Formation
Top (m) Bottom (m) Top (ft) Bottom (ft)
Nilo (Minas) 0 45.72 0 150
Korinci 45.72 106.68 150 350
Binio 106.68 152.4 350 500
Telisa 152.4 304.8 500 1000
Tualang 304.8 381 1000 1250
Lakat 381 609.6 1250 2000
Kelesa 609.6 1828.8 2000 6000
batupasir regresi,
Intermediate 1010 9 5/8 12 1/4 batubara, serpih, endapan
sedimen, batu lanau
Production 1400 7 8 1/2 serpih marine, batu lanau
Target
Formasi Lakat
Perforation
Top (ft) Bottom (ft) Length (ft)
1260.885 1268 7.115
Total Depth
1400 ft MD
Top Formation
Nilo (Minas) 150 ft Bit size @17 1/2"
Korinci 350 ft
Binio 500 ft
Telisa 1000 ft
Tualang 1250 ft
Lakat 1400 ft
Completion Summary
Bit size @12 1/4"
Cased Hole
Single Packer
Single Tubing
Rate Maksimum OD Tubing ID Tubing
(BOPD) 7 6.456 Bit size @8 1/2"
Ketebalan (ft) Lithology
150 gravel, sand , and clay, batubara
200 batupasir regresi, batubara, serpih
150 endapan sedimen, serpih highstand marine
500 serpih marine, batu lanau
250 serpih calcareous, batupasir, batulanau glaukonit
750 batupasir fluvial, endapan flood plain, sedimen, serpih keabu-abuan
4000 sedimen konglomerat, batupasir, serpih, batubara, material tufaan
Telisa, Tualang
Tualang, Lakat
Pf Prf Pf Margin Prf Margin
ppg psi depth ppg psi depth ppg psi ppg psi
8.29518 5.813382 13.4772 8.31024 5.82977 13.4907 8.79518 6.663789 7.81024 4.979011
9.04819 12.9805 27.5884 14.003 23.32051 32.0268 9.54819 14.1978 13.503 21.98781
9.15361 51.5509 108.303 14.1084 67.92479 92.5864 9.65361 54.86678 13.6084 65.01754
9.13855 96.15575 202.346 14.0934 151.5438 206.785 9.63855 101.9167 13.5934 145.6674
9.31928 146.9717 303.283 14.259 223.1745 300.99 9.81928 155.3571 13.759 214.8487
9.53012 197.002 397.529 14.4849 302.7682 401.968 10.03012 207.8377 13.9849 291.8171
9.68072 247.5311 491.721 14.6355 372.4871 489.441 10.18072 260.8158 14.1355 359.2616
9.75602 304.0236 599.282 14.7108 461.8226 603.72 10.25602 320.1049 14.2108 445.6259
9.77108 355.7034 700.071 14.7259 539.4755 704.509 10.27108 374.4052 14.2259 520.6583
9.77108 406.9068 800.846 14.741 612.1364 798.579 10.27108 428.2288 14.241 590.8733
9.83133 460.9626 901.675 14.7861 696.6896 906.113 10.33133 484.9061 14.2861 672.6307
9.86145 510.6206 995.759 14.8163 770.6017 1000.2 10.36145 537.0104 14.3163 744.0965
9.87651 563.1645 1096.55 14.8313 849.1139 1100.99 10.37651 592.1748 14.3313 819.9881
9.90663 616.8086 1197.35 14.8614 928.7347 1201.79 10.40663 648.4397 14.3614 896.9881
9.89157 667.698 1298.11 14.8313 1020.095 1322.69 10.39157 701.9488 14.3313 985.2051
9.83133 715.1227 1398.83 14.7861 1078.942 1403.27 10.33133 751.9923 14.2861 1041.957
9.81627 762.0347 1492.88 14.7711 1150.08 1497.31 10.31627 801.3496 14.2711 1110.65
9.78614 810.9602 1593.62 14.741 1224.964 1598.06 10.28614 852.8943 14.241 1182.915
9.69578 850.8551 1687.6 14.6355 1287.705 1692.02 10.19578 895.2327 14.1355 1243.213
9.60542 896.5749 1795.01 14.5452 1355.924 1792.72 10.10542 943.7452 14.0452 1308.814
9.53012 936.1246 1889 14.5 1427.661 1893.45 10.03012 985.7386 14 1377.932
9.48494 981.3734 1989.74 14.4398 1497.369 1994.18 9.98494 1033.607 13.9398 1445.02
9.37952 1016.294 2083.7 14.3193 1554.822 2088.12 9.87952 1070.97 13.8193 1500.031
9.24398 1049.989 2184.35 14.1988 1616.066 2188.79 9.74398 1107.282 13.6988 1558.657
9.1988 1096.259 2291.81 14.1536 1694.949 2302.96 9.6988 1156.346 13.6536 1634.572
9.18373 1139.372 2385.85 14.1536 1759.23 2390.3 9.68373 1201.904 13.6536 1696.582
Ph Mud 1 ECD Ph cement
ppg psi ppg psi ppg psi
11 7.708958 11.00431 7.7197049 12.918735811 9.062705
