Document No Rev.
CP12-PPS-3274B-CV-CA-007 0
TABLE OF CONTENTS
Page
1.0 INTRODUCTION 4
2.0 SUMMARY 4
3.0 DESIGN CRITERIA
3.1 Design Capacity 4
3.2 Hydraulic Calculation 5
3.3 Free Board 5
3.4 Codes, Sandards, AND Reference 5
3.5 Materials 6
4.0 CALCULATION OPEN DITCH
4.1 Calculation for Open Ditch U-Type 6
5.0 REINFORCEMENT 7
ATTACHMENT
A. Sketch of Garawangi's Drainage AREA
B. Open Ditch Calculation
PT. PGN (PERSERO) Tbk PT. PETROTECHINDO UTAMA PT. PRATIWI PUTRI S
1.0 INTRODUCTION
This document covers the calculation of Open Drainage System for Sewer and Storm Water Drainage GARAWANGI
SUNYARAGI OFFTAKE STATION Project, owned by PT. PGN (Persero) Tbk. The Open Drainage System is designe
reinforce concrete.
Drainage of rainfall passes the road, pavement, gravel or other area drain from high level to low level and distribute to
3.5 Materials
The structural materials used in this designed based on design basis:
·
Reinforcing bars in general use for concrete shall be deformed bars conforming to ASTM A615 Grade 60 or equ
with yield stress 4218 kg/cm2 (60,000 psi). Reinforcing bars for shear minimum10 mm diameter shall be plain ba
conforming to ASTM A615 Grade 40 or equivalent with yield stress 2812 kg/cm 2 (40,000 psi).
For easy step, calculation for open ditch drainage system is prepared in spreadsheet (table format Ms.Excel) because
only solve this problem by trial and error. For detail calculation open ditch see attachment – B.
4.1 Calculation for Open Ditch U-Type
Table format Ms.Excel calculation is follow:
· Col (1) Mark for area
· Col (2) One line ditch
· Col (3) Qi, total discharge from other source line
· Col (4) Length of one ditch from manhole to manhole (m)
· Col (5) Type of surface
· Col (6) Coefficient of runoff = 0.6 (for sandy surface)
· Col (7) Time Concentration (Tc = minute)
Tc = 0.0195 * [(Col (4)/Col (19)0.5]0.77
· Col (8) Rain Intensity (mm/Hour)
( I = (R/24) * (24/t)2/3 )
· Col (9) Area (m2)
· Col (10) Rain discharge ( Q = C.i.A )
Q = (1/1000) * Col (6) * Col(8) * Col (9) = m 3 / hr
· Col (11) Total design discharge
Q from other source line = Col (3) + Col (10)
· Col (12) Trial start
Width of water b = 100 cm
· Col (13) Trial start
Height of water h = 50 cm
· Col (14) Ditch material = reinforce concrete
· Col (15) Manning coefficient = 0.012 for concrete
· Col (20) Decision, if S < 0.002 or S > 0.004 then b, h or ∆ must be changed, if 0.002 < S < 0.004 then b, h and ∆
acceptable we get S = 0.0023 > 0.002 …OK.
· Col (21) Flow velocity, V = 1/n * R2/3 * S1/2
1 / Col (15) * Col (16)2/3 * Col (19)1/2
·
Col (22) Decision, if V < 0.6 or V > 2.1 then b and h must be changed and if 0.6 < V < 2.1 then b and h are acce
· Col (23) Flow discharge Q = A.V = (b.h).V
(Col (12) * Col (13)) * 10-4 * Col (21)
· Col (24) Ratio of Q design total / flow discharge
Col (11) / Col (23)
· Col (25) Decision, if ratio ≤ 1 then b and h are acceptable.
