You are on page 1of 19

1 2 3 4 5 6 7 8

A A
ELECTRIFICATION DISTRIBUTION SOLUTION FACTORY, VIET NAM
Lot C3, TS3 Road, Tien Son IZ, Dong Nguyen, Tu Son, Bac Ninh
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

B B

Project Title : BYD FACTORY

Project No. : UG23021


C C
Purchaser : BYD

Client :

Sale Order Number : 4202786788

D D

FOR APPROVAL
KINDLY TICK THE FOLLOWING BOX

1 Reviewed & Accepted as Final & Certified.


Manufacture may proceed

2 Reviewed & Accepted as Noted. Revise and Resubmit


Manufacture may proceed
E E
3 Reviewed & Returned. Correct and Resubmit
Manufacture should not proceed

4 Not Reviewed, Information only


Manufacture may proceed

Substation : 24kV SWITCHGEAR FACTORY NO.7 All comments and correction from customer should be mark in red.
This approval drawing should be returned within 2 working weeks.
Drawing Title: GENERAL DRAWINGS No manufacturing work will start before approval.

F PROJECT NO.: UG23021 DRAWING NO.: 1YUX200001A0302 F


D FOR REVISION 26/09/23 PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
C FOR REVISION 11/08/23 BYD FACTORY GENERAL DRAWINGS SCALE: 1: 1
B FOR REVISION 05/09/23 CUSTOMER: COVER SHEET START: 24/08/2023
BYD
A FOR APPROVAL 31/08/23 SHEET: ==SWG1=J00/A00
ELDS FACTORY
REV. DESCRIPTION DATE DESIGNED: HANG PTD CHECKED: KIM NH APPROVED: TUAT MB TEL: (+84) (222) 374 8535, TELEFAX: (+84) (222) 3748 531 CONT.: B01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

TABLE OF CONTENTS
PAGE NAME DRAWING Nr. SHEET Nr. PAGE REVISION
A GENERAL DRAWINGS 1YUX200001A0302 ==SWG1=J00/A00 A B C D A
COVER SHEET
GENERAL DRAWINGS 1YUX200001A0302 ==SWG1=J00/B01 A B C D
TABLE OF CONTENTS
GENERAL DRAWINGS 1YUX200001A0302 ==SWG1=J00/C00 A
TECHNICAL DATA
GENERAL DRAWINGS 1YUX200001A0302 ==SWG1=J00+SLD/A01 A B C D
SINGLE LINE DIAGRAM
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

GENERAL DRAWINGS 1YUX200001A0302 ==SWG1=J00+GA/D01 A B


GENERAL ARRANGEMENT
B GENERAL DRAWINGS 1YUX200001A0302 ==SWG1=J00+GA/D02 A B B
PLAN VIEW
GENERAL DRAWINGS 1YUX200001A0302 ==SWG1=J00+GA/D03 A B
DETAIL OF SWITCHGEAR INSTALLATION
GENERAL DRAWINGS 1YUX200001A0302 ==SWG1=J00+GA/D04 A B
SECTIONAL VIEW
GENERAL DRAWINGS 1YUX200001A0302 ==SWG1=J00+GA/D05 A B C
SECTIONAL VIEW
GENERAL DRAWINGS 1YUX200001A0302 ==SWG1=J00+GA/E01 A B C
PANEL RATING
C C

D D

E E

F PROJECT NO.: UG23021 DRAWING NO.: 1YUX200001A0302 F


D FOR REVISION 26/09/23 PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
BYD FACTORY GENERAL DRAWINGS
C FOR REVISION 11/08/23 SCALE: 1: 1
B FOR REVISION 05/09/23 CUSTOMER: TABLE OF CONTENTS START: 24/08/2023
BYD
A FOR APPROVAL 31/08/23 SHEET: ==SWG1=J00/B01
EPDS FACTORY, BAC NINH
REV. DESCRIPTION DATE DESIGNED: HANG PTD CHECKED: KIM NH APPROVED: TUAT MB TEL: (+84) (222) 3748 530, TELEFAX: (+84) (222) 3748 531 CONT.: C00
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

NO. CATOGARY DESCRIPTION NO. CATOGARY QTY. DESCRIPTION


1 TECHNICAL System : 22kV 3 PHASE 3 WIRE 50Hz 9 PACKING DETAILS Domestic
CHARACTERISTIC Rated Voltage : 24 kV
Power-frequency withstand voltage: 50 kV
Lighting impulse withstand voltage: 125 kV 10 NOTE
Rate short time withstand current: 25 kA / 3ss
Rate peak withstand current: 63 kA
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

