Document Title:
Method Statement
For
Earthworks
Document No:
CHEC / / / /
Issuer Project Type Sequential Revision
Code Document No. Index
Signature
Date:
Contract No. XXX
XXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXxxxx
3.0 References
4.0 Definitions
5.0 Responsibilities
6.0 Resources
6.1 Materials
6.2 Equipments
11.0 Records
12.0 Appendices
REVISION HISTORY
A First issue
NOTE:
Revision A denotes the First Issue of the Method Statement. Any revision made further to this
document will be updated alphabetically.
(Identify the purpose of this method statement e.g. The purpose of this method statement is to
provide a detailed guide on the steps to taken and processes to be followed to ensure that
concreting works are carried out in a systematic and efficient manner)
(Identify the scope of this method statement and defined the area or section or location by
which this activity is applicable e.g. This method statement is applicable to all water supply
pipeworks to be laid in external areas excluding those pipeworks installed inside building
structures, chambers, manholes, etc)
3.0 REFERENCES
4.0 DEFINITIONS
(List of definitions of terms used in this method statement e.g. GS denotes General
Specifications, PS denotes Particular Specifications, BS denotes British Standards, HyD
denotes Highways Departments, SO denotes Supervising Officer, ASTM denotes American
Society for Testing and Material, ITPs denotes Inspection and Test Plans, etc.)
5.0 RESPONSIBILITIES
(Identify the relevant project staffs responsible for ensuring that the works described in this
method statement are carried out in a satisfactory manner)
6.1 Materials
(List the materials and approximate quantity to be used for the Works e.g. concrete, rebar,
concrete pipes, admixtures, etc)
(List the plant / equipments and approximate number to be used for the Works e.g. backhoes,
rollers, dump trucks, drilling equipments, grout mixer, air compressor, etc)
(Described the detailed step-by-step method by which this Works are carried out to ensure a
satisfactory completion of the Works)
(Define the safety risk assessment applicable for the Works to ensure compliance of the
contract specifications and the Safety Plan. If the Risk Assessment for this Works is available
from the Safety Manager, please attached as an appendix)
(Define the environmental impact assessment applicable for the Works to ensure compliance
of the contract specifications and the Environmental Plan. If the Impact Assessment for this
Works is available from the Environmental Manager, please attached as an appendix)
11.0 RECORDS
12.0 APPENDICES