You are on page 1of 10

FLYOVER

TO MANDI DABWALI TO BATHINDA


A1 P1 P2 A2

'1'
'2'

LONGITUDINAL ELEVATION

A1 P1 P2 A2

B A
41°

HALF BOTTOM PLAN HALF TOP PLAN B A


PLAN

SCALE : - CLIENT:- CONSULTANTS:- PROJECT:- TITLE: DWG NO.:-URS-60542289/STR/FO/35+500/GAD/01


(sheet 1 of 3)
Consultancy Services for Preparation of DPR for Development of
URS Scott Wilson India Pvt. Ltd. In Association with GENERAL ARRANGEMENT
AECOM India Private limited Economic Corridors, Inter Corridors, Feeder Routes to Improve DATE:- October 2021 PAPER :- A2
AS SHOWN 3rd Floor, Building No.-8A, DLF Cyber City, Gurgaon-122002, Haryana, India DRAWING FOR FLYOVER
the Efficiency of Freight Movement in India Under Bharatmala
© AECOM India Pvt. Ltd. 2014 AT CH. 35+500 DRAWN (A) DESIGN (B) CHECKED (C) APPROVED (D)
The information contained in this document produced by AECOM is solely for the use of the Client identified on the cover sheet for the purpose Pariyojna: LOT-2 (Malout Bypass)
R0 08-10-2021 INITIAL SUBMISSION NATIONAL HIGHWAYS AUTHORITY OF for which it has been prepared and AECOM undertakes no duty to or accepts any responsibility to any third party who may rely upon this
document.All rights reserved. No section or element of this document may be removed from this document, reproduced, electronically stored or
INDIA (NHAI) transmitted in any form without the written permission of AECOM.
MANISH VERMA S.P. SINGH S.P. SINGH S. RASTOGI
RE WALL

SECTION A-A

SECTION B-B

SCALE : - CLIENT:- CONSULTANTS:- PROJECT:- TITLE: DWG NO.:-URS-60542289/STR/FO/35+500/GAD/01


(sheet 2 of 3)
Consultancy Services for Preparation of DPR for Development of
URS Scott Wilson India Pvt. Ltd. In Association with GENERAL ARRANGEMENT
AECOM India Private limited Economic Corridors, Inter Corridors, Feeder Routes to Improve DATE:- October 2021 PAPER :- A2
AS SHOWN 3rd Floor, Building No.-8A, DLF Cyber City, Gurgaon-122002, Haryana, India DRAWING FOR FLYOVER
the Efficiency of Freight Movement in India Under Bharatmala
© AECOM India Pvt. Ltd. 2014 AT CH. 35+500 DRAWN (A) DESIGN (B) CHECKED (C) APPROVED (D)
The information contained in this document produced by AECOM is solely for the use of the Client identified on the cover sheet for the purpose Pariyojna: LOT-2 (Malout Bypass)
R0 08-10-2021 INITIAL SUBMISSION NATIONAL HIGHWAYS AUTHORITY OF for which it has been prepared and AECOM undertakes no duty to or accepts any responsibility to any third party who may rely upon this
document.All rights reserved. No section or element of this document may be removed from this document, reproduced, electronically stored or
INDIA (NHAI) transmitted in any form without the written permission of AECOM.
MANISH VERMA S.P. SINGH S.P. SINGH S. RASTOGI
TO MANDI DABWALI TO BATHINDA
A1

W
O
PR
t
Flyover

ou

W
O
al
TYPE PSC GIRDER

PR
M
SPAN

To
1x15.0+1x30.0+1x15.0

35+600
35+500

W
CHAINAGE 35+500

O
PR
PROPOSAL NEW CONSTRUCTION

W
O
PR
PROW PROW PROW
PROW PROW PROW

PROW PROW PROW


PROW PROW PROW

0+100

0+000
W
O
PR
W

N
O

da
PR

in
th
Ba
MID SECTION

W
RE WALL SUPPORT SECTION

To
PR
W
O
CROSS SECTION OF PSC PRECAST I-GIRDER

PR
KEY PLAN

NOTES:-

DETAIL-'1'

P1

MID SECTION SUPPORT SECTION


CROSS SECTION OF PSC PRECAST I-GIRDER

LEGEND:-

DETAIL-'2'

