AIMS

Generic Performance Standard

PASSIVE FIRE & EXPLOSION PROTECTION

ORIGINATOR:

ESR/OSD
ADCO DOCUMENT No. 30.99.09.0204 Page 1 of 9

AIMS TASK No. 5.1.3 PROJECT No. AIMS REV. 0 DATE: 12.11.2007
REVISION RECORD

REV. DATE ORIGINATOR AUTHORISED REVIEWED APPROVED DESCRIPTION

0 12.11.2007 R Bailey J Krol Core Team ISM Issued for Implementation

DOCUMENT TITLE: ADCO DOCUMENT No.


AIMS: Generic Performance Standard – Passive Fire & Explosion 30.99.09.0204
Protection
Page 2 of 9
PROJECT No. AIMS REV. 0 DATE: 12.11.2007
1 INTRODUCTION
The following document is a generic example of a performance standard Passive Fire
Protection Systems and Explosion Protection Systems.

A specific performance standard is required for Passive Fire Protection Systems and
Explosion Protection Systems that has been captured as being a HSE Critical
Equipment and System or Business Critical Equipment and System (HSE&B-CES)
and these should follow the same format as that shown here.

In the example given, examples of the various aspects to be considered are given. In
practice, the text should be modified to reflect the actual intent for the specific
Passive Fire Protection Systems and Explosion Protection Systems under
consideration.

Similar performance standards for other equipment types have been developed as a
part of the AIMS project, and these follow the same general principles as those
developed for Passive Fire Protection Systems and Explosion Protection Systems.

In the template, the sections to be filled in by the user are shown with GREEN text
indicating the format of the data to be entered.

2 OBJECTIVE
This document is a check-list that will establish a common basis between EMPD,
IMD, and Field Operations on what needs to be done to assure the integrity of the
Asset over the life-cycle. It may also be used by a third party to assess the Asset
integrity at any stage within this life-cycle. It is not, however, a replacement for either
Engineering Standards or for Project Engineering Specifications.

In essence, the Performance Standard is an assurance document intended to


demonstrate that the specific item (equipment) or system is:
• suitable for its intended function and, when verified as being suitable:
− is kept in good condition (i.e. maintained in such a condition as to be able to
function as intended).

DOCUMENT TITLE: ADCO DOCUMENT No.


AIMS: Generic Performance Standard – Passive Fire & Explosion 30.99.09.0204
Protection
Page 3 of 9
PROJECT No. AIMS REV. 0 DATE: 12.11.2007
Asset System : Passive Fire and Explosion Protection Generic Performance Standard No. 30.99.09.0204

Title Asset Holder to Insert Equipment/Unit Name


Reference XXX.XXXX.XX Rev X Criticality Rating Rating
Tag number XXXXXXXXXX HSE&B-CES Y/N
EQUIPMENT IDENTIFICATION
FUNCTION

HAZARD IDENTIFICATION
Identification of principal hazards being protected.

APPLICABLE STANDARDS
STANDARDS USED

Document Ref Title Revision

DEVIATIONS

Detail any deviations from design standards/codes.

APPROVALS
Name Date Signature
Prepared by Name Date Signature
Checked by Name Date Signature
Approved by Name Date Signature

DOCUMENT TITLE: ADCO DOCUMENT No.


AIMS: Generic Performance Standard – Passive Fire & Explosion 30.99.09.0204
Protection
Page 4 of 9
PROJECT No. AIMS REV. 0 DATE: 12.11.2007
Asset System : Passive Fire & Explosion Protection Generic Performance Standard No. 30.99.09.0204

Title Reference XXX.XXXX.XX Rev X


Asset Holder to Insert Equipment/Unit Name
REVISION STATUS
Rev. No. Date issued Reason for Revision
a 13/07/06 First issue
b 20/07/06 Revised to agree with Generic Performance Standard Template Rev c.
c 29/06/07 Draft issued for comment by Project Champions
d 07/11/07 No comments received from Project Champions. Document moved to ‘Ready for
Issue’.

DOCUMENT TITLE: ADCO DOCUMENT No.


AIMS: Generic Performance Standard – Passive Fire & Explosion 30.99.09.0204
Protection
Page 5 of 9
PROJECT No. AIMS REV. 0 DATE: 12.11.2007
Asset System : Passive Fire & Explosion Protection Generic Performance Standard No. 30.99.09.0204

Title Asset Holder to Insert Equipment/Unit Name Reference XXX.XXXX.XX Rev X


REFERENCE DOCUMENTS
Ref Title Document Ref Rev
1 Project Definition Report (PDR) XXXXXX X
2 Project Identification Document (PID) XXXXXX X
3 Terms of Reference for Engineering (TOR) XXXXXX X
4 Project Execution Plan (PEP) XXXXXX X
5 Health Safety and Environmental Impact Analysis (HSEIA) XXXXXX X
6 HAZOP Study Report XXXXXX X
7 Risk Assessment (QRA) XXXXXX X
8 HSE Plan XXXXXX X
9 Design Fabrication and Installation Resume (DFI) XXXXXX X
10 SIL Assessment XXXXXX X
11 Design Calculations XXXXXX X
12 Master Drawing List number XXXXXX X
13 PFD XXXXXX X
14 P&ID XXXXXX X
15 Procurement Specifications XXXXXX X
16 Data Sheets XXXXXX X
17 Factory Acceptance Test (FAT) Report XXXXXX X
18 Performance Test results XXXXXX X
19 Commissioning Plans XXXXXX X
20 PSHER Reports XXXXXX X
21 Documents for Operation (DFO) XXXXXX X
22 Operation Manual XXXXXX X
23 Maintenance strategy document XXXXXX X
24 Maintenance Manual XXXXXX X
25 Training Manual XXXXXX X
26 Fitness for Service assessment XXXXXX X
27 Fluid Characteristic Test Report XXXXXX X
28 Corrosion Risk Assessment (CRA) XXXXXX X
29 RBI Assessment XXXXXX X
30 Inspection and Function Test Plans XXXXXX X
31 Maintenance Plans XXXXXX X

DOCUMENT TITLE: ADCO DOCUMENT No.


