-2

C-2
2"x3/4" 3/4"

2"x3/4" 3/4"
PT

?
001
N/A ET 10 008
ET 10 38 C-1 B

PJB(0.4)
ISSUED FOR ESTIMATE

5119160
E LTE 24" MW FV PCV
2" 2" V 2"-GI-246018-ULB

ULB
1/2" WEEP HOLE 001 009

C-2
001 010 11 Jul 2011

3/4"

3/4"

C-2
?
3/4" LL 1"
SAB SAG 2" 2"x1" 2"x1" 2"x1" 2"x1" 246.030
V 2" 2" 2" FT 2"
5115277 GI
C-1 5097550 ? FC ? 001 1" ? 12425
1" C-2 C-1 C-1 1" C-1 C-1 C-1 G 07/11/11 ISSUED FOR PHA III
3/4" 2"
V 5

5134289
CSO NC 04/20/11 ISSUED FOR ESTIMATE

C-2
F

3/4"
V 5134289 ? HHLL=1000 mm
C-1
1"-SS-248003-SAG

5069816
C-2 C-2
C-3

2" 03/01/11 ISSUED FOR PHA II


2"

? C-1 E
?

2" V-24806 HLL=880 mm ? D 01/10/11 ISSUED FOR CLIENT REVIEW


C-2 C 12/02/10 ISSUED FOR INTERNAL REVIEW
NLL=700 mm
B ISSUED FOR PRELIMINARY REVIEW
LLL=290 mm H LC SIGNAL ISSUED
LG LT LC REV DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT
2" 12328 248.003 DATE APP
LLLL=150 mm 004 004 004
V V-24805 SO L TO LV-004
5115277

5115277

?
C-2

MAG
C-2

3/4"
3/4"

C-2
2" 2"
? ? 2"
7000 mm MIN.

FILE:\\F:\1025\DRAWINGS\CO2\248\248.002.pid MODEL DATE:7/7/2011 2:34:26 PM BY:ahm14887


2"-SCH-248001-SAG 4
C-2 C-2
FREE DRAINING ?

5134289
MAG 2"

C-2
3/4"
8" C-2
H 2"
LC LT LG HH TI
?
5134289

003 003 003 003


3/4"

C-2

L C-2
HLL=1120 mm 4
2" D
2"
NLL=690 mm
? ? SHELL CANADA
3/4"

3/4"

C-2 C-2 LLL=260 mm


5115277
5115277

TT
C-2

C-2

2"-SCH-248002-SAG D
LV D 003 QUEST CCS PROJECT
3 003
HP CONDENSATE 1" 1-1/2"
LEAN TEG
A
ET 10 2" 2"x1" 2"x1" 2" 2" 6"x3" 6"x3" ET 10
38 38 3"-KP-248008-PJB(0.4)
246.020 12427 12386 248.003
MIN

? FC ?
C-2
5115277

TO V-24607 TWO PHASE FLOW


2"

TO E-24803
3/4"

?
C-2

R
C-2

C-1 C-1 C-1


2"
?

D D
D PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
UNIT 248 - DEHYDRATION
TEG STRIPPER, REBOILER & CONDENSATE POT
SCALE: NONE

248.002
SHELL DWG NO.: REV.
248.0000.000.041.002 G
4 3 2 1
4 3 2 1

V-24803 E-24803
TEG FLASH DRUM LEAN/RICH TEG EXCHANGER 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
SIZE: 1900 mm ID x 4800 mm T/T RATED DUTY: 0.6 MW GENERAL NOTES & CONNECTION DETAILS.
DESIGN PR. & TEMP: 480 kPa-g @ 105 °C / FV @ 105°C SURFACE AREA: 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "248" UNLESS OTHERWISE
MATERIAL(VESSEL/INTERNALS): CS +3 mm 304L SS CLAD/ 316L SS HOT COLD STATED.
INSULATION TYPE/THK: H/ DESIGN PRESS: 400 kPa-g / HV 520 kPa-g / FV
TRIM: KP-248030-PJB(0.4) 3 . ELECTRIC TRACE TO HLL (ET 10).
DESIGN TEMP: 230 °C / 150 °C 210 °C / 210 °C
MATERIAL: PLATES: 304L SS 4 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE.
FRAME: CS 5 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012.
INSULATION TYPE/THK: / /
TRIM: KP-248031-PJB(0.4)
TEMA TYPE: COMPABLOC

D D

HOLDS:
TI
006 • NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
• INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.

E-24803
LEAN TEG ET 10 TT
3"-KP-248008-PJB(0.4) 006
12386 248.002 38
FROM V-24806 3" 3"
1-1/2"
RICH TEG ET 10 6"x3" 6"x3" 6"x3" 6"x3" ET 10 LEAN TEG
3"-KP-248023-PJB(0.4) 3" 3"-KP-248009-PAB
248.002 12385 38 38 12378 248.004
TO V-24802 TWO PHASE FLOW 3" TO P-24801A/B
1-1/2"
PJB(0.4) PAB
TT
005
PC H
005
TI
005

PT
005

C PV
C
3/4"

C-2
?