11 15.78056 11.00431 18.32651 12.918735811 21.51478
11 61.94932 11.0351 53.128426 12.918735811 62.19716
11 115.7419 11.0351 118.65848 12.918735811 138.9128
11 173.4779 11.0351 172.7157 12.918735811 202.1973
11 227.3866 11.0351 230.65944 12.918735811 270.0318
11 281.2644 11.0351 280.85367 12.918735811 328.7939
11 342.7893 11.0351 346.42986 12.918735811 405.5636
11 400.4406 11.0351 404.26514 12.918735811 473.271
11 458.0839 11.0351 458.2449 12.918735811 536.4648
11 515.7581 11.0351 519.95063 12.918735811 608.7034
11 569.5741 11.0351 573.94014 12.918735811 671.9086
12 684.2472 12.46239 713.49013 12.918735811 739.6167
12 747.1464 12.46239 778.81298 12.918735811 807.3316
12 810.0206 12.46239 857.16152 12.918735811 888.5491
12 872.8699 12.46239 909.38091 12.918735811 942.6807
12 931.5571 12.46239 970.32299 12.918735811 1005.854
12 994.4189 12.46239 1035.6134 12.918735811 1073.536
12 1053.062 12.46239 1096.5037 12.918735811 1136.655
12 1120.086 12.46239 1161.7617 12.918735811 1204.303
12 1178.736 12.46239 1227.0392 12.918735811 1271.971
12 1241.598 12.46239 1292.3167 12.918735811 1339.639
12 1300.229 12.46239 1353.194 12.918735811 1402.745
12 1363.034 12.46239 1418.4326 12.918735811 1470.373
12 1430.089 12.46239 1492.4198 12.918735811 1547.069
12 1488.77 12.46239 1549.0199 12.918735811 1605.742
Pressure Window
0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500
0
Conductor
200
Surface
400
600
800 Intermediate
1000
Production
TVD, ft
1200
1400
1600
1800
2000
2200
2400
Pf Prf Pf margin Prf margin Mud 1 P
2600 Pressure, Psi
PPFG Window
densitas, ppg
8 9 10 11 12 13 14 15 16
0
500
1000
depth, ft
1500
2000
2500
on
DATA SG MATERIAL
Component Specific Gravity Density (lb/gal)
Fresh Water 1 8.33
Sea Water 1.03 8.5799
Saturated Salt Water 1.2 9.996
Diesel #2 0.84 6.9972
API Bentonite 2.6 21.658
API Barite 4.2 34.986
API Hematite 5.05 42.0665
Lime, Ca(OH)2 2.2 18.326
Calcium Carbonate - -
Aragonite 2.71 22.5743
Calcite 2.83 23.5739
Gypsum 2.3 19.159
Potassium Hydroxide, KOH 2.1 17.493
Lignosulfonate 0.45 3.7485
Lignite 1.5 12.495
Soda Ash, Na2CO3 2.53 21.0749
Salt, KCL 1.984 16.52672
Coconut Shell 1.6 13.328
Soltex 1.54 12.8282
PAC-UL 1.55 12.9115
XCD 1.5 12.495
PAC-R 1.6 13.328
STARCH 1.09 9.0797
PHPA 1.03 8.5799
PAC-LV 1.6 13.328
Durian Peel 0.4 3.332
Detergent 1.01 8.4133
Kulit Kacang 0.93 7.7469
Resinex II (2 to 8 ppb) 1.35 11.2455
CMC 1.59 13.2447
Caustic Potash (KOH) 2.04 16.9932
Egg Shell 2.47 20.5751
Attapulgite 1.47 12.2451
Tannate 1.046 8.71318
Defoamer 0.925 7.70525
Biocide 2.21 18.4093
Xanthan Gum 1.5 12.495
MI Lube 0.91 7.5803
NaBr 3.21 26.7393
CaCl2 2.24 18.6592
CaBr2 3.35 27.9055
ZnBr2 4.2 34.986
Density
Komposisi Fungsi
lb/gal
Air fasa cair/base fluid 349.86
Barite weighting agent 1469.412
XCD viscosifier 524.79
KCl Polymer shale inhibitor 694.12224
CaCO3 lost control material 990.1038
TOTAL 4028.28804
Density
Komposisi Fungsi
lb/gal
Air fasa cair/base fluid 349.86
Barite weighting agent 1469.412
XCD viscosifier 524.79
KCl Polymer shale inhibitor 694.12224
CaCO3 lost control material 990.1038
TOTAL 4028.28804
Density
Komposisi Fungsi
lb/gal
Air fasa cair/base fluid 349.86
Barite weighting agent 1469.412
XCD viscosifier 524.79
KCl Polymer shale inhibitor 694.12224
CaCO3 lost control material 990.1038
TOTAL 4028.28804
Section Surface
Depth 420 ft
17 1/2 in
Bit Size
1.458 ft
Max Density 11 ppg
701.823 cuft
Vmud min
124.924 bbl
SF 2.000
Volume 249.849
Section Intermediate
Depth 1010 ft
12 1/4 in
Bit Size
1.021 ft
