Contract, Agreement, or
2 Specification Reference(s) Package-C17, Technical Specifications Sec 020200
*Limit to 5Nos. References
Revision History
Changes List
Section Page
Change No. Change Description
Number(s) Number(s)
* Software Change Tracker may be used to identify and list changes. Where used File shall be provided.
Table of Contents
1. INTRODUCTION...............................................................................................................42. SCOPE OF WORK
43. REFERENCES...............................................................................................................44. PROJECT DETAILS
45. KEY PERSONNEL INVOLVED....................................................................56. ROLES AND RESPONSIBILITIES
5 6.1 Project
Manager……………………………………………………………………………………………………………………………………5 6.2
Construction Manager…………………………………………………………………………………………………………………………..5 6.3
SHE Director/Manager………………………………………………………………………………………………………………………….5 6.4
QA/QC Inspector…………………………………………………………………………………………………………………………………..6 6.5
Site Engineer…………………………………………………………………………………………………………………………………………6 6.6
Site supervisor………………………………………………………………………………………………………………………………………7 6.7
SHE Officer……………………………………………………………………………………………………………………………………………87. KEY
PLANT TOOLS AND EQUIPMENTS REQUIRED................................98. SPECIFIC IDENTIFIED RESIDUAL HAZARDS
99. SPECIFIC STAFF TRAINING REQUIREMENTS.....................910. SEQUENCE OF ACTIVITIES:………………………..
………………………………………………………………………………………….. 911. INSPECTION HOLD POINTS .................1112
MONITORING AND COMPLIANCE............................................1113. ACCESS AND EGRESS TO WORKING AREAS
1114. FALL PROTECTION MEASURES.............................................................................................................11
15. SPECIFIC IDENTIFIED RESIDUAL HAZARDS........................................................1116. SAFE WORKING LOADS
1217. REQUIRED PERSONNEL PROTECTIVE EQUIPMENT (P.P.E)...............1318. EMERGENCY PROCEDURES &
ARRANGMENT...........................................................................................................1319. FIRST AID FACILITIES
1320. LOCATION OF NEAREST HOSPITAL1421.
ATTACHMENTS……………………………………………………………………………………………………………………………………….14
1.0 INTRODUCTION:
The objective of the method statement is to outline the efficient and safe method of work to be
followed in order to safely and efficiently complete the Earth works (excavation & back filling)
required for skywalk foundation and the precautionary measures taken to protect workers and
existing facilities.
To define standard operating procedure for the Earth works (excavation & back filling) required
for skywalk foundation, it is the policy of BAYTUR to provide a safe and healthy place of
employment.
3.0 REFERENCES:
Ensure that daily Safety Task Analysis Risk Reduction Talks (START) are conducted and
recorded prior to the commencement of any task / activity;
Eliminate or mitigate any hazard or potential hazard to the health and safety of employees;
Provide and maintain a work environment that is safe and without risk to the health and
safety of the employees and the environment;
Provide such information, instructions, training and supervision as may be necessary to
ensure, as far as reasonably practicable, the health and safety of the employees and
environmental is protected;
Taking the necessary, corrective and preventative actions on all deviations reported and
enforcing such measures and discipline as may be necessary in the interests of employee
health and safety and the environment;
Maintaining proper written records of all aspects to SHE matters and SHE operational
requirements;
Ensure that high standards and required levels of housekeeping is maintained;
Ensure that Permit to Work requirements are complied with and adhered to;
Ensure that ALL incidents are investigated, recorded and discussed at the SHE Committee
Meetings and corrective action implemented and communicated;
Identifying areas of potential fire hazards and implement required control measures.
6.4 QA / QC Inspector:
Conduct surveillance & monitoring activity from time to time on a daily basis while work is
in progress as per approved drawings and project specification.
Setting out inspection: Obtain approval from Engineer (DAR) for setting out prior to
commence with installation
QC inspector will ensure the material shall conform to project specification and approved
samples.
Work should be carried out as per latest approved drawings.
QC inspector will confirm the storage and place of the material on site as per project
requirements.
Ensure MEP clearance & signed off by concerned site engineer or DAR engineer (if any)
prior to proceed with installation.
Prior to Final inspection request for consultant check and ensure required work is
completed.
QCI will keep records of all inspections and testing related to the activities.
Responsible to co-ordinate with sub-contractors (if any) and other contractors in the work
area to avoid any confusion about areas of responsibility.
Ensure that equipment, both power and hand tools are safe and maintained in good
operating condition and is suitable and safe to do the assigned job;
Ensure that his Personnel does not leave their work area unless permitted by you in
writing;
To ensure that all visitors visiting your area of responsibility, comply to the set SHE
requirements and standards as specified in the minimum requirements;
Assign a competent guide to assist drivers delivering materials to the site and lay down
areas;
Ensure that NO work requiring permit approval is permitted, unless proper permit approval
is obtained.