2 CONSTRUCTION Type : UniGear ZS1


Material : Metal-clad Switchgear
Access Location : Front Access
B Switching Device Type : Withdrawable Vacuum Circuit Breaker B
Degree of Protection : External - IP 4X, Internal - IP 2X
3 PAINT FINISH Doors and End Covers : RAL7035 "Light Grey"
Remainder : Aluminium-Zinc Steel Sheets 11 REMARKS
4 BUSBAR RATING Main Busbar Rated Current : 1250 A Size : 1 x 80 x 10mm²
Earth Bar Size : 1 x 30 x 8mm²
Insulation : YES Finishing : Bare Copper
5 AUXILIARY CIRCUIT Voltage Supply :
- Protection, Control & Indication 110V DC
- Circuit Breaker Spring Charge Motor 110V DC
- Panel Heater & Cubicle Lighting 220V AC, 50Hz
Wire Size :
C - Control Circuit 1.5mm² Colour : Grey C
- Lighting & Heating Circuit 1.5mm² Colour : Black
- Current Transformer
Phase L1 4.0mm² Colour : Red
Phase L2 4.0mm² Colour : Yellow
Phase L3 4.0mm² Colour : Blue
Phase N 4.0mm² Colour : Black
- Voltage Transformer
Phase L1 2.5mm² Colour : Red
Phase L2 2.5mm² Colour : Yellow
Phase L3 2.5mm² Colour : Blue
Phase N 2.5mm² Colour : Black
D - Earthing Cable 2.5mm² Colour : Green/Yellow D
Wire Specification : 450/750V
Terminal Block : PHOENIX CONTACT
Test Terminal Block : YONGSUNG
Cable Termination : Blade
Cable Marker : Hot Marker
Cable Tray : Self-Extinguishing, Warp Proof PVC
Maximum Service Temperature : 85°C
6 POWER CABLE Entry : Bottom
Maximum Cable Size :
Terminating Facility : Undrilled Aluminium Gland Plate Only
7 CONTROL CABLE Entry : Bottom
E 8 LABEL Black Letter on White Background E
Material : Plastic
Fixing : Internal - Self Adhesive
External - Self Adhesive

F PROJECT NO.: UG23021 DRAWING NO.: 1YUX200001A0302 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
BYD FACTORY GENERAL DRAWINGS SCALE: 1: 1
CUSTOMER: TECHNICAL DATA START: 24/08/2023
BYD
A FOR APPROVAL 31/08/23 SHEET: ==SWG1=J00/C00
ELDS FACTORY
REV. DESCRIPTION DATE DESIGNED: HANG PTD CHECKED: KIM NH APPROVED: TUAT MB TEL: (+84) (222) 374 8535, TELEFAX: (+84) (222) 3748 531 CONT.: +SLD/A01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A 3P3W, 24kV, 1250A, 25kA/3s, 50Hz A

-QB -QB -QB -QB -QB -QB -QB -QB


VCB VCB VCB VCB VCB VCB VCB VCB
M 1250A M 1250A M 1250A M 1250A M 1250A M 1250A M 1250A M 1250A

P2 -BC P2 -BC P1 -BC P1 -BC P1 -BC P1 -BC P1 -BC P1 -BC


This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

B P1 P1 P2 P2 P2 P2 B
P2 P2

-SA -SA

-BV -BV -QE -QE -QE -QE -QE -QE

EARTHING BUS BAR

-PU -PU -PU -PU -PU -PU -PU -PU

C C

PANEL NUMBER =MV8.1 =MV8.2 =MV8.3 =MV8.4 =MV8.5 =MV8.6 =MV8.7 =MV8.8
INCOMING PANEL SPARE PANEL OUTGOING PANEL OUTGOING PANEL OUTGOING PANEL OUTGOING PANEL OUTGOING PANEL SPARE PANEL
MAIN LABEL

MAIN SWITCH VD4/P 24.12.25.P210 VD4/P 24.12.25.P210 VD4/P 24.12.25 P210 VD4/P 24.12.25 P210 VD4/P 24.12.25 P210 VD4/P 24.12.25 P210 VD4/P 24.12.25 P210 VD4/P 24.12.25 P210
D 600-800-1200/5/5A 600-800-1200/5/5A 150-300/5/5/5A 150-300/5/5/5A 100-200/5/5A 100-200/5/5A 100-200/5/5A 100-200/5/5A
D
CURRENT TRANSFORMER C1: CL0.5, 15VA C1: CL0.5, 15VA C1: CL0.5, 15VA C1: CL0.5, 15VA C1: CL0.5, 15VA C1: CL0.5, 15VA C1: CL0.5, 15VA C1: CL0.5, 15VA
C2: CL5P15, 15VA C2: CL5P15, 15VA C2, C3: CL5P15 15VA C2, C3: CL5P15 15VA C2: CL5P15 15VA C2: CL5P15 15VA C2: CL5P15 15VA C2: CL5P15 15VA

CABLE CT
EARTHING SWITCH ST-E ST-E ST-E ST-E ST-E ST-E
HV FUSE 2A 2A
SURGE ARRESTER SCIHE24(Uc=19,5KV, Ur=24KV) SCIHE24(Uc=19,5KV, Ur=24KV)
22 0.11 0.11 22 0.11 0.11
V3 V3 V3 V3 V3 V3
VOLTAGE TRANSFORMER CL0.5/3P CL0.5/3P
50VA/50VA 50VA/50VA