SCALE : - CLIENT:- CONSULTANTS:- PROJECT:- TITLE: DWG NO.:-URS-60542289/STR/FO/35+500/GAD/01


(sheet 3 of 3)
Consultancy Services for Preparation of DPR for Development of
URS Scott Wilson India Pvt. Ltd. In Association with GENERAL ARRANGEMENT
AECOM India Private limited Economic Corridors, Inter Corridors, Feeder Routes to Improve DATE:- October 2021 PAPER :- A2
AS SHOWN 3rd Floor, Building No.-8A, DLF Cyber City, Gurgaon-122002, Haryana, India DRAWING FOR FLYOVER
the Efficiency of Freight Movement in India Under Bharatmala
© AECOM India Pvt. Ltd. 2014 AT CH. 35+500 DRAWN (A) DESIGN (B) CHECKED (C) APPROVED (D)
The information contained in this document produced by AECOM is solely for the use of the Client identified on the cover sheet for the purpose Pariyojna: LOT-2 (Malout Bypass)
R0 08-10-2021 INITIAL SUBMISSION NATIONAL HIGHWAYS AUTHORITY OF for which it has been prepared and AECOM undertakes no duty to or accepts any responsibility to any third party who may rely upon this
document.All rights reserved. No section or element of this document may be removed from this document, reproduced, electronically stored or
INDIA (NHAI) transmitted in any form without the written permission of AECOM.
MANISH VERMA S.P. SINGH S.P. SINGH S. RASTOGI
TO MANDI DABWALI TO BATHINDA
A1 P1 P2 A2

'1'
'2'

LONGITUDINAL ELEVATION

A1 P1 P2 A2
B A

HALF BOTTOM PLAN HALF TOP PLAN B A


PLAN

SCALE : - CLIENT:- CONSULTANTS:- PROJECT:- TITLE: DWG NO.:-URS-60542289/STR/FO/39+005/GAD/01


(sheet 1 of 3)
Consultancy Services for Preparation of DPR for Development of
URS Scott Wilson India Pvt. Ltd. In Association with GENERAL ARRANGEMENT
AECOM India Private limited Economic Corridors, Inter Corridors, Feeder Routes to Improve DATE:- October 2021 PAPER :- A2
AS SHOWN 3rd Floor, Building No.-8A, DLF Cyber City, Gurgaon-122002, Haryana, India DRAWING FOR FLYOVER
the Efficiency of Freight Movement in India Under Bharatmala
© AECOM India Pvt. Ltd. 2014 AT CH. 39+005 DRAWN (A) DESIGN (B) CHECKED (C) APPROVED (D)
The information contained in this document produced by AECOM is solely for the use of the Client identified on the cover sheet for the purpose Pariyojna: LOT-2 (Malout Bypass)
R0 08-10-2021 INITIAL SUBMISSION NATIONAL HIGHWAYS AUTHORITY OF for which it has been prepared and AECOM undertakes no duty to or accepts any responsibility to any third party who may rely upon this
document.All rights reserved. No section or element of this document may be removed from this document, reproduced, electronically stored or
INDIA (NHAI) transmitted in any form without the written permission of AECOM.
MANISH VERMA S.P. SINGH S.P. SINGH S. RASTOGI
TO MANDI DABWALI TO BATHINDA
N

