PERIODE
NO URAIAN PEKERJAAN Unit Volume BOBOT AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER JANUARI FEBRUARI MARET APRIL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
23 - 29 30 - 05 06 - 12 13 - 19 20 -26 27 - 03 04 - 10 11 - 17 18 - 24 25 - 31 01 - 07 08 - 14 15 - 21 22 - 28 29 - 05 06 - 12 13 - 20 21 - 27 28 - 03 04 - 10 11 - 17 18 - 24 25 - 30 31 - 06 07 - 13 14 - 20 21 - 27 28 - 05 06 - 12 13 - 19 20 - 26 27 - 03 03 - 09 09 - 15 16 - 22
I PRELIMINERIES
1.1 Temporary site office ls 1.00 0.0471 0.0471
1.2 Surveying ls 1.00 0.0471 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010
1.3 Testing material & lab ls 1.00 0.0471 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010
1.4 mob & Demob ls 15.00 0.0707 0.0354 0.0354
1.5 Water for work ls 1.00 0.0189 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004
1.6 Power & lighting for work ls 1.00 0.0283 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006
1.7 Security ls 1.00 0.0283 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006 0.0006
1.8 C.A.R Insurance ls 1.00 0.0943 0.0943
II LAND GRADING
2.1 Land Clearing&stripping
- Area Package 1 m2 232,671.57 1.3164 0.1097 0.1097 0.1097 0.1097 0.1097 0.1097 0.1097 0.1097 0.1097 0.1097 0.1097 0.1097 0.0438814 0.0438814 0.0438814 0.0438814 0.0438814 0.0438814 0.0438814 0.0438814 0.0438814 0.0438814
2.2 Cut & Fill m3 522,774.47 80.8473 2.0212 2.0212 2.0212 2.0212 8.0847 8.0847 8.0847 8.0847 8.0847 8.0847 8.0847 8.0847 2.6949 2.6949 2.6949 2.4254 2.4254 2.4254 2.4254 2.4254 2.4254 2.4254 2.4254 2.4254 2.4254 2.4254 2.4254 2.4254 2.4254 2.4254 2.4254 2.4254 2.4254
- Cut m3 522,774.47
- Fill m3 522,774.47
2.3 Extra Hauling
- extra hauling ke disposal 1 (3592 M) m' 155,000.00 5.6828 0.3552 0.3552 0.7104 0.7104 0.7104 0.7104 0.7104 0.7104 0.1421 0.1421 0.1421 0.1421 0.1421 0.1066 0.1066 0.1066 0.1066 0.1066 0.1066 0.1066 0.1066 0.1066 0.1066 0.1066 0.1066 0.1066 0.1066 0.1066 0.1066 0.1066 0.1066
- extra hauling ke disposal 2 (5711 M) m' 176,652.90 11.7715 0.5886 0.5886 1.1772 1.1772 1.1772 1.1772 1.1772 1.1772 1.1772 1.1772 0.2943 0.2943 0.2943 0.2943 0.3531 0.3531 0.3531 0.3531 0.3531 0.3531 0.3531 0.3531 0.3531 0.3531 0.3531 0.3531 0.3531 0.3531 0.3531 0.3531 0.3531 0.3531
TOTAL 100.0000
PROGRESS MINGUAN 0.0000 0.2965 2.1762 2.4960 3.0846 3.4398 10.0919 10.0919 10.0919 10.0919 10.0919 9.5236 9.5236 9.4139 3.1413 3.1413 2.9992 0.3043 2.9327 2.9327 2.9327 2.9327 2.9327 2.9327 2.9327 2.9327 2.9327 2.9327 2.8889 2.8889 2.8889 2.8889 2.8889 2.8889 2.8889 2.8889
PROGRESS KOMULATIF 0.0000 0.2965 2.4727 4.9688 8.0534 11.4932 21.5851 31.6771 41.7690 51.8609 61.9528 71.4765 81.0001 90.4140 93.5553 96.6965 99.6957 100.0000 44.7017 47.6345 50.5672 53.4999 56.4327 59.3654 62.2982 65.2309 68.1637 71.0964 73.9853 76.8741 79.7630 82.6519 85.5407 88.4296 91.3184 94.2073
AKTUAL 0.0000 0.1482 0.6428 1.6366 2.9788 4.8943 7.0528 9.6926 12.6761 15.9174 19.3592 22.9330 26.6149 30.3821 34.1243 37.8434 41.4040 41.7690
DISETUJUI OLEH
PT. PURADELTA LESTARI
RORI HANDETAN
Project Manager
MEI KET:
23 - 29 30 - 06 07 - 13 14 - 20 20 - 26 27 - 31
100
0.0010 0.0010 0.0010 0.0010 0.0010 0.0010
0.0010 0.0010 0.0010 0.0010 0.0010 0.0010