CAP VOLTAGE DIVIDER 1 1 1 1 1 1 1 1


DAMPING RESISTOR
E E
PROTECTION REF615-HBFNAEAGNBC1BNA11G REF615-HBFNAEAGNBC1BNA11G RET615-HBTFBCADNBC1BNN11G RET615-HBTFBCADNBC1BNN11G REX6101GMBANNNNA REX6101GMBANNNNA REX6101GMBANNNNA REX6101GMBANNNNA
DEVICES 50/50N, 51/51N, 25, 27/59, 59G, 86 50/50N, 51/51N, 25, 27/59, 59G, 86 50/51, 50/51N, 59N,49, 50BF/51BF, 87 50/51, 50/51N, 59N,49, 50BF/51BF, 87 50/51, 50/51N, 59G,49, 50BF/51BF 50/51, 50/51N, 59G,49, 50BF/51BF 50/51, 50/51N, 59G, 49, 50BF/51BF 50/51, 50/51N, 59G, 49, 50BF/51BF

MEASURING MULTI METER MULTI METER MULTI METER MULTI METER MULTI METER MULTI METER MULTI METER MULTI METER
INSTRUMENTS M4M 30, Modbus TCP/IP, CL0.5 M4M 30, Modbus TCP/IP, CL0.5 M4M 30, Modbus TCP/IP, CL0.5 M4M 30, Modbus TCP/IP, CL0.5 M4M 30, Modbus TCP/IP, CL0.5 M4M 30, Modbus TCP/IP, CL0.5 M4M 30, Modbus TCP/IP, CL0.5 M4M 30, Modbus TCP/IP, CL0.5

COMMUNICATION IEC61850 IEC61850 IEC61850 IEC61850 IEC61850 IEC61850 IEC61850 IEC61850


POWER CABLE 1x1C-400mm²/phase 1x1C-400mm²/phase 1x1C-120mm²/phase 1x1C-120mm²/phase 1x1C-95mm²/phase 1x1C-95mm²/phase 1x1C-95mm²/phase 1x1C-95mm²/phase

F PROJECT NO.: UG23021 DRAWING NO.: 1YUX200001A0302 F


D FOR REVISION 26/09/23 PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
C FOR REVISION 11/08/23 BYD FACTORY GENERAL DRAWINGS SCALE: 1 : 1.2
B FOR REVISION 05/09/23 CUSTOMER: SINGLE LINE DIAGRAM START: 24/08/2023
BYD
A FOR APPROVAL 31/08/23 SHEET: ==SWG1=J00+SLD/A01
ELDS FACTORY
REV. DESCRIPTION DATE DESIGNED: HANG PTD CHECKED: KIM NH APPROVED: TUAT MB TEL: (+84) (222) 374 8535, TELEFAX: (+84) (222) 3748 531 CONT.: +GA/D01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

6460 mm
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

B B

W W W W W W W W
2325

OFF ON OFF ON OFF ON OFF ON OFF ON OFF ON OFF ON OFF ON

13 13 13 13 13 13 13 13
11 11 12 11 11 12 11 11 12 11 11 12 11 11 12 11 11 12 11 11 12 11 11 12

C C

W W W W W W W W

30 800 800 800 800 800 800 800 800 30

FRONT
D D
PANEL DEPTH : 1700mm

PANEL NO. =MV8.1 =MV8.2 =MV8.3 =MV8.4 =MV8.5 =MV8.6 =MV8.7 =MV8.8

INCOMING OUTGOING OUTGOING OUTGOING OUTGOING OUTGOING


PANEL TYPE SPARE SPARE
PANEL PANEL PANEL PANEL PANEL PANEL

CIRCUIT BREAKER VD4/P-1250A VD4/P-1250A VD4/P-1250A VD4/P-1250A VD4/P-1250A VD4/P-1250A VD4/P-1250A VD4/P-1250A

=J1.6 =J1.6

E E

LEGEND:
11 GUIDING HOLE FOR CB/VT TRUCK
12 OPENING FOR EARTH SWITCH AND INDICATOR
13 OPENING FOR RACKING IN & RACKING OUT OF CIRCUIT BREAKER/VOLTAGE TRANSFORMER
14 OPENING FOR MANUAL SPRING CHARGED WHEN CB DOOR IS CLOSING

F PROJECT NO.: UG23021 DRAWING NO.: 1YUX200001A0302 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
BYD FACTORY GENERAL DRAWINGS SCALE: 1 : 25
B FOR REVISION 11/08/23 CUSTOMER: GENERAL ARRANGEMENT START: 24/08/2023
BYD
A FOR APPROVAL 31/08/23 SHEET: ==SWG1=J00+GA/D01
ELDS FACTORY
REV. DESCRIPTION DATE DESIGNED: HANG PTD CHECKED: KIM NH APPROVED: TUAT MB TEL: (+84) (222) 374 8535, TELEFAX: (+84) (222) 3748 531 CONT.: D02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

B =MV8.1 =MV8.2 =MV8.3 =MV8.4 =MV8.5 =MV8.6 =MV8.7 =MV8.8 B

opening for power opening for power opening for power opening for power opening for power opening for power opening for power opening for power
cables cables cables cables cables cables cables cables
C C

