METHOD
STATEMENT
FOR
INSTALLATION
OF DUCTILE
IRON FLANGE
TYPE JOINT
1
METHOD STATEMENT
Dynamic Jaya Plumbing & Title : Method Statement For Installation Of Ductile Page : of 10
Iron Flange Type Joint
Construction Sdn Bhd
Reference :
TABLE OF CONTENTS
Contents Page
1.0 OBJECTIVE 1
2.0 SCOPE
2
METHOD STATEMENT
Dynamic Jaya Plumbing & Title : Method Statement For Installation Of Ductile Page : of 10
Iron Flange Type Joint
Construction Sdn Bhd
Reference :
1.0 OBJECTIVE
This method statement is to describe the method of which the installation of ductile
iron flange type pipe joint is carried out for this project.
2.0 SCOPES
This procedure applies to project site, which requires to installation work, which is carried
out by the company.
a. Prepare delivery schedule and check site conditions as well as storage capacity.
b. Prior to delivery of Material to site, a site survey and make all necessary co-
ordination with the main contractor as regards to access for the save transportation
of the said material to the designated location.
c. Coordinate with site workers responsible for the system installation.
3
METHOD STATEMENT
Dynamic Jaya Plumbing & Title : Method Statement For Installation Of Ductile Page : of 10
Iron Flange Type Joint.
Construction Sdn Bhd
Reference :
2) Fabricate Pipe
Cut the pipe to the required length. Refer to figure 1.
3) Jointing
Jointing the flange to either valve or pump. (Please refer to the Method
Statement for Valve with Flange End Connection Installation). Refer to figure
2.
4
METHOD STATEMENT
Dynamic Jaya Plumbing & Title : Method Statement For Installation Of Ductile Page : of 10
Iron Flange Type Joint.
Construction Sdn Bhd
Reference :
5
METHOD STATEMENT
Dynamic Jaya Plumbing & Title : Method Statement For Installation Of Ductile Page : of 10
Construction Sdn Bhd Iron Flange Type Joint.
Reference :
2) Positioning
Place the valve between the pipe flanges. Make sure the flange and adjacent
pipe work are clean of dirt. Refer to figure 1.
3) Select Gasket
Select the gasket size according to the valve size and associated pipe size
based on approved shop drawings so that it can match the pipe work flange.
Refer to figure 2.
4) Connecting
Connect the valve with the pipe flange. The pipe flange shall be square with
the associated pipeline. Refer to figure 3.
5) Tightening
When the valve is in proper position, install the bolts into the holes.
Tightening the nuts one by one evenly. Repeat the above steps for the other
joint. Refer to figure 4.
6
METHOD STATEMENT
Title : Method Statement For Installation Of Ductile Page : of 10
Dynamic Jaya Plumbing & Iron Flange Type Joint.
Construction Sdn Bhd
Reference :
7
METHOD STATEMENT
Dynamic Jaya Plumbing & Title : Method Statement for Fire Protection Services Page : of 10
Construction Sdn Bhd Installation
Reference :
2) Marking
Mark the location of the pipe and identify the size of pipe sleeve to be
provided. (Note : The pipe sleeve should be 1 pipe size bigger than the actual
pipe running)
4) Install
Upon approval, the pipe sleeve shall be provided before the concreting.
8
METHOD STATEMENT
Dynamc Jaya Plumbing & Title : Method Statement For Installation Of Ductile Page : of 10
Construction Sdn Bhd Iron Flange Type Joint
Reference :
9
METHOD STATEMENT
Dynamc Jaya Plumbing & Title : Method Statement For Installation Of Ductile Page : of 10
Construction Sdn Bhd Iron Flange Type Joint
Reference :
10