Project Name: MASRAF AL RAYAN HEAD OFFICE PROJECT at SEEF LUSAIL – QATAR
Project No.: 1328/18 / DJ-748
CONTRACTOR’S REPLY SHEET
DOC. REF. NO.: MARHQ-ADE-MTL-MEC-00150 REV. 00
TYPE OF DOC.: MATERIAL SUBMITTAL
DESCRIPTION: MATERIAL SUBMITTAL FOR GARBAGE CHUTE SYSTEM
Maurice Bayeh
Page 1 of 1
INDEX
COMPANY PROFILE
1.
LEGAL DOCUMENTS OF MANUFACTURER
2.
ISO CERTIFICATES
3.
PROJECT SPECIFICATION
4.
COMPLIANCE STATEMENT
5.
TECHNICAL DATASHEET
6.
QCDD CERTIFICATES
7.
TEST CERTIFICATES
8.
COUNTRY OF ORIGIN
9.
PROJECT REFERENCES
10.
PREVIOUS APPROVALS
11.
WARRANTY CERTIFICATE
12.
LOCAL AGENT/ SUPPLIER’S DETAILS
13.
MANUFACTURER’S AUTHORIZATION
14.
Lebanon: T. +961-1381381 F. +961-1383000 P.O. Box. 1165228 Beirut www.contraintl.com Qatar: T. +974-44429459 F. +974-44429435 P.O. Box. 24376 Doha
1
COMPANY PROFILE
Lebanon: T. +961-1381381 F. +961-1383000 P.O. Box. 1165228 Beirut www.contraintl.com Qatar: T. +974-44429459 F. +974-44429435 P.O. Box. 24376 Doha
CONTRACTING CAPABILITY
_CONTRACTING
www.contraintl.com
_
E
COMPANY PROFILE
Contra International stems from a Our Vision is to provide services and products that are
century old business rooted in Lebanon.
continuously developed and improved to meet today’s
We started operations in the G.C.C. in
2005 and, since then, we have grown into demanding market all while preserving our environment
a multi-tasked workforce catering for the
and natural resources.
construction industry, GREEN technology
and operating over three continents.
Our people and technologies make us a leader in the
Our headquarters are in Lebanon, with fields where we operate. We work together to constantly
full-fledged satellite offices in Qatar and
improve customer satisfaction, employee opportunity and
UAE and Ivory Coast.
brand value.
At Contra International we Think
GREEN®. We specialize in the design,
supply and installation of Green Products
& Technologies including but not limited
to Solar air-conditioning and Solar
lighting, Power generation, LED lighting,
as well as Land, Water and Air Quality
Improvement. At Contra International we strive to achieve continuous
From Chutes to Exhausts, Ducts, Building improvement of our own individual performance,
Automation and Security, our product creativity, and professionalism, thereby reaching more
lineup helps turning every facility into a
than the sum of the parts we touch and achieving
sustainable, healthy, and safe quarter.
Synergy!
ORGANIZATION CHART
Contra International management and employees bag a high standard of excellence and expertise, therefore
providing their valued clients with the utmost levels of satisfaction. The company’s systems are well established
yet flexible to suit most user requirements.
Contra International is a company committed to making a difference for our employees, our customers, the
environment and the communities we serve. As an industry leader, we commit our knowledge and experience
to lead by example, tackling the toughest engineering challenges from a conservationist’s stand point. All our
products are selected to have a positive impact on the environment and sustainability.
TOTALLY INTEGRATED SOLUTIONS
“A local company;
A global portfolio”
England, Italy, UAE,Qatar, KSA, China, India Canada,
EUROPE
ASIA
AMERICAS
ME&A
We
Theare an environmental
Environmental company.
Divisions What’s
at Meinhardt, more,
based in
Hong
we Kong
strive to and
be Melbourne, offervalued
a trusted and a wide range of
community
environmental services to state and local
partner, and we commit our resources and
governments, industry, developers and civil cont
resourcefulness to programs that build-up our
communities and our cities.
The brand says it all. Upon introducing the garbage and linen chutes to the GCC market in 2005, we
revolutionized the chute industry. We still are the only supplier that provides PLC controlled chutes compatible
with world known BMS, fire alarms, and vacuum collection systems. In 2012, and because of our rebranding
strategies, we renamed our chutes as GREEN® Chutes. By producing our chutes locally, we were able to
reduce our prices without affecting the quality required by our clientele. We continue to produce our complete
chute components in first class facilities as we have done since 2004.
Get us involved in the planning stages, or when the job is started and rest assured
that costly delays will be eliminated. As for certifications, our chutes are produced
according to the stringiest European standards: UNI EN ISO 9002, TÜV, IMQ-
QUALITY CIG, VKF, AEAI N 10401, CSTB and AQM.
Think GREEN® _Public Furniture
Safes
Steel Works Division
Contra International Steel Division is committed to providing you with top quality structural steel fabrication
products, as well as welding and installation services. Although young, our company quickly became a trusted
partner for major industry players. Our dedication to quality and versatility, along with our consideration for the
customer's deadlines and unique requirements, have set us apart from competition and gave us the ability to
complete the most complex projects that other companies usually back down from. Today, our services include:
Railings
CISD manufactures, assembles, and installs steel stairs and railings for a
variety of facilities. From simple to complex designs, from small
residential to large commercial and industrial projects - our team can
handle it all, exceeding your expectations and industry standards at
every step of the process.
Steel Stairs
Our professionals will build the stairs based on your specifications and
design. Some of the styles we handle include straight and spiral stairs,
rolling ladders, emergency stairs, vertical stairs, and specialty designs
depending on your facility and requirements. We also complete railings
for staircase and unique architectures.
All detailing and drafting work is done in-house using some of the most advanced steel detailing programs.
We can incorporate, concrete, wood, glass, mechanical components and equipment that interact and
may interfere with the steel structure. Our models can be used to cover the entire building process
from conceptual design to structural steel fabrication, erection, and construction management. This
ensures that we provide accurate and complete information to all members of the construction team.
Careful precision of on-site layout and calculations are made prior to steel fabrication to ensure ease and
timely installat
REFERENCE PROJECTS
2
LEGAL DOCUMENTS OF
MANUFACTURER
Lebanon: T. +961-1381381 F. +961-1383000 P.O. Box. 1165228 Beirut www.contraintl.com Qatar: T. +974-44429459 F. +974-44429435 P.O. Box. 24376 Doha
><Bar Code
**31928
5000562835 ﺭﻗﻢ ﺍﻟﺘﺴﺠﻴﻞ ﺍﻟﻀﺮﻳﺒﻲ: 31928 ﺭﻗﻢ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻯ:
ﺍﻟﺴﻤﺔ ﺍﻟﺘﺠﺎﺭﻳﺔ: ﻛﻮﻧﺘﺮﺍ ﺍﻧﺘﺮﻧﺎﺷﻴﻮﻧﺎﻝ ﺩﻭﺣﻪ ﺍﻷﺳﻢ ﺍﻟﺘﺠﺎﺭﻯ:
31/12/2022 ﺗﺎﺭﻳﺦ ﺍﻧﺘﻬﺎﺀ ﺍﻟﺴﺠﻞ: 02/01/2006 ﺗﺎﺭﻳﺦ ﺍﻧﺸﺎﺀ ﺍﻟﺴﺠﻞ:
200000 ﺭﺍﺱ ﺍﻟﻤﺎﻝ: ﺷﺮﻛﺔ ﺫﺍﺕ ﻣﺴﺌﻮﻟﻴﺔ ﻣﺤﺪﻭﺩﺓ ﺍﻟﺸﻜﻞ ﺍﻟﻘﺎﻧﻮﻧﻰ:
ﻗﻄﺮ ﺟﻨﺴﻴﺔ ﺍﻟﻤﻨﺸﺄﺓ: ﻧﺸﻂ ﺣﺎﻟﺔ ﺍﻟﺴﺠﻞ:
1 ﻋﺪﺩ ﺍﻟﻔﺮﻭﻉ:
ﻣﻌﻠﻮﻣﺎﺕ ﺍﻻﺗﺼﺎﻝ
+97477949462 ﺃﺭﻗﺎﻡ ﺍﻻﺗﺼﺎﻝ: 24376 ﺻﻨﺪﻭﻕ ﺍﻟﺒﺮﻳﺪ:
ﺍﻟﺸﺮﻛﺎﺀ
Page 1 of 2
ﺭﻗﻢ ﺍﻟﺴﺠﻞ 31928 :
ﺗﺸﻬﺪ ﻏﺮﻓﺔ ﺗﺠﺎﺭﺓ ﻭ ﺻﻨﺎﻋﺔ ﻗﻄﺮ ﺑﺎﻥ ﺍﻟﻤﻨﺸﺎﺓ ﺍﻟﻤﺬﻛﻮﺭﺓ ﺍﻋﻼﻩ ﺳﺠﻠﺖ ﻟﺪﻳﻨﺎ
Qatar Chamber certifies that the above mentioned establishment has been registered
><Bar Code
ﺍﻟﻔﺮﻭﻉ
ﺍﻷﻧﺸﻄﺔ ﺍﻟﺘﺠﺎﺭﻳﺔ
Page 2 of 2
ﺭﻗﻢ ﺍﻟﺴﺠﻞ 31928 :
ﺗﺸﻬﺪ ﻏﺮﻓﺔ ﺗﺠﺎﺭﺓ ﻭ ﺻﻨﺎﻋﺔ ﻗﻄﺮ ﺑﺎﻥ ﺍﻟﻤﻨﺸﺎﺓ ﺍﻟﻤﺬﻛﻮﺭﺓ ﺍﻋﻼﻩ ﺳﺠﻠﺖ ﻟﺪﻳﻨﺎ
Qatar Chamber certifies that the above mentioned establishment has been registered
14/09/2020
The General Tax Authority of Oatar certifies that the Ai r-ta.ii tUS.,
tf ,JJIAJJ ilol-cJl +i,f^ll .,.r .l','i
entity is registered as per the following details: :tdGJl CrUt-ull .:.r qJt:. ii [?' ur.n oUri iio-a.ll
Income Tax REGf STERED - 02/01 12006 - d"-.^$ .J>Jl ./c q,U,a-il
t-o,Ll,c t+ngll clq_paJl aj-o u-r.lJ 9 cJ.Lil pt t-Ot ,]rc o:p-i:-r-r-o ;6p9Lll
I
oio
Establishment Card
.duthorizers i;nji"ll
&rEjll f*)l _a5r6Jl as_J
Lebanon: T. +961-1381381 F. +961-1383000 P.O. Box. 1165228 Beirut www.contraintl.com Qatar: T. +974-44429459 F. +974-44429435 P.O. Box. 24376 Doha
4
PROJECT SPECIFICATION
Lebanon: T. +961-1381381 F. +961-1383000 P.O. Box. 1165228 Beirut www.contraintl.com Qatar: T. +974-44429459 F. +974-44429435 P.O. Box. 24376 Doha
MASRAF AL RAYAN HEAD OFFICE BUILDING
MAIN WORKS
TENDER DOCUMENTS Division 14 Conveying Equipment
PART 1 - GENERAL
A. Drawings and general provisions of the Contract, including General and Particular Conditions,
other Division 01 Specification Sections, Section 01, 02 and other relevant parts of latest edition
of Qatar Construction Specification (QCS 2014) apply to this section.