Max Density 11 ppg
826.981 cuft
Vmud min
147.203 bbl
SF 2.000
Volume 294.405
Section Production
Depth 1400 ft
8 1/2 in
Bit Size
0.708 ft
Max Density 12 ppg
551.910 cuft
Vmud min
98.240 bbl
SF 2.000
Volume 196.480
Hole Volume + SF V total + SF Density
-
249.981448501039 11.051076707 241.355515286
4161.427951 741.1269726427
294.561473483724 11.051076707 580.402548663
196.58405065796 12.00345766 873.851717618
Production
12.0034576595941
15-25
10,-20
water base
XCD, KCl polymer, CaCO3
Surface
Volume Massa Massa Total Volume
Density
bbl lb lb bbl
249.981448501039 - 87029.84681002 248.75620765
249.981448501039 110 27497.95933511 18.713580218
249.981448501039 2 499.9628970021 0.9526913565
11.0510767072
249.981448501039 2 499.9628970021 0.7202807635
249.981448501039 2 499.9628970021 0.504960083
116 116027.6948361 249.9814485
Intermediate
Volume Massa Massa Total Volume
Density
bbl lb lb bbl
294.561473483724 - 102550.1694911 293.11773135
294.561473483724 110 32401.76208321 22.050835357
294.561473483724 2 589.1229469674 1.1225879818
11.0510767072
294.561473483724 2 589.1229469674 0.848730833
294.561473483724 2 589.1229469674 0.5950112978
116 136719.3004153 294.56147348
Production
Volume Massa Massa Total Volume
Density
bbl lb lb bbl
196.58405065796 - 68439.79789958 195.62052792
196.58405065796 150 29487.60759869 20.067624056
196.58405065796 2 393.1681013159 0.7491912981
12.0034576596
196.58405065796 2 393.1681013159 0.5664248725
196.58405065796 2 393.1681013159 0.3970978612
156 99106.90980222 196.58405066
USD 8,016.97
Q 502 gpm Drillpipe AV
Densitas 12 ppg OD 4.5 in
PV 18 cp ID 3.826 in
YP 10 lb/100ft Drillcollar
Dcasing 7 in OD 6 1/2 in
Dhole 8 1/2 in ID 2.8125 in
Ploss Drillstring
Drillpipe Va > Vc, Nre > 3000 = aliran turbulen
24.48 Q 1.08 PV 1.08 ( PV ) 2 12.34d 2YP
Va Vc
Di2 d
Va 839.50869624 fpm Vc 22.92909 fpm
Va > Vc = Turbulen
Drillcollar
24.48 Q 1.08PV 1.08 ( PV ) 2 12.34d 2YP
Va Vc
Di2 d
Va 1553.5672889 fpm Vc 22 8/9 fpm
Va > Vc = Turbulen
Surface Casing
MW = 11
L = 420
String OD = 4.5
Hole = 17 1/2
V = 43
D = 420
YP = 10
PV = 18
APL = 243
ECD = 11.57844
P = 1/9
ECD = 11.00431
19.22691
Ploss Annulus
Drillpipe Va > Vc, Nre < 3000 = aliran laminar
24.48 Q 1.08 1.08 ( PV ) 2 9.26d H d p YP
2
Va Vc
d H d p
2
( D 2 Do )
Va 236.3261538 Vc 48.79733 fpm
Va>Vc = Turbulen
V ( D Do ) PV L V YP L
N re 15.47 PA
2
1000 ( ID OD) 200 ( ID OD)
Nre 9749.2416 Pa 32.22477 psi
Drillcollar Va > Vc, Nre < 3000 = aliran laminar
24.48 Q 1.08 1.08 ( PV ) 2 9.26d H d p YP
2
Va Vc
d H d p
2
( D 2 Do )
Va 409.632 Vc 12.61017 fpm
Va>Vc = Turbulen
V ( D Do ) PV L V YP L
N re 15.47 PA
2
1000 ( ID OD) 200 ( ID OD)
Nre 8449.34272 Pa 47.144 psi
Pparasitic PDP PHWDP PDC PDC hole PHWDP hole PDP hole PDP ca sin g Psc
Pparasitic = 353.353 psi
Ploss total
Pparasitic
PLosstotal
52%
Ploss total = 679.5246 psi
Pbit
BHHP = 95.5299
HHHP = 199.0206
48 %
on Casing
ppg
ft
inch
inch
bbl
ft
cp
lb/100ft
psi
ppg
psi
ppg
HP Pompa
q = 502
ΔP total = 679.5246
HP mud pump = 199.0206
IHP = 227.1176
IHM min = 272.5412
Section Bit size Formasi Lithologi
Conductor - Nilo (Minas), Korinci gravel, sand , and clay
Surface 17 1/2 Korinci, Binio gravel, sand , and serpih
batupasir regresi, batubara, serpih, endapan
Intermediate 12 1/4 Telisa, Tualang
sedimen, batu lanau
Production 8 1/2 Tualang, Lakat serpih marine, batu lanau
17 1/2 Inch Tricone Rock Drill Bits/ Bearing Tricone Bits/ Water Well Drill Bit - China 17 1/2" Tricone Rock Bit and Dr
IADC Code Bit type Jumlah RPM WOB Keterangan