50
2.4254 2.4254
0.1066 0.1066
0.3531 0.3531 0
DI BUAT OLEH
PT. MULTI CIPTA UTAMA
HUSEN
Project Manager
TIME SCHEDULE
LAND GRADING BLOK AG ZONE A - PHASE II, PACKAGE -4
KOTA DELTAMAS
PERIODE
NO URAIAN PEKERJAAN Unit Volume BOBOT AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER KET:
1 2 3 4 5 6 7 8
Chart
9
Title
10 11 12 13 14 15 16 17
23 - 29 30 - 05 06 - 12 13 - 19 20 -26 27 - 03 04 - 10 11 - 17 18 - 24 25 - 31 01 - 07 08 - 14 15 - 21 22 - 28 29 - 05 06 - 12 13 - 20
I PRELIMINERIES
1.1 Temporary site office ls 1.00 0.0471 0.0471 100
1.2 Surveying ls 1.00 0.0471 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028
1.3 Testing material & lab ls 1.00 0.0471 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028
1.4 mob & Demob ls 15.00 0.0707 0.0354 0.0354
1.5 Water for work ls 1.00 0.0189 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011
1.6 Power & lighting for work ls 1.00 0.0283 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017
1.7 Security ls 1.00 0.0283 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017 0.0017
1.8 C.A.R Insurance ls 1.00 0.0943 0.0943
II LAND GRADING 50
II LAND GRADING
2.1 Land Clearing&stripping
- Area Package 1 m2 232,671.57 600.00 139,602,942.00
2.2 Cut & Fill m3 522,774.47 16,400.00 8,573,501,308.00
- Cut m3 522,774.47 -
- Fill m3 522,774.47 -
2.3 Extra Hauling
- extra hauling ke disposal 1 (3592 M) m' 155,000.00 3,888.00 602,640,000.00
- extra hauling ke disposal 2 (5711 M) m' 176,652.90 7,066.50 1,248,317,717.85
Sub Total 10,564,061,967.85
TOTAL 10,604,561,967.85
PEMBULATAN 10,600,000,000.00
PPN 10% 1,060,000,000.00
GRAND TOTAL 11,660,000,000.00
( TEDDY BUDIMAN. )
Direktur Utama
Bill Of Quantites
PEKERJAAN SHEET PILE BLOK AG (GIIC) - ZONA A PHASE II
KOTA DELTAMAS
II LAND GRADING
2.1 Land Clearing&stripping
- Area Package 2 m2 206,175.69 1,800.00 371,116,242.00
2.2 Cut & Fill m3 837,086.99 16,600.00 13,895,644,034.00
- Cut m3 837,086.99 -
- Fill m3 837,086.99 -
2.3 Extra Hauling
- extra hauling ke disposal 4 (6577 M) m' 729,027.46 10,852.05 7,911,442,447.29
Sub Total 22,178,202,723.29
TOTAL 22,853,202,723.29
PEMBULATAN 22,850,000,000.00
PPN 10% 2,285,000,000.00
GRAND TOTAL 25,135,000,000.00
( TEDDY BUDIMAN. )
Direktur Utama
Bill Of Quantites
LAND GRADING BLOK AG ZONE A - PHASE II, PACKAGE -3
KOTA DELTAMAS
II LAND GRADING
2.1 Land Clearing&stripping
- Area Package 3 m2 265,467.64 1,800.00 477,841,752.00
2.2 Cut & Fill m3 1,164,766.91 16,600.00 19,335,130,706.00
- Cut m3 1,164,766.91 -
- Fill m3 1,164,766.91 -
2.3 Extra Hauling
- extra hauling ke disposal 2 (5711 M) m' 204,497.14 9,423.15 1,927,007,224.79
- extra hauling ke disposal 3 (5930 M) m' 570,067.06 9,784.50 5,577,821,148.57
Sub Total 27,317,800,831.36
III BIAYA KEBERSIHAN ls 1.00 500,000,000.00 500,000,000.00
Sub Total 500,000,000.00
TOTAL 27,992,800,831.36
PEMBULATAN 27,990,000,000.00
PPN 10% 2,799,000,000.00
GRAND TOTAL 30,789,000,000.00
( TEDDY BUDIMAN. )
Direktur Utama
Bill Of Quantites
LAND GRADING BLOK AG ZONE A - PHASE II, PACKAGE -4
KOTA DELTAMAS
II LAND GRADING
2.1 Land Clearing&stripping
- Area Package 1 m2 232,671.57 1,800.00 418,808,826.00
2.2 Cut & Fill m3 522,774.47 16,600.00 8,678,056,202.00