Read this Section in conjunction with, the other Division 1 Sections, the General and Particular
Conditions of Contract, the Scope of Works, the Drawings, the Specifications and should
discrepancies exist among the Contract Document, Standard and regulations, notify the
Engineer, and comply with the most stringent requirements.
1.2 SUMMARY
A. Section Includes:
1. Waste chutes.
B. Related Requirements:
1.3 DEFINITIONS
B. Intake Door: Door or hatch that penetrates the chase wall and chute, and through which
materials are fed into the chute.
C. Discharge Door: Door or hatch at the bottom of a chute, through which materials exit the chute.
D. Access Door: Door other than an intake or discharge door that penetrates the chase wall for
service access to devices in the chase.
________________________________________________________________________________________________________
TRASH CHUTES 149182
Tender Issue rev 00. Page 1 of 7
Copyright©2018 ARAB ENGINEERING BUREAU (AEB)
MASRAF AL RAYAN HEAD OFFICE BUILDING
MAIN WORKS
TENDER DOCUMENTS Division 14 Conveying Equipment
B. Shop Drawings:
A. Coordination Drawings: Plan and other details, drawn to scale, on which the following items are
shown and coordinated with each other, using input from installers of the items involved:
1. Size and construction of chase enclosing each chute; locations for power, signal, and
control wiring; and sprinkler-piping and water-service connections.
2. Chute-discharge locations coordinated with compactor-intake or container locations.
A. Operation and Maintenance Data: For chutes to include in operation and maintenance manuals.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Fire-Rated Door Assemblies: Assemblies complying with NFPA 80 that are listed and labeled
by a qualified testing and inspecting agency, for fire-protection ratings indicated.
1. Test Pressure: Test at atmospheric (neutral) pressure according to NFPA 252 or UL 10B.
2. Intake Doors: Labeled, 1-1/2-hour fire-resistance rated with 30-minute temperature rise
of 250 deg F (140 deg C).
3. Access Doors: Labeled, 1-1/2-hour fire-resistance rated with 30-minute temperature rise
of 250 deg F (140 deg C).
________________________________________________________________________________________________________
TRASH CHUTES 149182
Tender Issue rev 00. Page 2 of 7
Copyright©2018 ARAB ENGINEERING BUREAU (AEB)
MASRAF AL RAYAN HEAD OFFICE BUILDING
MAIN WORKS
TENDER DOCUMENTS Division 14 Conveying Equipment
C. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by
a qualified testing agency, and marked for intended location and application.
2.3 CHUTES
C. External Reinforcing for Offsets: Additional thickness of 0.11-inch- (1.7-mm)- thick chute
metal with bracing to structure.
2.4 DOORS
A. Intake-Door Assemblies: ASTM A 240/A 240M, Type 304, stainless-steel self-closing units
with positive latch and latch handle, with stainless-steel trim; constructed as required for
performance requirements indicated; and with frame suitable for the enclosing chase
construction.
________________________________________________________________________________________________________
TRASH CHUTES 149182
Tender Issue rev 00. Page 3 of 7
Copyright©2018 ARAB ENGINEERING BUREAU (AEB)
MASRAF AL RAYAN HEAD OFFICE BUILDING
MAIN WORKS
TENDER DOCUMENTS Division 14 Conveying Equipment
indicated; and equipped with 165 deg F (74 deg C) fusible links that cause doors to close in the
event of fire.
C. Detector System: Heat- and smoke- detecting interlock system with temperature-rise elements
that locks chute doors when temperature in chute reaches a predetermined, adjustable
temperature.
1. Locate smoke detector outside discharge door with solenoid to close discharge door.
E. Manual Control System: Control system with manual switch that lock chute doors during
shutdown hours and service operations.
2.5 DIVERTERS
A. Diverters: Manufacturer's standard motorized system for distributing materials from one chute
into two containers in the discharge room or as indicated on Drawings. Integrate diverter
controls with controls at intake doors.
B. Construction: Welded steel-plate housing with powered, internal steel blade(s) to deflect
materials from chute into appropriate containers.
C. Controls: Integrated, electronic master control unit in discharge room and electronic controls at
each intake door, including self-diagnostic program for whole system.
D. Motor Characteristics: Size sufficient to operate diverter blades without exceeding nameplate
rating or service factor.
2.6 ACCESSORIES
A. Chute Fire Sprinklers: NFPA 13; manufacturer's standard, recessed, automatic, NPS 1/2
(DN 13) sprinklers; ready for piping connections.
________________________________________________________________________________________________________
TRASH CHUTES 149182
Tender Issue rev 00. Page 4 of 7
Copyright©2018 ARAB ENGINEERING BUREAU (AEB)
MASRAF AL RAYAN HEAD OFFICE BUILDING
MAIN WORKS
TENDER DOCUMENTS Division 14 Conveying Equipment
B. Flushing Spray Unit: NPS 3/4 (DN 19) spray-head unit located in chute above highest intake
door, ready for hot-water piping connection, and with access door for spray-head and piping
maintenance.
C. Sanitizing Unit: NPS 3/4 (DN 19) disinfecting and sanitizing spray-head unit located in chute
above highest intake door, including 1-gal. (3.8-L) tank and adjustable proportioning valve with
bypass for manual control of sanitizing and flushing operation, ready for hot-water piping
connection, and with access door for spray-head and piping maintenance.
2.7 FABRICATION
B. Offsets: Construct offsets where indicated on Drawings. Fabricate so that installed chute is
without obstructions that might prevent materials from free falling within chute.
1. Offsets below Intake Doors: Unless otherwise indicated, do not exceed a 15 degree
maximum offset angle at any point, or place offset closer than 48 inches to nearest door
above offset.
2. Offset above Top Intake Door: Do not exceed a 45 degree maximum offset angle
between the highest intake door and the upper termination of chute.
3. Offsets at Floors: Complete offset between floors by returning chute to plumb before
penetrating floors.
4. External Reinforcing: Externally reinforce impact area of offsets located below top intake
door. Install vibration isolators where braced to structure.
C. Roof Vent: Fabricate vent unit as full-size extension of chute, open to the atmosphere. Extend
vent to height above roofing surface as indicated on Drawings. Equip vent with full insect
screening and metal explosion-release cap. Fabricate with roof-deck flange, counterflashing,
and clamping ring of nonferrous metal compatible with chute metal.
D. Chute Fire Sprinklers: Install internally within chute, recessed out of the chute area through
which material travels, and according to NFPA 13. Locate fire sprinklers at or above the top
service opening of chutes, within the chute at alternate floor levels in buildings more than two
stories tall, and at the lowest service level.
E. Equipment Access: Fabricate chutes with access for maintaining equipment located within the
chute, such as flushing and sanitizing units, fire sprinklers, and plumbing and electrical
connections.
________________________________________________________________________________________________________
TRASH CHUTES 149182
Tender Issue rev 00. Page 5 of 7
Copyright©2018 ARAB ENGINEERING BUREAU (AEB)
MASRAF AL RAYAN HEAD OFFICE BUILDING
MAIN WORKS
TENDER DOCUMENTS Division 14 Conveying Equipment
PART 3 - EXECUTION
3.1 INSTALLATION
B. Install chutes and diverters according to NFPA 82 and manufacturer's written instructions.
Assemble components with tight, nonleaking joints. Anchor chutes securely to supporting
structure to withstand impacts and stresses. Install chute and components to maintain fire-
resistive performance of chute and the enclosing chase construction.
C. Install chutes plumb, without obstructions that might prevent materials from free falling within
chutes.
D. Anchor flanges of chute vents to roof curbs before installing roofing and flashing. Install chute-
vent counterflashing after roofing and roof-penetration flashing are installed.
E. Intake and Discharge Doors: Interface door units with throat sections of chutes for safe, snag-
resistant, sanitary depositing of materials in chutes.
1. Coordinate installation of foot-pedal door operator with installation of door and the
enclosing chase construction.
2. Interconnect sanitizer control with door interlock system.
G. Test and adjust chute components after installation. Operate doors, locks, and interlock systems
to demonstrate that hardware operates properly and smoothly and electrical wiring is connected
correctly.
I. Operate sanitizing unit through one complete cycle of chute use and cleanup, and replenish
chemicals or cleaning fluids in unit containers.
J. Plumbing Access Doors: After construction of chase enclosure, verify that access doors have
been correctly located and properly installed for their purpose.
3.2 CLEANING
A. After completing chase enclosure, clean exposed surfaces of chute system's components. Do not
remove labels of testing and inspecting agencies.
3.3 DEMONSTRATION
________________________________________________________________________________________________________
TRASH CHUTES 149182
Tender Issue rev 00. Page 6 of 7
Copyright©2018 ARAB ENGINEERING BUREAU (AEB)
MASRAF AL RAYAN HEAD OFFICE BUILDING
MAIN WORKS
TENDER DOCUMENTS Division 14 Conveying Equipment
END OF SECTION
________________________________________________________________________________________________________
TRASH CHUTES 149182
Tender Issue rev 00. Page 7 of 7
Copyright©2018 ARAB ENGINEERING BUREAU (AEB)
5
COMPLIANCE STATEMENT
Lebanon: T. +961-1381381 F. +961-1383000 P.O. Box. 1165228 Beirut www.contraintl.com Qatar: T. +974-44429459 F. +974-44429435 P.O. Box. 24376 Doha
COMPLIANCE STATEMENT
Project: Masraf al Rayan
Contractor: Al Darwish Engineering
Consultant: Arab Engineering Bureau
C. Standard: Provide chutes complying with NFPA 82 unless otherwise Comply GREEN® Chutes are compliant with
indicated NFPA 82
2.3 CHUTES
A. Chute Metal: Type 304 stainless steel, ASTM A 240/A 240M. Comply Stainless Steel 304 or 304L (low carbon)
1. Thickness: Minimum 0.075 inch (1.9 mm). with standard 2B finish finish. Chute outer
surface is coated with sound dampening paint.
2.4 DOORS
A. Intake-Door Assemblies: ASTM A 240/A 240M, Type 304, stainless-steel self-closing Comply Our UL listed doors are also suitable for
nits with positive latch and latch handle, with stainless-steel trim; constructed as instalation in non masonary walls and are
required for performance requirements indicated; and with frame suitable for the self closing
enclosing chase construction.