- - - - - Hammer
Tricone (roller cone
537 1 220-50 0.45-1 Bor, Semen
bit)
Tricone (roller cone
537 1 220-50 0.45-1 Bor, Semen
bit)
Tricone (roller cone
537 1 220-50 0.45-1 Bor, Semen
bit)
Perhitungan harga
Bit size
USD
Casing Design
Collapse
Top, MD
Base, MD (ft) OD (in) Weight (lbs/ft) Grade Cost ($) Pressure
(ft)
(psi)
0,0 60 20" 106.5 K-55 12.235 770
0,0 420,0 13 3/8" 54.5 J-55 10.83 1130
0,0 1010,0 9 5/8" 36 J-55 16.13 2020
0,0 1400 7" 20 J-55 14.085 2270
Mud at Shoe (ppg)
Shoe (ppg)
11
11
11
12
Casing Design
0.35069 24.47
0.15459 151.62
0.07731 543.0433
0.04049 657.3
Conductor Surface
Intermediate Production
Production
Page 40
Prepared By Drillingformulas.com
Page 41
Prepared By Drillingformulas.com
Page 42
Prepared By Drillingformulas.com
Page 43
Prepared By Drillingformulas.com
Page 44
Prepared By Drillingformulas.com
Page 45
Prepared By Drillingformulas.com
Page 46
Prepared By Drillingformulas.com
Page 47
Prepared By Drillingformulas.com
Page 48
Prepared By Drillingformulas.com
Page 49
Prepared By Drillingformulas.com
Page 50
Prepared By Drillingformulas.com
Page 51
Prepared By Drillingformulas.com
Page 52
Prepared By Drillingformulas.com
Page 53
Prepared By Drillingformulas.com
Page 54
Prepared By Drillingformulas.com
Page 55
Prepared By Drillingformulas.com
Page 56
Prepared By Drillingformulas.com
Page 57
Prepared By Drillingformulas.com
Page 58
Prepared By Drillingformulas.com
Page 59
Prepared By Drillingformulas.com
Page 60
Prepared By Drillingformulas.com
Page 61
Prepared By Drillingformulas.com
Page 62
Prepared By Drillingformulas.com
Page 63
Prepared By Drillingformulas.com
Page 64
Prepared By Drillingformulas.com
Section Depth Bit
Conductor 180 -
Surface 420 17 1/2
Intermediate 1010 12 1/4
Production 1400 8 1/2
Bit @ Surface
WOB 10148.32 lbs
Bit size 17 1/2 in
579.904 in
RPM 216.94103404 rpm
ROP 14.348892782 ft/hr
Neutral Point
Trayek
Surface
WOB 10148.32
WDC 12685.4
BF 0.83206106870229
Lnp 0.961467889908257
L DC 134.605504587156
Intermediate
WOB 31781.3333333333
WDC 30505.3666666667
BF 0.83206106870229
Lnp 1.25210474571432
L DC 421.541931057154
Production
WOB 33200
WDC 42284.6666666667
BF 0.816793893129771
Lnp 0.961264027274566
L DC 448.589879394798
orkstrings International
Workstrings International
gtools.com)
IDR to USD (HARGA / USD 2.05
m ke ft 32.80839895
Price (USD)
1000
1000
1000
Bit @ Production
33200 lbs
8 1/2 in
3905.882352941 in
216.9410340393 rpm
26.89943432605 ft/hr
Price
USD 17.48
USD 42.03
USD 58.26
USD 117.77
Top Drive PDSI PERTAMINA - BISNIS KAMI
Depth OD ID
Trayek Cement Density
ft in in
Conductor 60 20 19 -
Surface 420 13 3/8 12.615 12.5
Intermediate 1010 9 5/8 8.921 12.5
Production 1400 7 6.456 12.5
Displa
Komposisi Fungsi Density Volume Massa
lb/gal bbl lb
Air fasa cair/base fluid 349.86 170.9486849621 -
Barite weighting agent 1469.412 170.9486849621 240
Bentonite viscofifier 909.636 170.9486849621 30
TOTAL 2728.908 270
CPF 377
19500
Wadd Wair
Vadd Vair
420
1141.34050973307
1010
2974.48744087306
690
559.121983914209
1100
Surface Casing
Quantity Volume Fraksi ρ pengukuran
480 152.866242038217 20.909873103695
525.7 525.7 71.9080952344232
40 15.3846153846154 2.10439107517956 12.5416
15 6.81818181818182 0.93262786286367
40 30.3030303030303 4.14501272383853
731.072069544044 100 12.5416
Intermediate Casing
Quantity Volume Fraksi ρ pengukuran
330 105.095541401274 20.4038732613376
374.2 374.2 72.649412835129
30 11.5384615384615 2.24014552589511 12.5206
20 9.09090909090909 1.76496314161433
