SHAHBAZ ENTERPRISES

BBS Of U-G-W-T For 2 Lac Gallons 50'-6"X49'-00"


PRECINCT
Total Length of Bar (Ft)
Sr. Bar Spacin Nos Total Cut Length Total
#3 #4 #5 #6
No Member Dia g c/c Nos of Bar Nos of (Ft) Length Bar Details
Bar (Ft) 0.170 0.303 0.473 0.681
UGWT BASE SLAB BOTTOM SIDE:

1 Bottom Main Bar (A to E) #4 6" 1 107 107 53 5671 1718.313 11" 51.17 11"

2 Bottom Distribution Bar (1 to 4) #4 8" 1 78 78 57 4446 1347.138 11" 52.67 +(Lap 2.50) 11"

UGWT BASE SLAB TOP SIDE:

3 Top Main Bar (A to E) #4 6" 1 56 56 53 2968 899.304 11" 51.17 11"

4 Top Main Bar (A to E) #4 12" 1 27 27 53 1431 433.593 11" 51.17 11"

5 Top Distribution Bar (1 to 4) #4 6" 1 56 56 57 3192 967.176 11" 52.67 +(Lap 2.50) 11"

6 Top Distribution Bar (1 to 4) #4 12" 1 25 25 57 1425 431.775 11" 52.67 +(Lap 2.50) 11"

7 Top Extra Bar Outer Corner Column Side #4 6" 8 13 104 5.75 598 181.194 5.75

8 Top Extra Bar Outer Center Column Side #4 6" 8 17 136 5.75 782 236.946 5.75

9 Top Extra Bar Outer Center Column Side #4 6" 8 13 104 8 832 252.096 8.00

10 Top Extra Bar Center Column Side #4 6" 8 21 168 11 1848 559.944 11.00
1'
11 Chamfer Bars Both Side #4 12" 1 186 186 5.42 1008.12 305.460 1' 3'-5"

12 Bottom Main Bar Both Side #4 4" 2 17 34 7.92 269.28 81.592 1'-6" 4.92 1'-6"

13 Top Main Bars #4 12" 2 6 12 6.75 81 24.543 11" 4.92 11"

Total Weight in Tons 7.439


PUMP ROOM BASE SLAB BOTTOM SIDE:

14 Bottom Main Bar #4 8" 1 40 40 16.50 660 199.980 11" 14.67 11"

15 Bottom Distribution Bar #4 8" 1 23 23 27.67 636.41 192.832 11" 25.83 11"

PUMP ROOM BASE SLAB TOP SIDE:

16 Top Main Bar #4 6" 1 53 53 16.5 874.5 264.974 11" 14.67 11"

17 Top Distribution Bar #4 6" 1 30 30 27.67 830.1 251.520 11" 25.83 11"

Total Weight in Tons 0.909


UGWT WALL W1 : LONGER SIDE
SHAHBAZ ENTERPRISES
BBS Of U-G-W-T For 2 Lac Gallons 50'-6"X49'-00"
PRECINCT
Total Length of Bar (Ft)
Sr. Bar Spacin Nos Total Cut Length Total
#3 #4 #5 #6
No Member Dia g c/c Nos of Bar Nos of (Ft) Length Bar Details
Bar (Ft) 0.170 0.303 0.473 0.681
18 Outer & Inner Wall Main Bars #5 4 1/2" 2 213 426 16.58 7063.08 3340.837 9" 14.83 1'

