You are on page 1of 11

ZARANDA

6 X 14 DD
### 4.0
Cc 1.6 ### 250
237 4.0
228 ### CHANCADOR
A METSO
C100
FAJA N°3
Ratio
FAJA N°4 2.86

ZARANDA
6 X 16 DD

156 4.0
150 ### FAJA N°2
FAJA N°4B

CHANCADOR 156 4.0


A HP200 150 ###
Ratio 4 FAJA N°6

FAJA N°5

### 4.0
### ###

FAJA TEMP Nº 2 FAJA TEMP Nº 1

FAJA OP ACTUAL Nº4

FAJA OP ACTUAL Nº5

TMH-Hr %H

Tonelaje ###
TMS-Hr D80 mm
Hrs Chancado 16
FAJA N°1

ZARANDA
6 X 14 DD
### 4.0 ALIMENTADOR
RECIPROCANTE
### 250

### 4.0
### ###

98 4.0
94 ###

AJA OP ACTUAL Nº5


CAPACITIES, BELT WIDTHS AND SPEEDS
FAJA Nº 1 Faja Nº 2 FAJA Nº 3 FAJA Nº 4A FAJA Nº 5
belt width (inch) b 36 30 30 30 30
recommended lump size 20 a.surcharge 90% fines lr1 12 10 10 10 10
recommended lump size 20 a.surcharge all lumps lr2 7.2 6 6 6 6
recommended lump size 30 a.surcharge 90% fines lr3 6 5 5 5 5
recommended lump size 30 a.surcharge all lumps lr4 3.6 3 3 3 3
recommended speeds (fpm) v 73.2 193.6 188.3 175.8 90.0

TROUGHED BELT LOAD AREAS - STANDARD EDGE DISTANC

angle surcharge (grados) a 20 30 23 25 20


angle of idler roll (grados) b 32.11 32.11 34.72 34.21 34.72
area of surcharge (inch2) As 45.36 47.22 34.59 37.98 29.92
base trapezoidal area (inch2) Ab 91.29 61.46 65.22 64.50 65.22
length,one edge trapezoidal area (inch) l 13.61 11.38 11.38 11.38 11.38
length,other edge trapezoidal area (inch) l1 27.70 22.83 22.49 22.56 22.49
heigth of trapezoidal area (inch) j 4.42 3.59 3.85 3.80 3.85
slant length trapezoid (inch) m 8.32 6.76 6.76 6.76 6.76
radius of surcharge arc (inch) r 40.49 22.83 28.78 26.69 32.88
horizontal projection of slant side of trapezoid (inch) f 7.05 5.73 5.56 5.59 5.56
edge distance, edge of material to edge of belt (inch) c 2.88 2.55 2.55 2.55 2.55
total area (ft2) At 0.95 0.75 0.69 0.71 0.66
belt width comp. b 36 30 30 30 30

CAPACITY

densidad del material (lb/ft3) d 116.30 116.30 116.30 116.30 116.30


real capacity (tph) Q 220.47 463.53 413.89 396.78 188.60
real capacity (ft3/hr) C 4170.49 8768.24 7829.18 7505.42 3567.53
FAJA Nº 6 FAJA Nº 4BFAJA TpN°1FAJA TpN°2
24 24 24 24
8 8 8 8
4.8 4.8 4.8 4.8
4 4 4 4
2.4 2.4 2.4 2.4
113.6 250.9 78.6 101.2

25 20 25 25
34.40 21.10 36.87 35.23
23.48 21.04 22.80 23.26
39.53 26.24 41.57 40.23
9.15 9.15 9.15 9.15
17.74 18.86 17.48 17.65
2.94 1.87 3.12 3.00
5.20 5.20 5.20 5.20
20.99 27.57 20.68 20.89
4.29 4.85 4.16 4.25
2.22 2.22 2.22 2.22
0.44 0.33 0.45 0.44
24 24 24 24

116.30 116.30 116.30 116.30


157.63 261.34 111.44 141.52
2981.72 4943.44 2108.06 2677.04
Metodo N°1
FAJA Nº 1 Faja Nº 2 FAJA Nº 3FAJA Nº 4AFAJA Nº 5 FAJA Nº 6FAJA Nº 4B
Longitud de la faja ( mts ) 22.37 15.00 29.10 3.40 8.60 26.30 3.40
Altura de la faja (ft) 26.15 11.83 33.72 3.45 3.40 20.33 0.98
Potencia del motor ( Hp) 20.00 7.50 15.00 5.00 5.00 10.00 5.00

Capacidad Teorica ( ton/hr 370.18 251.03 214.47 655.98 374.17 192.62 1024.22

Manzaneda

Longitud Longitud Ancho Angulo Motor Carga teo.