20 15.1515151515152 2.94160523602388
515.07642718216 100 12.5206
Production Casing
Quantity Volume Fraksi ρ pengukuran
350 111.464968152866 21.0213747690694
383 383 72.2306449279378
30 11.5384615384615 2.17605879477619 12.6149
20 9.09090909090909 1.71447056558124
20 15.1515151515152 2.85745094263541
530.245853933752 100 12.6149
Displacement Fluid
Massa Total Volume Density Massa
lb bbl ton
48067.1258108099 137.389601014148 0.1561876499
41027.6843909073 27.9211578447075 0.6559881297
13.1233019361591
5128.46054886342 5.63792610325824 0.4060878898
94223.2707505806 170.948684962114 1.2182636695
Perhitungan Washer
Surface
Volume water head 10 bbl
Volume water behind 8.8993173836715 bbl
Intermediate
Volume water head 10 bbl
Volume water behind 8.60185405019771 bbl
Production
Volume water head 10 bbl
Volume water behind 8.51735349435436 bbl
Density spacer 12 ppg
Volume total 26.0185249282236 bbl
ρ teoritis Annulus volume (bbls) Total Quantity (sack) Volume Field (bbls)
10.927328400469
37.578581533329
12.9187358105439 52.2591808485837 188 1/9 1.0997375377395
3.5631259669489
2.1661496955476
12.9187358105439 52.2591808485837 188.099551579999 55.334923134034
ρ teoritis Annulus volume (bbls) Total Quantity (sack) Volume Field (bbls)
11.555800601869
41.145233447238
12.9187358105439 56.6353282725259 203.850877083483 1.268713772373
0.9995926691424
1.6659877819039
12.9187358105439 56.6353282725259 203.850877083483 56.635328272526
ρ teoritis Annulus volume (bbls) Total Quantity (sack) Volume Field (bbls)
3.2757839368691
11.255780794736
12.9187358105439 15.583109919571 56.0892065374304 0.3390976339045
0.2671678327732
0.4452797212887
12.9187358105439 15.583109919571 56.0892065374304 15.583109919571
Price Massa
(USD) sack 124.477619040681
0 0
108.23804140842 3.60433038323077
690.3494127348 2.231252142
798.58745414322 5.83558252523077
1597.17490828644
Waktu
Surf
Densitas cement 12.91874 ppg
PV 49 cp
Bit size 17.5 in
OD casing 13.375 in
ID Casing 12.615 in
Vol. Total Cement 409.6298 bbl
Interme
Densitas cement 12.91874 ppg
PV 49 cp
Bit size 12.25 in
OD casing 9.625 in
ID Casing 8.921 in
Vol. Total Cement 509.6623 bbl
Produ
Densitas cement 12.91874 ppg
PV 49 cp
Bit size 8.5 in
OD casing 7 in
ID Casing 6.456 in
Vol. Total Cement 184.164 bbl
Wak
Surface
98.92891 min
Casing
1.648815 hr
97.11328 min
Annulus
1.618555 hr
Waktu operasi
Intermediate Production
68.491545091 min 34.19868
Casing Casing
1.1415257515 hr 0.569978
65.174727868 min 33.2367
Annulus Annulus
1.0862454645 hr 0.553945
Horse power
Pf @420 ft 207.83770582 psi
Ppompa 55.671504805 psi
HP 45.19936285 HP
Intermediate Casing
Rate pompa @annulus 328.43737591 gpm
Rate pompa @casing 312.53224858 gpm
Rate total 640.96962449 gpm
Efisiensi pompa 0.85
Rate effisiensi 544.82418082 gpm
Rate pompa 1185.7938053 gpm
Horse power
Pf @1010 ft 701.9488485 psi
Ppompa 217.54579963 psi
HP 157.71961876 HP
@Production Casing
Rate pompa @annulus 232.72134064 gpm
Rate pompa @casing 226.17511454 gpm
Rate total 458.89645519 gpm
Efisiensi pompa 0.85
Rate effisiensi 390.06198691 gpm
Rate pompa 848.9584421 gpm
Horse power
Pf @1400 ft 751.99226588 psi
Ppompa 585.08383757 psi
HP 229.34677621 HP
𝐾𝑒𝑐𝑒𝑝𝑎𝑡𝑎𝑛 𝐴𝑙𝑖𝑟 @𝑐𝑎𝑠𝑖𝑛𝑔=(𝑁𝑟𝑒×𝑃𝑉)/(928×𝜌𝑠𝑒𝑚𝑒𝑛×𝐼𝐷 𝐶𝑎𝑠𝑖𝑛𝑔)
ft/s
ft/min
𝑅𝑎𝑡𝑒 𝑃𝑜𝑚𝑝𝑎 (𝑔𝑝𝑚)@𝑐𝑎𝑠𝑖𝑛𝑔=(𝐾𝑒𝑐𝑒𝑝𝑎𝑡𝑎𝑛 𝐴𝑙𝑖𝑟 (𝑓𝑡/𝑚𝑖𝑛)×(𝐼𝐷𝐶𝑎𝑠𝑖𝑛𝑔)2)/24,5
gpm
min
"Kecepatan Alir @annulus=" "Nre×PV" /("928×ρsemen× " (𝑏𝑖𝑡 𝑠𝑖𝑧𝑒 −𝑂𝐷 𝐶𝑎𝑠𝑖𝑛𝑔))
ft/s
ft/min
gpm 𝑅𝑎𝑡𝑒 𝑃𝑜𝑚𝑝𝑎 (𝑔𝑝𝑚)@𝑎𝑛𝑛𝑢𝑙𝑢𝑠=(𝐾𝑒𝑐𝑒𝑝𝑎𝑡𝑎𝑛 𝐴𝑙𝑖𝑟 (𝑓𝑡/𝑚𝑖𝑛)×(𝐵𝑖𝑡𝑠𝑖𝑧𝑒2 −𝑂𝐷𝑐𝑎𝑠𝑖𝑛𝑔2))/24,5
min
on
min
hr
min
hr
)/24,5
𝐷 𝐶𝑎𝑠𝑖𝑛𝑔))
