PROFESSIONAL PERFORMANCE - ANNUAL PLANNING (2019 - 2020)
Quality Assurance and Control at MEP project sites KRA 1 Impact : High %Approval of the documents (MS, ITP and Checklist). Goal 1 % Completion of WIR against the installation. % Completion of MIR against the material receipt. Action Plan : Action Plan Expected Completion Date : Performance Indicator Required Resources Number of external NCR and its closure Number of Internal NCR and closure. Goal 2 Trainings to contractors and supervisor to improve the workmanship. Contractor evaluation. Action Plan : Action Plan Expected Completion Date : Performance Indicator Required Resources Cost optimization, Value engineering and process development at site KRA 2 Impact : Medium Goal 1 Cost saving by engineering change, Process modification or resource optimization. Action Plan : Action Plan Expected Completion Date : Performance Indicator Required Resources Goal 2 Action Plan : Action Plan Expected Completion Date : Performance Indicator Required Resources IMS and OHS KRA 3 Impact : Medium Implementation of quality IMS Documentation at site. Goal 1 Trackers and documents are updated and in line with the execution. Action Plan : Action Plan Expected Completion Date : Performance Indicator Required Resources Kaizens and Improvement KRA 4 Impact : Medium Goal 1 Need to drive the Kaizens at site, Weekly meeting for the kaizens. Individual and site Kaizens points need to achieve annual targets. Level 1 Kaizens and Level2 Kaizens inline with work activity at site. Action Plan : Action Plan Expected Completion Date : Performance Indicator Required Resources Goal 2 Action Plan : Action Plan Expected Completion Date : Performance Indicator Required Resources
L : AMIT RAJPUT L+1 : DESAI SHIVAJI VASANTRAO Division:E&E