iPON INFRASTRUCTURE SERVICES LIMITED (A Concem of DIPON Group) r «Dipon may cancel this WO at any time by giving the contractor a prior notice ‘Termination of Fifteen (15) days, + Adequate & Skilled manpower will be mobilized during construction period. © Necessary Approval (if requires) will be taken from required authority will be Bangla Tech Erection Scope. + Necessary & Standard Safety procedures will be followed by Bangla Tech Erection during construction period. «Accommodation is out of Dipon's Scope. Electricity & Water for Construction works will be provided by Dipon. «All kinds of supporting structures will be provided by Bangla Tech Erection Ltd. To execute the works during working period. «© Drawings (Design Engineering), As Built drawings & Technical Catalogues (06 Sets of Each documents) will be provided by Bangla Tech Erection Ltd, Ina Standard version. «User Training (for 02 persons) will be Bangla Tech Brection Ltd scope, Work Completion Period &Warranty: + Total Works (incl. Supply, Installation, Testing & Commissioning) will be completed ‘within 01 (One) Month from the date ofissulng Work Order & 1" Advance Payment. +12 (Rwelve) Months warranty will be applicable forall firefighting products will be applicable after installation & commissioning. D. Liquidity Damages (L/D): 0.5% L/D per day will be applicable ofthe contract value, if contractor fails ‘to complete the whole works within the scheduled time (i.e.01 Month). . Delivery terms (For Local Items): 05 (Five) days -07 (Seven} days, For Dipon Infrastructure Services Ltd, ‘Md. Shafquat Matin Director, corpoe oes estes oe: wow use ai ae Sncarone vasa Math, 24 YreocYoqendaNoger $53, Comer Tork Peon roa 817° oo Serres, AES sowuman Magura ma, Sadness [Doorn dar aa 35 teow etnias! indo toons Poe cmmametsiiceirm Lai comers Te aaa Treor-a-ease Tatiacjenosespusonetc55ia3r)— Srppor-casea, Tar sobenesin Tec w4naasere Can are pongo Tecoma TeeEStessot Eat mupsteomcon— Emaiapemetytoocen en Fr ves66225059

You might also like