𝑂𝐷𝑐𝑎𝑠𝑖𝑛𝑔2))/24,5
𝑜𝑚𝑝𝑎 (𝑔𝑝𝑚))
asumsi har 15700
Section Top (ft) Bottom (ft) OD (in) ID (in)
Conductor 0 180 20" 19
Surface 0 420 13 3/8" 12.615
Intermediate 0 1010 9 5/8" 8.921
Production 0 1400 7" 6.456
CASING
Conductor Casing (0-180 ft) Surface Casing (0-420 ft)
Length 180 ft Length 420
Weight 107 lbs Weight 55
y 11 y 11
Weight at
Weight at Bouyant 88.9275 lbs 45.5075
Bouyant
DRILLSTRING
Drilpipe
Surface Casing (0-420 ft) Intermediate Casing (0-1010 ft)
WOB 10148.32 ft WOB 24404.2933333
WOB 80 % WOB 80
WDC 12685.4 lbs WDC 30505.3666667
Drill collar
Drilling depth 420 ft Drilling depth 1010
Length 140 ft Length 336.666666667
Weight 12685.4 lbs Weight 30505.3666667
CASING
ng (0-420 ft) Intermediate Casing (0-1010 ft) Production Casing (0-1500 ft)
ft Length 1010 ft Length 1400 ft
lbs Weight 1,010 lbs Weight 1,400 lbs
y 11 y 12
Weight at
lbs Weight at Bouyant 843.35 lbs 1148 lbs
Bouyant
Horizontal Load
a 67.5
b 59
beban total 33759.12294 lbs
Horse Power pada Hoisting System
Horse Power Drawwork (HPDW)
W 133506.7 lbs
Vh 30 ft/min
n 0.9
HP drawwork 134.8552 HP
HP hoisting 149.8391 HP
Drilling Time
Operasi Depth (ft) Calculation
Persiapan 0
Rig move, rig Up, BOP 0
Hammer 20" Conductor Casing 60 0.174229471083
Drilling 17.5" OH, Circulating, Roundtrip, POOH, dan L/D BHA 420 1.25195268176
RIH & Cement casing 13 3/8", WOC & BOP test 420
Drilling 12.25" OH, Circulating, Roundtrip, POOH, dan L/D BHA 1010 3.010648115662
RIH & Cement casing 9 5/8", WOC & BOP test 1010
Drilling 8.5" OH, Circulating, Roundtrip, POOH, dan L/D BHA 1400 2.16857100511
RIH & Cement casing 7", WOC & BOP test 1400
Well Completion (formation, tubing, wellhead) 1400
Rig down and Rig move 1400
Total Operation Days
Drilling Duration
Drill Bit Depth (Ft) ROP (Ft/Hr) Cement, Etc (Day)
(Day)
17 1/2 420 14.3488927818399 1.2196062975778 1
12 1/4 1010 13.9781640751727 1.7586954339016 2
8 1/2 1400 26.899434326054 0.604101922852 1
Time (days) Total Time Ket
1 0 A
Drilling Time
1 2 B 0 2 4 6 8 10 12 1
0
1 3 C
1 4 D 200
A B C
1 5 E 400
2 7 F E
600
depth,ft
2 9 G
800 D
2 11 H
2 13 I 1000
2 15 J 1200
G
1 16 K 1400 F
16 days
1600 I
days H
Trip Time (Day)
0.0175 Drilling Time
0.04208333333
0.05833333333
g Time
8 10 12 14 16 18
I J K
days H
ling Time
Well Data
Depth 1500 ft
pb 2.1 m
Δtc 143.1 gr/cc
por 0.25 us/ft
GRmax 45
GRmin 26
GRread 28
Vshale 0.10526316
Kekuatan Formasi
tho 0.283157894736842
A 0.302496328928047
B 0.596671561429271
G/Cb 340835716490.645
Unconsolidated
> 0,8 x 1012 psi2 (kompak)
< 0,8 x 1012 psi2 (tdk kompak)
Faktor Sementasi
F 12.2129525803816
m 1.80517006030608
Moderately Cemented
Case Hole Completion
Completion
Formation Completion Cased hole
Tubing Completion Single Tubing
Wellhead Completion Single Packer
PRICE (USD)
USD 9,000.00
USD 5,500.00
USD 15,000.00
USD 29,500.00
Jenis
Section Trayek Lithology
Formasi
Middle Section
Top 960 ft
Bottom 1060 ft
Volume 22.7420285714 bbl
Bottom section
Material Role SG BWOC add WCR Quantity Volume
Cement kelas G base cement 3.14 - 130 41.40127
Water base fluid 1 - 250 250
Bentonite extender 2.6 5.3 44 20 3.773585
Flakes LCCA 2.2 1.5 10 6.666667
CaCl2 Accelerator 1.32 2 15 7.5
Total semen 26.19610155 sack 195.731707108 309.3415
Total bentonite 2.387685308 sack
Total air 158.1841517 bbl
Total Flakes 4.218244044 sack
Total CaCl2 4.74552455 sack
Middle Section
Material Role SG BWOC add WCR Quantity Volume
Cement kelas G base cement 3.14 - 30 9.55414
Water base fluid 1 - 44 80 80
44
Bentonite extender 2.6 2.6 27 10.38462
