SECTION 4 – FLEXIBLE PAVEMENT

4.5 HORIZONTAL ALIGNMENT, SURFACE LEVELS AND SURFACE


REGULARITY OF PAVEMENT COURSES ....................................................................... AS4-1

4.5.1 HORIZONTAL ALIGNMENT .................................................................................................. .. AS4-1


4.5.2 SURFACE LEVELS OF PAVEMENT COURSES ..................................................................... AS4-1
4.5.3 SURFACE REGULARITY .......................................................................................................... AS4-1

AS4 - i
SECTION 4 – FLEXIBLE PAVEMENT
_______________________________________________________________________________

This Addendum shall be made part of the `JKR Standard Specification For Road Works, Section 4:
Flexible Pavement - JKR/SPJ/2008-S4 ’.

4.5 HORIZONTAL ALIGNMENT, SURFACE LEVELS AND SURFACE REGULARITY OF


PAVEMENT COURSES

4.5.1 HORIZONTAL ALIGNMENT

Please refer to the JKR/SPJ/2008-S4.

4.5.2 SURFACE LEVELS OF PAVEMENT COURSES

Please refer to the JKR/SPJ/2008-S4.

4.5.3 SURFACE REGULARITY

After first paragraph, add the following paragraph:-

The regularity of surfaces shall be within the relevant limits given in Table 4.5.3.

A longitudinal irregularity is a variation in profile of the road surface as measured by the rolling
straight-edge or wedge and straight-edge device. The permissible number of such longitudinal
irregularities is indicated in Table 4.5.3.

The traverse length of 300 m and its associated maximum permissible number of irregularities
shall apply wherever the continuous length of the completed carriageway is 300 m or more,
whether or not it is constructed in shorter lengths.

Where the total length of pavement is less than 300 m the measurements shall be taken on 75 m
lengths.

The transverse regularity of a newly laid surface shall be measured with a 3 m straight-edge and
shall have no greater depression under the straight-edge than that shown in Table 4.5.3.

AS4(1)-1/2
TABLE 4.5.3 – TOLERANCE FOR SURFACE IRREGULARITIES

Longitudinal Direction Transverse


Direction

Maximum Permissible Number of Surface Irregularities


Class of Surface Maximum
Regularity Permissible
Depth Exceeding 4 mm Depth Exceeding 7 mm Depth of
Transverse
Over Over Over Over Irregularities
traverse traverse traverse traverse
length of length of length of length of
300m 300m 300m 75 m

Class SR 1 20 9 2 1 4 mm

Class SR 2 40 18 4 2 8 mm

Class SR 3 60 27 6 3 12 mm

No longitudinal irregularity exceeding 10 mm shall be permitted for Class SR 1 Surface


Regularity and no longitudinal irregularity exceeding 15 mm shall be permitted for Class SR2 and
Class SR3 Surface Regularities.

The class of Surface Regularity for each portion of the Works shall be as stated on the Drawings
or in the Bill of Quantities

For further specifications related to sub-clause 4.5.3, please refer to the


JKR/SPJ/2008-S4.

AS4(1)-2/2
FOR INTERNAL USE ONLY Standard Specification For Road Works

4.2.5 Bituminous Macadam 4.2.5.3 Equipment

4.2.5.1 Description The equipment shall be all as


specified in Sub-Section 4.2.4.4.
This work shall consist of furnishing,
placing, shaping and compacting 4.2.5.4 Construction Methods
bituminous macadam roadbase
and/or levelling course and/or binder All the provisions of Sub-Section
course and/or wearing course on a 4.2.4.5 for the construction of
prepared and accepted bituminous or asphaltic concrete pavement courses
bitumen primed pavement course, shall apply as appropriate to the
and shall include the careful and construction of bituminous macadam
thorough cleaning of surfaces which pavement courses with the
are to be covered without receiving a following variations and additions.
bituminous tack coat. The work shall
be carried out all in accordance with (a) Aggregate Heating
this Specification and the lines,
levels, grades, dimensions and cross- The aggregates shall be dried and
sections shown on the Drawings heated so that when delivered to the
and/or as required by the S.O. mixer they shall be at a temperature
in the range 140 oC to 160 oC.
4.2.5.2 Materials
(b) Rolling Temperature
The materials for bituminous
macadam (aggregates, mineral filler, The temperature of bituminous
bituminous binder and anti-stripping macadam at the commencement of
agent) shall comply with all the rolling shall be not less than 100 oC.
requirements of Sub-Section 4.2.4.2,
except for the combined gradation (c) Compacted Density
requirements.
The compacted density of
For each bituminous macadam mix, bituminous macadam shall be as
the gradation of the combined coarse follows :-
and fine aggregates, together with
ordinary Portland cement added as
an adhesion and anti-stripping agent Type of Pavement Required Compacted
Layer Density
and, if necessary, any other mineral
filler, shall conform to the Bound roadbase 90 - 100% Marshall
appropriate envelope given in Table density
4.12. The binder content shall also be Levelling course 90 - 100% Marshall
density
in accordance with Table 4.12.
Binder course 95 - 100% Marshall
Where the characteristics of the density
aggregates require a binder content Wearing course 98 - 100% Marshall
density
other than that given in the above
Table, the revised target binder
content shall be agreed between the
Contractor and the S.O. and the same
tolerances shall apply.