FLASHED CO2 005


H 3" 3"x1" 1" 2" TO ATMOSPHERE
3"-GC-248004-PJB(0.4) AT SAFE LOCATION
247.001 12367 25
DO NOT POCKET 5242893 FO 2"x1" ? CONTROL VALVE FAILURE
TO V-24701
3/4"

C-1 C-1 C-1 6Q8


5134289
C-2

D SET@
1" 480 kPa-g
RV N/A
NC
5096787 002 ET 10
8"-VA-248005-PJB(0.4)
C-1 C-1
8"x6"

3/4"
V 3/4"
5134289
C-1
5242525
CSO
C-1
8"

TO GRADE WITHIN
TEG CONTAINMENT AREA
2"-GC-248003-PJB(0.4)
8"-GC-248005-PJB(0.4)

RICH TEG ET 10 4"x3"


3"-KP-248005-PJB(0.4)
12380 248.002 38
FROM E-24801 TWO PHASE FLOW
V
MIN 10D

C-3
2"
?

24"
4"
MW
8" 10" 2"
5134289
3/4"

KO TEG
2" C-2
ET 10
2"-KP-247002-PJB(0.4) ?
12373 247.009 38 MAKE-UP TEG
HHLL=1100 mm 2" C-2 ET 10
FROM V-24708 TWO PHASE FLOW NNF 38 2"-KP-248022-PAB
HLL=750 mm 248.005 12831

V-24803 NLL=710 mm 5063244 INTERMITTENT FROM P-24802 (S-24802) ISSUED FOR ESTIMATE B
3 C-2
PJB(0.4)
PAB

H
LG LT LI 11 Jul 2011
LLL=350 mm 005 005 005
L
MAG
LLLL=250 mm E HH
2"
SO 004 G 07/11/11 ISSUED FOR PHA III
? F 04/20/11 ISSUED FOR ESTIMATE
C-2
E 03/01/11 ISSUED FOR PHA II

3"-KP-248007-PJB(0.4)
2"

TWO PHASE FLOW


D 01/10/11 ISSUED FOR CLIENT REVIEW
?
MIN

3/4"

C 12/02/10 ISSUED FOR INTERNAL REVIEW


C-2

C-2
?

B ISSUED FOR PRELIMINARY REVIEW


ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT
REV
LC SIGNAL DATE APP
5134289
3/4"

C-2

12328 248.002
3/4" 3/4"
FROM LC-004 LV

C-2
004 ?
3" ET 10 ET 10

FILE:\\F:\1025\DRAWINGS\CO2\248\248.003.pid MODEL DATE:7/7/2011 12:08:22 PM BY:ahm14887


6"x3" 6"x3" 3"-KP-248006-PJB(0.4) 3"x1-1/2" 1-1/2" 1-1/2" 1-1/2" 3"x1-1/2"
38 38
? FC ?
5134289

1-1/2"
2"

C-2

3/4"

C-1 C-1
?

C-1
C-2
3/4" 3/4"

3/4" 3/4"

D
C-1

C-1
?

TT
004

S-3
SHELL CANADA
TI 4 5 SP QUEST CCS PROJECT
004
002
A

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT
UNIT 248 - DEHYDRATION
TEG FLASH DRUM & LEAN/RICH EXCHANGER
SCALE: NONE

248.003
SHELL DWG NO.: REV.
248.0000.000.041.003 G
4 3 2 1
4 3 2 1

V-24808 V-24807 V-24804A /B


LEAN TEG POST FILTER LEAN TEG CARBON FILTER LEAN TEG FILTER 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
SIZE: mm ID x mm T/T x SIZE: mm ID x mm T/T x SIZE: mm ID x mm T/T x GENERAL NOTES & CONNECTION DETAILS.
RATED FLOW: 1 m^3/hr RATED FLOW: 1 m^3/hr RATED FLOW: 6 m^3/hr 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "248" UNLESS OTHERWISE
DESIGN PR. &TEMP: 7200 kPa-g @ 210 °C / HV @ 150°C DESIGN PR. &TEMP: 7200 kPa-g @ 210 °C / HV @ 150°C DESIGN PR. &TEMP: 7200 kPa-g @ 210 °C / HV @ 150°C STATED.
PRESSURE DROP (CLEAN/DIRTY): / PRESSURE DROP (CLEAN/DIRTY): / PRESSURE DROP (CLEAN/DIRTY): /
3 . POSITIVE DISPLACEMENT PUMP.
MATERIAL: 304L SS + 0.4 mm CA MATERIAL: 304L SS + 0.4 mm CA MATERIAL: 304L SS + 0.4 mm CA
INSULATION TYPE/THK: / INSULATION TYPE/THK: / INSULATION TYPE/THK: / 4 . STANDBY PUMP WILL START AUTOMATICALLY ON MAIN PUMP FAILURE.
7 7 7
TRIM: KP-248035-PAN TRIM: KP-248034-PAN TRIM: KP-248032-PAN 5 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE.
PARTICLE RETENTION SIZE: 5 MICRONS KP-248033-PAN 6 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012.
PARTICLE RETENTION SIZE: 5 MICRONS
7 . ELECTRIC TRACE (ET 10).
H
PDI
D HOLDS: D
007

H • NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.


