Qty in MT =
00420 HANDRAIL
Drwing No. 5236 Near Vessel C-03
Handrail (3.8+1.28=5.08) M 1 5.080
Height QTY.
133.839
4.069
3.052
2.035
0.977
27.469
9.900
17.100
47.560
27.469
20.449
Total = 293.919
Qty in MT = 0.294
5.080
Total = 5.080
4.262
0.130
0.097
0.065
0.031
0.875
0.660
1.140
1.450
0.437
0.326
Total = 9.473
4.262
0.130
0.097
0.065
0.031
0.875
0.660
1.140
1.450
0.437
0.326
Total = 9.473
5.300
Total = 5.300
Name of Work: Structure (Steel) works during plant shutdowns for various scheme jobs for provision of approach
platforms, walkway, staircase, valve operating platform & ladders for technological structure.
Agency : M/s HKS Infrastructure
W.O. No. : 28112841 dtd. 01.09.2022
Area : AVU-01
COST ABSTRACT SHEET
Monkey Ladder Platform Modification
SOR No. Descripation of Work Unit Qty. Rate Amount
SUPPLY,FABRICATION & ERECTION
00310 MT 0.294 106997.64 31,457.31
OF STRUCTURE STEEL
00420 HANDRAIL M 5.080 4506.24 22,891.70
00850 SURFACE PREPRATION M2 9.473 124.31 1,177.59
00900 PAINTING ON STRUCTURE STEEL M2 9.473 112.260 1,063.44
INSTALLATION OF ELECTROFORGED
01150 M2 5.300 88.820 470.75
GRATING
Total = 57,060.78
Add Surcharge @ 6.8% 3,880.13
Net Total = 60,940.91