Nº Faja m. pies pulg. º HP ton/hr
1 22.1 72.51 36 17.5 20 749.51
2 15 49.21 30 12.5 7.5 421.57
3 29.1 95.47 30 19 15 425.28
4A 3.4 11.15 30 18 5 1216.31
4B 2.9 9.35 24 6.5 5 1527.57
5 8.6 28.22 24 9 5 498.76
6 26.3 86.29 24 14 10 318.61
Temp. 1 10.4 34.12 18 21 4 316.05
Temp. 2 9.2 30.25 24 13 7.5 684.38
Actual 7 16.5 54.17 24 8 7.5 391.93
Actual 8 22.4 73.33 24 16.5 10 371.66
DATOS MEDIDOS
FAJA TpN°1
FAJA TpN°2 AMP.
4.75 10.70 DATOS DEL MOTOR 10/16/2011
15.37 34.63 CODIGO DE EQUIPO HP AMP.(A) AMP.(A)
5.00 5.00 FAJA TRANSPORTADORA  N° 1 20 24 8.5
FAJA TRANSPORTADORA  N° 2 7.5 9.08 5.6
223.18 99.07 FAJA TRANSPORTADORA  N° 3 15 17.1 16.6
FAJA TRANSPORTADORA  N° 4A 5 6.55 5
FAJA TRANSPORTADORA  N° 4B 5 6.5 3.5
FAJA TRANSPORTADORA  N° 5 5 6.55 4
FAJA TRANSPORTADORA  N° 6 10 11.8 8.2
FAJA TRANSPORTADORA  N° 7 7.6 9.08 8.4
FAJA TRANSPORTADORA  N° 8 10 11.9 6.8
FAJA TRANSPORTADORA  N° 1 TEMPORAL
4 6.83 3.8
FAJA TRANSPORTADORA  N° 2 TEMPORAL
7.5 9.08 3.8
 ALIMENTADOR RECIPROCANTE 15 18.5 10
ZARANDA PRIMARIA 6x14 25 30 16.7
ZARANDA SECUNDARIA 6x16 20 28.4 15.1
CHANCADORA HP 200 200 242 120
CHANCADORA C-100 150 185 70
BOMBA SALMSON N° 01 30 36 28.5
BOMBA SALMSON N° 02 30 36 33.3
BOMBA SALMSON - ZONA DE RE 30 36 33
CELDA ROUGHER 01 50 61.7 35.1
CELDA ROUGHER 02 50 61.7 34
CELDA ROUGHER 03 50 61.7 36
MOLINO 8x10 - N° 01 400 442 408
MOLINO 8x10 - N° 02 400 442 424
MOLINO 8x10 - N° 03 400 442 360
OS MEDIDOS DATOS MEDIDOS
T° (°C) AMP. T° (°C)
10/16/2011 10/17/2011 10/17/2011
(°C) AMP.(A) (°C)
28 8.9 25.3
35.2 4.6 35.7
42.4 15.3 40.2
29.6 4.5 30.4
26.2 3.5 32.2
33.6 4 31.5
22.3 7.3 23.1
49.2 7.3 48.8
27 5.6 29
32.4 3.8 30.3
30 3.8 28.2
39.2 10.4 37.5
26.2 17.9 25.8
32.1 14.9 38.7
23 120 20
33.2 75 35.8
25.2 28.5 28.4
33.1 33.5 34.9
34.2 32 32.5
32.3 33.5 33.5
32 34.5 31.8
31.7 37.1 33.3
34.6 408 42.2
35.3 432 41.3
32.9 352 37.1
FAJAS TRANSPORTADORAS

