Professional Documents
Culture Documents
009-2401-00 Savant Power Storage 20 Installation Guide
009-2401-00 Savant Power Storage 20 Installation Guide
This document guides the installer through the complete installation process for the following products:
Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 -2-
Important Safety Information - Read First Safety Statements
Before installing, configuring, or operating any equipment, Savant recommends Read this entire document before installing or using Savant Power Storage 20.
that each dealer, integrator, installer, etc. access and read all relevant technical Failure to read or follow any of the instructions or warnings in this document
documentation. Savant Power technical documentation can be located can result in personal harm, including death, or damage to the product,
by visiting savant.com/power. Vendor documentation is supplied with the potentially rendering it inoperable.
equipment.
Read and understand all safety instructions, cautions, and warnings in this DANGER!
document and the labels on the equipment. – A battery can present a risk of electrical shock, fire, or explosion
from vented gases. Observe proper precautions.
Safety Classifications In this Document – Savant Power Storage 20 must be installed by only Savant
authorized persons who have been trained in working with high
Provides special information for installing, voltage electricity.
NOTE:
configuring, and operating the equipment.
– Use Savant Power Storage 20 only as directed.
Indicates a potentially hazardous situation which, if
– Do not handle the device or its components with wet hands,
DANGER! not avoided, could result in injury, death, or damage
otherwise electric shock or death may occur.
to Savant Power Storage 20.
– Do not use Savant Power Storage 20 if it is defective, appears
Indicates potentially hazardous situation which, if cracked, broken, (or otherwise damaged) or fails to operate.
IMPORTANT! not avoided, could result in medium/slight injury or
damage to Savant Power Storage 20. – Never work on the system without first entirely powering down the
system and shutting off and locking out any power supplies to the
Provides special information for avoiding situations inverter.
CAUTION! that may cause damage to equipment.
– To protect the product and its components from damage when
transporting, handle with care. Do not impact, pull, drag, or step
on Savant Power Storage 20. Do not subject Savant Power Storage
20 to any high forces. To help prevent damage, leave Savant Power
Storage 20 in its shipping packaging until it is ready to be installed.
– Any installations must comply with The National Electric Code (NEC)
and local codes.
– Do not insert foreign objects into any part of the Savant Power
Storage 20.
– Any installation must comply with specifications for wire types,
conductor sizes, electrical and thermal insulation, branch circuit
protection, grounding, and disconnect devices.
CAUTION!
– Do not paint any part of Savant Power Storage 20, including any
internal or external components such as the exterior shell or casing.
– When installing Savant Power Storage 20 in a garage or near
vehicles, keep it out of the driving path. It shall be standing on the
floor. If possible, install Savant Power Storage 20 on a side wall.
– Ensure installation is compliant with local and national electrical
codes.
Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 -3-
Electronic Waste Information FCC Compliance
This symbol on the product or on its packaging indicates that this This device complies with Part 15 of the FCC Rules. Operation is subject to the
product must not be disposed of with normal household waste. It is following two conditions:
your responsibility to dispose of electrical waste in a manner that is 1. This device may not cause harmful interference, and
consistent with local guidelines.
2. This device must accept any interference received, including
interference that may cause undesired operation.
For more information about where you can drop off waste
equipment for recycling, please contact your local city office, waste disposal DANGER! Changes or modifications not expressly approved by the party
service, or the shop where you purchased the product. responsible for compliance could void the user’s authority to operate
the equipment.
RF Warning Statement
The device has been evaluated to meet general RF exposure requirement.
The device can be used in portable exposure conditions without restriction.
Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 -4-
1. System Introduction
The Savant Power Storage 20 is an all-in-one energy solution that acts as a power control system to manage a variety of interconnected power sources
alongside an energy storage system to enable energy resiliency in the event of grid disruptions and significant costs savings during every-day operation.
For Savant Power Storage 20 inverter and battery parts and features, see the Savant Power Storage 20 - 60A Quick Reference Guide or Savant Power
Storage 20 - 100A Quick Reference Guide on the Savant Customer Community.
Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 -5-
2. Pre-Installation
IP Network
Power Director
Service Entry Smart Meter Utility Service
Rated Disconnect
Automated Start
IP Network
Power Director
Main Service Panel Smart Meter Utility Service
(Non-backed up)
Automated Start
Generator DC Solar
Sub Panel Optional Optional
+
Savant Power Modules Power Storage 20
Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 -6-
2.3. Intregrating (AC Coupling) Existing Solar
Easily integrate existing grid tied solar installations with off-grid resiliency and time-of-use optimization.