2. Size: Manufacturer's standard size for door type, chute type, and diameter Comply
indicated.
3. Finish: Manufacturer's standard satin or No. 3 directional polish. Comply
4. Lockset: Lever-handle-type cylinder lock that releases latch with key that is Not Applicable Not applicable in general since doors are
removable only when cylinder is locked. electrically interlocked and no mechanical
a. Lock Cylinder: Cylinders standard with manufacturer. handles are available. If lever handles and
b. Keying: For each chute, key cylinders alike. mechanical locks are provided, then the
c. Keys: Three for each cylinder. electrical interlock will be redundant.
and All doors can be manually lock from control
panel at anytime.On the other hand, Doors are
automatically lock in the following cases:
1- In case of fire alarm signal
2-In case system is in cleaning mode
3-In case 1 door is open, automatically all the
other doors will close.
5. Latchset: Lever-handle type that unlatches door Not Applicable Garbage chutes are not provided
with Lever-handle latchset, if lever handles are
provided then the electrical interlock will
become redundant
6. Accessible Automatic Door Operating System: Manufacturer's standard system Not Applicable
complying with QCS 2017
7. Mechanical Interlocks: Interlock system for system servicing, operated from Comply All doors can be locked for maintenance
discharge door to automatically lock intake doors. activity by master controller.
Comply doors are failsafe: meaning they are
8. Electrical Interlocks: Interlock system that is energized by opening one intake open when energized. If a door is open, all the
door; remaining intake doors automatically lock when system is energized. other doors will electrically locked and remain
locked
9.Baffles:Rubber backdraft baffles at each intake.
B. Discharge-Door Assemblies: Aluminum-coated-steel doors;direct vertical-discharge Not applicable
type,inclined and horizontally closing and latching: constructed as required for
performance requirements indicated; equipped with 165 deg F (74 deg C) fusible
links that cause doors to close in the event of fire.
C Detector System: Heat- and smoke-detecting interlock system with temperature-rise Comply Our controller is designed to lock the
elements that locks chute doors when temperature in chute reaches a whenever a signal is recived from
predetermined, adjustable temperature. fire/smoke/temperature rise alarm.
Note: Heat/Smoke detectors and their cabling
are provided by Fire contractor.
1. Locate smoke detector outside discharge door with solenoid to close Not Applicable Not part of this submittal.
discharge door
Sl. No Project Specification Contra's Compliance Remarks
D. Comply as noted All doors are made of stainless steel
Access-Door Assemblies: Manufacturer's standard ASTM A 240/A 240M, Type grade 304 in satin finish
302/304, stainless-steel doors with trim; constructed as required for performance Note: Regarding the keys/locks, please
requirements indicated; with frame suitable for the enclosing chase construction; please referto 2.4 DOORS
and in satin or No. 3 directional polish finish; equipped with cylinder locks that
release latch with keys that are removable only when cylinder is locked.
1. Lock Cylinder: Cylinders standard with manufacturer.
2. Keying: Key access-door cylinders alike.
3. Keys: Three for each cylinder.
E. Manual Control System: Control system with manual switch that lock chute doors Comply All doors canbe locked from the
during shutdown hours and service operations. Master controller.
2.5 DIVERTERS
A. Not applicable There is no divertor in this system, as per IFC
Diverters: Manufacturer's standard motorized system for distributing materials from drawings two separate chute for two fraction of
one chute into two containers in the discharge room or as indicated on Drawings. waste shall be provided.
Integrate diverter controls with controls at intake doors.
B. Construction: Welded steel-plate housing with powered, internal steel blade(s) to Not applicable ditto
deflect materials from chute into appropriate containers.
C. Not applicable ditto
Controls: Integrated, electronic master control unit in discharge room and electronic
controls at each intake door, including self-diagnostic program for whole system.
D. Motor Characteristics: Size sufficient to operate diverter blades without exceeding Not applicable ditto
nameplate rating or service factor.
E. Not applicable
Recycling Containers: Industry standard, 90-gallon (340-L) containers for comingled
recyclables and2-cu. yd. (1.5-cu. m) containers for newspaper as recommended by
diverter manufacturer for compatibility with diverter system.
2.6 ACCESSORIES
A Chute Fire Sprinklers: NFPA 13; manufacturer's standard, recessed, automatic, NPS Comply QCDD approved, 1/2"standard response
1/2 (DN 13) sprinklers; ready for piping connections. pendant sprinklers are provided
B Flushing Spray Unit: NPS 3/4 (DN 19) spray-head unit located in chute above highest Comply
intake door, ready for hot-water piping connection, and with access door for
sprayhead and piping maintenance.
C Sanitizing Unit: NPS 3/4 (DN 19) disinfecting and sanitizing spray-head unit located in Comply Standard manufacturer tank size is 1 litre
chute above highest intake door, including 1-gal. (3.8-L) tank and adjustable higher capacities tanks are available as special
proportioning valve with bypass for manual control of sanitizing and flushing order
operation, ready for hot-water piping connection, and with access door for spray-
head and piping maintenance.
D. Not applicable Due to the presence of fire and flushing
Intake-Door Baffles: Rubber baffles, 1/8 inch (3 mm) thick
sprinklers
E. Sound Dampening: Manufacturer's standard sound-deadening coating on exterior of Comply Sound dampening compound is applied
chute sound and vibration isolator pads at supporting frame at each floor on all chute sections.
penetration
2.7 FABRICATION
A Comply All chute components are factory
General: Factory-assemble chutes to greatest extent practicable with nonleaking, faabriacated and assembled. No hot or
continuously welded or lock-seamed joints without bolts, rivets, or clips projecting fabrication works are allowed at site .
into chute interior. Include intake-door assemblies, metal supporting framing at each
floor, and chute expansion joints between each support point.
B Offsets: Construct offsets where indicated on Drawings. Fabricate so that installed Comply
chute is without obstructions that might prevent materials from free falling within
chute.
1. Offsets below Intake Doors: Unless otherwise indicated, do not exceed a Comply
15 degree maximum offset angle at any point, or place offset closer than 48
inches to nearest door above offset.
Not Applicable There are no offsets above top intake door
2. Offset above Top Intake Door: Do not exceed a 45 degree maximum offset angle
between the highest intake door and the upper termination of chute.
3. Offsets at Floors: Complete offset between floors by returning chute to plumb Comply If physical space allow
before penetrating floors.
Comply
4. External Reinforcing: Externally reinforce impact area of offsets located below top
intake door. Install vibration isolators where braced to structure.
C Roof Vent: Fabricate vent unit as full-size extension of chute, open to the Comply If physical space allow
atmosphere. Extend vent to height above roofing surface as indicated on Drawings.
Equip vent with full insect screening and metal explosion-release cap. Fabricate with
roof-deck flange, counterflashing, and clamping ring of nonferrous metal compatible
with chute metal.
D Comply Sprinklers will install asper NFPA 13
Chute Fire Sprinklers: Install internally within chute, recessed out of the chute area
through which material travels, and according to NFPA 13. Locate fire sprinklers at or
above the top service opening of chutes, within the chute at alternate floor levels in
buildings more than two stories tall, and at the lowest service level.
E Equipment Access: Fabricate chutes with access for maintaining equipment located Comply
within the chute, such as flushing and sanitizing units, fire sprinklers, and plumbing
and electrical connections.
PART 3 EXECUTION
3.1 INSTALLATION
A Install and test chutes before installing enclosing chase construction. Comply
B Install chutes according to NFPA 82 and manufacturer's written instructions. Comply
Assemble components with tight, nonleaking joints. Anchor chutes securely to
supporting structure to withstand impacts and stresses. Install chute and
components to maintain fire-resistive performance of chute and the enclosing chase
construction.
C Install chutes plumb, without obstructions that might prevent materials from free Comply
falling within chutes.
D Anchor flanges of chute vents to roof curbs before installing roofing and flashing. Comply
Install chute-vent counterflashing after roofing and roof-penetration flashing are
installed.
Sl. No Project Specification Contra's Compliance Remarks
E Intake and Discharge Doors: Interface door units with throat sections of chutes for Comply all intake doors are locked during chute
safe, snag-resistant, sanitary depositing of materials in chutes. sanitizing
1. Coordinate installation of foot-pedal door and the enclosing chase construction
2. Interconnect sanitizer control with door interlock system.
3.3 DEMONSTRATION
A Engage a factory-authorized service representative to train Owner's maintenance Comply Contra International is the
personnel to adjust, operate, and maintain each chute and related equipment. manufacturer/supplier of GREENchutes and
our qualified staff shall train Client/Operator
how to operate and maintain the system
elements
B Demonstrate replenishment of sanitizing-unit chemicals or cleaning fluids. Comply
6
TECHNICAL DATASHEET
Lebanon: T. +961-1381381 F. +961-1383000 P.O. Box. 1165228 Beirut www.contraintl.com Qatar: T. +974-44429459 F. +974-44429435 P.O. Box. 24376 Doha
General System Layout (Garbage Chute)
9
LOCK ALL
CHUTE
ALL CLEANING UNAVAILABLE DOORS
DOORS CLOSED
LOCK ALL
CHUTE
ALL CLEANING UNAVAILABLE DOORS
DOORS CLOSED
DISCONNECT SWITCH
EMERGENCY STOP
L+ M I1 I2 I3 I4 I5 I6 I7 I8 I9 IA IB IC
A1 B1 A2 B2
DC 12-24V
INPUT 12XDC
LED
+V
+V
-V
R1 R2 -V
N
L
OUTPUT 8XRELAY /10A
Q1 Q2 Q3 Q4 Q5 Q6 Q7
Q1 Q8
-205 +207 208 225 236 237 SP. N 221 222 224 N L -5 +7 8 25 36 37 SP N 21 22 24 N L 9 10 CB2 CB1 N L
ON ON
TO/FROM CHUTE 2 TO BMS/PWC TO BRUSH/SOLENOID TO FAN TO/FROM CHUTE 1 TO BMS/PWC TO BRUSH/SOLENOID TO FAN FRM PWC/BMS POWER POWER
LOCKS CHUTE 2 CHUTE 2 CHUTE 2 LOCKS CHUTE 1 CHUTE 1 CHUTE 1 CHUTE 2 CHUTE 1
ON ON
TO/FROM CHUTE 2 TO BMS/PWC TO BRUSH/SOLENOID TO FAN TO/FROM CHUTE 1 TO BMS/PWC TO BRUSH/SOLENOID TO FAN FRM PWC/BMS POWER POWER
LOCKS CHUTE 2 CHUTE 2 CHUTE 2 LOCKS CHUTE 1 CHUTE 1 CHUTE 1 CHUTE 2 CHUTE 1
This system not only allows one door open at a time, it allows for complete
system lock-out from the trash room below, interfaces with trash compactors to
lock out the chute when the compactor is full or at fault, interfaces with the
cleaning system to lock the doors during cleaning, and interfaces with
heat/smoke sensors and alarms to lock the chute if those alarms are available.
