You are on page 1of 1

5100

G.L. G.L.
206a
T
6 NOS. 20 Q 205 201 202 TOP OF PILE CAP
EMPTY BORING
CL OF PIER / PILE CAP 75
TO BE FILLED WITH
LOCAL SAND 75
MIN. 300 TO BE DONE 500 750
EMBEDMENT
WITH CONC. MIX. OF
1800 1300 SAME GRADE
+ 94.162 M
BOTTOM OF PILE CAP
206
1800
PILE
150 mm
CAP
PROJECTION
OF PILE 206
INTO PILE CAP 1200Ø 3600
10 TQ @150C/C 3
6 NOS. 20 Q
T PILE
(LATERAL TIES) BOTTOM OF PILE CAP
EVERY 4TH TIES TO 150
BE TACK WELDED TO
202
MAIN REINFORCEMENT
20 Q
T @150C/C (T) 206
203 204 150 mm THK PCC (M15)
STEEL LINER
2
2
8700
STEEL LINER UPTO 6M DETAIL - 1
(PROVIDED ONLY PIER PORTION.)
4 (SCALE 1:40)
20 DIA INTERNAL RING
TO BE PROVIDED AT
AN INTERVAL OF 2.0 M
204
25Q
T @125C/C(B)
3600
201
20Q
T @150C/C (T)
25 NOS 20 T
Q 1
(UPTO FULL LENGTH) 1200
DETAILS OF LEVELS & HEIGHT OF
750 PIER PORTION :
1. HFL 98.710 M
2. FINISHED ROAD LEVEL 102.100 M
24000

203 206a
3
25Q
T @125C/C (B) 99.916 M
3. TOP OF PIER CAP
750 1800 1800 750
4. TOP OF PILE CAP 95.000 M
PLAN SHOWING REINFORCEMENT DETAIL OF PILE CAP
75
5. SCOUR LEVEL 89.379 M
COVER
SCALE 1:75 1
6. (FOND. LEV.) 69.200 M
7. H2 5.150 M
SECTION 2-2
CL OF PIER & PILE CAP
(REINFORCEMENT ONLY)
SCALE 1:30
16T CHAIR BAR 205
Q
4 PLACED AT SUITABLE
POSITION 213
PIER 202
20 DIA INTERNAL RING 202
TO BE PROVIDED AT 201
AN INTERVAL OF 2.0 M TOP OF PILE CAP
206
LEGEND:-
6 NOS. 20 Q
T 1 OPP. EARTH FACE / TOP BAR
206 500 500 EARTH FACE / BOTTOM BAR
BOTTOM OF PILE CAP
203 150 mm THK STEEL LINER
75 MM COVER PCC (M15)
(ROLLER TYPE) NOTE:-
COVER BLOCKS 204
TO BE USED 1. ALL DIMENSIONS ARE IN MM & LEVELS ARE IN METRE
5100
+74.162 M UNLESS OTHERWISE SPECIFIED.
2. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
(FOUNDING LEV.)
SECTIONAL ELEVATION SHOWING
3. CONC. GRADE SHALL BE M-25 FOR PILE CAP & M35
1200 REINFORCEMENT DETAIL OF PILE CAP FOR PILE.
REINFORCEMENT DETAIL OF PILE (SCALE 1:75) 4. CLEAR COVER = 75 MM.
(SCALE 1:100) 5. DEVELOPMENT LENGTH SHOULD BE AS PER IRC:21-2000
TITLE : RCC DRAWING OF PILE & PILE CAP AT PIER SCALE
DISTRICT: EAST CHAMPARAN DRAWN BY: R.V. DATE :NOV., 2023
DEVELOPMENT OF RURAL EXECUTIVE ENGINEER, SUPERSTAR DESIGNER PVT. LTD.
CONSTRUCTION OF HL BRIDGE AT NH28B TO BALUA TICKULIA AS SHOWN
ROADS/BRIDGES IN THE STATE OF RURAL WORKS DEPARTMENT, PATH AT CHAINAGE 12 KM IN EAST CHAMPARAN DIST.
DESIGNED BY: S.R. CONSULTANT & ENGINEERS
BIHAR WORKS DIVISION CHECKED BY: PATNA REV. - 0