NOTE: AC Coupled solar may land in the load center as pictured in the diagram below, or directly into the GEN input of the Savant Power Inverter.
Contact Savant engineering for more information about how to integrate a generator with an AC Coupled system.
IP Network
Power Director
Solar AC Coupled Load Center Service Entry Smart Meter Utility Service
Solar + Rated Disconnect
Savant Power Modules
Power Storage 20
IP Network
Power Director
Automated Start
Load Center
+
Savant Power Modules Whole Home Generator DC Solar
Power Storage 20
Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 -7-
2.5. Installation Location
The components of the Savant Power Storage 20 shall be installed in a location that is suitable for use. Installing the system in a manner inconsistent
with the guidance given below may void system warranty. The following items should be considered when installing the Savant Power Storage 20:
– The Savant Power Storage 20 is built with NEMA 4X enclosure, enabling outdoor install locations. Choose an installation area where ambient
temperature remains between 32°F to 114°F (0°C to 46°C) and out of direct sunlight. Exposing the system to temperatures outside of this range
can negatively impact the longevity of the equipment and will void the warranty.
– Choose a flat, horizontal foundation against a wall without potential exposure to overhead water sources, snow accumulation or flooding.
IMPORTANT! Concrete anchors are included with each system to allow the system to be secured to the foundation.
– Reserve enough space for maintenance requirement for each side of the unit.
– Ensure enough clearance around the system and space between multiple Savant Power Storage 20 units to correspond with National Electric
Code (NEC) and local requirements.
8.0in
(20cm)
11.8in 36in
(30cm) (92cm)
Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 -8-
3. Physical Installation
CAUTION!
– Dust collection required during drilling.
– Make sure the cabinet is firmly on the floor. The wall bracket is only designed to keep the battery system from tipping forward and cannot
support the weight of the battery.
1. Open the battery enclosure with a PH2 Philips screwdriver and remove the accessories kit.
2. Assemble the bracket as shown using M5x12 screws.
3. Attach the bracket to the back side of the battery system with M5x12 machine screws. Torque: 44 lb-in (5 N*m).
1 2 3
Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 -9-
4. (OPTIONAL, Per Local Code) Drill a 0.5 in (25mm) hole with a 2 in (50mm) depth. Embed the anchor expansion bolts and affix the cabinet to
the ground. Use included cardboard template and take note of spacing between unit and wall to allow for the bracket.
5. Install bracket and battery system on the wall with M6x50 tapping screws.
NOTE: If installing on a concrete wall, properly drill into the wall with M6x50 expansion anchor screws.
6. Remove the battery seal cap (BAT/COM) on the bottom of Savant Power Inverter.
406mm
(16in)
305mm
(12in)
4 5 6 7
Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 10 -
8. Fasten Savant Power Inverter and the battery cabinet with conduit and screw kits.
9. Fasten the inverter and the bracket with M5x12 machine screws. Torque: 26.5 lb-in (3 N*m).
10. If the inverter is installed separately from the battery system, use the bracket to mount inverter. Install the bracket on the wall with M6x50
tapping screws, hang on bracket, and fasten it with M4x16 screws.
NOTE: If you are installing it on a concrete wall, drill into the wall and attach with M5x12 tapping screws.
11. If the battery system is installed separately from inverter, the bracket for battery system is required. Attach the bracket to the back side of the
battery system with M8x16 machine screws. Torque: 44 lb-in (5 N*m). Install the bracket on the wall with M6x50 tapping screws.
NOTE: If you are installing it on a concrete wall, drill into the wall with M6x50 expansion anchor screws.
8 9 10
11
10
16in
12in
Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 11 -
3.3. Internal Wiring
1
DC 12V
CAN
1. Unfasten the screws from the battery storage wiring cover and wiring panel of the
Savant Power Inverter using a 4mm hex screwdriver, removing both cover plates.
2. Connect the inverter to the battery system with ground wire, Torque: 26.5 lb-in (3
N*m) feeding the ground wire through the BAT/COM to the battery storage wiring
panel.
3. Connect power, 12V DC and communication cables from the battery system to the
inverter. Insert the wires according to the corresponding colors of the silkscreen on
the terminal.
NOTE: Conductor colors of the 60A unit will differ from the installation guide.