PI • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
003
PDT
007
PAB PAN
FIRE
RV PT
3/4
3/4"x1"
1"-VA-248010-PAB 007 SET@ 003
C-1 7200 kPa-g
V

3/4" 3/4"
FV

3/4" 3/4"
3/4" 3/4"

C-2
2"

C-2

C-2
TO SAFE LOCATION

?
2"-KP-248016-PAN

C-2
005

?
?
3/4"-KP-248038-PAN
LEAN TEG ET 10 2"x1" 1" 2"x1"
2" 2" 2" RS RS 2"
248.001 12616 63

5115273
? FO ? ? ?

5115273

5115273
3/4"

3/4"
C-2
TO E-24804

3/4"

C-2
C-1 C-1 C-1 C-2 C-2

C-2
3/4" 3/4"

3/4" 3/4"
D D D
C-1

C-1
H
?

?
PDC 1-1/2"
V-24804A
ET 10

ET 10

ET 10
38

38

38
016

5115273
NC

C-2
5062541

2"
H
C-1 PDC FX
D

2"-KP-248017-PAN

2"-KP-248015-PAN
015 FIRE 005
3/4
3/4"x1"
PDT PDT SET@ PAB PAN FIRE

1"-VA-248009-PAB

2"-KP-248018-PAN
016 015 7200 kPa-g 3/4"x1"
3/4
2"-KP-248020-PAN

RV
RV PAN PAB SET@
FC 1"-VA-248011-PAB 008 7200 kPa-g
009

2"-KP-248014-PAN
005 C-1

5115273 3/4"-KP-248044-PAN
C-1
TO SAFE LOCATION V
V V
5115273

3/4" 3/4"
5115273
C C
3/4" 3/4"
3/4" 3/4"

FT
C-2
3/4"

3/4"
TO SAFE

C-2
C-2
3/4" 3/4"

2"
C-2

?
C-2

?
C-2
C-2

LOCATION 3/4"-KP-248039-PAN

?
?

005
2" RS RS RS RS 2" 2" RS RS 2"
? ? NC NC
3/4"

3/4"

3/4"

3/4"
5115273
C-2
5115273

5115273
C-2

C-2
C-2

C-2 2"-KP-248019-PAN C-2 ? ?


D D C-2 D D C-2
V-24804B
V-24808 V-24807
5115273
5115273
C-2

C-2
1"

1"

C-2
2"
?
D D SP
D 004
S-9

5 6

ET 10

ET 10
38

38
LEAN TEG ET 10

C-1

C-1
2"

2"
?

?
3"-KP-248009-PAB 38
12378 248.003
FROM E-24803 3/4"
D 3/4"
5115273 D
C-1 5115273
5063244 B
C-1
C-1
ISSUED FOR ESTIMATE

5063244
C-1
ET 10
BLOCKED 11 Jul 2011
38
BLOCKED DISCHARGE
DISCHARGE 1D2
1D2 SET@
2"-KP-248012-PAN

PG 7200 kPa-g PG G 07/11/11 ISSUED FOR PHA III


SET@

2"-KP-248013-PAN
7200 kPa-g 012 013
RV F 04/20/11 ISSUED FOR ESTIMATE
RV 005 E 03/01/11 ISSUED FOR PHA II
003 C-1 D 01/10/11 ISSUED FOR CLIENT REVIEW
C-1
C 12/02/10 ISSUED FOR INTERNAL REVIEW
B ISSUED FOR PRELIMINARY REVIEW
2"-KP-248041-PAN

ISSUED PEM CLIENT

2"-KP-248043-PAN
REV DESCRIPTION BY CKD PRS CS PDP MC APE
DATE APP
1"-KP-248040-PAN 1"-KP-248042-PAN

PP 3/4" 3/4" PP 3/4" 3/4"

? ?

FILE:\\F:\1025\DRAWINGS\CO2\248\248.004.pid MODEL DATE:7/7/2011 4:30:49 PM BY:ahm14887


C-2 PP C-2 HOA
PP HOA
E HS E HS
? ?
C-2 01 005A C-2 01 006A
3"-KP-248010-PAN
SP

3/4" 3/4"
3/4" 3/4"

PAN
PAN
PAB

SP PAB 003B
C-2

C-2
4 4
?

