Professional Documents
Culture Documents
Eot Crane Quarterly Checksheet
Eot Crane Quarterly Checksheet
No : RS/MW/GND/39
ROLLING STOCK DEPARTMENT Rev No: 00
PREVENTIVE MAINTENANCE RECORD DATE :
Name of M&P: E.O.T CRANE SCHEDULE : Quarterly
1. Safety
Switch off the power supply prior to any maintenance and put UNDER MAINTENANCE
Board on the panel, also switch off the CB of respective crane.
Visually check operation of thrusters during hoist movement of EOT crane.
2. Tools and Equipments Required
(a) Paint Brush (b) Torch (c) Spanners (d) Dust clothes (e) Sand papers (f) Safety Helmet
(g) WD-40 (h) Grease. (i) Lubrication Oil
NOTE:- Use scissor lift to access bridge area of crane to check for any fault( WS, PWL).
Task Equipment Maintenance Actions OK / Remarks
No NOT OK
CRANE BRIDGE
1 Main Girder Check for any Mechanical Damage.
Check for any weld seems for cracks.
Name
Checked By Signature
Name