Total semen 7.825498862 sack 137 99.93876
Total bentonite 8.505715301 sack
Total air 65.52551047 bbl
Top section
Material Role SG BWOC add WCR Quantity Volume
Cement kelas G base cement 3.14 - 50 15.92357
Water base fluid 1 - 44 95 95
Bentonite extender 2.6 2.6 15 5.769231
Total semen 20.10588399 sack 160 116.6928
Total bentonite 7.284516432 sack
Total air 119.9517039 bbl dik 1 sak 50 kg
Cost Total
TOTAL u/ cement plug ton USD/ton
Semen 54.12748441 sack 2.70637422026055 811.912266078
Bentonite 18.17791704 sack 0.908895852074299 90.8895852074
Air 343.661366 bbl 17.1830683020803 0
Flakes 4.218244044 sack 0.210912202210035 38.8078452066
CaCl2 4.74552455 sack 0.237276227486289 28.4731472984
total cost USD 970.08
Data Squeeze
TOC 1248.885 ft
Kapasitas casing 0.04048954342 bbl/ft
Kapasitas Annulus
0.02258597241 bbl/ft
Kapasitas Tubing 0.04048954342 bbl/ft
n
Fraksi Densitas pengukuran Densitas teoritis V Field,bbl Quantity,sak
13.383678063944 7.27799081309 26.1961015483801
80.81682523228 43.9478676021 158.184151657526
1.2198766072797 11.449966165259 11.4 0.66336403928 2.38768530803813
2.1551153395275 1.17194313606 4.2182440442007
2.4245047569684 1.31843602806 4.74552454972579
54.3796016186
n
Fraksi Densitas pengukuran Densitas teoritis V Field, bbl Quantity,sak
9.5599950974384 2.17413681649 7.82549886190535
80.049025615884 11.4245769236426 11.4 18.2047722767 65.5255104703541
11.4245769236426 11.4
10.390979286677 2.36311947823 8.5057153014402
22.7420285714
0.05 ton
bbl
Fraksi Densitas pengukuran Densitas teoritis V Field Quantity,sak
10.250344963532 1.16556819014 4.19529832540152
80.46520796373 11.4001497338853 11.4 9.14971029259 32.9330918544019
9.284447072738 1.05573580299 3.79997213704638
11.3710142857
bbl
Fraksi Densitas pengukuran Densitas teoritis V Field Quantity,sak
10.539238395256 3.59198649704 12.9288488338796
80.369220791254 11.4259502918558 11.4 27.3914627445 98.5917072503561
9.0915408134902 3.09858175843 11.152908059995
34.082031
Perhitungan slurry cement @perfo Volume spacer (fresh water)
panjang kolom 7.11 ft V water ahead 5 bbl
with SF 129.11 ft h water ahead 221.3763 ft
vol.cement kolom casing 5.2277669 bbl V water behind 8.963427 bbl
total lubang perfo 35.57 lubang h water behind 221.3763 ft
vol.cement annulus 0.1606766 bbl V spacer 13.96343 bbls
10 cuft
IRT
0.2811358 cuft/hole
Vol.cement yg msuk
1.7809439 bbl Volume displacement fluid (mud)
formasi
Vol cement yg msuk perfo 1.9416205 bbl h cement slurry 4.45713 ft
Total cement @perfo 7.1693874 bbl V displacement fluid 42.19681 bbl
with 50% access 10.754081 bbl h dispacement fluid 1042.17 ft
Total sack 36.395762 sack
0-60 ft
BP
BP : 330 ft
Mud
330-910 ft
CR
910-1060 ft
CR
CR
CR : 1060,885 ft Mud 50 ft
@1110,885 ft
100 ft
@1160,885 ft
Top perfo :1260,885 ft
Bottom perfo :1268 ft
100 ft @1368 ft
TOTAL
Barite 17.8616142312402 sack
Bentonite 14.9524839258713 sack
Air 20.5355699225721 ton
Top section (330-910)
Massa Massa Total Volume
Density
lb lb bbl
105 42086.8582463 120.296284932035
55 7254.70711429 4.93714976758439
13.015579886618
46 6067.57322286 6.67033101466646
101 55409.1385835 131.903765714286
Cost Total
ton USD/ton
3.25081379008571 536.3842753641
2.72135207450857 272.1352074509
20.5355699225721 0
total cost USD 808.52
USD 50,110.23
USD 776,708,548.49
Massa Price Massa
ton (USD) sack
18.7707387778595 0 0
3.23559937297143 533.873897 17.77802
2.70613765739429 270.613766 14.86889
24.7124758082252 804.487662 32.64691
REFERENCE
Rigless method
Electronic CTU
CTU- LGC180