?
003A R/S R/S
3" I HIS 3" I HIS
I I
01 005 ? 01 006
SHELL CANADA
C-1 3/4"

?
5115273

5115273

5115273
3/4"
5115273

C-1
C-1

C-1
3/4"

C-1 3/4" 3"-KP-248011-PAN


D D
C-1
D D QUEST CCS PROJECT
P-24801A P-24801B
3 3 A
XA XL SI
VFD VFD
002 002 002
P-24801A /B VFD LOCAL/
R

LEAN TEG PUMPS FAULT REMOTE


PIPING AND INSTRUMENT DIAGRAM
RATED FLOW: 6.2 m^3/hr
DIFF. PR.: 5742 kPa XA XL SI QUEST CCS PROJECT
DRIVER: 10.0 kW 001 001 001 HIC HS PUMP DUTY
CASING INTERNALS SELECTOR UNIT 248 - DEHYDRATION
MATERIAL: CS CS VFD LOCAL/ 012 007
INSULATION TYPE/THK: / FAULT REMOTE LEAN TEG PUMPS & FILTERS
TRIM: KP-248037-PAN
KP-248036-PAN SCALE: NONE

248.004
SHELL DWG NO.: REV.
248.0000.000.041.004 G

4 3 2 1
4 3 2 1

S- 24802
TEG MAKE-UP PACKAGE 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "248" UNLESS OTHERWISE
STATED.
3 . POSITIVE DISPLACEMENT PUMP WITH ADJUSTABLE STROKE.
4 . GRADUATED GLASS COLUMN FOR CONTINUOUS TOTE TANK LEVEL AND INJECTION
PUMP CALIBRATION.

HOLDS:

• NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.


D D
• INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
INSIDE OUTSIDE

3/4"-VA-248007-PAB
1"-VA-248006-PAB

?
?
1" HOSE

SP
005
?
?

6" FILL CAP


S-24802
2"x1"

C 2" C
SET@
530 kPa-g
RV
1"-VA-248008-PAB

006
1000L PT PI
TOTE TANK C-1 011 011
(REMOVABLE)
(BY SHELL)

3/4" 3/4"

C-2
INSIDE OUTSIDE MAKE-UP TEG
2" 2"x1" 2" 2" ET 10 ET 10
I N/A 2"-KP-248022-PAB
38 12831 248.003
? 02 C-1 C-1

3/4"
C-2
TO V-24803
?
PG D
2"

010
?

SP
?

D LI
006
1" HOSE

011
L C-2

2"x1"
1-1/2"x3/4"

6" FILL CAP

2" 2"x1" 2" HOSE


3/4"

LG
2" 4
009 PP

C-2
1000 L MAG
TOTE TANK LG LT HOA
1-1/2"x3/4"

(OPERATING) E HS B
X2 011 011 ISSUED FOR ESTIMATE
004 008A
3/4" 3/4"

C-2

2" 11 Jul 2011


C-2
3/4"

2" 2" HOSE 2" 2" R/S


I HIS
I
C-1 002 008 G 07/11/11 ISSUED FOR PHA III
3/4"

3/4"

C-1

3/4"
D D F 04/20/11 ISSUED FOR ESTIMATE
D
2"

P-24802 3 E 03/01/11 ISSUED FOR PHA II


D D 01/10/11 ISSUED FOR CLIENT REVIEW

C 12/02/10 ISSUED FOR INTERNAL REVIEW


B ISSUED FOR PRELIMINARY REVIEW

ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT


REV
DATE APP

CURB CURB

FILE:\\F:\1025\DRAWINGS\CO2\248\248.005.pid MODEL DATE:7/7/2011 12:09:35 PM BY:ahm14887


SHELL CANADA
QUEST CCS PROJECT
A

P-24802
PIPING AND INSTRUMENT DIAGRAM
TEG MAKE-UP PUMP
RATED FLOW: 620 L/hr QUEST CCS PROJECT
DIFF. PR.: 380 kPa UNIT 248 - DEHYDRATION
DRIVER: 1.00 kW
CASING INTERNALS TEG MAKE-UP TANK & PUMP
MATERIAL: CS CS
INSULATION TYPE/THK: / SCALE: NONE
TRIM:

248.005
SHELL DWG NO.: REV.
248.0000.000.041.005 G

4 3 2 1
4 3 2 1

E-44014
WASH WATER MAKE-UP COOLER 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
RATED DUTY: 0.7 MW (TOTAL) GENERAL NOTES & CONNECTION DETAILS.
SURFACE AREA: 31.8 m^2
TEMA TYPE: BEU 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY"440' UNLESS OTHERWISE
SHELL TUBE 4 STATED.
DESIGN PRESS: 3100 kPa-g / 4025 kPa-g / FV 3 . ELECTRIC TRACE (ET10) E-44014.
DESIGN TEMP: 58 °C / 150 °C / 150 °C 4 . OPEN PATH (NO BLOCK VALVES) REQUIRED FROM E-44014 (FV-440076) TO V-44119
MATERIAL: CS + 3 mm CA CS + 0.38 mm CA TO MEET SAD LINE SPECIFICATION REQUIREMENTS.
INSULATION TYPE/THK: / 3 / 3
TRIM: PROCESS SIDE: WB-440012-SAD
COOLING WATER SIDE: CWS-440077-SAD

D D
441 E HH
453

FC
FYE
076 S
L 076

FO
1-1/2"
FT FV
076 076
BFW FOR WASH WATER ET 10 1-1/2"
2"-WB-440010-SAG 2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2" 1-1/2" 2"x1-1/2"
440.021 38
? ? FC ? COOLING WATER RETURN

5115277
FROM HEADER

3/4"
? ?