19 Outer & Inner Distribution Bars #4 12" 2 14 28 84.33 2361.24 715.456 79.33+2 Laps (2.50)

20 Vertical Extra Bars #5 4 1/2" 1 213 213 6.25 1331.25 629.681 1' 5.25

Total Weight in Tons 0.72 3.97


UGWT WALL W1 : SHORTER SIDE

21 Outer & Inner Wall Main Bars #5 4 1/2" 4 132 528 16.58 8754.24 4140.756 9" 14.83 1'

22 Outer & Inner Distribution Bars #4 12" 4 14 56 51.17 2865.52 868.253 48.67+1 Laps (2.50)

23 Vertical Extra Bars #5 4 1/2" 2 132 264 7.00 1848 874.104 1' 6.00

Total Weight in Tons 0.868 5.015


UGWT WALL W2 : SHORTER SIDE

24 Inner Wall Main Bars #5 10" 2 28 56 18.58 1040.48 492.147 9" 16.83 1'

25 Inner Distribution Bars #4 12" 2 16 32 24.17 773.44 234.4 21.67+1 Laps (2.50)

Total Weight in Tons 0.234 0.492


PUMP ROOM WALL W1

26 Outer & Inner Wall Main Bars #5 4 1/2" 2 132 264 18.58 4905.12 2320.122 9" 16.83 1'

27 Outer & Inner Distribution Bars #4 12" 2 16 32 54.17 1733.44 525.232 49.17+2 Laps (2.50)

28 Vertical Extra Bars #5 4 1/2" 1 132 132 6.25 825 390.225 1' 5.25

Total Weight in Tons 0.53 2.71


COLUMN- C-1

29 Dowel Length #5 - 12 8 96 16.33 1567.68 741.513 9" 14.83 9"

8"
30 Ties ( 0' To 3' ) & ( 7'-4" To 10'-4" ) #3 3" 12 25 300 3.17 951 161.670 8"

8"
31 Ties (3" To 7'-4" ) #3 6" 12 9 108 3.17 342.36 58.201 8"

32 Ties ( 0' To 3' ) & ( 7'-4" To 10'-4" ) #3 3" 12 25 300 2.36 708 120.360 5 1/2"
SHAHBAZ ENTERPRISES
BBS Of U-G-W-T For 2 Lac Gallons 50'-6"X49'-00"
PRECINCT
Total Length of Bar (Ft)
Sr. Bar Spacin Nos Total Cut Length Total
#3 #4 #5 #6
No Member Dia g c/c Nos of Bar Nos of (Ft) Length Bar Details
Bar (Ft) 0.170 0.303 0.473 0.681

33 Ties (3" To 7'-4" ) #3 6" 12 9 108 2.36 254.88 43.330 5 1/2"

Total Weight in Tons 0.384 0.742


COLUMN- C2

34 Dowel Length #5 - 4 8 32 16.83 538.56 254.739 1' 14.83 1'

11"
35 Ties ( 0' To 3' ) & ( 6' To 9' ) #3 3" 4 25 100 4.16 416 70.720 11"

11"
36 Ties (3' To 6' ) #3 6" 4 6 24 4.16 99.84 16.973 11"

37 Ties ( 0' To 3' ) & ( 6' To 9' ) #3 3" 4 25 100 3.07 307 52.190 7 1/2"

38 Ties (3' To 6' ) #3 6" 4 6 24 3.07 73.68 12.526 7 1/2"

Total Weight in Tons 0.152 0.255


TOP SLAB

39 Bottom Main Bars (A to C) #4 8" 1 41 41 49.33 2022.53 612.827


4" 48.67 4"

40 Bottom Main Bars (C to E) #4 8" 1 35 35 67.09 2348.15 711.489


4" 61.42 +1 (Lap 2.50) 4"

41 Bottom Distribution Bars (1 to 4) #4 8" 1 74 74 53.33 3946.42 1195.765


4" 50.17 +(Lap 2.50) 4"

42 Bottom Distribution Bars (4 to 5) #4 8" 1 20 20 24 480 145.440


4" 23.33 4"

43 Top Extra Bars ( Corners ) #4 5" 1 371 371 6.08 2255.68 683.471 4" 5.75

44 Top Extra Distribution Bars (Corners) Longer Side #4 8" 2 10 20 52.67 1053.4 319.180 50.17 +(Lap 2.50)

45 Top Extra Distribution Bars (Corners) Shorter Side #4 8" 2 10 20 51.17 1023.4 310.090 48.67 +(Lap 2.50)

46 Top Extra Distribution Bars (Corners) Longer Side #4 8" 1 10 10 23.33 233.3 70.690 23.33

47 Top Extra Distribution Bars (Corners) Shorter Side #4 5" 2 10 20 12.75 255 77.265 12.75
SHAHBAZ ENTERPRISES
BBS Of U-G-W-T For 2 Lac Gallons 50'-6"X49'-00"
PRECINCT
Total Length of Bar (Ft)
Sr. Bar Spacin Nos Total Cut Length Total
#3 #4 #5 #6
No Member Dia g c/c Nos of Bar Nos of (Ft) Length Bar Details
Bar (Ft) 0.170 0.303 0.473 0.681