- Cut m3 522,774.47 -
- Fill m3 522,774.47 -
2.3 Extra Hauling
- extra hauling ke disposal 1 (3592 M) m' 155,000.00 5,926.80 918,654,000.00
- extra hauling ke disposal 2 (5711 M) m' 176,652.90 9,423.15 1,664,626,774.64
Sub Total 11,680,145,802.64
III BIAYA KEBERSIHAN ls 1.00 500,000,000.00 500,000,000.00
Sub Total 500,000,000.00
TOTAL 12,355,145,802.64
PEMBULATAN 12,350,000,000.00
PPN 10% 1,235,000,000.00
GRAND TOTAL 13,585,000,000.00
( TEDDY BUDIMAN. )
Direktur Utama
PEKERJAAN SHEET PILE BLOK AG TAHAP II
KOTA DELTAMAS
PROGRES MINGUAN 0.060 0.095 0.509 6.042 6.515 7.807 9.441 9.868 9.142 6.853 6.408 12.462 5.117 3.313 3.062 3.227 3.544 2.410 2.070 1.131 0.748 0.2360
PROGRES KUMULATIF MINGGUAN 0.060 0.006 0.515 6.557 13.072 20.879 30.320 40.188 49.330 56.183 62.591 75.053 80.170 83.483 86.545 89.773 93.317 95.727 97.798 98.929 99.677 100
REALISASI PROGES MINGGUAN
DEVIASI
PROGRES MINGUAN 0.060 0.095 0.273 0.308 0.781 2.073 3.044 5.196 4.639 8.048 8.990 14.934 12.025 10.143 9.704 8.390 3.894 2.540 2.200 1.279 1.147 0.3660
PROGRES KUMULATIF MINGGUAN 0.060 0.006 0.279 0.587 1.368 3.441 6.485 11.681 16.319 24.367 33.357 48.291 60.317 70.460 80.164 88.554 92.448 94.988 97.188 98.468 99.615 100
REALISASI PROGES MINGGUAN 0.060 #REF!
DEVIASI #REF!
DISETUJUI OLEH : PEKERJAAN SHEET PILE BLOK AG TAHAP 1 : Rencana DI BUAT OLEH
PT. PURADELTA LESTARI : PEKERJAAN SHEET PILE BLOK AG TAHAP 2 : Actual PT. TOP PONDASI INDONESIA
RORI HANDETAN
Project Manager Project Manager
TIME SCEDHULE PEKERJAAN SHEET PILE BLOK AG TAHAP II
KOTA DELTAMAS
PROGRES MINGUAN 0.060 0.095 0.273 0.308 0.781 2.073 3.044 5.196 4.639 8.048 8.990 14.934 12.025 10.143 9.704 8.390 3.894 2.540 2.200 1.279 1.147 0.3660
PROGRES KUMULATIF MINGGUAN 0.060 0.006 0.279 0.587 1.368 3.441 6.485 11.681 16.319 24.367 33.357 48.291 60.317 70.460 80.164 88.554 92.448 94.988 97.188 98.468 99.615 100
REALISASI PROGES MINGGUAN
DEVIASI
18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4
MADE
RIZAL
Project Manager
MANPOWER SCEDHULE OKI2-DRIVEN SPUN PILE
OKI PULP & PAPER
I RC - LK Area
RC 2 3 3 3 3 3 12 12 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 19 19 19 19 19 19 19 19
-
LK 20 34 34 34 34 34 25 25 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 18 18 18 18 18 18 18 18
-
II WHP Area
WHP 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23
-
Total Menpower 22 37 37 37 37 37 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 0 0 60 60 60 60 60 60 37 37
SUBMIT BY,
PT. TOP PONDASI INDONESIA
RIZAL
Project Manager
Company Name : PT. Top Pondasi Indonesia
Area : Lime Kiln
Contractor Supv : Asep Latif
OKI Supv/PIC : Budi Hadawi
Rig (PR)
Company Name : PT. Top Pondasi Indonesia
Area : Lime Kiln
Contractor Supv : Asep Latif
OKI Supv/PIC : Budi Hadawi
Rig (PR)
WEEKLY PROGRESS REPORT
Contractor Name : PT. TOP PONDASI INDONESIA Contractor SPV : Asep Latip
Project Name : Driven Pile Foundation Work For OKI Expansion 2 OKI SPV/PIC : Budi hadawi
Area : RC_LK Contract Schedule :
Contract REALIZATION OF QUANTITY WORK PERFORMANCE ( % ) TOTAL PROGRESS ( % )
No. Work Item Last Period This Period Up to This Period Last Period This Period Up to This Period Up to
Last This
Unit QTY Percentage This
