You are on page 1of 6

中国港湾(新加坡)工程有限公司

China Harbour (Singapore) Engineering Company Pte Ltd


(ISO 9001:2015, ISO 14001:2015, ISO 45001:2018) Co. Reg No.: 198600104W
Document No.

CONTRACT NO. AND NAME Revision

Document Title:
Method Statement
For
Earthworks

Document No:
CHEC / / / /
Issuer Project Type Sequential Revision
Code Document No. Index

* Delete where appropriate

Prepared by: Reviewed by: Approved by:


Name To be appointed To be appointed To be appointed* To be appointed
Engineering Manager* /
Position Site Engineer Construction Manager Project Manager
Design Manager*

Signature

Date:
Contract No. XXX
XXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXxxxx

SECTION CONTENTS PAGE

1.0 Purpose of Method Statement

2.0 Scope of Method Statement

3.0 References

4.0 Definitions

5.0 Responsibilities

6.0 Resources

6.1 Materials

6.2 Equipments

7.0 Detailed Method of Carrying Out This Method Statement

8.0 Inspection and Testing Requirements

9.0 Safety Risks Assessment

10.0 Environmental Impact Assessment

11.0 Records

12.0 Appendices

Method Statement Page 1 of 4


Rev. A, DD/MM/YY
Contract No. XXX
XXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXxxxx

REVISION HISTORY

REV REV DATE DESCRIPTION OF CHANGES

A First issue

NOTE:

Revision A denotes the First Issue of the Method Statement. Any revision made further to this
document will be updated alphabetically.

Method Statement Page 2 of 4


Rev. A, DD/MM/YY
Contract No. XXX
XXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXxxxx

1.0 PURPOSE OF METHOD STATEMENT

(Identify the purpose of this method statement e.g. The purpose of this method statement is to
provide a detailed guide on the steps to taken and processes to be followed to ensure that
concreting works are carried out in a systematic and efficient manner)

2.0 SCOPE OF METHOD STATEMENT

(Identify the scope of this method statement and defined the area or section or location by
which this activity is applicable e.g. This method statement is applicable to all water supply
pipeworks to be laid in external areas excluding those pipeworks installed inside building
structures, chambers, manholes, etc)

3.0 REFERENCES

(List of documents to be referenced or used in the preparation of this method statement


including but not limited to ISO Standards, British Standards, Codes of Practice,
Specifications, Drawings, etc)

4.0 DEFINITIONS

(List of definitions of terms used in this method statement e.g. GS denotes General
Specifications, PS denotes Particular Specifications, BS denotes British Standards, HyD
denotes Highways Departments, SO denotes Supervising Officer, ASTM denotes American
Society for Testing and Material, ITPs denotes Inspection and Test Plans, etc.)

5.0 RESPONSIBILITIES

(Identify the relevant project staffs responsible for ensuring that the works described in this
method statement are carried out in a satisfactory manner)

6.0 RESOURCES TO BE USED FOR THE WORKS

6.1 Materials

(List the materials and approximate quantity to be used for the Works e.g. concrete, rebar,
concrete pipes, admixtures, etc)

6.2 Plant and Equipments

(List the plant / equipments and approximate number to be used for the Works e.g. backhoes,
rollers, dump trucks, drilling equipments, grout mixer, air compressor, etc)

7.0 DETAILED METHOD OF CARRYING OUT THIS METHOD STATEMENT

(Described the detailed step-by-step method by which this Works are carried out to ensure a
satisfactory completion of the Works)

8.0 INSPECTION AND TESTING REQUIREMENTS

Method Statement Page 3 of 4


Rev. A, DD/MM/YY
Contract No. XXX
XXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXxxxx
(Define the quality inspection and testing requirements applicable for the Works including
the submission requirements, works process requirements and testing requirements to ensure
compliance of the contract specifications and Quality Plan. If ITP for this Works is available
from the Quality Manager, please attached as an appendix)

9.0 SAFETY RISK ASSESSMENT

(Define the safety risk assessment applicable for the Works to ensure compliance of the
contract specifications and the Safety Plan. If the Risk Assessment for this Works is available
from the Safety Manager, please attached as an appendix)

10.0 ENVIRONMENTAL IMPACT ASSESSMENT

(Define the environmental impact assessment applicable for the Works to ensure compliance
of the contract specifications and the Environmental Plan. If the Impact Assessment for this
Works is available from the Environmental Manager, please attached as an appendix)

11.0 RECORDS

(List of records to be maintained to confirm satisfactory completion of this method statement)

12.0 APPENDICES

(List all appendices that this method statement will include

Method Statement Page 4 of 4


Rev. A, DD/MM/YY
Contract No. XXX
XXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXxxxx

You might also like