TG 2137 - Summary

Suhaib Bashar Abdel Kareem Otoum <suhaib.otoum@trojan.ae>


Thu 11/9/2023 9:52 AM
To:​Homam Joud <homam.joud@trojan.ae>​
Dear Eng. Homam,

Please find below the Summary as of Today for TG 2137 - ADLI at the table below.

VILLA HARD PRECAST ROYAL ADVANCE ECG TGC

The Precast drawings have


First Floor Slab
been revised incorporating Roof MEP Coordination
Topping Shop
the comments of first floor drawings will be submitted N/A
Drawings will be
wall shifting and the on 9/11/2023
submitted on 9/11
canceled shaft
T2
The Precast Drawings have
been submitted to third
party for their review and
approval

Foundation Shop
Drawings are
Confirmation of the Builders Work shop approved -
T22 Staircase modification is drawings have been N/A awaiting the final
pending submitted on 4/11/2023 precast drawings in
order to revise
them
First Floor Slab
Slab on Grade
Builders Work shop Topping Shop
Shop Drawings is
V2G N/A drawings will be submitted Drawings will be
Under Review
on 9/11/2023 submitted on
since 1/11/2023
10/11

Slab on Grade
The precast drawings and MEP IFC
Shop drawings will
V2GN Model will be submitted Awaiting IFC Drawings Drawings shall be
be submittted on
on 9/11/2023 issued by ECG
11/11/2023

Regards,