800 800 800 800 800 800 800 800

D D

FRONT

E E

F PROJECT NO.: UG23021 DRAWING NO.: 1YUX200001A0302 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
BYD FACTORY GENERAL DRAWINGS SCALE: 1 : 25
B FOR REVISION 11/08/23 CUSTOMER: PLAN VIEW START: 24/08/2023
BYD
A FOR APPROVAL 31/08/23 SHEET: ==SWG1=J00+GA/D02
ELDS FACTORY
REV. DESCRIPTION DATE DESIGNED: HANG PTD CHECKED: KIM NH APPROVED: TUAT MB TEL: (+84) (222) 374 8535, TELEFAX: (+84) (222) 3748 531 CONT.: D03
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

590
105 105
A A

40

150

>0,5
430
100 600 100

680

1590
1700

80
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

1400
Power cables entry
Ø16

B B

200
65 BASE IRONS ON CONCRETE FLOOR
Control cables entry

200
4-mounting hole
(36X20)

80

40
70
105 590 105
A1
-K1
A2

800

80
FOR PANELS = MV8.1~=MV8.8
Ø16

C C
ANCHORING BOLT FIXING SYSTEM
ANCHORING BOLTS ON CONCRETE FLOOR

590
105 105

40

150
430
100 600 100

D D
M12
680

THREADED HOLE ON METAL STRUCTURE

1590
1700

1400
Power cables entry
200

65

Control cables entry


200

4-mounting hole
(36X20)
80

M12
40
70

THROUGH HOLE ON METAL STRUCTURE


E 105 590 105 E
800

FOR PANELS = MV8.1~=MV8.8

BASE IRON FIXING SYSTEM

F PROJECT NO.: UG23021 DRAWING NO.: 1YUX200001A0302 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE:ENG
BYD FACTORY GENERAL DRAWINGS SCALE:1 : 25
B FOR REVISION 11/08/23 CUSTOMER: DETAIL OF SWITCHGEAR INSTALLATION START: 24/08/2023
BYD
A FOR APPROVAL 31/08/23 SHEET: ==SWG1=J00+GA/D03
ELDS FACTORY
REV. DESCRIPTION DATE DESIGNED: HANG PTD CHECKED: KIM NH APPROVED: TUAT MB TEL: (+84) (222) 374 8535, TELEFAX: (+84) (222) 3748 531 CONT.: D04
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A
632

LEGEND :
1 LV COMPARTMENT
2 CB COMPARTMENT
3 CABLE COMPARTMENT
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

1 4 -

705
180
5 VOLTAGE TRANSFORMER
B B
6 WOUND CURRENT TRANSFORMER
7 HEATER
180

8 CAPACITIVE INSULATOR
9 CIRCUIT BREAKER
290

10 CABLE TERMINATION
2 11 -
12 SURGE ARRESTER
C 50W 7 13 - C
310
2200

Shutter painted "Signal Red" color 537 in BS381C,


Labelled " BUSBAR" with white letters.
6

1620
A BUSBAR
8
D D
B CIRCUIT
1075

B 10

A 3 Shutter painted "Lemon Yellow" color 355 in BS381C,


100W 7 Labelled " CIRCUIT" with white letters.

12
CABLE TERMINATION DETAILS (A) CABLE TERMINATION DETAILS (B)
5
60
80
E 4 4 E
∅1 ∅1
40 1590 70
210 210 210 210

25
1700

25
A B

SECTIONAL VIEW FOR PANEL =MV8.1, =MV8.2

F PROJECT NO.: UG23021 DRAWING NO.: 1YUX200001A0302 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
BYD FACTORY GENERAL DRAWINGS SCALE: 1 : 13
B FOR REVISION 11/08/23 CUSTOMER: SECTIONAL VIEW START: 24/08/2023
BYD
A FOR APPROVAL 31/08/23 SHEET: ==SWG1=J00+GA/D04
ELDS FACTORY
REV. DESCRIPTION DATE DESIGNED: HANG PTD CHECKED: KIM NH APPROVED: TUAT MB TEL: (+84) (222) 374 8535, TELEFAX: (+84) (222) 3748 531 CONT.: D05
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A 632 A

LEGEND :
1 LV COMPARTMENT
2 CB COMPARTMENT
3 CABLE COMPARTMENT
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

705
180

4 EARTHING SWITCH
B 5 - B
180

6 WOUND CURRENT TRANSFORMER


7 HEATER
8 CAPACITIVE INSULATOR
290

9 CIRCUIT BREAKER
10 CABLE TERMINATION
11 -
2
12 -
310

C C
13 -
7
2200

Shutter painted "Signal Red" color 537 in BS381C,


6 4
Labelled " BUSBAR" with white letters.