39+100
To Malout
38+900

39+000
PROW PROW PROW PROW

PROW PROW PROW PROW


Flyover

ahib
TYPE PSC GIRDER
SPAN 1x15.0+1x30.0+1x15.0

To Sri Muktsar S
CHAINAGE 39+005
PROPOSAL NEW CONSTRUCTION

KEY PLAN

NOTES:-

SECTION B-B

RE WALL

LEGEND:-

SECTION A-A
SCALE : - CLIENT:- CONSULTANTS:- PROJECT:- TITLE: DWG NO.:-URS-60542289/STR/FO/39+005/GAD/01
(sheet 2 of 3)
Consultancy Services for Preparation of DPR for Development of
URS Scott Wilson India Pvt. Ltd. In Association with GENERAL ARRANGEMENT
AECOM India Private limited Economic Corridors, Inter Corridors, Feeder Routes to Improve DATE:- October 2021 PAPER :- A2
AS SHOWN 3rd Floor, Building No.-8A, DLF Cyber City, Gurgaon-122002, Haryana, India DRAWING FOR FLYOVER
the Efficiency of Freight Movement in India Under Bharatmala
© AECOM India Pvt. Ltd. 2014 AT CH. 39+005 DRAWN (A) DESIGN (B) CHECKED (C) APPROVED (D)
The information contained in this document produced by AECOM is solely for the use of the Client identified on the cover sheet for the purpose Pariyojna: LOT-2 (Malout Bypass)
R0 08-10-2021 INITIAL SUBMISSION NATIONAL HIGHWAYS AUTHORITY OF for which it has been prepared and AECOM undertakes no duty to or accepts any responsibility to any third party who may rely upon this
document.All rights reserved. No section or element of this document may be removed from this document, reproduced, electronically stored or
INDIA (NHAI) transmitted in any form without the written permission of AECOM.
MANISH VERMA S.P. SINGH S.P. SINGH S. RASTOGI
A1
P1

RE WALL

DETAIL-'1'

DETAIL-'2'

MID SECTION SUPPORT SECTION


CROSS SECTION OF RCC PRECAST I-GIRDER
MID SECTION SUPPORT SECTION
CROSS SECTION OF PSC PRECAST I-GIRDER

SCALE : - CLIENT:- CONSULTANTS:- PROJECT:- TITLE: DWG NO.:-URS-60542289/STR/FO/39+005/GAD/01


(sheet 3 of3)
Consultancy Services for Preparation of DPR for Development of
URS Scott Wilson India Pvt. Ltd. In Association with GENERAL ARRANGEMENT
AECOM India Private limited Economic Corridors, Inter Corridors, Feeder Routes to Improve DATE:- October 2021 PAPER :- A2
AS SHOWN 3rd Floor, Building No.-8A, DLF Cyber City, Gurgaon-122002, Haryana, India DRAWING FOR FLYOVER
the Efficiency of Freight Movement in India Under Bharatmala
© AECOM India Pvt. Ltd. 2014 AT CH. 39+005 DRAWN (A) DESIGN (B) CHECKED (C) APPROVED (D)
The information contained in this document produced by AECOM is solely for the use of the Client identified on the cover sheet for the purpose Pariyojna: LOT-2 (Malout Bypass)
R0 08-10-2021 INITIAL SUBMISSION NATIONAL HIGHWAYS AUTHORITY OF for which it has been prepared and AECOM undertakes no duty to or accepts any responsibility to any third party who may rely upon this
document.All rights reserved. No section or element of this document may be removed from this document, reproduced, electronically stored or
INDIA (NHAI) transmitted in any form without the written permission of AECOM.
MANISH VERMA S.P. SINGH S.P. SINGH S. RASTOGI
TO MANDI DABWALI TO BATHINDA
A1 P1 P2 A2

'1'
'2'

LONGITUDINAL ELEVATION

A1 P1 P2 A2

B A

21°

HALF BOTTOM PLAN HALF TOP PLAN B A


PLAN

SCALE : - CLIENT:- CONSULTANTS:- PROJECT:- TITLE: DWG NO.:-URS-60542289/STR/FO/40+945/GAD/01


(sheet 1 of 3)
Consultancy Services for Preparation of DPR for Development of
URS Scott Wilson India Pvt. Ltd. In Association with GENERAL ARRANGEMENT
AECOM India Private limited Economic Corridors, Inter Corridors, Feeder Routes to Improve DATE:- October 2021 PAPER :- A2
AS SHOWN 3rd Floor, Building No.-8A, DLF Cyber City, Gurgaon-122002, Haryana, India DRAWING FOR FLYOVER
the Efficiency of Freight Movement in India Under Bharatmala
© AECOM India Pvt. Ltd. 2014 AT CH. 40+945 DRAWN (A) DESIGN (B) CHECKED (C) APPROVED (D)
The information contained in this document produced by AECOM is solely for the use of the Client identified on the cover sheet for the purpose Pariyojna: LOT-2 (Malout Bypass)
R0 08-10-2021 INITIAL SUBMISSION NATIONAL HIGHWAYS AUTHORITY OF for which it has been prepared and AECOM undertakes no duty to or accepts any responsibility to any third party who may rely upon this
document.All rights reserved. No section or element of this document may be removed from this document, reproduced, electronically stored or
INDIA (NHAI) transmitted in any form without the written permission of AECOM.
MANISH VERMA S.P. SINGH S.P. SINGH S. RASTOGI
TO MANDI DABWALI TO BATHINDA