Responsible for overseeing and ensuring the keeping of up to date SHE records, forms
and files in accordance to the Project H&S Plan to ensure compliance and to enable
auditing to be carried out;
Ensure application of, and the adherence to, the BAYTUR Integrated H&S Management
System;
To prevent unsafe acts being undertaken by anyone on the site and to stop and prevent
work to continue / commence in prevailing unsafe conditions;
Ensure that all employees / workers (including subcontractors) are issued with and
properly use the correct PPE and safety devices for the work being performed;
Report any incidents, accidents or near misses immediately, as per the BAYTUR
procedure, (this may include liaison with police and / or authorities) and to secure the area
by preventing that the area be tampered with;
Investigate incidents, accidents and near miss events to determine the root, basic and
immediate causes and ensure that correction / corrective / preventative actions are
implemented for all H&S related events.
Ensure site welfare facilities (rest areas, water, toilets, etc.) are sufficient for the number of
personnel, and are being provided by the site supervisory staff as well as ensuring that
high standards of hygiene are maintained;
Promote a positive SHE attitude to personnel, subcontractors, consultants and clients;
Be proactive in addressing operational SHE issues to ensure that the risk to workers and
others are managed, minimized and prevented as well as the potential environmental
impact prevented / mitigated;
Ensure and facilitate communication and coordination between the company and
subcontractors with respect to health & safety requirements;
Establishing a list of hazardous tasks, requiring safe work permits, implement and maintain
the required permit systems.
Type Quantity
JCB 01
Manual Excavation Tools 05
Vertical Supports for Utilities 10
10.0 PROCEDURE:
10.2 Survey:
The coordinates and elevations of the survey monuments shall be given to the Contractor
by the Client.
The Contractor shall verify the survey reference points.
The Contractor shall furnish these reference points on the Site and using these reference
points, shall perform all surveying and staking required to complete the Work.
Existing Survey Monuments in the Work area shall be preserved and protected from
damage or disturbance and shall not be removed unless necessary.
Areas to be excavated, filled, or graded shall be cleared and grubbed (removing tiles,
cleaning the grass and roots etc..).
Holes remaining after removal of stumps, roots, and other similar refuse shall be backfilled
with suitable material and compacted to at least the density of the adjacent undisturbed
material.
Material cleared from the site shall be removed from the site. Disposal of cleared materials
shall comply with local laws, codes, regulations and the approved SHE Plan.
10.4 Excavation
Excavation shall be done after clearing and grubbing has been completed.
Excavations shall preferably be performed in dry conditions.
Proper drainage for excavated areas shall be maintained to prevent ponding of water.
For personnel safety and work protection, excavation shoring shall be used when
necessary.
Excavation supports shall conform to the approved SHE Plan.
Extra care shall be taken during excavation work around the existing facilities.
Excavation shall be started manually until reaches the MEP utilities.
After identifying & protecting the utilities, only a 2-meter area shall be excavated manually
& by JCB as per site conditions.
Utilities shall be vertically supported properly & after securing utilities supports next 2-
meter area shall be excavated. This procedure shall be followed until complete excavation.
After completing the required excavation level shall be checked by the surveyor and
confirmed by DAH engineer/Surveyor.
Foundation concrete shall be cast as per approved concrete MES.
Before placing classified fill-in areas where structural excavations have been made, all
formwork, sheeting, shoring and other temporary facilities shall be removed.
Areas to receive fill shall be essentially free of soft or loose soils, roots, trash, and other
foreign matter. Only classified fill material approved by the Client shall be placed in the
permanent work.
Only approved material by the Client shall be used for fill operations.
Special care shall be taken when backfilling adjacent to manholes, catch basins, and other
structures to prevent settlement of pipes entering or leaving structure.
Fill material shall be placed on spreads of thickness as per project specification or CSC
engineer instruction to achieve specified compacted density.
Backfill & fill materials to be placed in layers not greater 200mm loose depth compacted by
mechanical compaction.
Compaction shall begin only after the fill has been properly placed and the material to be
compacted is at the proper moisture content.
Each layer of fill shall be compacted to the required density before proceeding with the
next layer.
Compaction shall be performed with equipment or manually compatible with site condition
& the soil type.
After compaction of the fill, field density tests shall be made by approved 3 rd party.
Fill adjacent to the structures such as foundations, beams, trenches, retaining walls, pit
walls and basement walls to a minimum distance of from 1.2m from the sides of the
structure, shall be compacted with hand-operated equipment only.
All earthworks shall be inspected/tested in accordance with the approved Inspection &
Test Plan.
After completion & approval of earth work, re-install finishing (tiles, concrete etc..) as per
surrounding area finish & CSC engineer instruction.
The following Personal Protective Equipment (PPE) will be used during the activities
Head Protection (Hard hat)
Hand protection (Hand gloves)
Foot protection (Safety Shoes)
High visibility Vest
Safety Harness
Lanyard.
Face Mask.
In case of any Emergency, emergency arrangements will be carries out in accordance with
the Emergency Response Plan ref. KAFD-SKW-SAB-HSE-ERP-PLN-00003