A) DESIGN FEATURES
HOLD POINTS
REFERENCE
a) Material
Dimension, As p er respective Inspection
Chemical
3. W
S h aft
Mfgr's Test
R
p ro p erties C ertificates an d
approved Drgs.
b) Nozzle pipe &
Chemical
Nozzles F lan g es
“ “
Non-Pressure Parts.
6
Material stamp transfer for Material grade Inspection
R
shell, dished end, etc.
Moly test Approved Drg
Report
Weld geometry
S et u p o f lo n g seam s o f m ain
offset. Profile
Internal
E S ec VIII
7 W
shell courses, dish ends and ASM
W.R.T T em p late ID,
Inspection R
fabricated pipes etc Div I
ovality. Etc.
Report
D.P. test of back chip of
Internal
8 Welding defects. E S ec V W
Report .
Inspection
ASM R
long seam welding
Profile as per the
tem p late an d
E S ec VIII
ASM Internal
In clu d in g th in n in g
Dimensions
9 W
at K R , S F , D P test
Dished ends Forming Div I &Approved Inspection R
Drg. Report .
REFERENCE
11 Welding defects E S ec V W
S h ells.
Inspection
ASM R
RT of lo n g seam, C irc
Report
Report
Back chip &D.P.test of
n o zzles to d ish ed en d
15 Welding Defects W
welding.
Inspection
ASM
E sec V R
Report .
C irc seam set u p o f
b o tto m d ish ed en d to Weld geometry, E S ec VIII Div I
16 W
m ain sh ell.
ASM Inspection
R
orientation etc. &Approved Drg. Report
Back chip &D.P.test of
Bottom dished end to shell
17 Welding Defects E S ec V W
welding.
Inspection
ASM R
Report
Weld geometry, No. of
L im p et coil fit up on tu rn s o n sh ell an d
E S ec VIII Div I
b o tto m dish
Internal
ASM
18 W
&Approved Drg.
bottom dish and on Inspection R
shell Report
Press: 1.25 Kg/cm
2
20 W
ASM Inspection
R
orientation etc. &Approved Drg.
Report
21 Welding Defects E S ec V W
welding.
Inspection
ASM R
Report
S et up of Lugs support,
Tightness of Wear
Plates, elevation ASM
E sec VIII Internal
27 W
Inspection
Div I & R
geometry.
Approved Drg.
Dish end Report
29
dimensional check of strikes etc. Div I &
Inspection
W W/R
Approved Drgs.
vessel prior to Report
Hydrostatic test.
Approved drg. M
Test pressure as per
H y d ro statics Testing of
water Duration: 30
edium: ASM
E sec VIII
Inspection
30 min. H W
Limpet and Shell side
Div I &
Report
Approved Drgs.
RPM, current drawn at
E S ec VIII
Internal
32 S u rface finish W
ASM Inspection
Polishing P
Report
Div I
C ertificates
Chart, Test