AIMS: Generic Performance Standard – Passive Fire & Explosion 30.99.09.0204
Protection
Page 6 of 9
PROJECT No. AIMS REV. 0 DATE: 12.11.2007
Asset System : Passive Fire & Explosion Protection Generic Performance Standard No. 30.99.09.0204

Title Asset Holder to Insert Equipment/Unit Name Reference XXX.XXXX.XX Rev X


CHANGE REGISTER
MOC Ref Description Status Date of
Completion
Brief description of changes requested and reasons.

Rejected /
XXX.XXX dd/mm/yyy
Accepted

DOCUMENT TITLE: ADCO DOCUMENT No.


AIMS: Generic Performance Standard – Passive Fire & Explosion 30.99.09.0204
Protection
Page 7 of 9
PROJECT No. AIMS REV. 0 DATE: 12.11.2007
Asset System : Passive Fire and Explosion Protection (PF&EP) Generic Performance Standard No. 30.99.09.0204

Title Asset Holder to Insert Equipment/Unit Name Reference XXX.XXXX.XX Rev X


ASSURANCE CHECKLIST
Ref Assurance Acceptance Criteria Done Accepted Remarks
CONCEPT
1 PF&EP function and design basis are clearly a) Project Definition Report (PDR – basis of design) including
defined. preliminary Fire and Explosion Risk Assessment (FERA)
produced
b) Performance criteria (HSE Philosophy) defined
2 HSE implications of PF&EP have been considered. a) Preliminary HSEIA report produced
b) PHSER-1 report produced
c) Criticality assessment report produced
DESIGN
3 The extent of PF&EP a) Preliminary FERA updated to FEED.
b) FERA identifies the overpressures to which buildings,
structures and equipment will be subjected.
c) FERA identifies the fire intensities and durations to which
buildings, structures and equipment will be subjected.
5 Inspection and repair philosophy of PF&EP defined a) Inspection plans produced
b) Repair methods defined
6 Design review carried out. a) Lessons learnt in ADCO, if any, incorporated
b) Constructability review carried out
c) Inspectability / maintainability review carried out
d) PHSER-III completed and actions closed-out
e) HSEIA reviewed and updated as necessary
PROCUREMENT / FABRICATION / INSTALLATION
8 PF&EP materials are procured in accordance with a) QA/QC requirements defined
ADCO procedures.
9 PF&EP materials are applied in accordance with a) Appropriate Contractor selected (ADCO approved or newly
ADCO procedures to all required buildings, qualified by ADCO)
structures and equipment. b) QA / QC processes applied and results acceptable
c) Material certification provided and accepted
d) Any deviations to specifications approved and recorded

DOCUMENT TITLE: ADCO DOCUMENT No.


AIMS: Generic Performance Standard – Passive Fire and Explosion Protection 30.99.09.0204

Page 8 of 9
PROJECT No. AIMS REV.0 DATE: 12.11.2007
Asset System : Passive Fire and Explosion Protection (PF&EP) Generic Performance Standard No. 30.99.09.0204

Title Asset Holder to Insert Equipment/Unit Name Reference XXX.XXXX.XX Rev X


ASSURANCE CHECKLIST
Ref Assurance Acceptance Criteria Done Accepted Remarks
e) Application in accordance with relevant Shell DEPs (eg.
80.47.10.30-Gen/34.19.20.11-Gen/34 17.10.30-Gen)
f) Field inspection in accordance with [HOLD]
g) Completion Certificate issued
h) PHSER-IV completed and actions closed-out
i) Post project review
10 Documentation required for integrity management a) Vendor drawings and material specifications provided
prepared / supplied a) DFI / DFO documents produced
b) Inspection plans entered into 3MS (Maximo)
COMMISSIONING
11 PF& EP certified for service a) All punch-list actions satisfactorily closed-out
OPERATION
12 PF& EP materials are inspected to verify a) Inspection plans complete and up-to-date
acceptable integrity condition. b) Appropriate data / reports held in Maximo
c) Identified anomalies registered, assessed, and
satisfactorily addressed
d) Any necessary changes to inspection plans approved and
communicated to all concerned parties
ABANDONMENT
13 PF& EPmaterials disposed of in a safe and a) Decommissioning / disposal carried out by suitably
environmentally sympathetic manner at the end of qualified and experienced personnel.
life. b) Decommissioning / disposal carried out in accordance with
approved plans.
c) Affected drawings (plot plans etc) are modified to reflect
removal of secondary containment.

DOCUMENT TITLE: ADCO DOCUMENT No.


AIMS: Generic Performance Standard – Passive Fire and Explosion Protection 30.99.09.0204

Page 9 of 9
PROJECT No. AIMS REV.0 DATE: 12.11.2007