EHSMSM/WORKS/446/4009 Rev No.

01 Effective Date: 16/10/2006


SAFE WORK PROCEDURE - FOR TENTATIVE JOB
(Performance Criteria – Perfection in job with no injury to persons or damage to property)
AIC Leader : PRATAP KR. SINHA
1. DEPARTMENT : ENGG. & PROJECT DOC. NO. : E&P/SAF-TSJ-LD#1&2 Long tom Area-Elect/EHSMS/SWP/4702
2. SECTION / LOCATION : LD-1, LD-2, Long tom Area NAME OF WORKING AGENCY : G.B. ENGINEERS
3. JOB TITLE : Misc. Electrical work D. O. NO. : 3700882605/109 dt. 09.06.2023
4. JOB DURATION : START DATE 09.06.2023 END DATE 30.06.2024 W. O. NO. : 4200001761/109 dt. 23.06.2021

Sl. Activities Hazards Safety Precautions Persons Condition of Tools/ Reference to document /
No. (Sequence of work) Responsible Tackles required criteria and remarks
Name & G P. No. OK / NOT OK
2) Fixing of light set. Falling from height ● Ensure that power is off before taking new connection.
● Use proper plug to connect the light fittings TSL
● Use safety belt while working at height. Mr. Anil Kumar SS/ENG-05
● Use proper ladder for erection of light fitting. The ladder (Mob-9204750502) OK
must be tied or held by one person while working.
● Use all PPE for gas cutting and welding jobs. Use both the cables Mr. S.F Hussain
for welding. Follow the instructions of gas cutting and welding (Mob-9234511429)
mentioned in the clearance form # EHSMSM/WORKS/446/4007
● The fitting should be held by proper support like rope.
● Standard scaffolding / platform to be provided.

3) Area Lighting Elect. Shock hazards. ● Cable joint with proper insulation with junction box to be SS/ENG-13
maintained at area lighting.
Fall from height ● GI wire anchoring not be allowed for cable fixing. G. B. Engineers OK
● FBH safety belt to be use at height work. P. Mandal
● PPE properly use. (Mob- 8603401650)

4) Cable laying on the Falling from height ● Use proper surface for lifting the cable drum on the jack. S.K Paul SS/ELECT - 01
tray / bracket ● Skilled persons to be deployed at site. (Mob- 7209336162) SS/GEN - 25
Electric shock ● Caution board to be displayed on live trays. OK SS/ENGG-07
● If working at open height place must use safety belt. (1.8M length)
Hand injury due to Working area must be barricated
open nails form both ● Entry & exit path to be kept clean
wheel of cable drum ● Open nails to be to be removed from cable drum

Dept. (E&P) TSL (Safety) G. B. ENGINEERS

Note : 1.This Safe Work procedure shall be prepared by owner department countersigned by Working agency / contractor’s representative and safety department.
2. Sequence of work shall involve step-by-step jobs. 3. All possible hazards including proximity hazards shall be identified
4. With the change of working conditions, the procedure shall be amended and persons shall be trained accordingly.
5. Review on status of implementation shall be done through task observation (Ref. Form # EHSMSM/WORKS/446/4008) and / or site severity audit
6. Before start of the job, induction shall be given to persons engaged at site by departmental and subsequent daily induction shall be given by Working agency /Contractor's representative