48 Top Extra Bars Longer Side ( Center ) #4 5" 2 120 240 10 2400 727.200 10.00

49 Top Extra Distribution Bars ( Center ) Longer Side #4 8" 2 16 32 52.67 1685.44 510.688 50.17 +(Lap 2.50)

50 Top Extra Bars Shorter Side ( Center ) #4 5" 2 117 234 10 2340 709.020 10.00

51 Top Extra Distribution Bars ( Center ) Longer Side #4 8" 2 16 32 51.17 1637.44 496.144 48.67 +(Lap 2.50)

1'
52 Top Slab Chamfer Both Side UGWT #4 12" 1 186 186 5.42 1008.12 305.460 1' 3'-5"

1'
53 Top Slab Chamfer Both Side PUMP ROOM #4 12" 1 58 58 4.83 280.14 84.882 1' 2'-10"

Total Weight in Tons 6.960


BEAM 1

54 Bottom Dowel Length #6 - 2 3 6 5.00 30 20.430


1'-8" 50.17 +(Lap 2.50) 1'-8"

55 Top Dowel Length #6 - 2 3 6 56.00 336 228.816


1'-8" 50.17 +(Lap 2.50) 1'-8"

11"
56 Ties Shorter Side #3 6" 2 49 98 5.68 556.64 94.629 1'-8"

11"
57 Ties Long Side #3 9" 2 30 60 5.68 340.8 57.936
1'-8"

58 Top Extra Bars #6 - 4 2 8 10.25 82 55.842 10.25

Total Weight in Tons 0.153 0.305


BEAM 2

59 Bottom Dowel Length #6 - 1 3 3 54.50 163.5 111.344


1'-8" 48.67 +(Lap 2.50) 1'-8"

60 Top Dowel Length #6 - 1 5 5 54.50 272.5 185.573


1'-8" 48.67 +(Lap 2.50) 1'-8"

11"
61 Ties Shorter Side #3 6" 1 48 48 5.68 272.64 46.349 1'-8"
SHAHBAZ ENTERPRISES
BBS Of U-G-W-T For 2 Lac Gallons 50'-6"X49'-00"
PRECINCT
Total Length of Bar (Ft)
Sr. Bar Spacin Nos Total Cut Length Total
#3 #4 #5 #6
No Member Dia g c/c Nos of Bar Nos of (Ft) Length Bar Details
Bar (Ft) 0.170 0.303 0.473 0.681

11"
62 Ties Long Side #3 9" 1 28 28 5.68 159.04 27.037 1'-8"

63 Top Extra Bars #6 - 4 2 8 9.00 72 49.032 10.25

Total Weight in Tons 0.073 0.346


BEAM 3

64 Bottom Dowel Length #6 - 1 4 4 15.26 61.04 41.568


1'-8" 11.92 1'-8"

65 Top Dowel Length #6 - 1 3 3 15.26 45.78 31.176 1'-8" 11.92 1'-8"

11"
66 Ties Shorter Side #3 6" 2 8 16 5.68 90.88 15.450 1'-8"

11"
67 Ties Longer Side #3 9" 1 5 5 5.68 28.4 4.828 1'-8"

Total Weight in Tons 0.020 0.073


BEAM 3

68 Bottom Dowel Length #6 - 1 4 4 16.75 67 45.627


1'-8" 13.42 1'-8"

69 Top Dowel Length #6 - 1 3 3 16.75 50.25 34.220 1'-8" 13.42 1'-8"

11"
70 Ties Shorter Side #3 6" 2 9 18 5.68 102.24 17.381 1'-8"

11"
71 Ties Longer Side #3 9" 1 6 6 5.68 34.08 5.794 1'-8"

Total Weight in Tons 0.023 0.080

TOTAL WEIGHT IN TON 0.805 17.651 13.18 0.804

SUB TOTAL IN TON >>>>>>>>> 32.444