1620
A BUSBAR
8
D D
1075

3
B CIRCUIT
10

B
771

A
Shutter painted "Lemon Yellow" color 355 in BS381C,
7
Labelled " CIRCUIT" with white letters.
457
CABLE TERMINATION DETAILS (A)

40
4
∅1
E E
40 1590 70
210 210

25
1700

SECTIONAL VIEW FOR PANEL = MV8.3~=MV8.8

F PROJECT NO.: UG23021 DRAWING NO.: 1YUX200001A0302 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
C FOR REVISION 26/09/23 BYD FACTORY GENERAL DRAWINGS SCALE: 1 : 13
B FOR REVISION 11/08/23 CUSTOMER: SECTIONAL VIEW START: 24/08/2023
BYD
A FOR APPROVAL 31/08/23 SHEET: ==SWG1=J00+GA/D05
ELDS FACTORY
REV. DESCRIPTION DATE DESIGNED: HANG PTD CHECKED: KIM NH APPROVED: TUAT MB TEL: (+84) (222) 374 8535, TELEFAX: (+84) (222) 3748 531 CONT.: E01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

Serial number: 1YUX 4202786788 /PANEL/7 Serial number: 1YUX 4202786788 /PANEL/7

Prod. Year: 2023 IEC62271-200 Prod. Year: 2023 IEC62271-200


This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

Unigear ZS1 Metal-clad Switchgear Unigear ZS1 Metal-clad Switchgear

Rated voltage 24 kV Rated voltage 24 kV


B B
Rated current 1250 A Rated current 630 A

Rated lightning impulse withstand voltage 125 kV Rated lightning impulse withstand voltage 125 kV

Rated power-frequency withstand voltage 50 kV Rated power-frequency withstand voltage 50 kV


Rated current of main busbar 1250 A Rated current of main busbar 1250 A

Rated short time withstand current ( 3s) 25 kA Rated short time withstand current ( 3s) 25 kA

Rated peak withstand current 63 kA Rated peak withstand current 63 kA

Rated frequency 50 Hz Rated frequency 50 Hz

Protection class IP4X Protection class IP4X

Made by ABB Made by ABB


C C

PANEL =MV8.1~ =MV8.2 PANEL =MV8.3~ =MV8.8

D D

E E

F PROJECT NO.: UG23021 DRAWING NO.: 1YUX200001A0302 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
C FOR REVISION 26/09/23 BYD FACTORY GENERAL DRAWINGS SCALE: 1: 1
B FOR REVISION 11/08/23 CUSTOMER: PANEL RATING START: 24/08/2023
BYD
A FOR APPROVAL 31/08/23 SHEET: ==SWG1=J00+GA/E01
ELDS FACTORY
REV. DESCRIPTION DATE DESIGNED: HANG PTD CHECKED: KIM NH APPROVED: TUAT MB TEL: (+84) (222) 374 8535, TELEFAX: (+84) (222) 3748 531 CONT.: +LP/G01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A
ELECTRIFICATION DISTRIBUTION SOLUTION FACTORY, VIET NAM
Lot C3, TS3 Road, Tien Son IZ, Dong Nguyen, Tu Son, Bac Ninh
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

B B

Project Title : BYD FACTORY

Project No. : UG23021


C C
Purchaser : BYD

Client :

Sale Order Number : 4202786788

D D

FOR APPROVAL
KINDLY TICK THE FOLLOWING BOX

1 Reviewed & Accepted as Final & Certified.


Manufacture may proceed

2 Reviewed & Accepted as Noted. Revise and Resubmit


Manufacture may proceed
E E
3 Reviewed & Returned. Correct and Resubmit
Manufacture should not proceed

4 Not Reviewed, Information only


Manufacture may proceed

Substation : 24kV SWITCHGEAR FACTORY NO.8 All comments and correction from customer should be mark in red.
This approval drawing should be returned within 2 working weeks.
Drawing Title: GENERAL DRAWINGS No manufacturing work will start before approval.

F PROJECT NO.: UG23021 DRAWING NO.: 1YUX200001A0302 F


D FOR REVISION 26/09/23 PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
C FOR REVISION 11/08/23 BYD FACTORY GENERAL DRAWINGS SCALE: 1: 1
B FOR REVISION 05/09/23 CUSTOMER: COVER SHEET START: 24/08/2023
BYD
A FOR APPROVAL 31/08/23 SHEET: ==SWG2=J00/A00
ELDS FACTORY
REV. DESCRIPTION DATE DESIGNED: HANG PTD CHECKED: KIM NH APPROVED: TUAT MB TEL: (+84) (222) 374 8535, TELEFAX: (+84) (222) 3748 531 CONT.: B01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

TABLE OF CONTENTS
PAGE NAME DRAWING Nr. SHEET Nr. PAGE REVISION
A GENERAL DRAWINGS 1YUX200001A0302 ==SWG2=J00/A00 A B C D A
COVER SHEET
GENERAL DRAWINGS 1YUX200001A0302 ==SWG2=J00/B01 A B C D
TABLE CONTENTS
GENERAL DRAWINGS 1YUX200001A0302 ==SWG2=J00/C00 A
TECHNICAL DATA
GENERAL DRAWINGS 1YUX200001A0302 ==SWG2=J00+SLD/A01 A B C D
SINGLE LINE DIAGRAM
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