When ALL DOORS LOCK selector is in the OFF position, the system operation is
automatic. All doors are locked in the situations below:
- Any door is opened
- Compactor is full
- Compactor AUTO/HAND selector is in HAND position
- Cleaning system
- Emergency STOP button is depressed
- Fire alarm sounds (Optional. Requires signal from fire alarm controller)
- Main Isolation Switch is in OFF position
To clean the system, the operator must put the CLEANING SYSTEM selector in
ON position. This locks all intake doors and opens the solenoid valve at the top of
the chute. Note: A pressure of 0.5 bar is required at the uppermost cleaning
sprinkler.
11
FAB2 Intelligent Controller
8
FAB2 Intelligent Controller
6 points AC digital
1 AF-10MR-A2 AC100V-240V
input
4 points relay output
The removable LCD panel that can modify parameters through the
13 AF-HMI
panel
12
FAB2 Intelligent Controller
1. For FAB2s like AF-10MR-A2 and AF-20MR-A2, its applicable power supply
is 100~240VAC, 50/60Hz. The grid voltage fluctuation range is about 10%.
3. For FAB2s like AF-10MR-E2 and AF-20MR-E2, its applicable power supply
voltage is AC/DC12V-24V.
16
Chapter II Installation and wiring
FAB2 series power wiring diagram is as shown in Fig 2.4 and Fig 2.5,
N M
L L+
Note:
1. Analog can be input into analog-receivable FAB2s like AF-10/20MR-D2, AF-
10/20MT-D2, AF-10/20MT-GD2 through all the input ports (I1-I6/I1-IC). As long as
the analog-related function blocks are used in the program, Its port is automatically set
to analog input. If in the program do not use the analog-related function blocks, its port
is automatically set to digit input.
2. The analog inputs require DC 0V~10V voltage signals, which are divided equally
in 0.1V increments. When you edit the program, all the block parameters related to the
analog inputs are based on the minimum increment of 0.1V.
3.When the input voltage is higher than DC10.0V, it can only be used as switch, not be
used as analog.
4.For digit input, when the switch state changes from 0 to 1, the time of the 1 state
must be greater than 50ms. When the switch state changes from 1 to 0, the 0 state must
also exist for more than 50ms.
USER'S MANUAL
17
FAB2 Intelligent Controller
Delay Time
Changed From 1 to 0 Typical 50ms
Changed From to 1 Typical 50ms
Length of Power Line(without shield) 100m
Digital output
Transistor output( equivalent
Output type
NPN)
Output voltage
≤DC80V
Output Current
Max 2A
Short Circuit and Overload Protection No
Reduction of the rated value No( even in the whole temperature range)
2.4 AF-10MR-D2/AF-20MR-D2
Power Supply
Signal 0 <DC4.5V
Signal 1 DC7.5-24V
Signal 1 DC0-10V
119
Technical specifications
Digital output
Output Type Relay output
Electrical Isolation Yes
Group 1
Continuous Current Ith Max. 10A
Incandescent Lamp Load (25,000 switch cycles) 1000W
Fluorescent Light Tube With Electrical
10×58W
Controller (25,000 Switch cycles)
Fluorescent Light Tube With Regular
1×58W
Compensation (25,000Switch cycles)
Fluorescent Light Tube without
10×58W
Compensation (25,000 Switch Cycles)
Short Circuit Protection cos1 Power Supply Protection B16 600A
Short Circuit Protection cos0.5-0.7 Power Supply Protection B16 900A
Output Relay Protection Not allowed
Switch Frequency Max. 20A FeatureB16
Machine
Resistor Load/Lamp Load 10Hz
Induced Load 2Hz
Output Type 0.5Hz
2.5 AF-10MT-E2/AF-20MT-E2
Power supply
The rated Voltage of power supply DC12/24V
Allowable range of the rated input voltage DC10-28V
Power Consumption (DC24V) Typical 80mA
(Output full load) Typical 2W
Input section (digital input)
Signal 0 <DC4.5V
Signal 1 DC7.5-24V
Input current of Signal 1 <2.5mA
Delay Time
Changed From 1 to 0 Typical 50ms
Changed From to 1 Typical 50ms
The length of power line(without shield) 100m
USER'S MANUAL
120
6.2
INTAKE DOOR WITH 3D VOLUME CONTROL DESIGN
Access to the chute from each floor shall be via stainless steel, bottom-hinged,
noiseless, self-sealing and self-closing doors.
Each door comes with one UL listed fire sprinkler set to operate at 68°C and with
a cleaning sprinkler to be connected to the flushing riser and sanitizing unit. The
sprinkler operates every time the CLEANING SYSTEM selector is in ON position
and at preset times as entered into the Master Controller.
All electrical, fire and plumbing accessories are to be supplied, installed, and
connected to the chute by corresponding contractor unless otherwise agreed in
writing.
For Pneumatic Waste Collection Systems, the Intake Door is equipped with 3D
Volume Control Damper to limit the size of garbage bags.
(Refer Drawing no. INT-DR-03-20).
500
14
GENERAL NOTES:
PROFILE
STRUCTURAL OPENING-405
100
100
9
APPROVAL STAMP & SIGNATURE
50
TOTAL WIDTH-500
PROJECT
500
100
395
9
50
STRIKE PLATE
Ø12 ANCER BOLT CLIENT
STRUCTURAL OPENING-605
FRAME HIGHT INSIDE-600
CONTRA INTERNATIONAL
TOTAL HIGHT-697
DOHA
LEAF HIGHT-592
WALL OPENING 600
SUPPLIER
SOHAR STEEL
DOORS AND WINDOWS
INDUSTRIES(FZC) LLC
TRADING W.L.L
697
592
MANUFACTRING
LEAF TICKNESS-35
15 15 1. All Dimensions are in millimeter.
9
9
90
2. Verify sizes & hardware requirements.
ANCER BOLT
50
3 mm gap
50
DOOR 50
35
BUDGET LOCK PARMENET SEAL
LEAF WIDTH-521
SWING HIGES
TOTAL WIDTH-627 PROFILE
90
627
9
Rev. Description Date Checked
BUDGET LOCK
521 50 APPROVAL STAMP & SIGNATURE
9
15
50
50
PROJECT
35
STRUCTURAL OPENING-505
FRAME INSIDE HIGHT-500
LEAF HIGHT-521
521
627
SWING HINGE
CLIENT
3
CONTRA INTERNATIONAL
50
50
DOHA
15
FRAME INSIDE WIDTH-500 SUPPLIER
SOHAR
DOORS STEEL
AND INDUSTIES
WINDOWS
PULL HANDLE
(FZC)LLC
TRADING W.L.L
MANUFACTRING
HARDWARE
Sr.
DESCRIPTION FINISH QTY/SET
No.
DRAWN BY CHECKED BY APPROVED BY
1. PULL HANDLE SS 01 KHALID
GARBAGE CHUTE SCHEDULE
2. BUDGET LOCK 01 SCALE DATE
Sr. FRAME & DOOR SIZE FINISH DOOR AS-SHOWN 22-08-2021
TYPE
3. SWING HINGE SS 02 No. DEPTH
HANDLING QTY
HEIGHT WIDTH DWG. No. REV.
4. PARAMETER SEAL 01 1 RECESS 627 627 90 BRUSH RH-LH 100 ALO-RSD-22082021-01 00
CHUTE ELEMENTS AND SUPPORTS
Each section fits inside the one below rendering the system water-tight.
6
Above the topmost intake section a chute head plate is installed to which a
flexible airtight hose is attached. The hose runs up to the vent section where an
inline fan is installed to extract foul air from the chute.
14
A flash and counter flash accessory should be installed to render the chute shaft
water tight. The chute shaft shall be closed with hollow concrete blocks except
for a Ø300 mm hole where the vent pipe passes. (By others)
15
Supports are manufactured from mild steel angles 50 mm x 50 mm x 3mm thick
coated with epoxy.
16
Contra International Doha
The Disinfecting and Sanitizing Unit is usually located at the top of the
trash chute. It uses the flushing spray head at the top of the chute to
disburse cleaning solution down the inside of the chute. The unit is
operated manually or uses a programmable control panel to run
automatically.
The sanitizing system comes complete with an electrical brushing unit. All
components and accessories are required for the efficient functioning of
the system and should be supplied as one package.
A minimum pressure of 0.5 Bar must be available at the sanitizing unit
connection point.
Specifications: The chute shall be supplied complete with automatic
cleaning system comprising of powerful flushing spray, one on the chute
head plate and passing through the disinfectant unit and one at every
individual floor inside the intake throat of the chute system.
Any commercial, non-chemical disinfecting agent can be used during
cleaning operations.
PROSERIES 150 VALVES
The 1" Jar-Top valve provides the professional Captured Plunger – Allows for the solenoid to be removed without
easy servicing access without removing the valve losing the internal plunger.
from the system. External Bleed Screw with Removable Metering Pin – Allows for
easy cleaning of he metering pin without disassembling the valve.
MODELS
7101 1" Female Thread, NPT
7101-SL 1" Female Slip
7101-BSP 1" Female Thread, BSP 7101-J - 1" JAR-TOP VALVE FEATURES & BENEFITS
7101-J 1" Female Thread, NPT, Jar-Top Threaded Jar-Top – Allows for quick removal of the cap for
7101-J-SL 1" Female Slip, Jar-Top easy servicing after installation.
7101-J-BSP 1" Female Thread, BSP, Jar-Top Glass-Filled Nylon Screw Cap – Increased durability.
Heavy Duty, Corrosion and UV Resistant PVC
Construction – Increases the life of the valve.
Manual External Bleed Screw – Provides for manual operation
in system start up.
Manual Internal Bleed through Solenoid – Provides for manual
operation without discharging water outside the valve.
Captured Plunger – Allows for the solenoid to be removed
without losing the internal plunger.
OPERATING SPECIFICATIONS
ProSeries 150 1" VALVE
FLOW RATE - GPM 5 10 15 20 30
PSI LOSS 2.9 2.1 1.8 3.0 5.0
HOW TO SPECIFY ProSeries 150 1" VALVE WITH JAR-TOP
FLOW RATE - GPM 5 10 15 20 30
7101 1" Thread
PSI LOSS 3.3 3.9 2.9 3.2 6.1
ELECTRICAL BRUSH
ELECTRICAL BRUSH WITH PA-200 ELECTRICAL HOIST
Product Description
Electric hoist is a light and small crane machinery, which can be fixed on single or double girder bridge
crane, portal crane. It is often used in factories, mines, ports, storage houses, workshops etc. which is
the necessary machinery to raise labor productivity and improve working conditions.