2
PV1+ PV1- PV2+ PV2- REF BAT- BAT+ REF DC- DC+ L1 N L2 L1 N L2 L1 N L2
TRG GBA
DC 12V
RS232 DC 12V DC 12V UPCS
L HG PS G
CAN RSD C-LED DC 12V
L1 N L2 L1 N L2
DC- DC+ REF L1 N L2
BAT- BAT+ REF
RS232
PS G GBA
BCMS
L HG TRG C-LED UPCS
RS232 DC 12V DC 12V
GPS
USB4
DC 12V
RESET GROUND
CAN
BCMS TO CAN
DC 12V
BAT+
GROUND
GROUND
DC 12V
REF
BAT-
BAT-
BAT/COM TO
INVERTER WIRING
BAT+
BAT/COM TO
BATTERY STORAGE
BCMS TO CAN
WIRING
REF
CAN
Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 12 -
3.4. Battery System Installation
3. Install battery 8 in the bottom battery slot. Then continue to install all batteries in ascending slots in reverse numerical order, with battery 8 on
the bottom and battery 1 in the top. See the diagram below for reference.
NOTE: Always keep the batteries connected in the order that they were originally installed.
4. Fasten all modules on both sides using M4x8 screws. Torque: 10 lb-in (1.2 N*m).
NOTE: Do not install the door on the cabinet until installation has been completed and the system has been tested for proper function.
1 2 3
Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 13 -
3.5. External Wiring
CAUTION! All cables shall be connected in sequence as listed in this manual.
1. Make all grid, generator and load connections as shown in the single line diagrams in Appendix: Single Line Diagrams.
NOTE: Savant Power Inverter includes a built-in RSD transmitter. Please contact Savant for supported models of RSD receivers. If the Savant
Power Storage 20 is placed near the main panel, the PV disconnect (PV switch) on the Savant Power Inverter can be used as an RSD Initiation
Device.
If the Savant Power Storage 20 is placed far from the main panel, it is recommended to use the Emergency Switch as an RSD Initiation Device.
CAUTION! In areas with frequent lightning storms, a Class 2 SPD (Surge Protection Device) shall be installed in front ends of both Solar
and Grid inputs.
2. Refer to the table below for minimum copper wire sizing and ratings.
3. Refer to the table below for minimum external circuit breaker sizing and ratings.
NOTE: If smaller-size wires and breakers are to be used for AC connection, grid output current can be configured via the Savant Power Storage
app. Please contact Savant Support to confirm your configurations.
Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 14 -
4. Connect Savant Power inverter to ground. Torque: 26.5 lb-in (3 N*m).
6. Connect output of generator or AC coupled solar inverter to GEN terminals of inverter. Follow the instructions on the Savant Power Storage app
for wiring and setting of generator automatic control.
NOTE: System must be programmed for appropriate connected power source. Programming details can be found in the Savant Power Storage
App Setup Guide on the Savant Customer Community.
L1 N L2 L1 N L2
DC- DC+ REF L1 N L2
BAT- BAT+ REF
PS G GBA
L HG TRG C-LED UPCS
RS232 DC 12V DC 12V
DC 12V DC 12V
CAN
BCMS 6
4
RS485-1 DC 12V
Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 15 -
7. Make load connections from Savant Power Inverter to load.
8. Make photovoltaic array connections from the Savant Power Inverter as shown below.
CAUTION! Do not connect the positive or negative PV connections to ground. Doing so may damage the inverter.
9. Connect the communication cable to RS232 port and 12Vdc power cable to DC 12V port.
10. Connect Savant Power Inverter to a router or Savant Power Director using a CAT5 or higher Ethernet cable.
NOTE: Use waterproof port where required.
11. For systems with connections to AC coupled PV Inverter, and/or multiple parallel applications, see section 3.6.
8
CONNECTIONS TO
PHOTO VOLTAIC 7
ARRAY
PV1+ PV1- PV2+ PV2- REF BAT- BAT+ REF DC- DC+ L1 N L2 L1 N L2 L1 N L2
TRG I O PS G GBA
RS232 RSD C-LED UPCS
G CW G F G SW H L
CAN DC 12V DC 12V DC 12V
CONNECTIONS TO
PHOTO VOLTAIC
ARRAY RS232 BCMS
GPS
USB4 CONNECTIONS
CONNECTION
10 TO ROUTER OR RESET
TO LOAD
DIRECTOR
NETWORK USB2 USB3 SD SIM C-LED RS485-1 DC 12V
RS232 CONNECTION
9 DC 12V CONNECTION
Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 16 -
3.6. Power Director Installation
Refer to Savant Power & Light App Deployment Guide and Savant Power Quick Reference Guide on the Savant Customer Community for more
detailed instructions regarding installing and configuring the Savant Power Director.