· Col (26) Freeboard = 15 cm
· Col (27) Width b start = 50 cm
· Col (28) Height h start = h + freeboard
· Col (29) Width b end = 50 cm
· Col (30) Height h end = h + ∆ + freeboard
Col (13) + Col (17) + Col (26)
5.0 REINFORCEMENT
Unit Weight of Material Material Properties
Loading Design
The forces are considered in the design U ditch concrete :
- Active Lateral pressure of soil
- Surcharge Load = 0,6 x g soil
= 0,6 x 1679 = 1007.4 kg/m3 (AASHTO 3.11.6.4)
Loading Combination
Factored loading combination for wall of cellar concrete design:
LCOMB1 = 1.4 D
Detail Calculation
h= 600 mm
b= 500 mm
t1 = 100 mm
t2 = 100 mm
h= 400 mm
b= 300 mm
t1 = 100 mm
t2 = 100 mm
Reinforcement design
Wall design
Ditch wall shall be design to resist load are consist :
- Soil active pressure
- Surcharge Load
PT. PGN (PERSERO) Tbk PT. PETROTECHINDO UTAMA PT. PRATIWI PUTRI S
Ptotal = Pa + Ps
= 0.486 t/m2
Reinforcement
Wall is assumed as free at the top side reinforcement wall per 1m width.
Vertical reinforcement
Horizontal reinforcement
Ptotal = Pa + Ps
= 0.072 t/m2
Reinforcement
Wall is assumed as free at the top side reinforcement wall per 1m width.
Vertical reinforcement
As total = rused x b x d
= 217.000 mm2 per 1m length
Min No of wire = As total / As
= 3
Spacing = 333 mm
≈ 300 mm
Use D 13 - 300 for all depth
Provide rebar diameter 13 mm - space 300 mm one layer
Use Wiremesh M8 - 150 (As = 335) for all depth.
Horizontal reinforcement
TABLE OF CONTENTS
Page
PT. PRATIWI PUTRI SULUNG
pen Drainage System for Sewer and Storm Water Drainage GARAWANGI AND
owned by PT. PGN (Persero) Tbk. The Open Drainage System is designed with
ment, gravel or other area drain from high level to low level and distribute to biopory
PT. PRATIWI PUTRI SULUNG
ation for Steel Sheet, Zinc Coated (Galvanized) by Hot-Dip Process, for Storm Sewer
Precast Reinforced Concrete Box Section for Culverts, Strom Drains and Sewer.
Precast Reinforced Concrete Box Section for Culverts, Strom Drains and Sewer
Subjected to Highway Loading.
PT. PRATIWI PUTRI SULUNG
0.004 then b, h or ∆ must be changed, if 0.002 < S < 0.004 then b, h and ∆ are
2 …OK.
1 then b and h must be changed and if 0.6 < V < 2.1 then b and h are acceptable.
10.0000000000000
PT. PRATIWI PUTRI SULUNG
600
600 + Fy
PT. PRATIWI PUTRI SULUNG
600
600 + Fy
Sketch of Garawangi's Drainage AREA
F G H I J K L
A7
A3 5 A6
A2 A8
A5
A4
A1
1 2
A9
D
C B A
M
A7
Area Luas (m2)
A1 121.800
A2 6.000
N A3 6.000
A4 111.100
A5 111.100
A6 14.800
A7 6.576
A8 6.576
A9 11.694
P
OPEN DITCH CALCULATION
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