Safety Features
Basic Information
Model NO. PA200 Certification CE, ISO9001:2000
Material Forged OEM Yes
Usage Construction Hoist Trademark GREEN Chutes
Origin China HS Code 842511000
Model PA200
Rated Volt (V) 230~50HZ
Input power (W) 450
Rated lifting (kg) 100/200
Lifting height (m) varies
Lifting speed (m/min) 10/5
Packing dimensions (cm) 44x38x20cm
Gross Weight (kg) 24
EXTRACTION FAN
SECTION 6.6
EXTRACTION FAN
Chute Diameter: 500mm = 0.5 M
No Floors: 8
Chute Volume =
( )
=
V= 8.4 M3
= 10 8.4
= 84
Flushing Sprinkler
7
SPRAYS
3 SUPERIOR SEAL
• 10-year rating; exceeds 11,000 cycles in sand burial tests • The ultimate nozzle for flexibility in the field and
• One piece seal design prevents cap to body leaks reducing nozzle inventories
• Ultra-low flushing design enables pop-up & sealing at • Arcs are easily adjusted by hand using sure-grip
only 5 psi and allows more heads to be installed on a line ridges or by coin/screwdriver in slot
• Extra long wiper seal design provides extended life • Color-coded identification in a resealable bag
and positive retraction in the toughest conditions
6 SUPERIOR MATERIAL
11 LX VALUE
• Weathermatic uses only 100% virgin material
– no regrind • Considering all of these benefits, you will be amazed to buy the LX line of
• For added strength: eight internal reinforcements sprays and nozzles at an extremely competitive price
and a ribbed body • Try the entire LX Series and experience the LX difference!
SPRAYS
Page 2
B Series brass nozzles SPRAYS
strip nozzles
SECTION 6.8
SOUND DAMPENING PAINT
RAPTOR
Black
TECHNICAL DATA SHEET & PROCESS GUIDE
TOUGH PROTECTIVE COATING
U-POL’s RAPTOR Tough Protective Coating is a 2K polyurethane coating that provides surfaces with a protective barrier.
RAPTOR Tintable is also available.
FEATURES
• CUSTOMISABLE
Can be tinted to match required colour.
Available in black and tintable versions.
• DURABLE
Provides tough mechanical damage and stain resistant surface.
Protects against rust, corrosion and extreme temperatures.
• UV RESISTANT
Delivers the highest level of fade protection.
• WATERPROOF
Provides a water tight seal, keeping moisture out and eliminating the chance for rust.
• SOUND DEADENER
Flexible and reduces noise and vibrations.
• RESISTANT
Resistant against fuels, hydraulic oils, animal urine, salt water and more.
CERTIFICATES
• FIRE RESISTANCE
RAPTOR has passed flammability testing for motor vehicles according to the test methods FMVSS 302, ISO 3795 &
BS AU 169A.
• SLIP RESISTANCE
When used with RAPTOR Traction Additive (available separately: RLTR/SM), it produces a finish meeting
BS7976-2.
Substrate Preparation To achieve best results with RAPTOR, good preparation is essential.
1. Remove all loose material and any rust from the surface to be coated.
2. Clean and degrease the surface.
3. Abrade the surface with P120-P180 grit sand paper.
4. Re-clean the surface.
* Aluminium, bare metal, and galvanized: prime with an etch primer, such as two
coats of U-POL ACID#8.
* Fiberglass and plastic: for optimal adhesion, use an adhesion promoter, such
as U-POL's GRIP#4.
* Wood: RAPTOR can go direct to stable wood. New wood requires sealing first.
* Concrete: for best results, clean the surface and remove dust. Seal first with
proprietary concrete sealer before applying RAPTOR.
* OEM E-Coat: scuff the surface with an abrasive pad then clean and degrease.
MIXING
Mixing Ratio
As simple as
FILL - SHAKE - SHOOT®
RAPTOR can be applied using U-POL's SCHUTZ gun or an HVLP Gravity Gun.
Mix ratios are dependent on the type of gun used.
Using an accelerator is not recommended.
*** Only mix one bottle of RAPTOR at a time. Clean gun between mixes. ***
Simply FILL the Raptor coating bottle with 250nl of hardener, replace cap and Shake contents vigorously for at least
2 minutes. SHOOT.
Adding RAPTOR Traction Add 200g of RAPTOR Traction per liter of RAPTOR Coating.
Anti-Slip Granules Shake well and spray the final coat. For large areas, it may be more convenient
to mix in a separate container rather than the RAPTOR bottle.
2K ISOCYANATE HARDENER
• Specially designed to provide optimum results independent of climatic conditions and size of repair
• Use with RAPTOR coating only
Shelf Life 9 months in unopened containers. Lids must be replaced after every use.
Storage Temperature +5°C - +25°C
RAPTOR hardener must not be used on its own, it must always be mixed with RAPTOR coating.
APPLICATION
Spraying RAPTOR 1. Remove cap from RAPTOR bottle with the mixed RAPTOR
2. Attach the RAPTOR bottle to the U-POL SCHUTZ GUN
3. Adjust the air pressure on your compressor to 40-60 PSI
4. Apply to the prepared surface with an even sweeping motion to obtain the
desired texture
5. If applying additional coats allow to flash off for 60 minutes between coats
U-POL recommends that you spray a test panel with RAPTOR first to ensure
the desired texture is achieved
IMPORTANT! Do not place heavy loads on the surface until RAPTOR is fully cured. Please see dry times below.
Drying Times
Touch Dry @ 20°C Less than 1 hour
Light Duty @ 20°C 2-3 days
Regular Duty @ 20°C 5-7 days
Force Drying @ 65°C 40 minutes. 5 days to build final hardness for heavy duty
Reducing flash off time, excessive film build and/or reduced temperatures will alter drying time.
Baking RAPTOR can be baked for 30 minutes @ 60°C. Baking will speed up
the initial cure, but it is still recommended that you wait 2-3 days for
light usage and 7 days for heavy duty usage.
I.R. Cure I.R. curing is not recommended.
Over Painting RAPTOR can be overpainted with most modern paint systems. When
overpainting, prep the surface as follows:
1. Let sprayed RAPTOR dry for 24 hours
2. Abrade with a fine abrasive pad
3. Clean and degrease
Q. Does the milk colour of RAPTOR lighten up the tint colour? How can I get a brilliant colour?
A. For best colour match results, Tintable RAPTOR requires a urethane single stage colour. If you choose to use
basecoat, ask your paint supplier to leave the binder out of the formulation so it is pure pigment. The final colour will
appear slightly lighter than the base colour. Once mixed, check the colour of the tinted system before spraying and
adjust if critical.
Q. How do you change the colour after an incorrect colour has been sprayed?
A. If the colours are close, reapply with the correct shade of RAPTOR. If the colours are not close, strip back the
original RAPTOR and reapply.
Q. Can I apply Raptor directly to bare metal, aluminium, galvanised and steel?
A. ACID#8 Etch Primer must be applied first to bare metal surfaces.
PROPERTIES
Data
Flash point -18°C
Solid content without thinner Approx. 57 %
Specific weight Approx. 1.1
VOC Information The EU limit for this product (product category: IIB(e) in ready to use form is
840g/litre.
The VOC content of this product in ready to use form is 486g/litre.
IMPORTANT: FOR PROFESSIONAL USE ONLY. Read full instructions before use.
This product contains hazardous materials and therefore appropriate personal protective equipment should always be used. Please refer to
the label and consult the material safety data sheet for full handling instructions and personal protection information. U-POL disclaims any liability where
the user does not wear the recommended personal protective equipment. The above data is for information only and may change without prior notice. It
is the Buyers responsibility to ensure the suitability of the products for their own use and check the up-to-datedness of this information. The
recommendation of use of our products and application are based on our knowledge and experience. Please refer to the label and consult the material
safety data sheet for full handling instructions and personal protection information. These are available via your local stockist or via the U-POL website
at WWW.U-POL.COM. U-POL is not responsible for the results obtained by others over whose methods we have no control and thereof U-POL is not
liable for consequential or incidental damages including loss of profits.
U-POL AUSTRALIA PTY LTD U-POL NEW ZEALAND LTD U-POL UK - TECHNICAL
PO BOX 375 T: +61 2 4731 2655 T: +64 27 630 3691 T: +44 (0)1933 230 310
SPRINGWOOD NSW 2777 F: +61 2 4731 2611 F: +61 2 4731 2611 F: +44 (0)1933 425 797
WWW.U-POL.COM SALES@U-POL.COM.AU SALES@U-POL.CO.NZ TECHNICALDEPARTMENT@U-POL.COM
Fire Sprinkler
7
LIFECO003
LIFECO004 AUTOMATIC
LIFECO005
LIFECO006 SPRINKLERS
TECHNICAL DATA
UPRIGHT SPRINKLERS AND PENDENT SPRINKLERS
MODEL: LIFECO003 / LIFECO004/LIFECO005 / LIFECO006
STANDARD SPRAY, STANDARD / QUICK RESPONSE, 5 / 3 mm BULB
TYPE, K5.6, 1/2" CONNECTING THREAD
1
8
1-19/32" ( 40.9mm )
2
3
2-5/16" ( 58.2mm )
2-1/4" ( 56.9mm )
4
1-11/16" ( 42.5mm )
5
6
CENTERLINE OF
WATERWAY
TECHNICAL SPECIFICATIONS
65
240
Button Brass UNS-28000 60
220
Spring Stainless Steel
¡ü
DISCHARGE IN LITERS PER MINUTE (LPM)
55
200
Seal Teflon® Tape 50 5.
6
K=
¡ý
180
Standard 45
IN
AL 80
K= 160
Escutcheon Cold Rolled Steel 40
N
O
M
AL
IN 140
(Type E-0) 35 O
M
N 120
30
25 100
ACCESSORIES
20 80
Installation Wrench 60
15
Type T-1 10 40
PARTIAL CURVE ONLY
5 MAX. PRESSURE 1.2 MPA
20
DISCHARGE COEFFICIENT 0 0.2 0.4 0.6 0.8 1.0 1.2
PRESSURE IN MPA
Model LIFECO003/LIFECO004 Upright and
INSTALLATION
NOTES
Do not install any bulb type sprinkler if the bulb
is cracked or there is a loss of liquid from the
bulb. With the sprinkler held horizontal, a small
air bubble should be present. The diameter of TYPICAL INSTALLATION
the air bubble is approximately 1/16" (1.6 mm)
for the 135°F/57°C to 3/32" (2.4 mm) for the
FIGURE C : MODEL LIFECO005/LIFECO006
286°F/141°C rating. (At higher ambient
temperatures, the bubble may be barely PENDENT SPRINKLER INSTALLED WITH A
perceptible for the lower temperature ratings.) STANDARD ESCUTCHEON
The Model LIFECO003/LIFECO004 Upright
Sprinklers and Model LIFECO005/LIFECO006
Pendent Sprinklers must be installed in SPRINKLER WRENCH T-1
accordance with the following instructions.