2. The Savant Power Director and Savant Power Inverter communicate over IP. Connect the PoE port of Director to the Network Port of inverter.
NOTE: If using the Director over WiFi, the router may be omitted.
3. Commission the Director according to the Savant Power & Light App Deployment Guide.
PV1+ PV1- PV2+ PV2- REF BAT- BAT+ REF DC- DC+ L1 N L2 L1 N L2 L1 N L2
TRG I O PS G GBA
RS232 RSD C-LED UPCS
G CW G F G SW H L
CAN DC 12V DC 12V DC 12V
RS232 BCMS
GPS
USB4
RESET
Power Director
Network Switch
GPIO
PoE
MAIN
NETWORK
5VDC
Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 17 -
3.7. Optional Power Source Integration and Wiring
1. Land the AC output of the generator into the GEN input of the inverter (L1/L2/N).
2. If using a whole home generator with two-wire start, wire the Energy Management System (EMS) as shown:
NOTE: Other generators are supported with different wiring configurations; contact Savant support for more information.
PV1+ PV1- PV2+ PV2- REF BAT- BAT+ REF DC- DC+ L1 N L2 L1 N L2 L1 N L2
TRG I O PS G GBA
RS232 RSD C-LED UPCS
G CW G F G SW H L
CAN DC 12V DC 12V DC 12V
RS232 BCMS
GPS
USB4 CONNECTIONS
RESET
TO GENERATOR
AC OUTPUT
1
NETWORK USB2 USB3 SD SIM C-LED RS485-1 DC 12V
COM2
N02
N01
DI3
DI1
CONNECTIONS
2 TO GENERATOR
NC1
COM1
NC2
DI2
COM
3. Use the Savant Power Storage app to program the auto-start and stopping parameters of the connected generator.
Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 18 -
3.7.2 AC Coupled Solar Wiring
The Savant Power Storage 20 enables easy integration of a grid tied solar installation to enable continued solar production in a grid down scenario. It
is recommended to use a UL 1741SA compliant inverter when AC coupling into the Savant Power Storage 20.
CAUTION! Do not interconnect a generator to a system that is installed with AC Coupled solar attached as it can lead to damage to the
generator and inverter!
1. Land the output of the AC coupled solar inverter into the GEN input of the inverter or into the backed-up load center.
NOTE: The PS-INV-12.5KW-60A-XX model will only support AC coupling into the backed-up load center whereas the PS-INV-12.5KW-100A-XX
can support either location
NOTE: Paralleled systems should only have AC coupling into the GEN input of the inverter.
2. Use the Savant Power Storage app to program the parameters of the AC coupled system.
Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 19 -
3.8. Parallel Systems
The Savant Power Storage 20 can support multi-unit installs with all units operating in parallel to increase the available power and storage for a
single site installation. The Appendix provides single line diagrams giving a high level overview of parallel system configuration.
NOTE: Systems with a model number ending in ‘NS’ do not support parallel configuration. Please contact Savant support for more information.
1. Wire internal components for all units in system in alignment with section 3.3.
3. Combine the Load Output of all units at a single location before landing in the backed-up loads panel.
4. Connect CAT5 or CAT6 cable between the external RJ45 ports marked ‘Parallel’ between each inverter in the system.
NOTE: External Parallel ports are equivalent and can be used interchangeably.
5. Install the included resistors in the first and last system of the parallel install. Make sure to tighten the RJ45 port where resistors are installed.
PARALLEL
6. Assign one of the units in the system as the “Leader” of the system. Additional systems will be designated as “Followers”.
7. Wire all optional accessories (generator auto-start, E-Stop Button, etc) to the Leader of each parallel installation. See more about accessories in
section 3.8.
Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 20 -
8. Use a network switch to wire the Power Director to each unit in the parallel system.
Power Director
GPIO
PoE
5VDC
RS232 BCMS
GPS
USB4
RESET
Network Switch
MAIN
Inverter Connections
NETWORK
9. Follow the instructions in the Savant Power Storage App Setup Guide for guidance on programming for parallel installations..
Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 21 -
3.9. Additional Accessories
Optional accessories are available to enable additional functionality with the Power Storage 20. Application and installation guidance for available
accessories is given below.
1. Choose a lockable, UL certified E-Stop button or switch with at least two normally closed (NC) contacts.
3. Connect the second NC contact wire pair to the pins labeled DI1 and COM within the EMS GPIO.
NOTE: There is no polarity with these contacts. This simply functions as an off/on switch.