Flyover
N
TYPE PSC GIRDER
SPAN 1x15.0+1x30.0+1x15.0
CHAINAGE 40+945
PROPOSAL NEW CONSTRUCTION

t
alou
40+800

41+000
40+900
M
To
PROW PROW PROW PROW PROW PROW PROW

PROW PROW PROW PROW PROW PROW PROW

To F
NT
NALLAH REALIGNME

azilk
LVERT
PROPOSED CU

a
KEY PLAN

NOTES:-

SECTION B-B

RE WALL

LEGEND:-

SECTION A-A
SCALE : - CLIENT:- CONSULTANTS:- PROJECT:- TITLE: DWG NO.:-URS-60542289/STR/FO/40+945/GAD/01
(sheet 2 of 3)
Consultancy Services for Preparation of DPR for Development of
URS Scott Wilson India Pvt. Ltd. In Association with GENERAL ARRANGEMENT
AECOM India Private limited Economic Corridors, Inter Corridors, Feeder Routes to Improve DATE:- October 2021 PAPER :- A2
AS SHOWN 3rd Floor, Building No.-8A, DLF Cyber City, Gurgaon-122002, Haryana, India DRAWING FOR FLYOVER
the Efficiency of Freight Movement in India Under Bharatmala
© AECOM India Pvt. Ltd. 2014 AT CH. 40+945 DRAWN (A) DESIGN (B) CHECKED (C) APPROVED (D)
The information contained in this document produced by AECOM is solely for the use of the Client identified on the cover sheet for the purpose Pariyojna: LOT-2 (Malout Bypass)
R0 08-10-2021 INITIAL SUBMISSION NATIONAL HIGHWAYS AUTHORITY OF for which it has been prepared and AECOM undertakes no duty to or accepts any responsibility to any third party who may rely upon this
document.All rights reserved. No section or element of this document may be removed from this document, reproduced, electronically stored or
INDIA (NHAI) transmitted in any form without the written permission of AECOM.
MANISH VERMA S.P. SINGH S.P. SINGH S. RASTOGI
A1 P1

RE WALL

DETAIL-'1'

DETAIL-'2'

MID SECTION SUPPORT SECTION


CROSS SECTION OF RCC PRECAST I-GIRDER
MID SECTION SUPPORT SECTION
CROSS SECTION OF PSC PRECAST I-GIRDER

SCALE : - CLIENT:- CONSULTANTS:- PROJECT:- TITLE: DWG NO.:-URS-60542289/STR/FO/40+945/GAD/01


(sheet 3 of 3)
Consultancy Services for Preparation of DPR for Development of
URS Scott Wilson India Pvt. Ltd. In Association with GENERAL ARRANGEMENT
AECOM India Private limited Economic Corridors, Inter Corridors, Feeder Routes to Improve DATE:- October 2021 PAPER :- A2
AS SHOWN 3rd Floor, Building No.-8A, DLF Cyber City, Gurgaon-122002, Haryana, India DRAWING FOR FLYOVER
the Efficiency of Freight Movement in India Under Bharatmala
© AECOM India Pvt. Ltd. 2014 AT CH. 40+945 DRAWN (A) DESIGN (B) CHECKED (C) APPROVED (D)
The information contained in this document produced by AECOM is solely for the use of the Client identified on the cover sheet for the purpose Pariyojna: LOT-2 (Malout Bypass)
R0 08-10-2021 INITIAL SUBMISSION NATIONAL HIGHWAYS AUTHORITY OF for which it has been prepared and AECOM undertakes no duty to or accepts any responsibility to any third party who may rely upon this
document.All rights reserved. No section or element of this document may be removed from this document, reproduced, electronically stored or
INDIA (NHAI) transmitted in any form without the written permission of AECOM.
MANISH VERMA S.P. SINGH S.P. SINGH S. RASTOGI

You might also like