You are on page 1of 3

EHSMSM/WORKS/446/4009 Rev No.

01 Effective Date: 16/10/2006


SAFE WORK PROCEDURE - FOR TENTATIVE JOB
(Performance Criteria – Perfection in job with no injury to persons or damage to property)
AIC Leader : PRATAP KR. SINHA
1. DEPARTMENT : ENGG. & PROJECT DOC. NO. : E&P/SAF-TSJ-LD#1&2 Long tom Area-Elect/EHSMS/SWP/4702
2. SECTION / LOCATION : LD-1, LD-2, Long tom Area NAME OF WORKING AGENCY : G.B. ENGINEERS
3. JOB TITLE : Misc. Electrical work D. O. NO. : 3700882605/109 dt. 09.06.2023
4. JOB DURATION : START DATE 09.06.2023 END DATE 30.06.2024 W. O. NO. : 4200001761/109 dt. 23.06.2021

Sl. Activities Hazards Safety Precautions Persons Condition of Tools/ Reference to document /
No. (Sequence of work) Responsible Tackles required criteria and remarks
Name & G P. No. OK / NOT OK
Unawareness of safety a) Written clearance to be taken before starting the job from concern authorities.
1) General Safety appliances may cause b) Safety induction training to be given to all workmen. TSL SS/GEN - 04
activities before damage loss or accident c) Brief description about hazards/safety measure to be given to all workmen at Mr. Anil Kumar SS/GEN - 05
starting the job every morning before starting of the job. Tool box talk (Mob-9204750502) SS/GEN - 06
d) First aid box to be kept at site. SS/GEN - 07
e) All traffic rules will be followed in site works. Mr. S.F Hussain SS/ENGG - 07
f) All workmen will be use safety helmet, safety boot, safety goggles and others safety (Mob-9234511429) SS/ENGG - 13
appliances properly (Manufacture as per standard) SS/ENGG - 27
g) Constant supervision will be there at site.
h) Always one safety sup and flagmen must be present at site.
i) Welding m/c and DB to be kept at protected area as per safety standard of TSL
j) LPG and Oxygen cylinder to be kept vertically separately (min. gap 3mtr) protected
and well mentioned area & bring in use with proper pressure gauge & safety devices
k) Use scrap bin for scrap dumping
l) Submit workmen list who will work at site. G. B. Engineers
m) Gas cylinder will be carried one site to another site by trolley (Bulk LPG and O2 P. Mandal
cylinder not carry together) (Mob- 8603401650)
n) Certified welder / electrician / rigger to be provided with copies of certificate of
Electrician / welder / rigger will be submitted before starting the job. S.K Paul
o) Tools & tackles certificate to be submitted before starting the job. (Mob- 7209336162)
p) Medical fitness certificate of all workmen for height work to be submitted before
starting the job.
q) Do not work in such places where another work is going in different level and
do not work in barricaded area of another agency.
r) Six direction hazard form to be filled up daily basis.
s) All Elect. equipt / lighting system should be kept in off position when not in use.

Dept. (E&P) TSL (Safety) G. B. ENGINEERS

Note : 1.This Safe Work procedure shall be prepared by owner department countersigned by Working agency / contractor’s representative and safety department.
2. Sequence of work shall involve step-by-step jobs. 3. All possible hazards including proximity hazards shall be identified
4. With the change of working conditions, the procedure shall be amended and persons shall be trained accordingly.
5. Review on status of implementation shall be done through task observation (Ref. Form # EHSMSM/WORKS/446/4008) and / or site severity audit
6. Before start of the job, induction shall be given to persons engaged at site by departmental and subsequent daily induction shall be given by Working agency /Contractor's representative
EHSMSM/WORKS/446/4009 Rev No. 01 Effective Date: 16/10/2006
SAFE WORK PROCEDURE - FOR TENTATIVE JOB
(Performance Criteria – Perfection in job with no injury to persons or damage to property)
AIC Leader : PRATAP KR. SINHA
1. DEPARTMENT : ENGG. & PROJECT DOC. NO. : E&P/SAF-TSJ-LD#1&2 Long tom Area-Elect/EHSMS/SWP/4702
2. SECTION / LOCATION : LD-1, LD-2, Long tom Area NAME OF WORKING AGENCY : G.B. ENGINEERS
3. JOB TITLE : Misc. Electrical work D. O. NO. : 3700882605/109 dt. 09.06.2023
4. JOB DURATION : START DATE 09.06.2023 END DATE 30.06.2024 W. O. NO. : 4200001761/109 dt. 23.06.2021

Sl. Activities Hazards Safety Precautions Persons Condition of Tools/ Reference to document /
No. (Sequence of work) Responsible Tackles required criteria and remarks
Name & G P. No. OK / NOT OK
2) Fixing of light set. Falling from height ● Ensure that power is off before taking new connection.
● Use proper plug to connect the light fittings TSL
● Use safety belt while working at height. Mr. Anil Kumar SS/ENG-05
● Use proper ladder for erection of light fitting. The ladder (Mob-9204750502) OK
must be tied or held by one person while working.
● Use all PPE for gas cutting and welding jobs. Use both the cables Mr. S.F Hussain
for welding. Follow the instructions of gas cutting and welding (Mob-9234511429)
mentioned in the clearance form # EHSMSM/WORKS/446/4007
● The fitting should be held by proper support like rope.
● Standard scaffolding / platform to be provided.