TRG I O PS G GBA
RS232 RSD C-LED UPCS
11 12
21 22
G CW G F G SW H L
CAN DC 12V DC 12V DC 12V
COM2
RS232 BCMS
N02
GPS
N01
DI3
DI1
USB4
RESET
NC1
COM1
NC2
DI2
COM
Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 22 -
3.9.2 Acrel Meter
Meter Zero mode enables the Savant Power Storage 20 to power non-backed up loads to offset utility consumption while grid connected. Meter Zero
mode requires the use of an external power meter. The Acrel AGF-AE-D/200 meter used for this application must be purchase separately. Reach out
to Savant Support for more information.
2. Install split-core CTs on mains feeding the loadcenter (one CT per phase).
NOTE: Ensure the arrow of the CT is pointing toward the main breaker, otherwise CT measurement will be inaccurate.
3. Connect CTs to the CT input on the Acrel meter for the corresponding phase where CT is installed.
4. Tap the mains and feed tap into the L1/L2/N terminals of the Acrel meter.
5. Connect the RS485 A+ and B- terminals of the Acrel Meter to the RS485-1 RJ45 input of the Power Storage inverter at pins 7 and 8, respectively,
as shown below.
RS485-1 Port
RS232 BCMS
7 RS485A
1 2 3 4 5 6 7 8
RS485-1 DC 12V 8 RS485B
Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 23 -
M
GRID
G H- H+ - + - +
N
RS485 L2 CT L1 CT L1 L2
S G
C-LED DC 12V
RS232 BCMS
6. Verify there are no issues with the Acrel meter using the three LED indicators on the meter front.
7. Program the Savant Power Storage 20 to use the Meter-Zero Mode. Refer to the Savant Power Storage App Setup Guide for more details.
Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 24 -
3.9.3 Antennas
1. Install antennas into the relevant antenna inputs corresponding to planned use of the system.
NOTE: Antennas are only required if using the functionality supported by the antenna; for example, if cellular service will never be used to the
monitor the system, it is not required to use the antenna ports labeled 4G.
2. If using LTE, insert the 4G LTE SIM card into port within internal wiring area.
1 2
RS232 BCMS
GPS
USB4
RESET
4G MAIN WIFI
4G DIV GPS
RESET
Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 25 -
3.10. Safety Check
CAUTION! Before booting up ESS, perform the following safety checks. Failure to perform relevant safety checks could lead to unsafe conditions or
system damage.
Battery Disconnect is in OFF position.................................................................. Load output of all systems combined with correct phasing ........................
External Breaker or Disconnect installed ............................................................ AC and DC Conductors do not share conduit.....................................................
Measured voltage at inverter is correct ............................................................... Ampacity rating of conductors appropriate for installation..........................
Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 26 -
4. Basic Operations
2. Press START button for one second. Wait 60 seconds for modules to initialize. Once initialized, all LEDs will be solid green.
3. Press ON/OFF button of Savant Power Inverter. Wait 60 seconds for system to initialize.
5. Close external breaker for Load output. Verify backed up loads are powered by system.
6. Close external breaker for Grid connection and turn Grid switch to ON position. Grid LED indicator should turn green.
8. (First Boot of Savant Power Storage 20 Only) Switch external Grid disconnect or breaker to OFF position. Verify the Savant Power Storage 20
continues to power critical loads without issue. Reconnect the system to grid by switching external disconnect to ON position.
NOTE: Refer to section 7 for system troubleshooting or call Savant Support if any issues are experienced.
9. Switch PV Disconnect to ON position. Run indicator should turn green and system should start producing PV power.
Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 27 -
4.2. System Shut Down
CAUTION! Failure to follow the instructions given below may result in damage to the ESS.
1. Before shutting down, switch all external disconnects to OFF position or bypass Savant Power Storage 20 using on-site equipment.
3. Turn Grid Switch to OFF position. Grid indicator should turn off.
Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 28 -
5. System Commissioning
1. Download the Savant Power Storage app. Search “Savant Power Storage” in Apple App Store or Google Play, or scan the QR code below or on the
packing box to download the app from Apple App Store or Google Play.
2. Add New Devices. Start the app and click the add device button, then scan the device QR code or input the device code to add devices. The QR code
and device code can be found on the label pasted on the device.
3. Detailed device data, e.g. running status, history and alerts can be checked on the Savant Power Storage app. Set the working modes, grid type, utility
rate plan, and generator information following the guidance on the app.
4. Additional commissioning instructions with the Savant Power Storage app can be found in the Savant Power Storage App Setup Guide on the Savant
Customer Community.
Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 29 -
6. Troubleshooting
In any cases of device failure, please check alarms on the Savant Power Storage app and proceed as instructed, accordingly. If the Savant Power Storage
app fails to connect to the device, check the status of each indicator and possible reasons and solutions as follows:
The Status Indicator on BCMS module/battery system is solid red and the Status Indicator on at least one battery module is solid red.
– The battery system is in the most critical level protection mode. Charge the battery, or reboot the battery system. If it does not recover, shut ESS down
and contact Savant support.
The Status Indicator on BCMS module/battery system is solid red and the Status Indicator on every battery module is solid green.
– Battery system over-current/ short circuit protection. Disconnect output switch of battery system, check if there is an external short circuit, and reboot
the battery system. If it does not recover, shut ESS down and contact Savant support.
The Status Indicator on BCMS module/battery system is solid red and the Status Indicator on at least one battery module is solid yellow or off.
– The battery system is in low voltage protection mode. Charge the battery.
– The battery system is in high voltage protection mode. Check if the communication cable for BCMS and EMS is disconnected; Leave it switched ON for
30 minutes. If it does not recover, shut it down and contact Savant support.
Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 30 -
The Status Indicator on BCMS module/battery system keeps blinking blue for over 60 seconds.
– Battery system failed in self-inspection. Reboot the battery system.
The Status Indicator on at least one battery module keeps blinking blue for over 30 seconds.
– Failure in CAN communication. Reconnect communication cable between BCMS and battery module, then reboot the system. Refer to section 3.3 for
more information.
The Status Indicator on BCMS module/battery system/battery module is solid yellow while SOC is 0%.
– Low battery. Charge the battery.
The Run Indicator on Savant Power Inverter is blinking green, and the Status Indicator on Savant Power Inverter is blinking blue.
– Inverter unit/PV charging unit is updating. Wait until update is finished. If the blinking blue persists, reboot Savant Power Inverter. If it does not recover,
shut it down and contact Savant support.
Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 31 -
7. Warranty and Service
POWER DIRECTORS - WARRANTY
Savant Power Directors have a two (2) year limited warranty as described in more detail in the New Savant Product Limited Warranty. Savant’s warranty
does not cover any product that is not maintained in accordance with Savant’s maintenance recommendations, is operated in a manner other than that
specified by Savant, is damaged from misuse, abuse, accidental damage, modifications, improper wiring, improper repair or operation outside of specified
operating temperatures, or is damaged from outside forces such as humidity, weather, or electrical surges.
Savant Power Storage 20 Installation Guide Copyright 2023 Savant Systems, Inc
009-2401-00 | 090623 - 32 -
Appendix: Single Line Diagrams
This appendix gives example single line diagrams (SLDs) for different configurations of the Savant Power Storage 20. Please contact Savant Support for
additional information or if your desired installation is not shown below.
BACKED UP
LOADS
LAWS OF LOCAL, STATE AND
BACKED UP FEDERAL GOVERNMENT,
LOADS
OTHER AUTHORITIES HAVING
JURISDICTION AND
BACKED UP
LOADS
20 SPECIFICATIONS FOR
ADDITIONAL INFORMATION.
THIS DRAWING WAS PREPARED BY SAVANT INTER-DISCIPLINE REVIEW DSGN JOB NUMBER REV
POWER. FOR A SPECIFIC PROJECT, SAVANT POWER
DRN MAW 8/1/23
Savant Power Storage
DISC
20 Installation
ARCH CIVIL ELECT
TAKING INTO CONSIDERATION THE SPECIFIC
AND UNIQUE REQUIREMENTS OF THE PROJECT. Guide
I&C MECH STRUCT
CKD JP Copyright 2023 Savant Systems,
RESIDENTIAL MICROGRID
- Inc
B
REUSE OF THIS DRAWING OR ANY INFORMATION
DATE * * * * * *
009-2401-00 | 090623
CONTAINED IN THIS DRAWING FOR ANY PURPOSE B DC BATTERY UPDATE 8-1-23 MAW
- 33 - SCALE: AS NOTED - DRAWING NUMBER
E00-001 SH 1
IS PROHIBITED UNLESS WRITTEN PERMISSION
A FINAL CONCEPT TEMPLATE 7-12-2023 MAW -
FROM RACEPOINT ENERGY
INIT * * * * * * - 60A: 12.5KW - 20KWH PARTIAL BACKUP ESS
GRANTED. REV REVISIONS DATE DRN DSGN CKD APPD CERTIFICATE OF REGISTRATION NO. X-0000 PS20 ONELINE DIAGRAM
Appendix: Single Line Diagrams
1 2 3 4 5 6 7 8
THROUGH
GENERAL NOTES
1. CONCEPT ONLY: NOT FOR
CONSTRUCTION OR PERMIT
SUBMITTAL.