?
? TW 6"-CWR-441045-UAB
441.031 12722
D 010
1" 1" FROM E-44129
? CSC 5062543

5115277

5115277
3/4"
3/4"
? COOLING WATER RETURN

?
?
? 1-1/2" 3" ET 10 8"x3"
D 38 8"-CWR-440045-UAB
440.012
SAG SAD CSO TO HEADER
?
?
4

3/4"
V
5115277
TW 1-1/2" ?
008

C C

RS
UAB
SAD

E-44014
H
TI
009
SAD
UAB

RS
TT
009
4
1-1/2" ET 10 WASH WATER
38 2"-WB-440011-SAD
12113 441.030

5115277
TO V-44119

3/4"

?
ET 10 8"x3" COOLING WATER SUPPLY
3" 8"-CWS-440075-UAB
38 440.012
?
? FROM HEADER

3"

?
?
BACK FLUSH COOLING WATER SUPPLY
6"-CWS-440076-UAB
12721 441.031
TO E-44129
ISSUED FOR ESTIMATE B
11 Jul 2011

G 07/11/11 ISSUED FOR PHA III

F 04/20/11 ISSUED FOR ESTIMATE

E 03/01/11 ISSUED FOR PHA II

D 01/10/11 ISSUED FOR CLIENT REVIEW

C 12/02/10 ISSUED FOR INTERNAL REVIEW


B ISSUED FOR PRILIMINARY REVIEW
ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT
REV
DATE APP

FILE:\\F:\1025\DRAWINGS\HMU\440\440.048.pid MODEL DATE:7/10/2011 10:26:02 PM BY:muk22296


SHELL CANADA
QUEST CCS PROJECT
A

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT
UNIT 440 - HYDROGEN MANUFACTURING UNIT
WATER MAKE-UP COOLER
SCALE: NONE

440.048
SHELL DWG NO.: REV.
440.0000.000.041.048 G
4 3 2 1
4 3 2 1
FIRE
V-44118 1-1/2H3
SET@
AMINE ABSORBER 3 RV kPa-g 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
V
SIZE: 4270 mm ID x 23500 mm T/T 023 GENERAL NOTES AND CONNECTION DETAILS.
DESIGN PR. & TEMP: 3500 kPa-g @ 95 °C / HV @ 150° C 3/4"
6"x3" 440.049 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "441" UNLESS OTHERWISE
MATERIAL(VESSEL/INTERNALS): CS + 3 mm 304L SS CLAD/ 316L SS 6"-FL-441035-PAC STATED.

4"x1-1/2"
FL
INSULATION TYPE/THK: H / 7 FREE DRAINING 12777 3 . BOTTOM OF COLUMN IS PACKED WITH 600 mm OF #2 RASCHIG RINGS.
TRIM: P-441121-HJE(0.4) (TOP) 3/4"

3/4" 3/4"
P-441120-DJE(0.4) (BTM) CSO 4 . H2 RAW GAS BYPASS REQUIRED FOR SYSTEM PURGE AND PRESSURIZATION AT
B PAC START-UP.

CSO
HJE(0.4) 5 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012.

ET 10 FREE DRAINING

CSC
5 SP. 6 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE.

S-4
LEAN AMINE FLOW SIGNAL 050 7 . ELECTRIC TRACE TO HLL (ET 10).
6
4"-P-441097-HJE(0.4) 8 . LOCALIZED DEGASSING OF CO2 MAY OCCUR AT RESTRICTIONS, BENDS, TEES,
246.011
D 12983
ETC. RESULTING IN LOCALIZED TWO-PHASE FLOW AND VIBRATION. D
TO UC-246002

3/4" 3/4"
9 . 316 SS HARDFACED TRIM MATERIAL IS REQUIRED FOR THIS CHECK VALVE.
10. INADVERTANT SIMULTANEOUS CLOSING OF BOTH HV-014 AND HV-015 PREVENTED
H H2 RAW GAS BY INTERLOCK I-102.
16"-P-441096-HJE(0.4)
12074 441.030 11. VALVES ARE FOR BATTERY LIMIT ISOLATION OF UNIT.
SET POINT FREE DRAINING
TO V-44119 12. TOP CONNECTION.
FC
12405 246.002 E
075 V
FROM LX-246001 L 451 16"

6"
H HH HOLDS:
TI I
030 104 FYE
• NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
S 075
• INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
• CONFIRM AVAILABILITY OF DCS AND SIS INTERLOCK SEQUENCE NUMBERS ADDED
TT FT FV FOR QUEST.
030 075 FO 075
14"-P-441102-DAE 36"
LEAN AMINE 11 1-1/2" MW
ET 10 10" 18"x14" 18"
14"-P-441101-DAG 14"-P-441103-DJE(0.4)
12072 485.213 M

FROM P-24602A/B/C 14"x10" FC 14"x10" MIN


3/4"

V-44118

3/4"

