LECTURE 8 Relese Stratagy
LECTURE 8 Relese Stratagy
Release Procedure
Header & item level release possible Only item level release is possible
Release procedure with classification provides more flexibility and is used in most
of the business scenarios. Let us learn about the item & header level release
strategy for a PR.
Release Procedure
Release Strategy
Note: The SAP system provides the communication structures CEBAN for
mapping characteristics for purchase requisitions.
Note: The SAP system provides the communication structures CEKKO for
mapping characteristics for purchase requisitions.
In communication structure CEBAN, you will find all the fields that can be used as
characteristics for a release condition. E.g. Field BSART for the PR document type.
Go to Tcode : SE11 ABAP Dictionary as shown below:
Table
Characteristics Field Name
Plant
CEBAN
WERKS
EKORG
Purchasing Organisation
EKGRP
Purchasing Group
GSWRT
Total Value Of item
Define Characteristics for Plant (Tcode:CT04)
d
assign them to one class.
Value Change: Specifies the percentage by which the value of the purchase
requisition can be changed after the release procedure has started. If the
requisition is changed more than the specified limit entered here, its subjected
against to the release procedure.
v. Define Release Strategy
Create a release strategy for your release group and assign your
release codes accordingly.
C6
vi.Release Prerequisites
It specify the order in which the individual release points (individuals or
departments) represented by the release codes may release the item or
document
In this release strategy, the codes C1, C2 & C3 must successively release the
purchase requisition. Read the table from left to right, for code C3, release via
code C1 and code C2 is a prerequisite.
viii.Classification
Values are assigned to defined characteristics as shown below.
With these characteristics & their values, release strategy is triggered
during PR Creation. Save the configurations before going to next step.
document.
Also by using Tcode CL24N you can manually assign classes and
characteristics to release strategies S2 as shown below.
From the above images it is clear that release strategy is triggered at item level
for both materials.
Step 5: Release PR (Tcode: ME54N for Individual Release)
Tcode ME54N.
Hence, with above steps it can be concluded that header level release
of PR is completed.