Professional Documents
Culture Documents
QGTL1 Pro 07 00007 001 - 08
QGTL1 Pro 07 00007 001 - 08
TYPICAL PUMP CONFIGURATIONS MINIMUM FLOW BY-PASS CONFIGURATIONS 1. USE RO ONLY >100 DEG C OR HIGH VISCOSITY.
tten
50 50
or wri
3. CASING DRAIN TO FLARE SYSTEM 20 21 FOR MATERIALS
AT OR NEAR AUTO IGNITION, BUTANE FRACTIONS OR LETHAL
th the pri
49 49
VAPOURS. WAX GOES TO GRADE BLIND FLANGE.
ed or wi
5. INDIVIDUAL PUMP SPILL BACK REQUIRED IF AN RO IS USED.
i
47 47
t was suppl
3/4" 3/4" 6. FOR CLARITY, LINES TO UTILITES (O8,09 & 13) DO NOT NEED
TO BE SHOWN ON P&IDs. EPC CONTRACTOR TO DEVELOP DETAILED
46 46 PUMP HOOK-UP DRWGS, BASED ON THESE AS A GIUDE.
FV
ch i
RO RO 7. THIS CAN ALSO BE USED AS A COMMON BYPASS i.e. ONE
XXXX
41 41
n accordance wi
3/4" 3/4" FIC FT
40 40
XXXX XXXX
39 39
TS
38 38
M M
MINIMUM FLOW BYPASS >100KW NO SPARE REMOTE LARGE/TOXIC INVENTORY (NOTE 8)
37 37
3/4" 3/4"
36 36
e or i
n whol
35 35
3/4" 3/4"
shed i
3/4" 3/4"
34 3/4" 3/4" 3/4" 3/4" 34
lnot be furni
33 33
on shal
08 09 SPEC 08 09 SPEC
32 32
COOLING WATER COOLING WATER BREAK COOLING WATER COOLING WATER BREAK
nform ati
SUPPLY RETURN SUPPLY RETURN FV
31 31
XXXX
s i
NOTE 3 NOTE 3
on.Thi
30 NO 30
cati
12 12
i
ntended for publ
29 29
TO OILY SEWER TO OILY SEWER
OR CLOSE DRAIN OR CLOSE DRAIN SPEC.
28 28
BRK.
s not i
27 27
.
or express approval
25 25
MI
ORYX GTL LI
24 24
i
ng to or l
MI
21 21
on bel
3/4"
nform ati
19 19
on thereof requi
RO
ali
18 XXXX 18
denti
ns confi
NOTE 1
on or adaptati
17 RO 17
ng contai
16 BYPASS 16
CONNECTION NO
ghts reserved.Thi
XXXX
SPEC.
14 14
BRK.
3/4"
REFERENCE DRAWINGS
13 13
alproperty ri
P&ID SYMBOLOGY QGTL1-PRO-07-00001 TO 00007
12 12
MI
3/4"
ndustri
TS
11 11
M
3/4"
lother i
08 21/11/16 AS BUILT ( WO-02 ) AH RG RRR
10 10
ght,patents,and al
07 30/04/07 AS BUILT CARINCI LIPPI CORSI/BULLETTI
ng i
04 31/01/05 REVISED AS SHOWN
s drawi
CAPOZZA LIPPI DI CINTIO/GRANO
8 8
3/4"
REV. DATE DESCRIPTION PREPARED CHECKED APPR/AUTH
censor.Copyri
n thi
3/4"
7 3/4" 3/4" 7
ght i
lbe returned upon request.The copyri
6 6
S Li
TED (Q.S.C.) (ORYX) or ORYX'
08 09 SPEC
5 5
COOLING WATER COOLING WATER BREAK
SUPPLY RETURN
4 4
NOTE 3 NO
P&ID SYMBOLOGY
MI
consent of ORYX GTL LI
PUMP EXAMPLES
TECHNIP DRAWING NO. SHEET NO. REV.
ng i
2158-00-PID-0021-007
s drawi
ORYX DRAWING NO.
001 of 001 08
Thi
QGTL1-PRO-07-00007
00-03PI00-IFC
TECHNIP ITALY S.p.A. - 00148 ROMA - Viale Castello della Magliana, 68