GENERAL DRAWINGS 1YUX200001A0302 ==SWG2=J00+GA/D01 A B


GENERAL ARRANGEMENT
B GENERAL DRAWINGS 1YUX200001A0302 ==SWG2=J00+GA/D02 A B B
PLAN VIEW
GENERAL DRAWINGS 1YUX200001A0302 ==SWG2=J00+GA/D03 A B
DETAIL OF SWITCHGEAR INSTALLATION
GENERAL DRAWINGS 1YUX200001A0302 ==SWG2=J00+GA/D04 A B
SECTIONAL VIEW
GENERAL DRAWINGS 1YUX200001A0302 ==SWG2=J00+GA/D05 A B C
SECTIONAL VIEW
GENERAL DRAWINGS 1YUX200001A0302 ==SWG2=J00+GA/E01 A B C
PANEL RATING
C C

D D

E E

F PROJECT NO.: UG23021 DRAWING NO.: 1YUX200001A0302 F


D FOR REVISION 26/09/23 PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
BYD FACTORY GENERAL DRAWINGS
C FOR REVISION 11/08/23 SCALE: 1: 1
B FOR REVISION 05/09/23 CUSTOMER: TABLE CONTENTS START: 24/08/2023
BYD
A FOR APPROVAL 31/08/23 SHEET: ==SWG2=J00/B01
EPDS FACTORY, BAC NINH
REV. DESCRIPTION DATE DESIGNED: HANG PTD CHECKED: KIM NH APPROVED: TUAT MB TEL: (+84) (222) 3748 530, TELEFAX: (+84) (222) 3748 531 CONT.: C00
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

NO. CATOGARY DESCRIPTION NO. CATOGARY QTY. DESCRIPTION


1 TECHNICAL System : 22kV 3 PHASE 3 WIRE 50Hz 9 PACKING DETAILS Domestic
CHARACTERISTIC Rated Voltage : 24 kV
Power-frequency withstand voltage: 50 kV
Lighting impulse withstand voltage: 125 kV 10 NOTE
Rate short time withstand current: 25 kA / 3ss
Rate peak withstand current: 63 kA
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

2 CONSTRUCTION Type : UniGear ZS1


Material : Metal-clad Switchgear
Access Location : Front Access
B Switching Device Type : Withdrawable Vacuum Circuit Breaker B
Degree of Protection : External - IP 4X, Internal - IP 2X
3 PAINT FINISH Doors and End Covers : RAL7035 "Light Grey"
Remainder : Aluminium-Zinc Steel Sheets 11 REMARKS
4 BUSBAR RATING Main Busbar Rated Current : 1250 A Size : 1 x 80 x 10mm²
Earth Bar Size : 1 x 30 x 8mm²
Insulation : YES Finishing : Bare Copper
5 AUXILIARY CIRCUIT Voltage Supply :
- Protection, Control & Indication 110V DC
- Circuit Breaker Spring Charge Motor 110V DC
- Panel Heater & Cubicle Lighting 220V AC, 50Hz
Wire Size :
C - Control Circuit 1.5mm² Colour : Grey C
- Lighting & Heating Circuit 1.5mm² Colour : Black
- Current Transformer
Phase L1 4.0mm² Colour : Red
Phase L2 4.0mm² Colour : Yellow
Phase L3 4.0mm² Colour : Blue
Phase N 4.0mm² Colour : Black
- Voltage Transformer
Phase L1 2.5mm² Colour : Red
Phase L2 2.5mm² Colour : Yellow
Phase L3 2.5mm² Colour : Blue
Phase N 2.5mm² Colour : Black
D - Earthing Cable 2.5mm² Colour : Green/Yellow D
Wire Specification : 450/750V
Terminal Block : PHOENIX CONTACT
Test Terminal Block : YONGSUNG
Cable Termination : Blade
Cable Marker : Hot Marker
Cable Tray : Self-Extinguishing, Warp Proof PVC
Maximum Service Temperature : 85°C
6 POWER CABLE Entry : Bottom
Maximum Cable Size :
Terminating Facility : Undrilled Aluminium Gland Plate Only
7 CONTROL CABLE Entry : Bottom
E 8 LABEL Black Letter on White Background E
Material : Plastic
Fixing : Internal - Self Adhesive
External - Self Adhesive

F PROJECT NO.: UG23021 DRAWING NO.: 1YUX200001A0302 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
BYD FACTORY GENERAL DRAWINGS SCALE: 1: 1
CUSTOMER: TECHNICAL DATA START: 24/08/2023
BYD
A FOR APPROVAL 31/08/23 SHEET: ==SWG2=J00/C00
ELDS FACTORY
REV. DESCRIPTION DATE DESIGNED: HANG PTD CHECKED: KIM NH APPROVED: TUAT MB TEL: (+84) (222) 374 8535, TELEFAX: (+84) (222) 3748 531 CONT.: +SLD/A01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

6460 mm
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

B B

W W W W W W W W
2325

OFF ON OFF ON OFF ON OFF ON OFF ON OFF ON OFF ON OFF ON

13 13 13 13 13 13 13 13
11 11 12 11 11 12 11 11 12 11 11 12 11 11 12 11 11 12 11 11 12 11 11 12