Wage Material Wage Material Wage Material Wage Material Wage Material Wage Material Period Period
Period
C PILING_WORKS
C.1 Driven Spun Pile ⌀500 M' 36,608.00 14.06% 40,074 - 40,074 109.47% 0.00% 109.47% 15.39% 0.00% 15.39%
C.2 Joint Welding Spun Pile ⌀500 Set 2,496.00 2.36% 2,865 - 2,865 114.78% 0.00% 114.78% 2.71% 0.00% 2.71%
C.3 Penetran test welding Spun Pile ⌀500 Set 124.00 0.20% - - - 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
C.4 Dolly Pile dia 500- 2 ML M' 499.00 0.19% - - - 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
C.5 Material Delivery Spun Pile ⌀500 M' 39,936.00 3.07% 53,968 7,808 61,776 135.14% 19.55% 154.69% 4.15% 0.60% 4.75%
C.6 Driven Spun Pile ⌀600 M' 23,012.00 9.38% 12,122 - 12,122 52.67% 0.00% 52.67% 4.94% 0.00% 4.94%
C.7 Joint Welding Spun Pile ⌀600 Set 1,569.00 1.62% 807 - 807 51.43% 0.00% 51.43% 0.83% 0.00% 0.83%
C.8 Penetran test welding Spun Pile ⌀600 Set 78.00 0.13% - - - 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
C.9 Dolly Pile dia 600 - 2 ML M' 314.00 0.13% - - - 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
C.10 Material Delivery Spun Pile ⌀600 M' 25,104.00 2.23% 11,448 1,872 13,320 45.60% 7.46% 53.06% 1.01% 0.17% 1.18%
C.11 PDA Test Ordinary Point 40.00 1.30% 24 - 24 60.00% 0.00% 60.00% 0.78% 0.00% 0.78%
C.12 PDA Monitoring test during driving Point 8.00 0.26% - - - 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
C.13 Pile Integrity Tes (PIT) Point 27.00 0.24% 43 - 43 159.26% 0.00% 159.26% 0.38% 0.00% 0.38%
Description Last Week This Week Up to Date Description Last Week This Week Up to Date
1. Rig Crane 3 4 4 Indirect
2. Crane service 0 0 0 1. Project Manager 1 1 1
3. Excavator 1 1 1 2. Quantity Surveyor 1 1 1
4. Welder Machine 3 4 4 3. Quality Control 2 2 1
5. Hammer Diesel 3 4 4 4. Quality NDT 0 0 0
6.Trailer 1 1 1 5. Adm Project 0 0 0
7.Storing car 1 1 1 6. Supervisor 1 1 1
7. Logistik 1 1 1
8. Operator 3 4 4
9. Riger 3 4 4
10. Welder 6 6 6
11. Driver 1 1 1
11. Daily worker 1 1 1
Company Name : PT. Top Pondasi Indonesia
Area : Recausticizing
Contractor Supv : Asep Latif
OKI Supv/PIC : Budi Hadawi
Rig (PR)
No PIT STAGE AREA PILE NO. DATE CHARACTERISTICS OF PILE PILE CONDITION
TESTED
Last Progress 16
1 LINE 4 SUPPORT 2 LK SP 16 26-Dec-22 Spun-500mm, L=42m (12+12+12+6) Pile is Good
2 LINE 4 SUPPORT 2 LK SP 17 26-Dec-22 Spun-500mm, L=42m (12+12+12+6) Pile is Good
3 LINE 4 SUPPORT 2 LK SP 31 26-Dec-22 Spun-500mm, L=42m (12+12+12+6) Pile is Good
4 LINE 3 SUPPORT 1 LK SP 16 26-Dec-22 Spun-500mm, L=42m (12+12+12+6) Pile is Good
5 LINE 3 SUPPORT 1 LK SP 17 26-Dec-22 Spun-500mm, L=42m (12+12+12+6) Pile is Good
6 LINE 3 SUPPORT 1 LK SP 31 26-Dec-22 Spun-500mm, L=42m (12+12+12+6) Pile is Good
7 LINE 4 SUPPORT 4 LK SP 14 26-Dec-22 Spun-500mm, L=44m (12+12+12+8) Pile is Good
8 LINE 4 SUPPORT 4 LK SP 42 26-Dec-22 Spun-500mm, L=44m (12+12+12+8) Pile is Good
9 LINE 4 SUPPORT 4 LK SP 32 26-Dec-22 Spun-500mm, L=44m (12+12+12+8) Pile is Good
10 LINE 4 SUPPORT 4 LK SP 31 26-Dec-22 Spun-500mm, L=44m (12+12+12+8) Pile is Good
11 LINE 3 SUPPORT 2 LK SP 18 26-Dec-22 Spun-500mm, L=42m (12+12+12+6) Pile is Good
12 LINE 3 SUPPORT 2 LK SP 12 26-Dec-22 Spun-500mm, L=42m (12+12+12+6) Pile is Good