VNIV.EX6655
Sprinklers, Automatic and Open
Page Bottom
Sprinkler Identification Number (SIN), Glass Bulb Type, LF001, LF002, LF003, LF004, LF005, LF006, LF007, LF008, LF210, LF211, LF220,
LF221, LF222, LF240, LF241, LF820 and LF821.
Response Nom
SIN Type Type KFactor Cover Temp Rating, °F
Temp Rating, °F
Response Nom
SIN Type Type KFactor Cover Sprinkler
http://database.ul.com/cgi-bin/XYV/template/LISEXT/1FRAME/showpage.html?name=VNIV.EX6655&ccnshorttitle=Sprinklers,+Automatic+and+Open&obj… 1/2
8/23/2015 VNIV.EX6655 - Sprinklers, Automatic and Open
LF720 SR Flush Pendent 5.6 — 162, 221
© 2015 UL LLC
The appearance of a company's name or product in this database does not in itself assure that products so identified have been manufactured
under UL's FollowUp Service. Only those products bearing the UL Mark should be considered to be Certified and covered under UL's FollowUp
Service. Always look for the Mark on the product.
UL permits the reproduction of the material contained in the Online Certification Directory subject to the following conditions: 1. The Guide
Information, Assemblies, Constructions, Designs, Systems, and/or Certifications (files) must be presented in their entirety and in a non
misleading manner, without any manipulation of the data (or drawings). 2. The statement "Reprinted from the Online Certifications Directory
with permission from UL" must appear adjacent to the extracted material. In addition, the reprinted material must include a copyright notice in
the following format: "© 2015 UL LLC".
http://database.ul.com/cgi-bin/XYV/template/LISEXT/1FRAME/showpage.html?name=VNIV.EX6655&ccnshorttitle=Sprinklers,+Automatic+and+Open&obj… 2/2
LIST OF MATERIALS & POWER LOAD CALCULATIONS
CHUTE CONTROLLER
Rating
No DESCRIPTION Q Consumption
Watt
1 ENCLOSURE 60*40*20 IP56 1 0
2 FAN & GRILL : 8*8cm 220V (EASY CAB 1134-12X) 1 10 10
3 POWER SUPPLY (MEAN WELL LRS-350) 1 0
5 CIRCUIT BREAKER 1*16A (DZ41-63 C10) 1 0
6 PLC (FAB2 AF-10MR-D2) 1 4 4
7 RELAY 4 Pin 12V DC 1 0
8 MAIN SWITCH 1*16A 1 0
9 PUSH BUTTON with LED indicator 2 0.24 0.48
10 PILOT LAMP 230VAC 1 0.24 0.24
11 PILOT LAMP 12/24VDC 7 0.24 1.68
12 SELECTOR SWITCH 0-1 1 0
Total Power Consumption (W) 16.4
LIST OF MATERIALS & POWER LOAD CALCULATIONS
Lebanon: T. +961-1381381 F. +961-1383000 P.O. Box. 1165228 Beirut www.contraintl.com Qatar: T. +974-44429459 F. +974-44429435 P.O. Box. 24376 Doha
2021-11-07 ﺗﺎﺭﻳﺦ ﺍﻟﻄﺒﺎﻋﺔ : ﻭﺯﺍﺭﺓ ﺍﻟﺪﺍﺧﻠﻴــــﺔ
AM 7:50 ﻭﻗـﺖ ﺍﻟﻄﺒﺎﻋﺔ : ﺍﻻﺩﺍﺭﺓ ﺍﻟﻌﺎﻣﺓ ﻟﻟﺩﻓﺎﻉ ﺍﻟﻣﺩﻧﻲ
PAC21011792 ﺭﻗــﻢ ﺍﻟﻄﻠـﺐ : ﺍﺩﺍﺭﺓ ﺍﻟﻮﻗﺎﻳﺔ
ﺑﻴﺎﻧﺎﺕ ﺍﻟﻤﻨﺸﺄﺓ
ﺗﻔﺎﺻﻴﻞ ﺍﻟﺸﻬﺎﺩﺓ
ﺗﻢ ﻣﺮﺍﺟﻌﺔ ﺍﻟﻄﻠﺐ ﺍﻟﻤﻘﺪﻡ ﻭﺍﺗﻀﺢ ﺑﺄﻧﻪ ﻻ ﻣﺎﻧﻊ ﻣﻦ ﺍﻋﺘﻤﺎﺩ ﺍﻟﻤﻨﺘﺞ /ﺍﻟﻤﻨﺘﺠﺎﺕ ﺍﻟﻤﻮﺿﺤﻪ ﻓﻰ ﺍﻟﺘﻘﺮﻳﺮ ﺍﻟﻔﻨﻰ ﺍﻟﻤﺮﻓﻖ ﺑﻨﺎﺀ ﻋﻠﻰ ﺍﻋﺘﻤﺎﺩﻩ ﻣﻦ ﻗﺒﻞ ﺍﻟﻬﻴﺌﻪ
ﺍﻟﻤﺨﺘﺒﺮﻳﺔ ﺍﻟﻤﻮﺿﺤﻪ ﻓﻰ ﺍﻟﺘﻘﺮﺭ ﺍﻟﻔﻨﻲ ﺍﻟﻤﺮﻓﻖ.
ﻣﻼﺣﻈﺎﺕ
.1ﻳﺠﺐ ﻋﻠﻰ ﺍﻟﺸﺮﻛﻪ ﺍﻻﻟﺘﺰﺍﻡ ﻭﺍﻟﻌﻤﻞ ﺑﻤﺎ ﺟﺎﺀ ﻓﻲ ﺍﺷﺘﺮﺍﻃﺎﺕ ﻗﺴﻢ ﺃﻧﻈﻤﺔ ﺍﻟﺴﻼﻣﻪ ﺍﻟﺘﻲ ﺗﻢ ﺍﻻﻃﻼﻉ ﻭﺍﻟﻤﻮﺍﻓﻘﺔ ﻋﻠﻴﻬﺎ ﻣﻦ ﺧﻼﻝ ﺍﻟﻤﻮﻗﻊ.
.2ﻳﺠﺐ ﺍﻥ ﻳﻘﻮﻡ ﺑﺘﺮﻛﻴﺐ ﻫﺬﺍ ﺍﻟﻤﻨﺘﺞ ﻣﻦ ﻗﺒﻞ ﻣﻬﻨﺪﺳﻴﻦ ﻭﻓﻨﻴﻴﻦ ﻣﻌﺘﻤﺪﻳﻦ ﻣﻦ ﺍﻹﺩﺍﺭﺓ ﺍﻟﻌﺎﻣﺔ ﻟﻠﺪﻓﺎﻉ ﺍﻟﻤﺪﻧﻲ.
.3ﻳﺠﺐ ﺍﻥ ﻳﺤﻤﻞ ﺍﻟﻤﻨﺘﺞ ﺍﻟﻌﻼﻣﺔ ﺍﻟﺘﺠﺎﺭﻳﺔ ﻟﻠﻬﻴﺌﻪ ﺍﻟﻤﺨﺘﺒﺮﻳﺔ ﺍﻟﻤﻌﺘﻤﺪﺓ ﻭﺍﻟﻤﻮﺿﺤﻪ ﻓﻲ ﺍﻟﺘﻘﺮﻳﺮ ﺍﻟﻔﻨﻲ ﺍﻟﻤﺮﻓﻖ .
ﻉ/
Page 1 of 2
ﻭﺯﺍﺭﺓ ﺍﻟﺪﺍﺧﻠﻴﺔ
DATE : 2021-11-07 : ﺍﻟﺘﺎﺭﻳـــــــﺦ
ﺍﻹﺩﺍﺭﺓ ﺍﻟﻌﺎﻣﺔ ﻟﻠﺪﻓﺎﻉ ﺍﻟﻤﺪﻧﻲ
PERMIT # PAC21011792 : ﺭﻗﻢ ﺍﻟﻄﻠﺐ
ﺇﺩﺍﺭﺓ ﺍﻟﻮﻗﺎﻳﺔ
Refer to Material Lab test report no. 181126590 (FRR-1901/319 SN 1/1) for the full details.
This product approval shall comply with the NFPA 80 (and/or other related NFPA Codes / Standards), other acceptable
International Codes / Standards, Local Regulations, Listing Instructions and/or Manufacturer's Published Instructions
subject to the technical review and approval of the Authority Having Jurisdiction / Qatar Civil Defence.
/ﻉ
Page 2 of 2
2021-08-30 ﺗﺎﺭﻳﺦ ﺍﻟﻄﺒﺎﻋﺔ : ﻭﺯﺍﺭﺓ ﺍﻟﺪﺍﺧﻠﻴــــﺔ
AM 6:57 ﻭﻗـﺖ ﺍﻟﻄﺒﺎﻋﺔ : ﺍﻻﺩﺍﺭﺓ ﺍﻟﻌﺎﻣﺓ ﻟﻟﺩﻓﺎﻉ ﺍﻟﻣﺩﻧﻲ
PAC21009187 ﺭﻗــﻢ ﺍﻟﻄﻠـﺐ : ﺍﺩﺍﺭﺓ ﺍﻟﻮﻗﺎﻳﺔ
ﺑﻴﺎﻧﺎﺕ ﺍﻟﻤﻨﺸﺄﺓ
ﺗﻔﺎﺻﻴﻞ ﺍﻟﺸﻬﺎﺩﺓ
ﺗﻢ ﻣﺮﺍﺟﻌﺔ ﺍﻟﻄﻠﺐ ﺍﻟﻤﻘﺪﻡ ﻭﺍﺗﻀﺢ ﺑﺄﻧﻪ ﻻ ﻣﺎﻧﻊ ﻣﻦ ﺍﻋﺘﻤﺎﺩ ﺍﻟﻤﻨﺘﺞ /ﺍﻟﻤﻨﺘﺠﺎﺕ ﺍﻟﻤﻮﺿﺤﻪ ﻓﻰ ﺍﻟﺘﻘﺮﻳﺮ ﺍﻟﻔﻨﻰ ﺍﻟﻤﺮﻓﻖ ﺑﻨﺎﺀ ﻋﻠﻰ ﺍﻋﺘﻤﺎﺩﻩ ﻣﻦ ﻗﺒﻞ ﺍﻟﻬﻴﺌﻪ
ﺍﻟﻤﺨﺘﺒﺮﻳﺔ ﺍﻟﻤﻮﺿﺤﻪ ﻓﻰ ﺍﻟﺘﻘﺮﺭ ﺍﻟﻔﻨﻲ ﺍﻟﻤﺮﻓﻖ.