3/4"
D D DAE DJE(0.4) PDT 3" 3"
10" 064 25

CSC H
PDI
DAG DAE
064

E
450
HZTE E
I
C 015 453 C
104
I
HYE
103
S 015
10
I HIC
102 015
FO

12" H2 RAW GAS


ET 35 20"x12"
20"-P-441095-HJE(0.4) 88 20"-P-441095-HJE(0.4)
12110 441.030
FO 20"x12" BYPASS TO HMU 3 PSA

HV
E 015
453
HIC
014 E
450
1
HYE 24"
I S 014 HZTE MW
10
102 014
3" 3"
FO SP.
3/4"

16" 12 051 9
H2 RAW GAS ET 35 24"x20" 24"
20"-P-441094-HJE(0.4)
12077 441.016 88
20"x16" FC 20"x16" MIN PP
FROM HMU 3 MIN
E HH
HV
014 451
B

3/4"
GWR

3/4" 3/4"
E LTE 3" 3"
MIN

450 154
LL
CSC

3/4"
3/4"

3/4" 2" 2" 2" 2"


4
G 06/13/11 ISSUED FOR PHA III
HHLL=4000 mm 14
V DP F 04/20/11 ISSUED FOR ESTIMATE
2"

HJE(0.4)
H
3/4"

440.046 ULB LT LI LHS LC E 03/01/11 ISSUED FOR PHA II


2"-GI-440072-ULB 2"
GI HLL=3300 mm 155A 155A 155 155 D 01/10/11 ISSUED FOR CLIENT REVIEW
13014
START-UP 7 L
SWING C 12/02/10 ISSUED FOR INTERNAL REVIEW
ELBOW NLL=2550 mm 24"
MAG B ISSUED FOR PRELIMINARY REVIEW
MW
LG LT LI REV
ISSUED DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT
DATE APP
2" 2" LLL=1800 mm 3" 3" 155 155B 155B
3/4"

E
3/4"

XZI
3" 2" 2" 450 020
SWING
ELBOW LLLL=300 mm

FILE:\\F:\1025\DRAWINGS\HMU\441\441.029.pid MODEL DATE:6/14/2011 1:17:42 PM BY:bes29451


D
3/4"

3/4"

TI
D
SO XYE
020 031
s
2"x3/4"
2"-P-441105-DJE(0.4)
A/S 3/4"
3 D
440.018 FO
3"-SL-440XXX-SAB 3" XZTE
SL
12724
020
XV
TT
031 8" SHELL CANADA
3/4"

LV 10"-P-441104-DJE(0.4)
4500 mm

N/A 020
ET 10 D 155 11 QUEST CCS PROJECT
20"x12" 1-1/2" 10"x8" ET 10 RICH AMINE
20" 10"-P-441104-DJE(0.4) 10"
1"-SL-441XXX-SAB 12076 485.213
440.018 12"x10"
FC FC
10"x8"
A
TO E-24602A/B
4"

3/4"
1"-SCL-441XXX-SAB D

3/4"
SCL T 8
TWO PHASE FLOW

3/4"
D D
3/4"

12723 3/4"
D R
3/4"

S-9 PIPING AND INSTRUMENT DIAGRAM


4"-P-441106-DJE(0.4)
QUEST CCS PROJECT
4"

SP 6 5
SP
052 UNIT 441 - HYDROGEN MANUFACTURING UNIT TRAIN 3
053
ISSUED FOR HAZOP
VACUUM TRUCK AMINE ABSORBER 3
SCALE: NONE

441.029
SHELL DWG NO.: REV.
441.0000.000.041.029 G
4 3 2 1
4 3 2 1

V-44119 FI
074B
ABSORBER 3 WASH WATER VESSEL 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
SIZE: 2100 mm ID x 11100 mm T/T FV GENERAL NOTES & CONNECTION DETAILS.
DESIGN PR. & TEMP: 3500 kPa-g @ 60 °C / HV @ 150 °C 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "441" UNLESS OTHERWISE
MATERIAL(VESSEL/INTERNALS): CS + 3 mm 304L SS CLAD / 316L SS FC SIGNAL STATED.
INSULATION TYPE/THK: H/ 5 FX
P-441126-HJE(0.4) 3 441.016 12714 3 . CALCULATE AMOUNT OF CO2 REMOVED FROM RAW H2 GAS.
TRIM: 074B
FROM FC-377 4 . H2 RAW GAS BYPASS REQUIRED FOR SYSTEM PURGE AND PRESSURIZATION AT
START-UP.
5 . ELECTRIC TRACE TO HLL (ET 10).
SET POINT 6 . EITHER LTE-441156 OR LTE-441159 SHALL BE SELECTABLE AS THE INPUT TO
FI FHS SAFETY INTERLOCKS E-452 AND E-453. A DEVIATION ALARM TO MONITOR THE
12864 443.003 TWO INSTRUMENTS SHALL BE PROVIDED AT THE DCS.
074A 074
D TO HMU 3 PSA SKID 7 . HAND SWITCH TO SEND FLOW SETPOINT FROM FC-377 TO PSA WHEN QUEST IS D
ISOLATED.
7
f(x) 8 . TWO CHECK VALVES IN SERIES, ONE IN THE HORIZONTAL AND ONE IN THE
VERTICAL POSITION, SEPARATED BY AT LEAST 500 mm.
FX
H2 RAW GAS 074A
ET 35
20"-P-441095-HJE(0.4) 88
12110 441.029 HOLDS:
FROM HMU 3 BYPASS
CO2 CO2 LEAN • INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
AI I • SCOPE FOR SIGNAL TRANSFER TO PSA PLC TO BE DETERMINED.
H
PC 016 101 • INTERLOCK I-101 ACTIONS, IF ANY, TO BE CONFIRMED.
CO2 RICH
067 HOLD • CONFIRM AVAILABILITY OF DCS AND SIS INTERLOCK SEQUENCE NUMBERS
ADDED FOR QUEST.
H
PV AIT TI
067 016 032
6" 10"x6" ET 10 440.049
10"-FL-441036-PAC FL
FC FREE DRAINING
DETAIL "B"
12775
TSO