13 LINE 3 SUPPORT 2 LK SP 26 26-Dec-22 Spun-500mm, L=44m (12+12+12+8) Pile is Good
14 LINE 4 SUPPORT 5 LK SP 52 26-Dec-22 Spun-500mm, L=42m (12+12+12+6) Pile is Good
15 LINE 4 SUPPORT 5 LK SP 40 26-Dec-22 Spun-500mm, L=42m (12+12+12+6) Pile is Good
16 LINE 3 SUPPORT 4 LK SP 22 26-Dec-22 Spun-500mm, L=42m (12+12+12+6) Pile is Good
Prepared By : Approved By :
Contractor OKI PIC
LENGTH LENGTH PILE CAPACITY (TONNES)
BELOW OF CAPWAP ANALYSIS
No PDA STAGE BUILDING PILE NO. GAGES PENETRATION DATE DRIVEN DATE TESTED SHAFT
PDA
TOTAL
(M) (M) FRICTION
Last Progress 17
1 LINE 4 SUPPORT 5 LK SP 49 42 41.5 14-Dec-2022 24-Nov-2022 342
2 LINE 4 SUPPORT 5 LK SP 22 42 41.5 18-Dec-2022 24-Nov-2022 284
3 LINE 3 SUPPORT 4 LK SP 04 42 41 18-Dec-2022 24-Nov-2022 275
4 LINE 3 SUPPORT 4 LK SP 06 42 41 17-Dec-2022 24-Nov-2022 346
5 LINE 3 SUPPORT 2 LK SP 49 44 43 17-Dec-2022 25-Nov-2022 286
6 LINE 3 SUPPORT 1 LK SP 04 44 42.5 18-Nov-2022 25-Nov-2022 262
7 LINE 3 SUPPORT 1 LK SP 03 44 43 20-Nov-2022 25-Nov-2022 252
8 LINE 4 SUPPORT 4 LK SP 02 44 41.5 5-Dec-2022 25-Nov-2022 264
9 LINE 4 SUPPORT 2 LK SP 45 42 41.5 30-Nov-2022 25-Nov-2022 265
10 LINE 4 SUPPORT 2 LK SP 43 42 41.5 1-Dec-2022 25-Nov-2022 257
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Prepare By : Approve By :
Contractor OKI PIC
APACITY (TONNES)
CAPWAP ANALYSIS
END
BEARING
Approve By :
OKI PIC
LK
DATE
No PIT STAGE AREA PILE NO.
TESTED
1 DISC FILTER BUILDING RC SP 22 06-Oct-23
2 DISC FILTER BUILDING RC SP 38 06-Oct-23
3 LIME MILKS RC SP 42 06-Oct-23
4 LIME MILKS RC SP 36 06-Oct-23
5 LIME MILKS RC SP 17 06-Oct-23
6 PREWASHED LM STORAGE RC SP 11 06-Oct-23
7 PROCESS WATER TANK RC SP 09 06-Oct-23
8 PROCESS WATER TANK RC SP 03 06-Oct-23
9 LIME MUD STORAGE TANK RC SP 20 06-Oct-23
10 LIME MUD STORAGE TANK RC SP 43 06-Oct-23
11 LIME MUD STORAGE TANK RC SP 23 06-Oct-23
1 GASIFICATION LK SP 04 24-Jan-23
2 GASIFICATION LK SP 05 24-Jan-23
3 GASIFICATION LK SP 16 24-Jan-23
4 GASIFICATION LK SP 21 24-Jan-23
5 GASIFICATION LK SP 40 24-Jan-23
6 GASIFICATION LK SP 46 24-Jan-23
7 GASIFICATION LK SP 47 24-Jan-23
8 GASIFICATION LK SP 58 24-Jan-23
9 GASIFICATION LK SP 66 24-Jan-23
10 GASIFICATION LK SP 71 24-Jan-23
11 GASIFICATION LK SP 72 24-Jan-23
12 LK 3 SUPPORT 3 LK SP 08 24-Jan-23
13 LK 3 SUPPORT 3 LK SP 13 24-Jan-23
14 LK 3 SUPPORT 3 LK SP 45 24-Jan-23
15 LK 3 SUPPORT 3 LK SP 52 24-Jan-23
16 LK 3 SUPPORT 3 LK SP 73 24-Jan-23
17 LK 3 SUPPORT 3 LK SP 104 24-Jan-23
18 LK 3 SUPPORT 5 LK SP 08 24-Jan-23
19 LK 3 SUPPORT 5 LK SP 46 24-Jan-23
20 LK 3 SUPPORT 5 LK SP 55 24-Jan-23
21 LK 3 SUPPORT 5 LK SP 69 24-Jan-23
22 LK 3 SUPPORT 5 LK SP 72 24-Jan-23
23 LK 4 SUPPORT 3 LK SP 72 24-Jan-23
24 LK 4 SUPPORT 3 LK SP 88 24-Jan-23
25 LK 4 SUPPORT 3 LK SP 96 24-Jan-23
26 LK 4 SUPPORT 3 LK SP 98 24-Jan-23
27 LK 4 SUPPORT 3 LK SP 99 24-Jan-23
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Prepare By :
Contractor
CHARACTERISTICS OF PILE PILE CONDITION
(M) (M)
PERIODE 01 sd 31 OKTOBER 11
1 WL DISC FILTER RC SP 22
2 WL DISC FILTER RC SP 38
3 LIME MILKS RC SP 42
4 LIME MILKS RC SP 36
5 LIME MILKS RC SP 06
6 PREWASHED RC SP 11
7 PROCESS WATER TANK RC SP 09
8 PROCESS WATER TANK RC SP 03