3) Area Lighting Elect. Shock hazards. ● Cable joint with proper insulation with junction box to be SS/ENG-13
maintained at area lighting.
Fall from height ● GI wire anchoring not be allowed for cable fixing. G. B. Engineers OK
● FBH safety belt to be use at height work. P. Mandal
● PPE properly use. (Mob- 8603401650)

4) Cable laying on the Falling from height ● Use proper surface for lifting the cable drum on the jack. S.K Paul SS/ELECT - 01
tray / bracket ● Skilled persons to be deployed at site. (Mob- 7209336162) SS/GEN - 25
Electric shock ● Caution board to be displayed on live trays. OK SS/ENGG-07
● If working at open height place must use safety belt. (1.8M length)
Hand injury due to Working area must be barricated
open nails form both ● Entry & exit path to be kept clean
wheel of cable drum ● Open nails to be to be removed from cable drum

Dept. (E&P) TSL (Safety) G. B. ENGINEERS

Note : 1.This Safe Work procedure shall be prepared by owner department countersigned by Working agency / contractor’s representative and safety department.
2. Sequence of work shall involve step-by-step jobs. 3. All possible hazards including proximity hazards shall be identified
4. With the change of working conditions, the procedure shall be amended and persons shall be trained accordingly.
5. Review on status of implementation shall be done through task observation (Ref. Form # EHSMSM/WORKS/446/4008) and / or site severity audit
6. Before start of the job, induction shall be given to persons engaged at site by departmental and subsequent daily induction shall be given by Working agency /Contractor's representative
EHSMSM/WORKS/446/4009 Rev No. 01 Effective Date: 16/10/2006
SAFE WORK PROCEDURE - FOR TENTATIVE JOB
(Performance Criteria – Perfection in job with no injury to persons or damage to property)
AIC Leader : PRATAP KR. SINHA
1. DEPARTMENT : ENGG. & PROJECT DOC. NO. : E&P/SAF-TSJ-LD#1&2 Long tom Area-Elect/EHSMS/SWP/4702
2. SECTION / LOCATION : LD-1, LD-2, Long tom Area NAME OF WORKING AGENCY : G.B. ENGINEERS
3. JOB TITLE : Misc. Electrical work D. O. NO. : 3700882605/109 dt. 09.06.2023
4. JOB DURATION : START DATE 09.06.2023 END DATE 30.06.2024 W. O. NO. : 4200001761/109 dt. 23.06.2021
Sl. Activities Hazards Safety Precautions Persons Condition of Tools/ Reference to document /
No. (Sequence of work) Responsible Tackles required criteria and remarks
Name & G P. No. OK / NOT OK
5) End-termination of Elect. shock * Tools must be inspected before use. OK SS/ELECT-01
cable * All wiring should be routed in proper way.
* Any joints of cable should be housed in junction box with proper
terminals. TSL
* Proper PPE (gloves, safety glasses etc. ) must be use. Mr. Anil Kumar
(Mob-9204750502)
6) Temp. Elect. Wiring Electrical shock ● Tools must be inspected before use. SS/ELECT - 01
Physical injury ● All electrical tools shall be insulated. Mr. S.F Hussain OK
● The equipment used for the temp. wiring must be in good and (Mob-9234511429)
working conditions.
● Proper PPE (gloves, safety glasses etc.) must be use.
7) Cable Diversion * Electric Shock * Absence of power to be ensured from source end with suitable power
detector device. OK SS/ELECT - 01
* Power cutting and positive isolation of feeder should be done if reqrd. SS/ENG - 01
* Falling from height * Do not step or put tension on nearby cables.
* if working at open height place must use safety belt(1.8m length with
double lanyard) G. B. Engineers
* Physical injury * Fall arrester must be used while climbing at height. P. Mandal
* Working area must be barricated. (Mob- 8603401650)
* Horizontal & vertical lifelines must be provided.
* Scaffolding must be provide at height work. S.K Paul
(Mob- 7209336162)

Dept. (E&P) TSL (Safety) G. B. ENGINEERS

Note : 1.This Safe Work procedure shall be prepared by owner department countersigned by Working agency / contractor’s representative and safety department.
2. Sequence of work shall involve step-by-step jobs. 3. All possible hazards including proximity hazards shall be identified
4. With the change of working conditions, the procedure shall be amended and persons shall be trained accordingly.
5. Review on status of implementation shall be done through task observation (Ref. Form # EHSMSM/WORKS/446/4008) and / or site severity audit
6. Before start of the job, induction shall be given to persons engaged at site by departmental and subsequent daily induction shall be given by Working agency / Contractor's representative