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 116


FOR INTERNAL USE ONLY Standard Specification For Road Works

The Marshall density of a Bituminous macadam levelling


bituminous macadam mix is defined course shall be finished in a neat and
as the average density of a set of workmanlike manner; its dimensions
three test specimens moulded in the shall be as specified or shown on the
same way as asphaltic concrete Drawings or as directed by the S.O.,
specimens are prepared for the all to the satisfaction of the S.O. The
standard stability and flow test in top surface of bituminous macadam
accordance with AASHTO Test levelling course shall have the
Method T 245 using the 75 blows
per face compaction standard. The required shape,, superelevation,
bulk specific gravity of the levels and grades, and shall be every
specimens shall be determined in where within the tolerances for
accordance with AASHTO Test binder course specified in Sub-
Method T 166. Section 4.4.

The Marshall density of each mix Bituminous macadam binder and


shall be determined using a sample wearing courses shall be finished in a
(or samples) taken from the mixing neat and workmanlike manner; their
plant soon after the commencement widths shall be everywhere at least
of preparing each mix for the Works. those specified or shown on the
(Note : Stability and flow tests are Drawings on both sides of the
not normally required for bituminous centre-line; the average thickness
macadam mixes.) over any 100 metre length shall be
not less than the required thickness,
(d) Finished Bituminous Macadam and the minimum thickness at any
point shall be not less than the
Bituminous macadam roadbase shall required thickness minus 5 mm. The
be finished in a neat and top surface of a wearing or binder
workmanlike manner; its width shall course shall have the required shape,
be everywhere at least that specified superelevation, levels and grades,
or shown on the Drawings on both and shall be everywhere within the
sides of the centre-line; and its tolerances specified in Sub-Section
average thickness over any 100 4.4.
metre length shall be not less than
the required thickness. The top
surface of bituminous macadam
roadbase shall have the required
shape, superelevation, levels and
grades, and shall be everywhere
within the tolerances specified in
Sub-Section 4.4.2.

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 117


FOR INTERNAL USE ONLY Standard Specification For Road Works

TABLE 4.12 - GRADATION LIMITS AND BINDER CONTENTS


FOR BITUMINOUS MACADAM

Mix Type Bound Bound Levelling Binder Binder Wearing Wearing


Roadbas Roadbase Course Course Course Course Coursex
e
Mix BMR40 BMR28 BML10 BMB28 BMB20 BMW14 BMW20
Designatio
n
B.S. Test % by Weight
Sieve Passing
50.0 mm 100 - - - - - -
37.5 mm 95 - 100 100 - 100 - - -
28.0 mm 70 - 94 90 - 100 - 90 - 100 100 - 100
20.0 mm - 71 - 95 - 71 - 95 95 - 100 100 95 - 100
14.0 mm 56 - 76 56 - 80 100 58 - 82 65 - 85 95 - 100 65 - 85
10.0 mm - - 85 - 100 - 52 - 72 70 - 90 52 - 72
6.3 mm 44 - 60 44 - 60 30 - 60 44 - 60 39 - 55 45 - 65 39 - 55
3.35 mm 32 - 46 31 - 45 15 - 25 32 - 46 32 - 46 30 - 45 32 - 46
1.18 mm - - - - - 15 - 30 -
300 mm 7 - 21 7 - 21 - 7 - 21 7 - 21 - 7 - 21
75 mm 2-9 2-8 2-6 2-8 2-8 3-7 2-8

Binder 3.5 " 4.0 " 5.1 " 4.7 " 4.7 " 5.0 " 4.9 "
Content
± ± ± ± ± ± ±
0.5% 0.5% 0.5% 0.6% 0.6% 0.5% 0.5%

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 118