2. AS A BASIS FOR THE
MINIMUM INSTALLATION
CRITERIA, ENGINEER OF
RECORD (EOR) IS TO
ENSURE THAT ALL WORK
MUST BE PERFORMED IN
ACCORDANCE WITH THE
B
LATEST EDITIONS OF THE
STATE BUILDING CODE,
STATE ELECTRICAL CODE,
NFPA, ANSI/NECA
INSTALLATION STANDARDS
AND OTHER APPLICABLE
CODES, REGULATIONS AND
LAWS OF LOCAL, STATE AND
FEDERAL GOVERNMENT,
OTHER AUTHORITIES HAVING
JURISDICTION AND
APPLICABLE BASE BUILDING
STANDARDS AND
SPECIFICATIONS.
3. THESE DRAWINGS
ILLUSTRATE A CONCEPT
SHOWING MAJOR C
EQUIPMENT AND
INTERCONNECTIONS BUT
ARE NOT TO BE CONSIDERED
FABRICATION / SITE
SPECIFIC DRAWINGS. CABLE
SIZING, SHORT CIRCUIT,
GROUNDING, OVERCURRENT
PROTECTION AND
DISCONNECTING MEANS TO
BE DESIGNED BY EOR WITH
PE STAMPED SITE SPECIFIC
CONTRACT DRAWINGS.
4. EOR TO ENSURE FINAL
SYSTEM DESIGN ADHERES
TO ALL APPLICABLE
ARTICLES OF NEC INCLUDING
D
ARTICLES 110, 240, 250, 310,
480, 690, 702, 705, 706 AND
750.
5. REFER TO POWER STORAGE
PS20 TEMPLATE_8_1_23 REVB.DWG
20 SPECIFICATIONS FOR
ADDITIONAL INFORMATION.
THIS DRAWING WAS PREPARED BY SAVANT INTER-DISCIPLINE REVIEW DSGN JOB NUMBER REV
POWER. FOR A SPECIFIC PROJECT, SAVANT POWER
DISC ARCH CIVIL ELECT I&C MECH STRUCT DRN MAW 8/1/23
TAKING INTO CONSIDERATION THE SPECIFIC
- B
AND UNIQUE REQUIREMENTS OF THE PROJECT. CKD JP RESIDENTIAL MICROGRID
REUSE OF THIS DRAWING OR ANY INFORMATION
DATE * * * * * * B DC BATTERY UPDATE 8-1-2023 MAW DRAWING NUMBER
CONTAINED IN THIS DRAWING FOR ANY PURPOSE SCALE: AS NOTED -
1 2 3 4 5 6 7 8
M
CONTINUOUS
EXISTING
LOADS 3. QTY (4) 8.5KW / 26A DC PV
EXISTING MPPT A
LOADS
EXISTING
4. QTY (2) 12.5KW GEN INPUTS
LOADS
OR AC COUPLED PV INPUTS
EXISTING
LOADS
5. 48KW / 200A GRID PASS
THROUGH
GENERAL NOTES
1. CONCEPT ONLY: NOT FOR
CONSTRUCTION OR PERMIT
SUBMITTAL.
2. AS A BASIS FOR THE
MINIMUM INSTALLATION
CRITERIA, ENGINEER OF
RECORD (EOR) IS TO
ENSURE THAT ALL WORK
MUST BE PERFORMED IN
ACCORDANCE WITH THE
B
LATEST EDITIONS OF THE
STATE BUILDING CODE,
STATE ELECTRICAL CODE,
NFPA, ANSI/NECA
INSTALLATION STANDARDS
AND OTHER APPLICABLE
CODES, REGULATIONS AND
LAWS OF LOCAL, STATE AND
FEDERAL GOVERNMENT,
OTHER AUTHORITIES HAVING
JURISDICTION AND
APPLICABLE BASE BUILDING
STANDARDS AND
SPECIFICATIONS.