3/4"
3/4" 3/4" 440.049
HJE(0.4) PAC AE
E FL
016

ET 38
12912

88
450
PI AP 3/4" 3/4"
E 065 016C
453

6"-P-441099-HJE(0.4)
INST
PIPING
XYE
019 PT AP FLOW
PT S
065 016B
067 TT FT
A/S

FREE DRAINING
AP 032 074
XZTE FO 016A

3/4" 3/4"
C C

3/4" 3/4"

3/4" 3/4"
019 XV 20"-P-441098-HJE(0.4)
INST
16" 019 1-1/2" H2 RAW GAS
20"x16" PIPING ET 35
88 12111 441.016
FREE DRAINING FC
TO HMU 3 PSA
DETAIL "B"
2"

3/4"
3"
V 16"
CSC

3"
3"
4

24"
MW

H
PDT PDI
8 8 066 066
WASH WATER 3"x2" 3"
2"-WB-440011-SAD 24"
12113 440.048 V-44119 MW
FROM E-44014 MIN
9
SAD HJE(0.4)
HJE(0.4) PJE(0.4)
7
8 8
6" 6"x4" ET 10 CIRCULATING WATER
24" 4"-P-441113-PJE(0.4)
441.031 12415
MW
FROM E-44129
6

GWR PP
LTE B
156
1 3" 3"
H2 RAW GAS H 18"x16" 18"
3/4"

3/4" 3/4"
16"-P-441096-HJE(0.4)
12074 441.029
FREE DRAINING
3/4"

3/4"

FROM V-44118 3/4" 2" 3" 3" G 06/13/11 ISSUED FOR PHA III
2"
F 04/20/11 ISSUED FOR ESTIMATE
3/4"

3/4"

3" 3" 2" 2" E 03/01/11 ISSUED FOR PHA II


LI H 6 HHLL=2550 mm
MAG D 01/10/11 ISSUED FOR CLIENT REVIEW
156 L
LG LT LI C 12/02/10 ISSUED FOR INTERNAL REVIEW
DP 24"
HH 2" 2" HLL=2380 mm MW 157 157A 157A B ISSUED FOR PRELIMINARY REVIEW
E LTE DP
H 2" 2" LC SIGNAL ISSUED DESCRIPTION BY CKD PRS CS MC PEM CLIENT
LI 453 159 LT LI LHS REV
DATE
PDP APE
APP
3/4"

6 NLL=1070 mm 12416 441.031


159 E 157B 157B 157A
3/4"

L 5
3/4"

TO LC-157
3/4"

452 LL LLL=910 mm
D 3" 3" 3" 3" D
3/4"

FILE:\\F:\1025\DRAWINGS\HMU\441\441.030.pid MODEL DATE:6/14/2011 2:17:59 PM BY:bes29451


3/4"

LLLL=300 mm
2"

SO

8"
SHELL CANADA
CIRCULATING WATER
7860 mm

8"x6" ET 10
6"-P-441107-PJE(0.4)
12414 441.031 QUEST CCS PROJECT
TO P-44108A/B
A
3"

PIPING AND INSTRUMENT DIAGRAM


QUEST CCS PROJECT
UNIT 441 - HYDROGEN MANUFACTURING UNIT TRAIN 3
ISSUED FOR HAZOP ABSORBER 3 WASH WATER VESSEL
SCALE: NONE
SHELL DWG NO.: REV.