ﻣﻼﺣﻈﺎﺕ
.1ﻳﺠﺐ ﻋﻠﻰ ﺍﻟﺸﺮﻛﻪ ﺍﻻﻟﺘﺰﺍﻡ ﻭﺍﻟﻌﻤﻞ ﺑﻤﺎ ﺟﺎﺀ ﻓﻲ ﺍﺷﺘﺮﺍﻃﺎﺕ ﻗﺴﻢ ﺃﻧﻈﻤﺔ ﺍﻟﺴﻼﻣﻪ ﺍﻟﺘﻲ ﺗﻢ ﺍﻻﻃﻼﻉ ﻭﺍﻟﻤﻮﺍﻓﻘﺔ ﻋﻠﻴﻬﺎ ﻣﻦ ﺧﻼﻝ ﺍﻟﻤﻮﻗﻊ.
.2ﻳﺠﺐ ﺍﻥ ﻳﻘﻮﻡ ﺑﺘﺮﻛﻴﺐ ﻫﺬﺍ ﺍﻟﻤﻨﺘﺞ ﻣﻦ ﻗﺒﻞ ﻣﻬﻨﺪﺳﻴﻦ ﻭﻓﻨﻴﻴﻦ ﻣﻌﺘﻤﺪﻳﻦ ﻣﻦ ﺍﻹﺩﺍﺭﺓ ﺍﻟﻌﺎﻣﺔ ﻟﻠﺪﻓﺎﻉ ﺍﻟﻤﺪﻧﻲ.
.3ﻳﺠﺐ ﺍﻥ ﻳﺤﻤﻞ ﺍﻟﻤﻨﺘﺞ ﺍﻟﻌﻼﻣﺔ ﺍﻟﺘﺠﺎﺭﻳﺔ ﻟﻠﻬﻴﺌﻪ ﺍﻟﻤﺨﺘﺒﺮﻳﺔ ﺍﻟﻤﻌﺘﻤﺪﺓ ﻭﺍﻟﻤﻮﺿﺤﻪ ﻓﻲ ﺍﻟﺘﻘﺮﻳﺮ ﺍﻟﻔﻨﻲ ﺍﻟﻤﺮﻓﻖ .
ﻉ/
Page 1 of 2
ﻭﺯﺍﺭﺓ ﺍﻟﺪﺍﺧﻠﻴﺔ
DATE : 2021-08-30 : ﺍﻟﺘﺎﺭﻳـــــــﺦ
ﺍﻹﺩﺍﺭﺓ ﺍﻟﻌﺎﻣﺔ ﻟﻠﺪﻓﺎﻉ ﺍﻟﻤﺪﻧﻲ
PERMIT # PAC21009187 : ﺭﻗﻢ ﺍﻟﻄﻠﺐ
ﺇﺩﺍﺭﺓ ﺍﻟﻮﻗﺎﻳﺔ
RECOMMENDATIONS ﺍﻟﺘﻮﺻﻴﺎﺕ
Intended to operate when the temperature of the heat-responsive element exceeds its thermal-response temperature.
INVESTIGATED TO STANDARD UL 199.
TRADEMARK AND/OR TRADENAME: LIFECO
This product approval shall comply with the Design, Inspection, Installation, Testing and Maintenance requirements of
NFPA 13/13R/25 (and/or other related NFPA Codes / Standards), other acceptable International Codes / Standards,
Local Regulations and/or Manufacturer's Published Instructions subject to the technical review and approval of the
Authority Having Jurisdiction (Qatar Civil Defense).
/ﻉ
Page 2 of 2
8
TEST CERTIFICATES
Lebanon: T. +961-1381381 F. +961-1383000 P.O. Box. 1165228 Beirut www.contraintl.com Qatar: T. +974-44429459 F. +974-44429435 P.O. Box. 24376 Doha
�1±3E�JN�m
Shinestar Holdings Group
r Jb mi .s. iiE � �
MILL TEST CERTIFICATE
�hl, am�*�*ffi���m��9%
Add: No.9 Xiangfu Road, Changsha, Hunan, China
Bestar Steel Co., Ltd. E-mail: service@bestarpipe.com
Tel: 86·731·88678506 P.O.: 410116
NO. BSD\iVX l81.48TW EN 10204 3.1/ISO 10474 3.lB
45Clii:$1:!z.(Purchaser):CONTRA INTERNATIONAL DOHA w.1.1. B:Jt,f.J(DATE): 2.018-5·1.4
f',N,�f$ Hi:*tff-tft
STAll'lU:SS STEEL COILS ASTM 1\240 18 HSCQ5l'i002 BSDWX 181•18TW
iiE�Mu-% 1}-laJMu-%
Product Spec License Contract No.
;/<J\ltioxSxL
304 2B Soild-Solut:on PiCkling M
WI W. i'ftiAf)JQI jJ�I1.irt: 3'.c:1/i::Jft�
Size (mm) Grade Type of End Processing Method Delivery Condition
AS BELOW ! COLD ROLLED
ff �1*:tLfEJliJl:�@:(/:JAIPJ) Body Tensile Test (Longitudinal) i'PmiJI:�@: Impact Test ®!ntiJI:�@:
R-J· tff-lle-lf:JJt ftllij!Bi/Jt m:tL�iJJt 1$-lf:$ IJ:lr mi 4'il: mi lfl R-st flitllai'PmffiAkV_(J) 'ii!;tmi.i'l1mffiAk_(J) Hardness
�
iJ\l;f,;} DxSxL
-% '.if'% tit%
Size (mm) Heat No, Batch No. Dimen- Gauge T.S E.L Reduction Dimen- 0 C Low 21 C Normal
° °
N Y.S �Jjlj ®!!Jtffi
0. Sion Length *3_(Mpa) Rm (Mpa) A(%) of Area sion temperature temperature Type Hardness �
*1(*2) (mm) is Z(%) (*4) impact impact Value
1 1220*1.6*C 80239750D --- --·- 224 481 55 -¥·- --- --- --- HRB 140/142/ 144
2 1220*l.6*C 802101210 --- --- 227 488 57 --- -·-- --- --- HRB 144/145/143
3 1220*1.S*C 80239750( --- ... 225 479 56 N•-- -·-- --- HRB 147/145/ 145
4 --- --- --- --- HRB /@j
,M __
)"f _m:jg
Jmlwi (xO.Olmm) ��!Jo/./ PCS
Si Cr Cu Fe Al Ti B Nb As Sn Pb Sb C.E.
-% �� iiUfLJJt wr �
N Decarbonization tJl�*6 (W.) Inclusion (tons)
t.!\l� DxSxL C Mn s p Ni Mo V
Size (mm)
0. 2 2 2 3 3 2 2 2 3 2 0 3 4 3 4 3 3 3 3 % P-J*: Micro- Grain X 0.1 �
3
j�*
1: xl0-1, 2: 10· 3: x10· , Inside Outside structure Size
2 f4
4: X lf A B C D
1
X ,
1220*1.6*C 5 39 29 2 24 1612 33 2 ·-- --- •M-- - - - 2 7475
--·
.
2 --- ---
•M--
��/&
�
t/DJ�.,.J 11,
o:! "
�
9
COUNTRY OF ORIGIN
Lebanon: T. +961-1381381 F. +961-1383000 P.O. Box. 1165228 Beirut www.contraintl.com Qatar: T. +974-44429459 F. +974-44429435 P.O. Box. 24376 Doha
MATERIAL LIST with ORIGINS & MODEL NUMBERS
GARBAGE CHUTE
Country of
Item Brand Name Model/Standard
Origin
Sanitizing Unit GreenChutes® SU-001-22VAC Qatar
Contra International reserves the right to make modifications to material origins, specifications, and measurements at
its entire discretion.
IMPORTANT NOTE:
In some cases, country of production may not be the same as the country of origin.
Contra International has no control over where actual production takes place.
However, all supplied material is covered by the same 5 year warranty regardless of country of
production.
