DATE: 4-Sep-23
PROJECT: NEW COAST HOTEL
LOCATION: M. H. Del Pilar Street, Malate, Manila, Metro Manila
SUBJECT: STRUCTURAL CHECKLIST

STRUCTURAL CONCERNS STRUCTURAL DRAWINGS DETAILS / REFERENCE


DESCRIPTION/ PARTICULARS CONSTRUCTION METHODOLOGY LEVEL

1 DRIVEWAY
1.1 demolish affected beams/girders (low headroom) (refer to framing plan) LOWER GROUND
1.2 new ramp (option 1 and option2) provide new ramp framing (refer to shop drawings)

2 STAIR
2.1 demolish existing stair (refer to shop drawings) GROUND FLR
2.2 new stair (refer to shop drawings)
2.3 cover up stair slab opening (refer to shop drawings)

3 GRAND LOBBY
3.1 demolish existing slab/beams and girders (refer 2nd floor and 3rd floor framing) 2ND FLR TO 3RD
3.2 retrofit affected columns (refer to shop drawings) GROUND TO 4TH
3.3 reinforce suspended slab (refer to shop drawings) 2ND FLR TO 3RD

3.1.a RAISE FLOOR


3.1.a.1 new floor (refer to shop drawings) GROUND FLR
3.1.a.2 rc upstand wall -termination of existing floor (refer to shop drawings) GROUND FLR
and new slab floor

4 ESCALATOR
4.1 relocation/ re-orientation of escalator (refer to shop drawings) GROUND , 2ND, 3RD, 6TH, 7TH
4.2 provision of escalator pit (refer to shop drawings) GROUND , 2ND, 3RD, 6TH, 7TH
4.3 demolish affected beams and slab (refer to shop drawings) GROUND , 2ND, 3RD, 6TH, 7TH
4.4 retrofit and reinforce beams and girders (refer to shop drawings) GROUND , 2ND, 3RD, 6TH, 7TH

5 ELEVATORS
5.1 flip elevator opening (refer to shop drawings)
5.2 additional elevator shaft-wall upward (refer to shop drawings)
H3, H4 (refer to shop drawings) ROOF DECK TO MACHINE ROOM
H8 (refer to shop drawings) ROOF DECK TO MACHINE ROOM
O1, O2 (refer to shop drawings) 7TH TO 10TH
C2, C3 (refer to shop drawings) 7TH TO 10TH
C6, C7 (refer to shop drawings) 7TH TO 10TH
C8 (refer to shop drawings) 10TH-11TH
5.3 additional elevator shaft-wall downward
H5, H6 (refer to shop drawings) LOWER GROUND TO BASEMENT 02
H8 (refer to shop drawings) 18TH TO 9TH
O1, O2 (refer to shop drawings) LOWER GROUND TO BASEMENT 02
C2 (refer to shop drawings) BASEMENT 01 TO BASEMENT 2
5.4 additional elevator pit (refer to shop drawings) ALL EXTENDED ELEVATOR SHAFT DOWNWARD
NOTE: NO EXTEND TO MAT FOUNDATION
ELAVATED ELEVATOR PIT

5.5 additional elevator overhead (refer to shop drawings) ALL EXTENDED ELEVATOR SHAFT UPWARD
5.6 additional elevator rc wall door opening cover (refer to shop drawings) FLOORS WHERE APPLICABLE

6 SKY LOBBY
6.1 demolish suspended slab/beams/girders (refer 10TH floor framing) 9TH TO 10TH
6.2 retrofit affected columns (refer to shop drawings) 9TH TO 10TH
6.3 reinforce perimeter beam/planted column (refer to shop drawings) 9TH TO 10TH
6.4 balcony framing plan provide new ramp framing (refer to shop drawings) 10TH FLOOR

7 ADDITIONAL STRUCTURE
7.1 additional suspended slab (refer 9TH floor framing) 9TH
7.2 leveling of lift lounge/ all day dining floor topping (refer to shop drawings) 9TH
7.3 additional steel structure/ frames (refer to shop drawings) 9TH

8 PIPE CHASE
8.1 demolish pipe chase block-out (refer to shop drawings) FLOORS WHERE APPLICABLE
8.2 new pipe chase slab cover (refer to shop drawings) FLOORS WHERE APPLICABLE

9 ADDITIONAL SUSPENDED SLAB


9.1 new slab flooring
9.2.a ≤1 sq. m steel deck form with temperature bars (refer to shop drawings) FLOORS WHERE APPLICABLE
9.2.b ≥1 sq. m additional framing with steel deck and rebars (refer to shop drawings) FLOORS WHERE APPLICABLE

Prepared by: Engr. Jose Carpio


Arch Roderick M. Canuel Structural Engineer
Project-In-Charrge

GREGORIO E. ORIGENES, MEng.-Structural, F.ASEP Engr.Angelo Renzo Olais


Principal- Structural Engineer Structural Engineer