9 LIME MUD STORAGE TANK RC SP 20
10 LIME MUD STORAGE TANK RC SP 43
11 LIME MUD STORAGE TANK RC SP 23
Prepare By :
Contractor
PILE CAPACITY (TONNES)
CAPWAP ANALYSIS
DATE DRIVEN DATE TESTED SHAFT END
PDA
TOTAL
FRICTION BEARING
Approve By :
OKI PIC
RECAPITULATION OF MATERIAL SPUNPILE DELIVERY
12 MS 12 ME 8 ME
NO. TGL MASUK
PCS M' PCS M' PCS M'
PERIODE JANUARY - - - - - -
PERIODE FEBRUARY - - - - - -
PERIODE MARCH - - - - - -
6 ME TOTAL
PCS M' PCS M'
- - - - OK
- - - - OK
- - - - OK
- - 175 1,992 OK
11 66 684 8,102 OK
- - 75 900 OK
10 60 608 7,136 OK
0 48 576
0 40 480
0 40 384
0 0 0
0 0 0
0 24 288
0 32 320
0 24 288
0 8 96
0 16 192
0 0 0
0 0 0
0 16 192
0 24 256
0 8 96
0 8 96
0 15 148
0 0 0
0 0 0
0 0 0
0 0 0
0 8 96
0 0 0
0 0 0
0 0 0
0 0 0
0 8 96
0 0 0
0 8 96
0 8 96
0 15 180
350 3,976
58,834
PERIODE 17 NOV -31 DESEMBER 2023
12MS 12ME 8ME 6ME
NO. TGL MASUK
PCS M' PCS M' PCS M' PCS
1 17/11/2022 0 67 39
2 18/11/2022 54 648 40 38
3 19/11/2022 0 60 720
4 20/11/2022 9 108 36 60 42
5 21/11/2022 71 1 12 106
6 22/11/2022 0 0 6 142
7 23/11/2022 0
8 24/11/2022 0
9 25/11/2022 0 0
10 26/11/2022 9 108 0 9 72 42
11 27/11/2022 9 108 54 648 29 15
12 28/11/2022 30 28 336 1 41
13 29/11/2022 0 0 0
14 30/11/2022 0
15 31/11/2022 0 0
6ME TOTAL
M' PCS M'
0 126 1512
0 81 972
0 36 432
0 54 648
288 61 444
72 22 192
0 26 312
0 36 432
216 36 216
72 39 396
48 60 672
0 2 24
60 10 60
0 144 1728
0 79 948
0 126 1512
48 35 372
72 21 180
60 79 888
0 78 936
288 111 828
72 48 504
0 0 0
1310 14208
6ME TOTAL
M' PCS M'
0 0
0 0
0 0
0 0 0
0 0
0 0 0
0 0
0 0
0 0
0 0
0 0
0 0 0
0 0 0
0 0 0
0 0
0 0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
ME TOTAL
M' PCS M'
0 0
0 0 0
0 0 0
0 0
0 0
0 0
0 0 0
0 0 0
0 0 0
0 0
0 0
0 0
0 0
0 0 0
0 0
0 0 0
0 0 0
0 0
0 0
ME TOTAL
M' PCS M'
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0
ME TOTAL
M' PCS M'
0 0 0
0 36 432
0 49 588
0 78 936
0 28 260
120 38 336
0 10 120
0 0 0
0 0 0
0 9 108
0 18 216
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
266 2996
ME TOTAL
M' PCS M'
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 10 120
0 38 456
0 38 456
0 89 960
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
175 1992
ME TOTAL
M' PCS M'
0 0 0
0 0 0
0 9 108
0 0 0
0 0 0
0 0 0
0 6 72
216 120 1152
0 0 0
0 27 216
0 27 324
0 0 0
0 0 0
0 0 0
0 24 288
0 65 780
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 41 492
0 73 876
0 42 504
0 30 332
48 30 312
0 0 0
108 40 372
534 5828
ME TOTAL
M' PCS M'
0 8 96
0 30 360
0 15 180
54 93 918
60 49 528
48 53 556
0 38 456
0 60 720
0 8 96
126 29 190
0 31 248
252 74 636
192 89 776
54 59 586
36 54 540
144 57 540
0 0 0
72 63 480
0 0 0
0 0 0
0 0 0
0 40 480
0 81 972
0 0 0
0 24 288
0 0 0
0 8 96
0 7 80
0 0 0
0 0 0
0 8 96
978 9918
ME TOTAL
M' PCS M'
0 62 744
0 54 648
0 44 528
0 9 72
0 36 432
0 77 924
0 0 0
0 86 1032
0 99 1188
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
54 17 150
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 18 216
0 9 108
0 0 0
0 34 408
0 0 0
0 0 0
0 18 216
563 6666
ME TOTAL
M' PCS M'
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 9 108
0 8 96
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 21 252
0 0 0
0 14 168
0 23 276
0 0 0
0 0 0
75 900
ME TOTAL
M' PCS M'
0 0 0
0 0 0
0 0 0
