[M1]
FORM 799-1
INPEX Browse Ltd. COMPANY Doc. No.L790-AF-SPC-0001
ICHTHYS ONSHORE LNG FACILITIES (FEED) JKC Doc. No. S-790-1241-102 Rev.B
PROJECT SPECIFICATION FOR FIRE AND GAS DETECTION SYSTEM Sheet No. 2 of 16
Hold List
(1) Delete.
(2) The location of local FGS system cabinets in Administration area
(3) Delete
(4) Delete
(5) The necessity of providing CO2 detector to be confirmed
(6) The spacing of manual call point
(7) Delete
(8) Delete
(9) Delete
(10) Operating pattern of VWD and AWD according to Australian standard
INPEX Browse Ltd. COMPANY Doc. No.L790-AF-SPC-0001
ICHTHYS ONSHORE LNG FACILITIES (FEED) JKC Doc. No. S-790-1241-102 Rev.B
PROJECT SPECIFICATION FOR FIRE AND GAS DETECTION SYSTEM Sheet No. 3 of 16
Contents
1. INTRODUCTION .............................................................................................4
1.1 Scope of Specification .....................................................................................4
1.2 Definition..........................................................................................................4
1.3 Applicable Specification and Standards ...........................................................4
1.4 Abbreviations...................................................................................................5
2. TECHNICAL REQUIREMENTS.......................................................................6
2.1 Overall System Design ....................................................................................6
2.2 Electrical Power Supply Requirements ............................................................8
2.3 Instrumental Requirements ..............................................................................8
2.4 Field Devices ...................................................................................................9
2.5 Indoor Device.................................................................................................14
3. INSTALLATION ............................................................................................15
1. INTRODUCTION
1.2 Definition
y COMPANY : INPEX Browse, Ltd.
y CONTRACTOR : EPC Contractor
y SUBCONTRACTOR : Subcontractor who is under EPC Contractor control in
during the EPC stage.
y MODULE FABRICATOR : Module Fabrication Subcontractor.
y PURCHASER : COMPANY or EPC Contractor. Used for Requisitioning
and Purchasing related work.
y SUPPLIER : Equipment Supplier, i.e. Vendor.
y INSPECTOR : COMPANY/CONTRACTOR/PURCHASER Inspector or
third party Inspector.
The following reference shall be applied to the extent specified herein this specification.
The following applicable Codes and Standards are either highlighted from or in addition to
those listed in L290-AG-LIS-0005 (S-290-1140-007) : REGULATIONS, CODES AND
STANDARDS.
1.4 Abbreviations
The following abbreviations are used in this document:
CCB Central Control Building
CCR Central Control Room
CCTV Closed Circuit Television
CIR Central Instrument Room
EDP Emergency Depressurization
ESD Emergency Shutdown
FGS Fire and Gas System
FAP Fire Alarm Panel
FAT Factory Acceptance Test
INPEX Browse Ltd. COMPANY Doc. No.L790-AF-SPC-0001
ICHTHYS ONSHORE LNG FACILITIES (FEED) JKC Doc. No. S-790-1241-102 Rev.B
PROJECT SPECIFICATION FOR FIRE AND GAS DETECTION SYSTEM Sheet No. 6 of 16
2. TECHNICAL REQUIREMENTS
In this Ichthys LNG Onshore Facilities, the selection of apparatus shall comply with the
following type of protection.
(1) Flame Proof Enclosure (Ex “d”) for Zone 2 and Zone 1 area
(2) Intrinsically Safe (Ex “ia”) for Zone 0 area
Max.
distance
The area to be served
between
the MACs
50 m
Along the periphery road around LNG Train-1/2 area
(HOLD 6)
Along the periphery road around liquid hydrocarbon
100 m
(e.g. condensate, propane, butane) storage tank, Boil
(HOLD 6)
Off Gas area and drainage effluent treatment area
Along the periphery around jetty except for jetty 100 m
header (HOLD 6)
100 m
Along the periphery road around Inlet facilities area
(HOLD 6)
Along the periphery road around Common Utility area 100 m
and Offices (HOLD 6)
For the main pipe rack of process area/utility area, one (1) MACs shall be located at each
edge of main pipe rack for emergency evacuation.
One MAC will be provided at the exit of each Jetty head and at the entrance from the site to
the main jetty trestle.
The MACs shall be designed, installed, and inspected according to AS 1603.5, “Automatic
fire detection and alarm systems Part 5: Manual call point, 1996”.
For executive action of manual initiation device per the area, please refer to Fire and Gas
detection philosophy, L790-AF-PHI-0002 (S-790-1241-002).
INPEX Browse Ltd. COMPANY Doc. No.L790-AF-SPC-0001
ICHTHYS ONSHORE LNG FACILITIES (FEED) JKC Doc. No. S-790-1241-102 Rev.B
PROJECT SPECIFICATION FOR FIRE AND GAS DETECTION SYSTEM Sheet No. 10 of 16
The equipment to be served in the list above are required to be monitored at the minimum.
The equipment to be served are summarized in Consolidated hazardous equipment list,
L790-AF-LIS-0001(S-790-1241-201).