1 B-C 0.00 11.50 Concrete 0.4 1.40 849.5 121.80 41.39 41.39 50 15 Conc. 0.013 0.094 2.3 11.50 0.002 OK! 0.710 OK! 191.68 0.22 OK! 15 50 30 50 32.3
2 E-F 0.00 4.40 Concrete 0.4 0.67 1391.0 6.00 3.34 3.34 50 15 Conc. 0.013 0.094 1 4.40 0.002 OK! 0.710 OK! 191.68 0.02 OK! 15 50 30 50 31
F-G 3.34 4.40 Concrete 0.4 0.67 1391.0 6.00 3.34 6.68 50 15 Conc. 0.013 0.094 1 4.40 0.002 OK! 0.710 OK! 191.68 0.03 OK! 15 50 31 50 32
3 1-2 0.00 21.00 Concrete 0.4 2.22 623.6 111.10 27.71 27.71 30 15 Conc. 0.013 0.075 5 21.00 0.002 OK! 0.612 OK! 99.11 0.28 OK! 15 30 30 30 35
2-J 27.71 13.80 Concrete 0.4 1.61 773.6 111.10 34.38 62.09 30 15 Conc. 0.013 0.075 3 13.80 0.002 OK! 0.612 OK! 99.11 0.63 OK! 15 30 35 30 38
4 J-K 0.00 4.43 Concrete 0.4 0.67 1387.0 14.80 5.03 5.03 50 15 Conc. 0.013 0.094 0.9 4.43 0.002 OK! 0.710 OK! 191.68 0.03 OK! 15 50 30 50 30.9
5 L-M 0.00 2.93 Concrete 0.4 0.49 1713.9 6.58 4.51 4.51 50 15 Conc. 0.013 0.094 1 2.93 0.002 OK! 0.710 OK! 191.68 0.02 OK! 15 50 30 50 31
M-N 4.51 3.50 Concrete 0.4 0.56 1564.4 6.58 4.11 8.62 50 15 Conc. 0.013 0.094 1 3.50 0.002 OK! 0.710 OK! 191.68 0.04 OK! 15 50 31 50 32
6 O-P 0.00 4.20 Concrete 0.4 0.64 1424.6 11.69 3.97 3.97 50 15 Conc. 0.013 0.094 0.9 4.20 0.002 OK! 0.710 OK! 191.68 0.02 OK! 15 50 30 50 30.9
7 A-B 0.00 20.50 Concrete 0.4 2.18 631.3 106.85 26.98 26.98 50 25 Conc. 0.013 0.125 5 20.50 0.002 OK! 0.860 OK! 387.01 0.07 OK! 25 50 50 50 53
D-E 3.34 15.40 Concrete 0.4 1.75 731.2 49.05 14.35 17.68 50 25 Conc. 0.013 0.125 4 15.40 0.002 OK! 0.860 OK! 387.01 0.05 OK! 25 50 53 50 54
G-H 6.68 7.10 Concrete 0.4 0.97 1088.1 59.97 26.10 32.78 50 25 Conc. 0.013 0.125 2 7.10 0.002 OK! 0.860 OK! 387.01 0.08 OK! 25 50 54 50 56
I-J 62.09 15.44 Concrete 0.4 1.76 730.2 49.71 14.52 76.61 50 25 Conc. 0.013 0.125 4 15.44 0.002 OK! 0.860 OK! 387.01 0.20 OK! 25 50 56 50 58
K-L 9.54 4.72 Concrete 0.4 0.70 1342.5 26.66 14.32 23.85 50 25 Conc. 0.013 0.125 1 4.72 0.002 OK! 0.860 OK! 387.01 0.06 OK! 25 50 58 50 59
N-O 8.62 11.45 Concrete 0.4 1.39 851.4 9.40 3.20 11.82 50 25 Conc. 0.013 0.125 3 11.45 0.002 OK! 0.860 OK! 387.01 0.03 OK! 25 50 50 50 53
PERHITUNGAN PLAT TUTUP SALURAN U-DITCH
Ultimate moment,
Mu = 1,2M1 + 1,6M2 = 12.03612 kN.m
Reinforcement design :
fc' = 29.05 Mpa
fy = 373.5 Mpa
b= 1200 mm
t= 100 mm
concrete cover = 20 mm
d = t - cover = 73.5 mm
Mu = 12.0361 kN.m
Mu
Rn = Rn = 2.06295 Mpa
0,9 x b x d2
ρ= 0.58 %
ρmax = 2.60 %
Asreq = ρ*b*d
Asreq = 50940.495
Rebar diameter, dr = 13 mm
Rebar section area, Ar = 79 mm2
Spacing, s= 200 mm
Vc = 0,2√fc*b*d Vc = 95076.16 N
= 95.07616 > Vu
….OK