441.030
441.0000.000.041.030 G
4 3 2 1
4 3 2 1

E-44129
ABSORBER 3 CIRCULATING WATER COOLER 1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
RATED DUTY: 0.3 MW GENERAL NOTES & CONNECTION DETAILS.
SURFACE AREA: 49.3 m^2
TEMA TYPE: BEU 2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "441" UNLESS OTHERWISE
SHELL TUBE STATED.
DESIGN PRESS: 3800 kPa-g / HV 2950 kPa-g / 3 . FOR PIPING DETAILS OF SAMPLE STATION SEE DRAWING 200.0000.000.041.012.
DESIGN TEMP: 60 °C / 150 °C 58 °C / 4 . CV OF CONTROL VALVE TO BE MINIMUM.
MATERIAL: CS + 3 mm 304L SS CLAD SUPER DUPLEX 2507 + 0.38 mm CA 5 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE.
INSULATION TYPE/THK: / 6 / 6
TRIM: P-441122-PJE(0.4) CWR-441XXX-PJE(0.4) 6 . ELECTRIC TRACE (ET 10).
7 . AUTO-START STAND-BY PUMP ON RUN FAILURE OF PRIMARY PUMP.
8 . VALVES ARE FOR BATTERY LIMIT ISOLATION OF UNIT.

D D
HOLDS:

• INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.


LC SIGNAL H • CONFIRM AVAILABILITY OF DCS AND SIS INTERLOCK SEQUENCE NUMBERS
LC LHS ADDED FOR QUEST.
12416 441.030
157 157B
FROM LHS-157A L
LV
157A

4
2"x1" 1"
FC 2"x1"

3/4"
8 PURGE WATER
D ET 10
38 2"-P-441116-PJE(0.4)
LV 441.013
157B TO V-44111

3/4"
2"x1" 1"

2"-P-441115-PJE(0.4)
FC 2"x1"

3/4"
E XZI
D 4 PI
452 018

3/4"
070
SP
054
XYE
S 018 3/4" PT
S-8 TW
A/S 070
035 V
FO 3 5 TG
XZTE

2"
034 1-1/2" COOLING WATER RETURN

3/4" 3/4"
018 XV ET 10
50 6"-CWR-441045-UAB
12722 440.048
018 1-1/2"
C CIRCULATING WATER
6"-P-441107-PJE(0.4)
ET 10 6"x4" 4"-P-441112-PJE(0.4) TO HEADER C
12414 441.030 50 CSO
FC 3/4"
FROM V-44119 6"x4" D

NC
UAB

RS
6
PJE(0.4)

4"-P-441XXX-PJE(0.4)
FC I
077 L 103 LL E-44129

PJE(0.4)
TG FT

RS
UAB
033 077

CIRCULATING WATER 1-1/2" COOLING WATER SUPPLY


ET 10 6"x4" 6"x4" 4"x3" 4"x3" ET 10
4"-P-441113-PJE(0.4) 38 4"-P-441113-PJE(0.4) 50 6"-CWS-440076-UAB
441.030 12415 440.048 12721

TO V-44119 FROM HEADER


3/4"

4"
D
D
BACK FLUSH

HS SEL
ET 10
50

B
7 7
R/S HOA R/S HOA
HIS I HS HIS I HS
016 100 016A 017 100 017A

G 06/13/11 ISSUED FOR PHA III

3/4" F 04/20/11 ISSUED FOR ESTIMATE


VFD VFD
V XA XA
E FAULT 3/4" FAULT E 03/01/11 ISSUED FOR PHA II
4"-P-441110-PJE(0.4)

4"-P-441111-PJE(0.4)
I 016 V E
I 017
ET 10

ET 10
452 D 01/10/11 ISSUED FOR CLIENT REVIEW
LOCAL/ 452
ET

ET
LOCAL/
ET 10

XL REMOTE XL
50

REMOTE C 12/02/10 ISSUED FOR INTERNAL REVIEW


016
ET 10

017 ISSUED FOR PRELIMINARY REVIEW


50

B
SI 3/4" SI 3/4" ISSUED
VFD DESCRIPTION BY CKD PRS CS PDP MC APE PEM CLIENT
VFD REV
DATE APP
MIN.

MIN.
6"-P-441108-PJE(0.4)

6"-P-441109-PJE(0.4)

D D
PP TO PP TO
GRADE GRADE

FILE:\\F:\1025\DRAWINGS\HMU\441\441.031.pid MODEL DATE:6/14/2011 1:17:46 PM BY:bes29451


PP 3/4" PP 3/4"
SP SP
3/4"

055
3/4"

055

3/4 3/4
" "
3/4"

3/4"

D D
SHELL CANADA
3/4"

3/4"

D D P-44108B
D P-44108A D
QUEST CCS PROJECT
A

P-44108A /B 7
PIPING AND INSTRUMENT DIAGRAM
ABSORBER 3 CIRCULATING WATER WASH PUMPS
RATED FLOW: 56.5 m^3/hr
ISSUED FOR HAZOP QUEST CCS PROJECT
DIFF. PR.: 233 kPa
DRIVER: 5.6 kW UNIT 441 - HYDROGEN MANUFACTURING UNIT TRAIN 3
CASING INTERNALS
MATERIAL: 316 SS 316 SS
ABSORBER 3 WASH WATER COOLER
INSULATION TYPE/THK: / 6 SCALE: NONE
TRIM: P-441123-PJE(0.4)
SHELL DWG NO.: REV.

441.031
441.0000.000.041.031 G
4 3 2 1

You might also like