-1.5
-3
-4.5
-6
-7.5
-9
Depth (m)
-10.5
-12
-13.5
-15
-16.5
-18
-19.5
-21
Qall (ton)
PILE AXIAL CAPACITY BH-2
Shape = Square Cu = 6 Nspt - (kPa) for CH or CL
Dimension = 0.3 m 2.5 Nspt - (kPa) for SC, ML, or MH
Perimeter = 1.20 m 2 Nspt - (kPa) for Clayshale (only for bore pile)
10D = 3m qs = α*Cu for clay
4D = 1.2 m = 0,1*N-SPT for sand with small displacement (t/m 2)
Area = 0.09 m2 = 0,2*N-SPT for sand with large displacement and bore pile (t/m 2)
Type = Driven qp = 9*Cu for clay
Interval = 1.5 m = 40*N-SPTavg < 1600 for sand - driven pile (t/m2)
= 7*N-SPTavg < 400 for sand - bore pile (t/m2)
-1.5
-3
-4.5
-6
Depth (m)
-7.5
-9
-10.5
-12
-13.5
-15
-16.5
Qall (ton)
PILE AXIAL CAPACITY BH-3
Shape = Square Cu = 6 Nspt - (kPa) for CH or CL
Dimension = 0.3 m 2.5 Nspt - (kPa) for SC, ML, or MH
Perimeter = 1.20 m 2 Nspt - (kPa) for Clayshale (only for bore pile)
10D = 3m qs = α*Cu for clay
4D = 1.2 m = 0,1*N-SPT for sand with small displacement (t/m2)
Area = 0.09 m2 = 0,2*N-SPT for sand with large displacement and bore pile (t/m2)
Type = Driven qp = 9*Cu for clay
Interval = 1.5 m = 40*N-SPTavg < 1600 for sand - driven pile (t/m2)
= 7*N-SPTavg < 400 for sand - bore pile (t/m2)
-1.5
-3
-4.5
-6
Depth (m)
-7.5
-9
-10.5
-12
-13.5
-15
-16.5
Qall (ton)
PILE FOUNDATION
Capacity of Pile
Concrete Spesification K- 600 kg/cm2
fc' = 52 Mpa
Diameter of Pile Dp = 400 mm
Area of Pile Ap = 0.25 * π * Dp2
= 125663.706 mm2 0.12566371
Moment Inertia Pile Ip = (1/64) * π * Dp4
= 0.00125664 m4
Modulus Section Pile Sxyp = Ip ÷ (0.5 * Dp)
0.0063 m3
Length of Pile Lp = 14 m
Safety Factor SF = 2.5
Horizontal Capacity
Poison Ratio μ= 0.2
Young's Modulus Es = 9000 kN/m2
Value take
nh = 1000 kN/m3
2.11768753 m
Qu = 39
cu * Dp2
cu = 17 kN/m2
Dp = 0.40 m
Efficientcy Factor
Ɵ = tan-1(Dp ÷ s)
= 18.4349488
Efficienty factor
= 0.89758362
Resume
By the calculation Bearing Capacity among each method, take the lowest value for Bearing Capacity Allowable Design
Allowable Ultimate
Compressed Pile Capacity Qcall = 1053 kN 268.794 kN
Tension Pile Capacity Qtall = 343 kN 46.107 kN
Horizontal Pile Capacity Qhall = 40.3266368 kN 53.7554068 kN
* Ultimate = Allowable x 1.33
LOADING DATA
Self Weight
Mat Foundation Wf = (L x B x t) x ɣc
= 2371.2 kg
Pedestal Wped = (Lped x Bped x Hped) x ɣs
= 11856 kg
Tie Beam Wtb = (Ltb x Btb x ttb) x ɣc
= 0 kg
Permanent Load
TABLE: Joint Reactions - Permanent Load
Joint OutputCase Length x y Hx Hy Vz Mx My
Text Text m m m KN KN KN KN-m KN-m
1 1.2DL-1.3WLA+0.5LL3.25 0 -0.5 3.821 0.012 63.606 -31.764 -12.41825
3 1.2DL-1.3WLA+0.5LL3.25 0 0.5 3.462 -0.009412 17.021 8.479911 -11.2515
TOTAL 7.283 0.002588 80.627 -23.284089 -23.66975
Total distance Ʃx = 0 m2
Ʃy = 0.72 m2
Total Pile n= 2
〖𝑄𝑢〗 _𝑖=𝑉𝑧/𝑛+(𝑀𝑥.𝑦𝑝)/Σ𝑦𝑝+(𝑀𝑦.𝑥𝑝)/Σ𝑥𝑝
Qu Qcall Qtall Qu Qcall Qtall
Pile Status Pile Status
(kN) (kN) (kN) (kN) (kN) (kN)
QuI = 130.85291 269 46 OK QuII = 92.046093 269 46 OK
Check Capacity
Qhall max(Hx,Hy)
53.755407 > 3.6415 OK
Dp = 400 mm
d= 590.5 mm
fc' = 52 MPa
Ø= 0.75
bo = [π x (Dp+d)] x d
= 1836555.39 mm2
