THANG LONG 2x300MW THERMAL POWER PLANT PROJECT Owner ¢ 2 THANG LONG POWER PLANT TIPA: C4) JOINT STOCK COMPANY Owner Consultant FICHTNER GmbH & Co. KG EPC Contractor KAIDI ELECTRIC POWER ENGINEERING CO., LTD. Designer | °""| SOUTHWEST ELECTRIC POWER DESIGN INSTITUTE CO., LTD. SWEPDI DocumentTitle: DESCRIPTION OF ELECTRICAL PRIMARY PART FAD i EPC Contract No.: 291210/EPC/TLP-KD Design Stage: DETAIL Document No. :50—F416S-D0101-01 Rev. No.:C C | 23Nov.2016 | Modified by owner's comments 4,771, | FE, 4 ay | g B | 90ct.2016 | Modified by owner's comments | &X 2 | TK H RAS | RA A | 28 Jun. 2016 First issue RAB | KH BAG | BO Rev. Date Description Prepared | Checked | Reviewed | Approved