3. THESE DRAWINGS
ILLUSTRATE A CONCEPT
SHOWING MAJOR C
EQUIPMENT AND
INTERCONNECTIONS BUT
ARE NOT TO BE CONSIDERED
FABRICATION / SITE
SPECIFIC DRAWINGS. CABLE
SIZING, SHORT CIRCUIT,
GROUNDING, OVERCURRENT
PROTECTION AND
DISCONNECTING MEANS TO
BE DESIGNED BY EOR WITH
PE STAMPED SITE SPECIFIC
CONTRACT DRAWINGS.
4. EOR TO ENSURE FINAL
SYSTEM DESIGN ADHERES
TO ALL APPLICABLE
ARTICLES OF NEC INCLUDING
D
ARTICLES 110, 240, 250, 310,
480, 690, 702, 705, 706 AND
750.
5. REFER TO POWER STORAGE
PS20 TEMPLATE_8_1_23 REVB.DWG
20 SPECIFICATIONS FOR
ADDITIONAL INFORMATION.
THIS DRAWING WAS PREPARED BY SAVANT INTER-DISCIPLINE REVIEW DSGN JOB NUMBER REV
POWER. FOR A SPECIFIC PROJECT, SAVANT POWER
DISC ARCH CIVIL ELECT I&C MECH STRUCT DRN MAW 8/1/23
TAKING INTO CONSIDERATION THE SPECIFIC
- B
AND UNIQUE REQUIREMENTS OF THE PROJECT. CKD JP RESIDENTIAL MICROGRID
REUSE OF THIS DRAWING OR ANY INFORMATION
DATE * * * * * * B DC BATTERY UPDATE 8-1-2023 MAW DRAWING NUMBER
CONTAINED IN THIS DRAWING FOR ANY PURPOSE SCALE: AS NOTED -
1 2 3 4 5 6 7 8
EXISTING
4. QTY (2) 12.5KW GEN INPUTS
LOADS
OR AC COUPLED PV INPUTS
EXISTING
LOADS 5. 48KW / 200A GRID PASS
THROUGH
GENERAL NOTES
1. CONCEPT ONLY: NOT FOR
CONSTRUCTION OR PERMIT
SUBMITTAL.
2. AS A BASIS FOR THE
MINIMUM INSTALLATION
CRITERIA, ENGINEER OF
RECORD (EOR) IS TO
ENSURE THAT ALL WORK
MUST BE PERFORMED IN
ACCORDANCE WITH THE
B
LATEST EDITIONS OF THE
STATE BUILDING CODE,
STATE ELECTRICAL CODE,
NFPA, ANSI/NECA
INSTALLATION STANDARDS
AND OTHER APPLICABLE
CODES, REGULATIONS AND
LAWS OF LOCAL, STATE AND
FEDERAL GOVERNMENT,
OTHER AUTHORITIES HAVING
JURISDICTION AND
APPLICABLE BASE BUILDING
STANDARDS AND
SPECIFICATIONS.
3. THESE DRAWINGS
ILLUSTRATE A CONCEPT
SHOWING MAJOR C
EQUIPMENT AND
INTERCONNECTIONS BUT
ARE NOT TO BE CONSIDERED
FABRICATION / SITE
SPECIFIC DRAWINGS. CABLE
SIZING, SHORT CIRCUIT,
GROUNDING, OVERCURRENT
PROTECTION AND
DISCONNECTING MEANS TO
BE DESIGNED BY EOR WITH
PE STAMPED SITE SPECIFIC
CONTRACT DRAWINGS.
4. EOR TO ENSURE FINAL
SYSTEM DESIGN ADHERES
TO ALL APPLICABLE
ARTICLES OF NEC INCLUDING
D
ARTICLES 110, 240, 250, 310,
480, 690, 702, 705, 706 AND
750.
5. REFER TO POWER STORAGE
PS20 TEMPLATE_8_1_23 REVB.DWG
20 SPECIFICATIONS FOR
ADDITIONAL INFORMATION.
THIS DRAWING WAS PREPARED BY SAVANT INTER-DISCIPLINE REVIEW DSGN JOB NUMBER REV
POWER. FOR A SPECIFIC PROJECT, SAVANT POWER
DISC ARCH CIVIL ELECT I&C MECH STRUCT DRN MAW 8/1/23
TAKING INTO CONSIDERATION THE SPECIFIC
- B
AND UNIQUE REQUIREMENTS OF THE PROJECT. CKD JP RESIDENTIAL MICROGRID
REUSE OF THIS DRAWING OR ANY INFORMATION
DATE * * * * * * B DC BATTERY UPDATE 8-1-2023 MAW DRAWING NUMBER
CONTAINED IN THIS DRAWING FOR ANY PURPOSE SCALE: AS NOTED -