Check ØVn Vu
0.90138782 > 0.07124909 OK
0.0003255208333
3.2552083333333
10910
44.94263305
REKAPITULASI PERHITUNGAN TIANG PANCANG
Depth (m)
-18 110 62 2378
-15 -15 -20 126 72 2787
-22 143 82 3197
-24 159 93 3606
-20 -20 -26 175 103 4016
-28 192 114 4426
-30 208 124 4835
-25 -25
-32 225 135 5245
-34 241 145 5654
-36 257 155 6064
-30 -30
-38 274 166 6474
Qall (ton) Qall (ton) -40 290 176 6883
Axial Capacity BH1 Axial Capacity BH2 Uplift Capacity BH1 Uplift Capacity BH2
Axial Capacity BH3 Uplift Capacity BH3
Qwp Qws
0 0 0
20 29 12
48 50 20
80 63 25
192 226 90
328 275 110
460 264 106
623 330 132
787 330 132
951 330 132
1115 330 132
1279 330 132
1443 330 132
1606 330 132
1770 330 132
1934 330 132
2098 330 132
2262 330 132
2426 330 132
2589 330 132
2753 330 132
Perhitungan Daya Dukung Tiang Berdasarkan NSPT
Iws = 3.917
Skin resistance settlement = se3 = 0.000 m
= 0.241 mm
Depth (m)
-24 CH 60 CH 60 CH 60 60.0
-26 CH 60 CH 60 CH 60 60.0 -15
-28 CH 60 CH 60 CH 60 60.0 60
-30 CH 60 CH 60 CH 60 60.0
-32 CH 60 CH 60 CH 60 60.0
-20
-34 CH 60 CH 60 CH 60 60.0
-36 CH 60 CH 60 CH 60 60.0
-38 CH 60 CH 60 CH 60 60.0
-40 CH 60 CH 60 CH 60 60.0 -25
-30
N-SPT
Depth (m)
-16.5 CH 30 CH 45 CH 41 38.7
-18 CH 27 CH 57 CH 36 40.0 -15
-19.5 CH 25 CH 60 CH 43 42.7
43
-21 CH 28 CH 60 CH 60 49.3
-22.5 CH 33 CH 56 CH 60 49.7
-24 CH 30 CH 60 CH 60 50.0 -20
Silty Clay (CH) -
-25.5 CH 38 CH 60 CH 60 52.7 Hard
-27 CH 60 CH 50 CH 41 50.3
-28.5 CH 25 CH 44 CH 44 37.7
-25
-30 CH 32 CH 40 CH 31 34.3
0 14
-5 14 -30
-5 30
-10 30 N-SPT
-10 43
-30 43 BH-1 BH-2 BH-3 N-SPT Design
Dia. Tiang 0.3 m
Jarak Antar Tiang 0.9 m
P 30.7 ton
Wpc 4.7 ton
V P + Wpc
35.4 ton
Mx 1.1 tm
My -32.1 tm
`
Reaksi
Pile
-8.4
-9.6 FX FY FZ MX MY MZ
26.1
27.3 tonf tonf tonf tonf-m tonf-m tonf-m
3,1672 0,5196 14,5334 -0,5147 12,6493 0,00001955
6,5705 0,7903 25,4253 -0,6795 25,752 0,00001958
6,173 0,6987 24,2136 -0,7699 23,1346 0,00001713
6,0857 0,3891 22,7282 -0,358 22,1135 0,000003856
5,497 0,3589 16,413 -0,2648 20,6098 -0,000006168
5,1989 0,2902 15,5043 -0,3327 18,6468 -0,000008006
4,8449 0,6498 28,9523 -0,5405 17,8358 0,00002359
2.333333
750
25
30
Dia. Tiang 0.3 m
Jarak Antar Tiang 0.9 m
P 49.12 ton
Wpc 7.5 ton
V P + Wpc
56.6 ton
Mx 1.8 tm
My -51.4 tm
2.333333
750
25
30
Perhitungan Penulangan Pile Cap
Gaya Tarik
As pasang*fy Ts = 1548066.90394617 N
Gaya Tekan
a = 143.97 mm
Cc = 1548066.90 N
c = 169.38 mm
Regangan netto Ɛt = 0.0060
Regangan baja Ɛy = 0.0021
Faktor reduksi Ф = 0.9
Kapasitas momen terfaktor ФMn = 604693921.710464 Nmm
= 604.69 kNm
Perhitungan Penulangan Pile Cap
Gaya Tarik
As pasang*fy Ts = 1548066.90394617 N
Gaya Tekan
a = 143.97 mm
Cc = 1548066.90 N
c = 169.38 mm
Regangan netto Ɛt = 0.0060
Regangan baja Ɛy = 0.0021
Faktor reduksi Ф = 0.9
Kapasitas momen terfaktor ФMn = 604693921.710464 Nmm
= 604.69 kNm
Efisiensi Metode Converse-Labarre
Diameter pondasi d = 30 cm
= 0.3 m
Jarak antar tiang s = 90 cm
Arc tan (d/s) dalam derajat Φ = 18.43495
Jumlah baris tiang n1 = 2
Jumlah tiang tiap baris n2 = 2
Efisiensi Eff = 0.795