0 0 0
0 6 72
0 0 0
0 0 0
0 0 0
0 0 0
0 8 96
0 7 84
0 0 0
0 0 0
0 0 0
0 0 0
0 23 276
0 16 192
0 0 0
0 0 0
0 8 96
0 49 488
0 16 192
0 8 96
0 0 0
0 0 0
0 0 0
0 32 320
0 32 384
0 16 192
0 0 0
0 8 64
229 2552
ME TOTAL
M' PCS M'
0 40 480
0 24 288
0 40 384
0 16 192
0 0 0
0 24 288
0 32 320
0 8 96
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
184 2048
48162
RECAPITULATION OF MATERIAL SPUNPILE DELIVERY
12 MS 12 ME 8
NO. TGL MASUK
PCS M' PCS M' PCS
1 01/12/2023 0 44 528 2
2 02/12/1900 0 7 84 41
3 03/12/2023 0 24 288 14
4 04/12/2023 0 6 72 7
5 05/12/2023 0 17 204 5
6 06/12/2023 0 12 144
7 07/12/2023 0 0
8 08/12/2023 0 0
9 09/12/2023 0 0
10 10/12/2023 0 0
11 11/12/2023 0 0
12 12/12/2023 0 0
13 13/12/2023 0 0
14 14/12/2023 0 0
15 15/12/2023 0 0
16 16/12/2023 0 0
17 17/12/2023 0 0
18 18/12/2023 0 0
19 19/12/2023 0 0
20 20/12/2023 0 0
21 21/12/2023 0 0
22 22/12/2023 0 0
23 23/12/2023 0 0
24 24/12/2023 0 0
25 25/12/2023 0 0
26 26/12/2023 0 0
27 27/12/2023 0 0
28 28/12/2023 0 0
29 29/12/2023 0 0
30 30/12/2023 0 0
31 31/12/2023 0 0
PERIODE NOVEMBER - - 110 1,320 69
GRAND TOTAL
RIAL SPUNPILE DELIVERY
ME 6 ME TOTAL
M' PCS M' PCS M'
- - - 252 3,024
16 0 46 544
328 0 48 412
112 0 38 400
56 0 13 128
40 0 22 244
0 0 12 144
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
552 - - 179 1,872
11,448
DELIVERY SPUN PILE D 600 MM
1 01/03/2023 0 0
2 02/03/2023 0 0
3 03/03/2023 0 0
4 04/03/2023 0 0 32
5 05/03/2023 7 84 21 252
6 06/03/2023 0 21 252
7 07/03/2023 0 0
8 08/03/2023 0 0
9 09/03/2023 0 0
10 10/03/2023 0 0 1
11 11/03/2023 0 0
12 12/03/2023 0 0
13 13/03/2023 0 0
14 14/03/2023 0 0
15 15/03/2023 0 0
16 16/03/2023 0 0
17 17/03/2023 0 0
18 18/03/2023 7 84 0
19 19/03/2023 0 28 336
20 20/03/2023 42 504 0
21 21/03/2023 0 0
22 22/03/2023 21 252 7 84
23 23/03/2023 0 21 252
24 24/03/2023 0 0
25 25/03/2023 0 0
26 26/03/2023 0 0
27 27/03/2023 0 0
28 28/03/2023 0 0
29 29/03/2023 0 15 180
30 30/03/2023 39 468 17 204
31 31/03/2023 0 0
GRAND TOTAL
PILE D 600 MM
ME 6 ME TOTAL
M' PCS M' PCS M'
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
56 0 7 56
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 7 84
72 0 9 72
0 0 0 0
0 0 0 0
0 0 0 0
0 0 56 672
136 0 19 160
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 56 672
0 0 0 0
0 0 0 0
0 0 21 252
0 0 35 420
0 8 48 15 132
0 0 44 528
0 0 0 0
0 0 0 0
0 0 9 108
0 0 0 0
278 3156
0 0 0 0
0 0 0 0
0 0 0 0
256 0 32 256
0 0 28 336
0 0 21 252
0 0 0 0
0 0 0 0
0 0 0 0
8 0 1 8
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 7 84
0 0 28 336
0 0 42 504
0 0 0 0
0 0 28 336
0 0 21 252
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 15 180
0 0 56 672
0 0 0 0
279 3216
ME 6 ME TOTAL
M' PCS M' PCS M'
0 0 21 252
144 0 18 144
0 0 0 0
0 0 0 0
0 0 0 0
144 0 0 144
0 0 112 1344
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 14 168
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
165 2052
ME 6 ME TOTAL
M' PCS M' PCS M'
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 7 84
0 0 73 876
0 0 0 0
0 0 169 2028
0 0 3 36
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
252 3024
11448
RECAPITULATION OF MATERIAL SPUNPILE DELIVERY
12 MS 12 ME 8 ME 6
NO. TGL MASUK
PCS M' PCS M' PCS M' PCS
1 01/04/2023 0 0 0