Several flame detectors shall be provided for area monitoring around the equipment
containing flammable liquid or gas. For area coverage of each fire zone, two (2) ~four (4)
MS-IR flame detectors shall be provided in one fire zone. If MS-IR flame detector for the
specified equipment monitoring can be combined with that for area monitoring, it can be used
in common. The number of flame detectors to be provided will be shown in F&G system
layout for each area. The location and number of flame detector will be confirmed by fire and
gas mapping study in EPC stage. If the result of fire and gas mapping study requires
additional detector, detectors shall be added.
For executive action of the detectors per the area, please refer to Fire and Gas detection
philosophy, L790-AF-PHI-0002 (S-790-1241-002).
z Low : 1 LELm
z High : 3 LELm
IR Point type flammable gas detectors shall be provided at least with the equipment as per
the following table to potential leak source, e.g. pump and compressor seals, of
combustible/flammable gas and/or liquid or monitor initial shutdown through FGS:
HP MR compressor (L-601/602-L-004)
MCHE FEED compressor (L-591/592-K-001)
End flash compressor (L-591/592-K-002)
Stabilizer OVHD compressor (L-521/522/523-K-001)
BOG compressor (L-410-K-001 A/B/C)
Propane BOG compressor (L-420-K-001 A/B)
LNG liquid expander (L-591/592-K-003)
MR liquid expander (L-591/592-K-004)
Demethanizer inlet expander (L-581/582-K-001)
Demethanizer recompressor (L-581/582-K-002)
Stabilizer recycle pump (L-521/522/523-P-001)
Deethanizer FEED pump (L-581/582-P-001 A/B)
Propane return pump (L-601/602-P-001/S)
LNG rundown pump (L-591/592-P-001 A/B)
Reinjection pump (L-611/612-P-004 A/B)
Deethanizer reflux pump (L-611/612-P-001 A/B)
Depropanizer reflux pump (L-611/612-P-002 A/B)
Debutanizer reflux pump (L-611/612-P-003 A/B)
The equipment to be served in the list above are required to be monitored at the minimum.
The equipment to be served are summarized in Consolidated hazardous equipment list,
L790-AF-LIS-0001 (S-790-1241-201).
The location and number of gas detector will be confirmed by fire and gas mapping study in
EPC stage. If the result of fire and gas mapping study requires additional detector, detectors
shall be added.
Beam IR type flammable gas detectors shall be provided at least with the area around the
equipment as per the following table:
For executive action of the detectors per the area, please refer to Fire and Gas detection
philosophy, L790-AF-PHI-0002 (S-790-1241-002).
INPEX Browse Ltd. COMPANY Doc. No.L790-AF-SPC-0001
ICHTHYS ONSHORE LNG FACILITIES (FEED) JKC Doc. No. S-790-1241-102 Rev.B
PROJECT SPECIFICATION FOR FIRE AND GAS DETECTION SYSTEM Sheet No. 13 of 16
(HOLD10)
(2) Gas detection alarm (flammable/ H2S) : 1000 Hz, 2 seconds on 2 seconds off
(HOLD10)
(3) Evacuation alarm : 1000 Hz and 800 Hz, Oscillating tone
(HOLD10)
(4) All clear alarm : 1000 Hz, Continuous tone for two minutes
(HOLD10)
2.5.6 Horn
Horns shall be positioned so that audio level be higher than relevant Australian standard
required. Operating tones to distinguish each alarm shall be same as field notification as
section 2.4.7.
INPEX Browse Ltd. COMPANY Doc. No.L790-AF-SPC-0001
ICHTHYS ONSHORE LNG FACILITIES (FEED) JKC Doc. No. S-790-1241-102 Rev.B
PROJECT SPECIFICATION FOR FIRE AND GAS DETECTION SYSTEM Sheet No. 15 of 16
3. INSTALLATION
SUPPLIER shall develop an Inspection and Test Plan and submit to CONTRACTOR for
review and approval.
Factory Acceptance Test (FAT) shall be executed with adequate personnel, test facilities and
test equipment.
Adequate final documentation shall be demonstrating the full requirements of FAT and
obtained results.
FAT procedure shall include at least followings:
- Schedule of the test
- Individual test procedure
INPEX Browse Ltd. COMPANY Doc. No.L790-AF-SPC-0001
ICHTHYS ONSHORE LNG FACILITIES (FEED) JKC Doc. No. S-790-1241-102 Rev.B
PROJECT SPECIFICATION FOR FIRE AND GAS DETECTION SYSTEM Sheet No. 16 of 16
FAT shall also include visual checks on workmanship, insulation test and a compete test to
demonstrate that the system is fully functional by utilising the stimulated signals or real
condition.
Site Acceptance Test (SAT) shall be performed by adequate personnel, test facilities and test
equipment. All SAT results shall be recorded prior the loop test from field.
For test and inspecition of FGS, please refer to specification of Fire and Gas system (FGS) ,
(L290-AJ-SPC-0005) S-290-1371-003.
Ex Certification shall be conducted as follows:
- SUPPLIER shall submit Ex certification of their proposal pressure instruments.
- Marking of Ex certification on the pressure instruments shall be checked visually during
inspection to confirm the coincidence with SUPPLIER’s submitted Ex certification.