C C

W W W W W W W W

30 800 800 800 800 800 800 800 800 30

FRONT
D D
PANEL DEPTH : 1700mm

PANEL NO. =MV8.1 =MV8.2 =MV8.3 =MV8.4 =MV8.5 =MV8.6 =MV8.7 =MV8.8

INCOMING OUTGOING OUTGOING OUTGOING OUTGOING OUTGOING


PANEL TYPE SPARE SPARE
PANEL PANEL PANEL PANEL PANEL PANEL

CIRCUIT BREAKER VD4/P-1250A VD4/P-1250A VD4/P-1250A VD4/P-1250A VD4/P-1250A VD4/P-1250A VD4/P-1250A VD4/P-1250A

=J1.6 =J1.6

E E

LEGEND:
11 GUIDING HOLE FOR CB/VT TRUCK
12 OPENING FOR EARTH SWITCH AND INDICATOR
13 OPENING FOR RACKING IN & RACKING OUT OF CIRCUIT BREAKER/VOLTAGE TRANSFORMER
14 OPENING FOR MANUAL SPRING CHARGED WHEN CB DOOR IS CLOSING

F PROJECT NO.: UG23021 DRAWING NO.: 1YUX200001A0302 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
BYD FACTORY GENERAL DRAWINGS SCALE: 1 : 25
B FOR REVISION 11/08/23 CUSTOMER: GENERAL ARRANGEMENT START: 24/08/2023
BYD
A FOR APPROVAL 31/08/23 SHEET: ==SWG2=J00+GA/D01
ELDS FACTORY
REV. DESCRIPTION DATE DESIGNED: HANG PTD CHECKED: KIM NH APPROVED: TUAT MB TEL: (+84) (222) 374 8535, TELEFAX: (+84) (222) 3748 531 CONT.: D02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

B =MV8.1 =MV8.2 =MV8.3 =MV8.4 =MV8.5 =MV8.6 =MV8.7 =MV8.8 B

opening for power opening for power opening for power opening for power opening for power opening for power opening for power opening for power
cables cables cables cables cables cables cables cables
C C

800 800 800 800 800 800 800 800

D D

FRONT

E E

F PROJECT NO.: UG23021 DRAWING NO.: 1YUX200001A0302 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
BYD FACTORY GENERAL DRAWINGS SCALE: 1 : 25
B FOR REVISION 11/08/23 CUSTOMER: PLAN VIEW START: 24/08/2023
BYD
A FOR APPROVAL 31/08/23 SHEET: ==SWG2=J00+GA/D02
ELDS FACTORY
REV. DESCRIPTION DATE DESIGNED: HANG PTD CHECKED: KIM NH APPROVED: TUAT MB TEL: (+84) (222) 374 8535, TELEFAX: (+84) (222) 3748 531 CONT.: D03
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

590
105 105

40
A A

>0,5
150
430
100 600 100

80
680

1590
1700

1400
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

Power cables entry Ø16

BASE IRONS ON CONCRETE FLOOR

200
B 65 B
Control cables entry

200
4-mounting hole
(36X20)

80

40
70
105 590 105 -K1
A1

A2

800

80
FOR PANELS = MV8.1~=MV8.8
Ø16

C ANCHORING BOLT FIXING SYSTEM C


ANCHORING BOLTS ON CONCRETE FLOOR

590
105 105

40

150
430
100 600 100

M12
D 680
D

1590
1700

THREADED HOLE ON METAL STRUCTURE

1400
Power cables entry
200

65

Control cables entry


200

4-mounting hole
(36X20)
80

40
M12
70

105 590 105 THROUGH HOLE ON METAL STRUCTURE


800
E E

FOR PANELS = MV8.1~=MV8.8

BASE IRON FIXING SYSTEM

F PROJECT NO.: UG23021 DRAWING NO.: 1YUX200001A0302 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
BYD FACTORY GENERAL DRAWINGS SCALE: 1 : 25
B FOR REVISION 11/08/23 CUSTOMER: DETAIL OF SWITCHGEAR INSTALLATION START: 24/08/2023
BYD
A FOR APPROVAL 31/08/23 SHEET: ==SWG2=J00+GA/D03
ELDS FACTORY
REV. DESCRIPTION DATE DESIGNED: HANG PTD CHECKED: KIM NH APPROVED: TUAT MB TEL: (+84) (222) 374 8535, TELEFAX: (+84) (222) 3748 531 CONT.: D04
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A
632

LEGEND :
1 LV COMPARTMENT
2 CB COMPARTMENT
3 CABLE COMPARTMENT
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

1 4 -

705
180

5 VOLTAGE TRANSFORMER
B B
6 WOUND CURRENT TRANSFORMER
7 HEATER
180

8 CAPACITIVE INSULATOR
9 CIRCUIT BREAKER
290

10 CABLE TERMINATION
2 11 -
12 SURGE ARRESTER
C 50W 7 13 - C
310
2200

Shutter painted "Signal Red" color 537 in BS381C,


Labelled " BUSBAR" with white letters.
6

1620
A BUSBAR
8
D D
B CIRCUIT
1075

B 10

A 3 Shutter painted "Lemon Yellow" color 355 in BS381C,


100W 7 Labelled " CIRCUIT" with white letters.

