PROFESSIONAL PERFORMANCE - ANNUAL PLANNING (2019 - 2020)


Quality Assurance and Control at MEP project sites
KRA 1
Impact : High
%Approval of the documents (MS, ITP and Checklist).
Goal 1 % Completion of WIR against the installation.
% Completion of MIR against the material receipt.
Action Plan :
Action Plan
Expected Completion Date :
Performance Indicator
Required Resources
Number of external NCR and its closure
Number of Internal NCR and closure.
Goal 2
Trainings to contractors and supervisor to improve the workmanship.
Contractor evaluation.
Action Plan :
Action Plan
Expected Completion Date :
Performance Indicator
Required Resources
Cost optimization, Value engineering and process development at site
KRA 2
Impact : Medium
Goal 1 Cost saving by engineering change, Process modification or resource optimization.
Action Plan :
Action Plan
Expected Completion Date :
Performance Indicator
Required Resources
Goal 2
Action Plan :
Action Plan
Expected Completion Date :
Performance Indicator
Required Resources
IMS and OHS
KRA 3
Impact : Medium
Implementation of quality IMS Documentation at site.
Goal 1
Trackers and documents are updated and in line with the execution.
Action Plan :
Action Plan
Expected Completion Date :
Performance Indicator
Required Resources
Kaizens and Improvement
KRA 4
Impact : Medium
Goal 1 Need to drive the Kaizens at site, Weekly meeting for the kaizens.
Individual and site Kaizens points need to achieve annual targets.
Level 1 Kaizens and Level2 Kaizens inline with work activity at site.
Action Plan :
Action Plan
Expected Completion Date :
Performance Indicator
Required Resources
Goal 2
Action Plan :
Action Plan
Expected Completion Date :
Performance Indicator
Required Resources

L : AMIT RAJPUT L+1 : DESAI SHIVAJI VASANTRAO Division:E&E