THANG LONG 2x300MW
THERMAL POWER PLANT PROJECT
Owner ¢ 2 THANG LONG POWER PLANT
TIPA:
C4) JOINT STOCK COMPANY
Owner Consultant
FICHTNER GmbH & Co. KG
EPC Contractor KAIDI ELECTRIC POWER ENGINEERING
CO., LTD.
Designer | °""| SOUTHWEST ELECTRIC POWER
DESIGN INSTITUTE CO., LTD.
SWEPDI
DocumentTitle:
DESCRIPTION OF ELECTRICAL PRIMARY PART
FAD i
EPC Contract No.: 291210/EPC/TLP-KD Design Stage: DETAIL
Document No. :50—F416S-D0101-01 Rev. No.:C
C | 23Nov.2016 | Modified by owner's comments 4,771, | FE, 4 ay | g
B | 90ct.2016 | Modified by owner's comments | &X 2 | TK H RAS | RA
A | 28 Jun. 2016 First issue RAB | KH BAG | BO
Rev. Date Description Prepared | Checked | Reviewed | Approved