PERIODE APRIL 72 864 178 2,136 119 952 121
PERIODE JULY - - - - - -
PERIODE SEPTEMBER - - - - - - -
ME TOTAL
M' PCS M'
0 0 0
726 490 4,678
- - -
12 341 4,076
- - -
- 312 4,988
0 48 3936
0 24 2208
0 40 480
0 16 192
0 0 0
0 24 288
0 32 320
0 24 288
0 8 96
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 216 7,808
53,968
PERIODE TGL 1 SD 31 PEBRUARI 2023
12 MS 12 ME 8 ME 6
NO. TGL MASUK
PCS M' PCS M' PCS M' PCS
1 01/01/2023 0 9 108 0
2 02/01/2023 25 300 59 708 0
3 03/01/2023 10 120 40 480 0
4 04/01/2023 24 288 53 636 0
5 07/01/2023 0 69 828 0
6 10/01/2023 24 288 0 27 216 10
7 12/01/2023 0 3 36 2 16 2
8 14/01/2023 9 108 35 420 0
9 15/01/2023 0 18 216 0
10 16/01/2023 0 53 636 0
11 17/01/2023 0 44 528 0
12 18/01/2023 0 27 324 0
13 20/01/2023 8 96 0 0
14 21/01/2023 0 17 204 18 144 12
15 22/01/2023 0 9 108 0
16 23/01/2023 0 9 108 0
17 24/01/2023 0 8 96 0
18 25/01/2023 0 45 540 0
19 27/01/2023 0 9 108 0
20 29/01/2023 72
21 30/01/2023 36
22 31/01/2023 9 108 0
GRAND TOTAL
ME TOTAL
M' PCS M'
0 9 108
0
0
0 77 924
0 69 828
60 61 564
12 7 64
0 44 528
0 18 216
0 53 636
0 44 528
0 27 324
0 8 96
72 47 420
0 9 108
0 9 108
0 8 96
0 45 540
0 9 108
0
0
0 9 108
553 6304
ME TOTAL
M' PCS M'
0 52 588
0 18 144
0 0 0
84 14 84
0 36 288
0 43 512
0 36 432
0 0 0
0 0 0
0 39 468
0 0 0
0 13 156
0 17 204
0 24 288
0 9 108
408 91 592
240 48 240
0 99 864
487 4380
ME TOTAL
M' PCS M'
0 0 0
0 0 0
72 56 528
0 36 288
0 81 720
0 117 936
0 26 276
0 0 0
54 93 726
126 33 230
0 72 864
0 40 480
0 56 672
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 30 360
48 24 240
0 0 0
0 0 0
0 9 108
0 0 0
0 38 456
0 0 0
0 37 444
0 30 240
0 0 0
0 17 204
795 7772
ME TOTAL
M' PCS M'
0 0 0
0 19 228
0 10 120
0 0 0
72 103 836
120 51 368
0 0 0
294 61 438
0 71 852
0 0 0
0 9 108
72 72 792
168 47 356
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
443 4098
ME TOTAL
M' PCS M'
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 18 216
0 0 0
0 0 0
0 0 0
0 32 384
0 0 0
0 10 120
0 0 0
0 10 120
0 20 240
0 30 360
0 84 1008
0 0 0
0 37 444
0 0 0
0 37 444
0 43 516
0 127 1524
0 0 0
0 36 432
258 70 510
0 6 72
0 16 192
216 52 408
0 0 0
628 6990
ME TOTAL
M' PCS M'
0 0 0
0 0 0
0 9 108
0 0 0
0 0 0
0 0 0
0 0 0
0 52 588
0 0 0
0 0 0
0 7 84
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 63 756
0 23 276
0 0 0
36 23 240
0 0 0
0 55 544
0 14 168
246 2764
ME TOTAL
M' PCS M'
0 8 96
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 24 224
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
84 58 584
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 16 192
0 25 300
0 25 300
0 9 72
0 76 912
0 48 576
24 69 804
358 4060
ME TOTAL
M' PCS M'
0 18 216
0 27 324
0 0 0
0 18 216
0 9 108
0 0 0
0 0 0
0 54 648
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 54 648
0 0 0
0 0 0
0 24 288
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 27 324
0 65 780
12 38 440
0 0 0
0 16 192
0 0 0
0 0 0
350 4184
ME TOTAL
M' PCS M'
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0
ME TOTAL
M' PCS M'
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 6 72
0 8 96
0 7 84
0 0 0
0 23 276
0 16 192
0 0 0
0 0 0
0 8 96
0 49 488
0 16 192
0 8 96
0 0 0
0 0 0
0 0 0
0 32 320
0 32 384
0 16 192
0 0 0
0 8 64
229 2552
43104