USD 48,000.00 USD/Day
Lama pengerjaan
1 hari
2 hari
1 hari
4 hari
E-CTU cost
96000 hari
96000 hari
192000 hari
PT.BUKITAPIT
untuk harga 1 kali job CTU Rp 750,000,000.00
USD 48,000.00
CTU SPECIFICATION
Model LGC450 LGC360
Main Truck Mercedes-Benz / MAN / Sinot
Chassis
Auxiliary Truck Mercedes-Benz / MAN / BEIBE
Power Source Chassis Engine
Tubing Reel Model LGGT 148-78-86 LGGT 148-78-86
2"-21,650 ft 2"-21,650 ft
(1 3/4"-28,990 ft) (1 3/4"-28,990 ft)
Tubing Reel Capacity
2"-6,600 m 2"-6,600 m
(1 3/4"-8,800 m) (1 3/4"-8,800 m)
Injector Model ZRT-100K ZRT-80K
Continuous Pulling Capacity 100,000 lb (45,000 kg) 80,000 lb (36,000 kg)
Continuous Snubbing Capacity 50,000 lb (22,500 kg) 40,000 lb (18,000 kg)
Well Control Equipment 3 1/16" / 4 1/16" / 5 1/8"
Max. Working Pressure 10,000 psi (69 MPa) /15,000 psi (103.5 M
Crane (Optional) 18 t
Model LGC180
Main Truck Mercedes-
Chassis
Benz ,
Power Source Chassis Engine
Tubing Reel Model LGGT 110-72-78
Tubing Reel Capacity (1 1/2"-4,400 m)
Injector Model ZRT-40K
Continuous Pulling Capacity 40,000 lb (18,000 kg)
Continuous Snubbing Capacity 20,000 lb (9,000 kg)
Well Control Equipment 3 1/16"
Max. Working Pressure 10,000 psi (69 Mpa) 1
Crane (Optional) 18 t
ION
LGC270 LGC180
edes-Benz / MAN / Sinotruck,
edes-Benz / MAN / BEIBEN / Sinotruck
Chassis Engine
LGGT 120-72-78 LGGT 110-72-78
1 1/2"-20,670 ft 1 1/4"-22,000 ft
(1 3/4"-14,100 ft) (1 1/2"-14,440 ft)
1 1/2"-6,300 m 1 1/4"-6,700 m
(1 3/4"-4,300 m) (1 1/2"-4,400 m)
ZRT-60K ZRT-40K
60,000 lb (27,000 kg) 40,000 lb (18,000 kg)
30,000 lb (13,600 kg) 20,000 lb (9,000 kg)
6" / 4 1/16" / 5 1/8"
MPa) /15,000 psi (103.5 MPa)
18 t
RIG SPECIFICATION
No Component Unit
Reclamation Equipment Rental
1
Reclamation Equipment Set
Rig
Rig beroperasi Day
2
Mobilisasi Day
Demobilization Day
Plugging
Mud Cost Set
Cement Set
Cementing Pump Unit Operation Day
3
Cement Retainer set
Bridge Plug Set
H2S Safety
H2S Unit, Equip, Personnel - Operation Day
Destruction Production Facilities
4
Pipeline Set
Gathering Station Set
Tank and Accessories Set
Terminal Set
5 Power and Control Cable Set
Supporting Facilities Set
Transportation
Truck Set
Storage
6
Warehouse Set
Restoration
7
Reforestation Set
TOTAL
Pencadangan Dana ASR/Tahun
Unit Price Quantity Sub total 750000*
mation Equipment Rental
- - -
Rig
USD 8,000 4 USD 32,000
USD 362 1 USD 362
USD 362 1 USD 362
Plugging
USD 809 6 USD 4,851
USD 257 6 USD 1,541
USD 8,017 6 USD 48,102
USD 508 1 USD 508
USD 500 1 USD 500
H2S Safety
USD 500 6 USD 3,000
tion Production Facilities
USD 600 1 USD 600
USD 5,500 1 USD 5,500 TOT. COST ASR
USD 3,800 1 USD 3,800 USD 50,110.23
USD 3,100 1 USD 3,100 Rp 778,562,626.96
USD 1,800 1 USD 1,800
USD 2,000 1 USD 2,000
Transportation
USD 500 4 USD 2,000
Storage
USD 1,000.00 1 USD 1,000
Restoration
USD 2,500 1 USD 2,500
USD 113,525
-
BIDANG JUMLAH KARYAWAN
OH 1
LPG JBB 4
Storage And Distribution 20
Plan And Maintenance 11
General Administration 22
HSE 20
Security 20
Umum 16
Total 114
TOTAL; $ 33,874.55
APD STANDARISASI HARGA JUMLAH
Helm ANSI Z89.1-2003,tipe I Class C Rp 360,000.00 114
Kacamata Pelindung ANZI Z87.1-2003 Rp 210,000.00 114
Pelindung Telinga ANZI Z87.1-2003 Rp 155,000.00 114
Sarung Tangan Bahan Semi Kulit Rp 55,000.00 114
Safety Shoes ANZI Z41-1991 Rp 364,000.00 114
Masker NIOSH P95/R95 Rp 27,000.00 114
Vest ANZI Z41-1991 Rp 190,000.00 114
TOTAL
TOTAL
Rp 41,040,000.00
Rp 23,940,000.00
Rp 17,670,000.00
Rp 6,270,000.00
Rp 41,496,000.00
Rp 3,078,000.00
Rp 21,660,000.00
Rp 155,154,000.00
$ 9,973.07