Presentation on Estimates Submitted by Engr Hayatullah CU-514-2011

Slab concrete with ratio 1;2;4

cement Crsushed
bags= stones
length ft depth (d) Volume cft Dry volume sum of 1xDV/(7x Sand cft= cft=
(l) width (w)ft ft =lxwxd (DV) cft Ratio ratio 1.25) 2xDV/7 4xDV/7
Example 20 10 0.5 100 154 1;2;4 7 18 44 88
Put Values 0 0 1;2;4 7 0 0 0
0 0 1;2;4 7 0 0 0
0 0 1;2;4 7 0 0 0
Total 18 44 88

Slab concrete with ratio 1;3;6

cement Crsushed
bags= stones
length ft depth (d) Volume cft Dry volume sum of 1xDV/(7x Sand cft= cft=
(l) width (w)ft ft =lxwxd (DV) cft Ratio ratio 1.25) 2xDV/7 4xDV/7
Example 20 10 0.5 100 154 1;3;6 10 12 46 92
Put Values 0 0 1;3;6 10 0 0 0
0 0 1;3;6 10 0 0 0
0 0 1;3;6 10 0 0 0
Total 12 46 92

Lean concrete with ratio 1;4;8


cement Crsushed
bags= stones
length ft depth (d) Volume cft Dry volume sum of 1xDV/(13 Sand cft= cft=
(l) width (w)ft ft =lxwxd (DV) cft Ratio ratio x1.25) 4xDV/13 8xDV/13
Example 20 10 0.5 100 154 1;4;8 13 9 47 95
Put Values 0 0 1;4;8 13 0 0 0
0 0 1;4;8 13 0 0 0
0 0 1;4;8 13 0 0 0

Total 9 47 95

Bricks and mortar estimate


Mortar cement
Volume bags=
length ft depth (d) Volume cft No of Bricks= cft =Vol.x Mortar sum of 1xVol./(5 Sand cft=
(l) width (w)ft ft =lxwxd Vol. x !3.5 0.3 Ratio ratio x1.25) 4xVol./5
Example 20 0.75 10 150 2025 45.00 1;4 5 7 36
Put Values 0 0 0 1;4 5 0 0
0 0 0 1;4 5 0 0
0 0 0 1;4 5 0 0

Total 2025 7 36