You are on page 1of 30
ITATION PROGRAM ENGNAAD dhta aevmOMENT AE ENSHAAl URE UN eA RR NDS aD Project: South Kuwait Excavation, TranspOrtation & Remediation Project (SKETR-II) Project, Zone-A. Contract No: 23059088 REQUEST FOR INSPECTION (RF!) Company Representative To owe 1 | Ret Number 73059088-SKA-QA-RFI-O0074 From Enshaat/Dekonta A. S Inspection Date & Time. 03/DEC/2023 & 11:00 AM FTP Ref. & | 23059088-sKA-CLATP-00004 | Inspection Location Activity 1D_| & 10: C-004-02, | tsubarea / Subzone / Gia) | SWP Me “44, Sheet Nos 1. Ground truthing Record (EN-ITR-00074-01) 3. 23059088-050-GI-MAP-00007-004Rev.A 2.VIP Field Log Sheet & Delineation Tracking ——«4.GIS Map Attachments | “Form along with photographs hupecton n Dewi Duxo B Environmental i Mechanical ps Yes _Celeetecal D General Intervention Point: Di Review Ci Witness 3 Hold Inspection Acti vE Inspection for Ground truthing activities (Visual Inspection Pit and Boundary Verification) for Contaminated {features in Subarea 4A Sheet 04 as per attached drawing. ‘Submitted (Contractor) | SELVAMURUGAN RAMAR Received (Company) Date & Sign on/Dec 2023 19 ff _ 4} Pate B Sign Time 09:00 aM | Time ‘Company / PMC Remarks: Contmnalre Shall refer & pbtthionl chad alinded with 425 BE! TT fe fara cchions yp \\) a Tre | "inspection Result: ‘APPROVED CO resecteo Subcontractor ‘Contractor ‘Company / PMC haat ORT YET ag Na Niyaz Shaik Ezekias Foncard?} Designation NA Environmental Engineer | Environment Engivieey 2 et [Stamp R. SELVAMURUGAN * QAIQC ENGINEER ‘ Form No: 28058088-SKA-OA-FRM-00001 Rev. 0 & Datel UBTRORS. ZONE A a 2)i2) 2022 BIN MOKA © Suir ENSHAA detente" tencdevorntsereinerosc ones Contract No: 23059088. Inspection & Test Record (ITR) ITR Form: 23059088-SKA-EN-CHK-00029 Rev. A Ground truthing Record TTR Ne, 73050988 50A-QA-RF-0074.1 [pate spec 2023 FrtReterence | 28059088-SKA-QA-RF-00078 Ttecstion7 | cup are-ah shest Noa |Stbarea rani t Drawing / |_| 23059088-050-Gi-MAP.00007-008 REV A. | Grid Number | All Grids a Tespeiion Fndngs Nos Description femarks Satisfactory Unsatisactory AT RSS WaT PATS ROT FE 1 | Work method statements and JSA) and conduct safety a a Ieobor a afere Sarina he war Erste UNO itn Ces ocs Ceti (COV ORD 2 | stat Atlan vxsvenpovtosan he Gounouting | o L activities. [3 _[ Vertcation forthe pre-condition ofthe features w Oo 4 | Recent satelite images used for the ground truthing activities wg QO S| Location and status of all features are verified gw a 5 _| Verify the data entered in the Field Log. 4 a a cotton baad Bereen Gain GSO ad 7 | oil iakes: i 2. Continuity f DOL [ B Oo | I B_OGP Typobogy and is above groundvoume. | «i o | | aiteaton a tonsion wel oto dy eae ard —| + | Sloe 2 a Stu inant Wo Coaniald and Catarina estar, | @ | oO | | 0” mur te ftw 2 ety vent iepciar WP)Toatone = =a b. Contaminated thickness, Geotagged Photos g a | ‘Feature type looging as per BS 5830-2015 3 o | | KOC EMC Remarks: ‘ITR STATUS OH acer CO NOTACCEPTED Subcontractor Contrador ROC T PME Name NA ‘iy Salk Designation NA Environmental Engineer Signature & Date NA Sem < as jer Form No:23058088-SKA-CA-FRO-00002 Rev. 0 Date 10-y-2023 a/v f2s Page of Company / PMC Remarks: RFI No.: 23059088-SKA-QA-RFI-00074 Area: Subarea 4-A Sheet No. 4 1. The VIPs depicted on the updated GT map were checked and approved by the Company with the following comments: 1.a. The amended GT map shapefiles and other necessary data must be submitted by the Contractor for the Company's review and approvai. 1.b. Groundtruthed area sizes shall be finalized based on the Groundtruthing Report which shall be submitted to the Company. 1.¢. The Contractor shall note that the VIPs which were part of the Proposed Visual Inspection Pits Location Map approved by the Company and were not reflected in this RFI shall also be excluded in the final Groundtruthing Map together with their area sizes. 1.d, The Contractor shall ensure all the utilities, access roads, and standoff distances are captured and updated correspondingly in the Groundtruthing Report. Signature: Pho — zekias Foncardas Environment Engineer Page 1of1 REMEDIATION GKETR - ZONE A) PROVE UXO Minor Grid 4 Visual Inspection Pit HEB 0 OF Lake © Cheek Poms yg HE oF Contaminated Pile f Subarea 4A \Note: The Polygor et i OTH ual Ground Tating VP Map, Subarea A Sheet No 6 swith VIP Refer to The Attached Table-4 308 «for ViPs Coordinates, %.

You might also like