FAJA Nº 1 Faja Nº 2 FAJA Nº 3FAJA Nº 4AFAJA Nº 5FAJA Nº 6FAJA Nº 4B


Carga de la Faja ( ton/Hr) 97.656 237.30 237.30 237.30 156.25 156.25 156.25
P.E. Mineral TM/m3 1.86 1.86 1.86 1.86 1.86 1.86 1.86
Longitud de la faja ( mts ) 22.37 15.00 29.10 3.40 8.60 26.30 3.40
Ancho de la Faja (inch) 36 30 30 30 30 24 24
Angulo de la Faja 19.21 15.5 19.21 15.39 18.97 19.09 3.05
Area de carga de la faja 0.40 0.40 0.40 0.40 0.40 0.40 0.40
Altura de la faja (ft) 26.15 11.83 33.72 3.446 3.402 20.326 0.984
Carga por pie de Long de Faja 46.4 46.4 46.4 46.4 46.4 46.4 46.4
Flujo 46.370 46.370 46.370 46.370 46.370 46.370 46.370
Velocidad de la faja ft/min 77 187 187 187 123 123 123
Tension necesaria para mover los polines Tx
Factor de friccion 0.035 0.035 0.035 0.035 0.035 0.035 0.035
Factor G (de tablas) 19 19 19 19 19 19 19
Tx Lb 48.81 32.73 63.49 7.42 18.76 57.38 7.42
Tension necesaria para move la faja vacia Ty
Factor de friccion 0.6 0.04 0.04 0.04 0.04 0.04 0.04
Q 46.37 46.37 46.37 46.37 46.37 46.37 46.37
Ty Lb 2042.1 91.3 177.1 20.7 52.3 160.0 20.7
Tension necesaria para levantar la carga Tz
H 26.20 11.90 33.80 3.50 3.50 20.40 1.00
Q 46.40 46.40 46.40 46.40 46.40 46.40 46.40
Tz 1216 552 1568 162 162 947 46
SUMA DE LAS TENSIONES Tx + Ty + Tz = TE
TE 3306.61 676.17 1808.89 190.51 233.50 1163.98 74.51
POTENCIA REQUERIDA (en el motoreductor)
HP 7.73 3.84 10.28 1.08 0.87 4.35 0.28
POTENCIA REAL = HPr
FACTOR DE ALTURA 1.4 1.4 1.4 1.4 1.4 1.4 1.4
EFICIENCIA DE LA TRANSMISION 0.9 0.9 0.9 0.9 0.9 0.9 0.9
EFICIENCIA DEL REDUCTOR 0.8 0.8 0.8 0.8 0.8 0.8 0.8
HPr Calculado 15.00 7.00 20.00 2.00 2.00 8.00 1.00
HPr Instalado 20.0 7.5 15.0 5.0 5.0 10.0 5.0

Velocidad de faja Medido 73.2 193.6 86.8 91.3 90.0 113.6 250.9
Velocidad de faja Calculado 77.1 187.5 187.5 187.5 123.4 123.4 123.4

Nº dientes Piñon 17 27 17 17 17 17 27
Nº de dientes Sproket 37 27 37 37 34 34 27
RPM ( motor ) 1750 1710 1750 1730 1730 1740 1730
Ratio ( dato de motoreductor) 71 51 51 51 43 43 35
RPM de la polea motriz 11.3 33.5 15.8 15.6 20.1 20.2 49.4
Diametro de polea de motor 24.7 22.1 21.0 22.4 17.1 21.4 19.4
RPM motoreductor 25.0 34.0 34.0 34.0 40.0 40.0 49.0

RPM de la polea motriz necesaria 11.9 32.5 34.0 32.0 27.6 22.0 24.3
Relacion de velocidad 2.1 1.0 1.0 1.1 1.4 1.8 2.0
Cant de dientes del motoreductor 18 26 37 35 23 19 13
FAJA TpN°1FAJA TpN°2
16.60 81.05
1.86 1.86
4.75 10.70
24 24
20.25 20.25
0.40 0.40
15.371 34.626
46.4 46.4
46.370 46.370 m/s
13 64 0.39 0.95 0.95 0.95 0.63 0.63 0.63 0.07 0.33

0.035 0.035
19 19
10.36 23.34

0.04 0.04
46.37 46.37
28.9 65.1

15.40 34.70
46.40 46.40
715 1610

753.83 1698.54

0.30 3.30

1.4 1.4
0.9 0.9
0.8 0.8
1.00 6.00
5.0 5.0

78.6 101.2
13.1 64.0

#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!

#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!

You might also like