10
PROJECT REFERENCES
Lebanon: T. +961-1381381 F. +961-1383000 P.O. Box. 1165228 Beirut www.contraintl.com Qatar: T. +974-44429459 F. +974-44429435 P.O. Box. 24376 Doha
REFERENCE PROJECTS
Project Description Type Award Date Status Client/ Contractor Consultant
Marina Mix 04 Garbage Chutes/PWC 2021 Submission Al-Attiyah Al-Alameia
Marina Mix 12 D Garbage Chutes/PWC 2021 Submission UCC LACASA
Katara Hotel Linen Chute 2021 Execution IMAR Dar Al Handasa
Qatar Airways Accomodation Garbage Chute 2021 Submission GET Dar Al Handasa
Floresta gardens - The Pearl PWC 2020 Execution Ramco Khatib & Alami
18 Mixed Use Buildings-Msaimeer Garbage Chutes 2020 Execution Bandary Engineering CEC
Garbage Chutes/PWC/
Commercial Boulevard (BP18A) 2020 Execution Redco Almana Dorsch
Linen Chutes
Masraf Al Rayyan HQ Garbage Chutes/PWC 2020 Execution Al Darwish Eng. AEB
LPS-5 (The Pearl) Garbage Chutes/PWC 2020 Execution Bandary Engineering MZP
The Dune Plaza-Tornado Tower Garbage Chutes 2020 Execution Bandary Engineering CICO
Residential Tower, Dafna Garbage Chutes 2019 Execution QAC LACASA
Garbage Chutes/PWC/
Marsa Arabia 2019 Execution CDC Dar Al Handasa
Linen Chutes
Marina Mix 12 F Garbage Chutes/PWC 2019 Execution Takyeef AEB
Waldorf Astoria Linen Chutes 2019 Execution Harinsa LACASA
Residential Building (Muntazah) Garbage Chute 2018 Completed Qatar Building ACE
Doha Festival City Garbage Chute 2018 Completed Salam Enterprises LACASA
Le Mirage Downtown Garbage Chutes 2018 Completed GCC AEB
Marina Residential 19 PWC 2018 Execution IBA IBA
Marina Residential 17 PWC 2018 Execution IBA IBA
Marina Residntial 16 PWC 2018 Completed IBA MZP
Marina Mix 11 Linen Chutes/PWC 2018 Execution Bandary Engineering EHAF
Y Tower Garbage Chutes/PWC 2017 Completed Ramaco Ramaco
Residential 01 Garbage Chutes/PWC 2017 Completed Ramaco Ramaco
Marina Com 07 Garbage Chutes/PWC 2017 Completed GCC AEB
Commercial 18 Garbage Chutes/PWC 2017 Completed UCC GHD
Residential 9 Garbage Chutes/PWC 2017 Completed Bandary Engineering AEB
The Pearl – Viva Bahria 08 Garbage Chutes 2017 Completed UCC LACASA
The Pearl Panorama Tower AQ7 Linen Chutes 2017 Completed KCT Projacs
The Pearl – Abraj Quartier 3,4,5,6 Garbage 2016 Completed Shapoorji Medad
The Pearl – Parcel 10A Garbage Chutes 2016 Completed Al Darwish Eng. James Kubit
Telecom Security Building Garbage Chutes 2016 Completed Target Engineering Co QP
Shahad Tower Garbage/Linen Chutes 2016 Execution Bandary Engineering MZP
Aspire Expansion Garbage Chutes 2016 Completed CDC KEO
Commercial Developement at
Garbage Chutes 2016 Completed Medgulf CICO
Al–Thumama
Burj Al Manaa Garbage Chutes 2016 Execution Al Bandary MZP
Energy City Garbage Chutes 2016 Completed Zublin MZP
National Cyber Security Center Garbage Chutes 2016 Completed Al Aali International MOI
Al Saad General
Office building Airport Road Garbage Chutes 2016 Completed MZP
Contracting
AL BANDARY
Doha Souq PR97 Garbage Chutes 2016 Completed Adnan Saffarini Office
SAFETY&SECURITY
AL BANDARY
Al Thuraya Tower Garbage Chutes 2016 Completed Diwan
SAFETY&SECURITY
REFERENCE PROJECTS
Project Description Type Award Date Status Client/ Contractor Consultant
Lusail Twin Towers Garbage Chutes/PWC 2015 Completed Red Line E Square Architects
Lusail Marina Com 27 Garbage Chutes/PWC 2015 Execution Al Hamad Engineering ERGA
Lusail Marina Mix 052 Garbage Chutes/PWC 2015 Completed MAN Enterprise AEB
Lusail Marina Mix 026 PWC 2015 Completed Ghantoot LACASA
Lusail Marina Com 005 Garbage Chute/PWC 2015 Completed Bandary Engineering EHAF
Lusail Residential tower Marina
PWC 2015 Completed Al Sraiya Sketch
District
AL BANDARY
Najma PR83 Garbage Chutes 2015 Completed Top Design
SAFETY&SECURITY
AL BANDARY
Bin Omran PR84 Garbage Chutes 2015 Completed United Consultants
SAFETY&SECURITY
AL BANDARY
Al Bustan PR100 Garbage Chutes 2015 Completed Petra Design
SAFETY&SECURITY
Lusail Office Tower Garbage Chute 2015 Completed UCC EHAF
ISF TCC Project Garbage Chutes 2015 Completed UCC KEO
Barwa Al–Khor Housing Development
Garbage Chutes 2015 Completed ICC MZP
(Package 2)
The Pearl – Parcel 2B Garbage Chutes 2015 Completed Harinsa Faithful Gould
The Pearl – Parcel 10B Garbage Chutes 2015 Completed Harinsa Faithful Gould
The Pearl – Parcel 16A Garbage Chutes 2015 Completed Harinsa Faithful Gould
The Pearl – Parcel 12A Garbage Chutes 2015 Completed Bandary Engineering MZP
The Pearl – Parcel VB 3 Garbage Chutes 2014 Completed Megatec AEB
The Pearl – Parcel VB 4 Garbage Chutes 2014 Completed Megatec AEB
The Pearl – Parcel VB 5 Garbage Chutes 2014 Completed Megatec AEB
ISF CPC 07A Garbage Chutes 2014 Completed QD–SBG KEO
Sunrise Residential Compound (9 Qatari Engineer &
Garbage Chutes 2014 Completed CRC
chutes) Associates
Al Sraiya Trading &
Hotel Apartment Building (2+G+7) Garbage Chutes 2014 Completed UDC
Contracting
Lusail Marina Com 11 Garbage Chutes 2014 Completed Gulf Contracting GHD
Union Residential Tower Garbage Chutes 2013 Completed UCC MZP
Hilton Hotel (Salata Hotel) Linen Chutes 2013 Completed KCT ERGA
Residential Flats Building (B+G+3) Garbage Chutes 2013 Completed Rakeen Contracting
Tawar Mall Garbage Chutes 2013 Completed Kittco Contracting ENAF
Samrya Hotel Suites Garbage Chutes 2013 Completed Gulf East Trading & Cont. ERGA
Halul Island Garbage Chutes 2013 Completed Target Engineering Co QP
Al Mana Hotel Garbage & Linen Chutes 2013 Completed Hamad Engineering LLC MZP
Al Sraiya Trading &
Residential tower Marina District Garbage Chutes 2013 Completed Al Sraiya
Contracting
Rabban Suites Garbage Chutes 2013 Completed CRC AEB
MPAC Garbage Chutes 2013 Completed CCC QP
The Pearl – Parcel 11B Garbage Chutes 2013 Completed CRC UDC
The Pearl – Parcel 3A Garbage Chutes 2012 Completed Megatec KEO
The Pearl – Parcel 3B Ducting 2012 Completed Megatec KEO
The Pearl – Viva Bahria 22,23 Ducting 2012 Completed MAN Enterprise AEB
Al Majal International
Ansar Residential Development Garbage Chutes 2011 Completed AEB
Trading & Contracting
Le Mirage Apartments Garbage Chutes 2011 Completed MID Contracting Al–AQSA
Dr. Ali Fetais Office Tower Garbage Chutes 2011 Completed MAN Enterprise MZP
Al Ghanem Apartments Garbage Chutes 2011 Completed Ramco Trading & Cont. Co KEO
Regent Hotel Linen Chutes 2011 Completed Ramco Trad& Cont’g KEO
Le Mirage Hotel Garbage & Linen Chutes 2011 Completed MID Contracting Al–AQSA
REFERENCE PROJECTS
Project Description Type Award Date Status Client/ Contractor Consultant
The Pearl – Parcel 10A Garbage Chutes 2011 Completed Al ARRAB UDC
The Pearl – Parcel 16A Garbage Chutes 2011 Completed Al ARRAB UDC
The Pearl – Parcel 11B Garbage Chutes 2011 Completed Al ARRAB UDC
The Pearl – Parcel 14B Garbage Chutes 2011 Completed Al ARRAB UDC
The Pearl – Parcel 15A Garbage Chutes 2009 Completed Megatec AEB
The Pearl – Parcel 15B Garbage Chutes 2009 Completed Megatec AEB
The Pearl – Parcel 16B Garbage Chutes 2009 Completed AFRINA AEB
The Pearl – Parcel VB10 Garbage Chutes 2009 Completed Gulf Contracting GHD
The Pearl – Viva Bahria 29 Garbage Chutes 2009 Completed QACC Dar Al Handassa
AL Baker Tower Garbage Chutes 2009 Completed PCSI James Kubit
Al Noor Tower Garbage Chutes 2009 Completed PCSI James Kubit
Circular Tower Garbage Chutes 2009 Completed CDC Dar Al Handassa
SAHARA Tower Garbage Chutes 2009 Completed PCSI James Kubit
St Regis 7 Star Hotel Garbage/Linen Chutes 2009 Completed CDC Dar Al Handassa
The Pearl – Parcel 8A Garbage Chutes 2008 Completed Al ARRAB UDC
The Pearl – Parcel 8B Garbage Chutes 2008 Completed Al ARRAB UDC
The Pearl – Parcel 9A Garbage Chutes 2008 Completed Al ARRAB UDC
The Pearl – Parcel 9B Garbage Chutes 2008 Completed Al ARRAB UDC
The Pearl – Parcel 10B Garbage Chutes 2008 Completed Al ARRAB UDC
Barwa City–Residential Development
Garbage Chutes 2008 Completed Bilfinger Berger Cansult Maunsell
Phase 1
Pumps & heat
Circular Tower 2008 Completed CDC Dar Al Handassa
exchangers
Medical Building Garbage Chutes 2008 Completed PCSI Global AEB
Pumps & heat
Shahaniya Labor Camp 2008 Completed CDC
exchangers
Al Fardan Twin Towers Garbage Chutes 2008 Completed CDC Dar Al Handassa
Kempenski Hotel Pre– insulated Ducts 2007 Completed CDC AEB
Kempenski Hotel Garbage/Linen Chutes 2007 Completed CDC AEB
The Pearl – Parcel 18 Garbage Chutes 2007 Completed CDC KEO
The Pearl – Parcel 2 Garbage Chutes 2007 Completed CDC KEO
The Pearl – Parcel 6 Garbage Chutes 2007 Completed AFRINA Global Design
The Pearl – Parcel 1 Garbage Chutes 2006 Completed CDC KEO
11
PREVIOUS APPROVALS
Lebanon: T. +961-1381381 F. +961-1383000 P.O. Box. 1165228 Beirut www.contraintl.com Qatar: T. +974-44429459 F. +974-44429435 P.O. Box. 24376 Doha
12
WARRANTY CERTIFICATE
Lebanon: T. +961-1381381 F. +961-1383000 P.O. Box. 1165228 Beirut www.contraintl.com Qatar: T. +974-44429459 F. +974-44429435 P.O. Box. 24376 Doha
DRAFT WARRANTY CERTIFICATE
Ref.: CID/MARHQ/WC/030322
Date: 03/03/2022
Contra International Doha w.l.l (hereinafter referred to as “CONTRA”) warrants each of their
products, against manufacturing defects within Five (5) years from date of start-up. During
this period, any product, or any part thereof that fails in material or workmanship will be
repaired or replaced at no extra charge to the client.
The warranty contained herein is the only warranty applicable to any product sold, shipped,
and installed by contra, and except as set forth herein, all warranties (expressed or implied)
are hereby disclaimed. No other agreements, guarantees or warranties, oral or written, are
made or intended to be made by CONTRA.
The warranty contained herein is for the following Material list as follows –
1. Sanitizing Unit
2. Extraction Fan
3. Brushing Unit
4. Garbage Intake Doors
5. Intake Sections
6. Straight Section
7. Master Control Panel
Maurice Bayeh
Project Coordinator
Contra International Doha W.L.L
13
LOCAL AGENT/ SUPPLIER’S DETAILS
Lebanon: T. +961-1381381 F. +961-1383000 P.O. Box. 1165228 Beirut www.contraintl.com Qatar: T. +974-44429459 F. +974-44429435 P.O. Box. 24376 Doha
CONTRA INTERNATIONAL DOHA w.l.l.
Palm Tower B, Sector 2, Floor 55
P.O. BOX: 24376 Doha – QATAR
TEL: +974 – 4442 9459
Fax: +974 – 4442 9435
www.contraintl.com
Lebanon: T. +961-1381381 F. +961-1383000 P.O. Box. 1165228 Beirut www.contraintl.com Qatar: T. +974-44429459 F. +974-44429435 P.O. Box. 24376 Doha
14
MANUFACTURER’S AUTHORIZATION
Lebanon: T. +961-1381381 F. +961-1383000 P.O. Box. 1165228 Beirut www.contraintl.com Qatar: T. +974-44429459 F. +974-44429435 P.O. Box. 24376 Doha
I
C hutes
bry eONTRA }NTERN,ATION.AL
JAN 2022
|anuary L,2O20