12
CABLE TERMINATION DETAILS (A) CABLE TERMINATION DETAILS (B)
5
60
80
4 4
E ∅1 ∅1 E
40 1590 70
210 210 210 210

25
25
1700
A B

SECTIONAL VIEW FOR PANEL =MV8.1, =MV8.2

F PROJECT NO.: UG23021 DRAWING NO.: 1YUX200001A0302 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
BYD FACTORY GENERAL DRAWINGS SCALE: 1 : 13
B FOR REVISION 11/08/23 CUSTOMER: SECTIONAL VIEW START: 24/08/2023
BYD
A FOR APPROVAL 31/08/23 SHEET: ==SWG2=J00+GA/D04
ELDS FACTORY
REV. DESCRIPTION DATE DESIGNED: HANG PTD CHECKED: KIM NH APPROVED: TUAT MB TEL: (+84) (222) 374 8535, TELEFAX: (+84) (222) 3748 531 CONT.: D05
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A 632 A

LEGEND :
1 LV COMPARTMENT
2 CB COMPARTMENT
3 CABLE COMPARTMENT
This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

705
180

4 EARTHING SWITCH
B 5 - B
180

6 WOUND CURRENT TRANSFORMER


7 HEATER
8 CAPACITIVE INSULATOR
290

9 CIRCUIT BREAKER
10 CABLE TERMINATION
11 -
2
12 -
310

C C
13 -
7
2200

Shutter painted "Signal Red" color 537 in BS381C,


Labelled " BUSBAR" with white letters.
6 4

1620
A BUSBAR
8
D D
1075

3 B CIRCUIT
10

B
771

A
Shutter painted "Lemon Yellow" color 355 in BS381C,
7
Labelled " CIRCUIT" with white letters.

457

CABLE TERMINATION DETAILS (A)


E E
40 1590 70 40
4
1700 ∅1

210 210

25
SECTIONAL VIEW FOR PANEL = MV8.3~=MV8.8 A

F PROJECT NO.: UG23021 DRAWING NO.: 1YUX200001A0302 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
C FOR REVISION 26/09/23 BYD FACTORY GENERAL DRAWINGS SCALE: 1 : 13
B FOR REVISION 11/08/23 CUSTOMER: SECTIONAL VIEW START: 24/08/2023
BYD
A FOR APPROVAL 31/08/23 SHEET: ==SWG2=J00+GA/D05
ELDS FACTORY
REV. DESCRIPTION DATE DESIGNED: HANG PTD CHECKED: KIM NH APPROVED: TUAT MB TEL: (+84) (222) 374 8535, TELEFAX: (+84) (222) 3748 531 CONT.: E01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

Serial number: 1YUX 4202786788 /PANEL/8 Serial number: 1YUX 4202786788 /PANEL/8

Prod. Year: 2023 IEC62271-200 Prod. Year: 2023 IEC62271-200


This document must not be copied without our written permission, and the contents thereof must not be imported to a third party not be used for any unauthorized purpose. Contravention will be prosecuted.

Unigear ZS1 Metal-clad Switchgear Unigear ZS1 Metal-clad Switchgear

Rated voltage 24 kV Rated voltage 24 kV

B Rated current 1250 A Rated current 630 A B


Rated lightning impulse withstand voltage 125 kV Rated lightning impulse withstand voltage 125 kV

Rated power-frequency withstand voltage 50 kV Rated power-frequency withstand voltage 50 kV


Rated current of main busbar 1250 A Rated current of main busbar 1250 A

Rated short time withstand current ( 3s) 25 kA Rated short time withstand current ( 3s) 25 kA

Rated peak withstand current 63 kA Rated peak withstand current 63 kA

Rated frequency 50 Hz Rated frequency 50 Hz

Protection class IP4X Protection class IP4X

Made by ABB Made by ABB

C C
PANEL =MV8.1~ =MV8.2 PANEL =MV8.3~ =MV8.8

D D

E E

F PROJECT NO.: UG23021 DRAWING NO.: 1YUX200001A0302 F


PROJECT TITLE: DRAWING TITLE: LANGUAGE: ENG
C FOR REVISION 26/09/23 BYD FACTORY GENERAL DRAWINGS SCALE: 1: 1
B FOR REVISION 11/08/23 CUSTOMER: PANEL RATING START: 24/08/2023
BYD
A FOR APPROVAL 31/08/23 SHEET: ==SWG2=J00+GA/E01
ELDS FACTORY
REV. DESCRIPTION DATE DESIGNED: HANG PTD CHECKED: KIM NH APPROVED: TUAT MB TEL: (+84) (222) 374 8535, TELEFAX: (+84) (222) 3748 531 CONT.: +LP/G01
1 2 3 4 5 6 7 8

You might also like