Gate No 1 Material
Gate No 1 Material
Page 1 of 5
Item No. Discription Unit Coff. No. Length
Stifner Plate 12 mm (2x6=12) KG 94.2 12 0.090
Page 2 of 5
ing works, shed and various allied
rians Entry Gate at paniapt refinery,
OCL.
23
1789.425
1699.050
900.900
106.623
849.525
Total = 5345.523
0.300 141.300
0.300 13.565
Page 3 of 5
Width Height QTY.
0.300 30.521
Total = 185.386
Page 4 of 5
Name of Work: Area Development works, building works, shed and various allied facilities for
provision of a pedestrians Entry Gate at paniapt refinery, IOCL.
Agency : M/s HKS Infrastructure
W.O. No. : 29024851 Dtd. 12.07.2023
COST - ABSTRACT
Item
No.
Description of Work Unit Qty. Rate Amount
Total =
Discount @ 6.5%