Description of Current Revision: FOR APPROVAL
Owner
Project
TAMBAK LOROK COMBINED CYCLE
POWER PLANT BLOCK 3 PROJECT
WITH NET DEPENDABLE CAPACITY OF 600 – 850 MW.
SEMARANG – CENTRAL JAVA
Subject: DEMINERALIZED WATER STORAGE TANK SIZING CALCULATION
Originator:
TBL/30/E/GHC---BV44/CA/004 Page 1 of 6
1
Tambak Lorok CCPP Block 3 Project Prepared by: Prempree Teerawittayanipon
196541.58.3406.1204 Date: Jul 13, 2018
Demineralized Water Storage Tank Sizing Verified by: Yasin Khanthong
Date: Jul 17, 2018
Page: 2 of 6
Contents
1.0 Purpose 3
2.0 References 3
5.0 Analysis 3
6.0 Conclusions 4
Attachments
Attachment 2 Terminal Point List Between B&V and GE, List of HRSG/BOP Mechanical
Interfaces 5
Attachment 3 Terminal Point List Between B&V and MC, List of HRSG/BOP Mechanical
Interfaces 6
1.0 Purpose:
To determine the dimensions (diameter and height) of Demineralized Water Storage Tank.
2.0 References:
2.1 Tambak Lorok Combined Cycle Power Plant Block 3 Project with Net Dependable Capacity of 600-850 MW,
Semarang - Central Java, Owner's Technical Requirements, Book II.
2.2 B&V Drawing No. 196541-30GHC-M2346 (Project Doc. No. TBL/30/E/GHC---BV44/FD/001), Piping and
Instrument Diagram Demineralized Water Distribution, Rev. C.
2.3 MC Drawing No. DM-900-TCM-B01 (Project Doc. No. TBL/30/E/GHC---ED71/GA/001), Demineralized
Water Storage Tank Capacity 900 cu.m., Rev. 0.
2.4 Terminal Point List Between B&V and GE, List of HRSG/BOP Mechanical Interfaces. (Attachment 2)
2.5 Terminal Point List Between B&V and MC, List of HRSG/BOP Mechanical Interfaces. (Attachment 3)
2.6 INDOSOL Drawing No. IWS-TL01-P-001 (Project Doc. No. TBL/31/E/GHC/---ED10/FD/020), Piping &
Instrumentation Diagram, WTP, Rev. B.
None
4.1 Per Reference 2.4, to be conservative, the maximum demineralized water flow of 25 m3/hr will be considered
as design flow rate for the tank sizing.
4.2 Per Reference 2.1, the storage capacity shall satisfy the demineralized water consumption of the Power Plant
for a period of 24 hours when operating at full load on natural gas with maximum blowdown from the HRSG and
all demineralized water plant trains shutdown.
5.0 Analysis:
Per Reference 2.2, the design demineralized water flow from Demineralized Water Storage Tank to various users
(turbine building cycle makeup and auxiliary boiler deaerator) during normal operation are as follows:
3
m
QTurbine := 25 (Design Basis 4.1)
hr
3
m
QAux_boiler := 8.25 (Ref. 2.5)
hr
3
m
QLab := 2 (Ref. 2.6)
hr
The total demineralized water flow from Demineralized Water Storage Tanks is:
3
m
QDemin := QTurbine + QAux_boiler + QLab = 35.25 ⋅
hr
Per Design Basis 4.2, the Demineralized Water Storage Tank must store a minimum of 24 hours.
TDemin := 24hr
Therefore, the required demineralized water volume in the Demineralized Water Storage Tank is:
3
VDemin := QDemin ⋅ TDemin = 846⋅ m
Tambak Lorok CCPP Block 3 Project Prepared by: Prempree Teerawittayanipon
196541.58.3406.1204 Date: Jul 13, 2018
Demineralized Water Storage Tank Sizing Verified by: Yasin Khanthong
Date: Jul 17, 2018
Page: 4 of 6
VDemin 3 3
VTank := ceil ⋅ 100m = 900⋅ m
3
100m
This is consistent with the volume of Demineralized Water Storage Tank specified in Reference 2.3.
Per Reference 2.3, the diameter of Demineralized Water Storage Tank is:
DTank := 12m
VTank
HDemin := = 7.96 ⋅ m
DTank 2
π⋅ 2
Per Reference 2.3, the actual height of each Service/Fire Water Storage Tank is:
HTank := 9.4m
If the height above overflow drain and below the lowest outlet connections are excluded:
From these results, it can be concluded that the current height of Demineralized Water Storage Tank is sufficient for all
requirements outlined in this calculation.
6.0 Conclusion
The Demineralized Water Storage Tank shall have capacity of 900 m3 with the following dimensions:
Operating Operating
pressure temper.
(barg) °C Design
Design Flow Design pressure
No. T.P No. Designation Fluid temper. REMARK
Continuous/Max (barg)
°C
Demin Water at
TERMINAL POINT DEMIN. WATER TANK TO
7 TP-MG-DW-002 DEMIN WATER 80 kg/s tank's water Ambient 4.0 40.0
CONDENSATE EMERGENCY MAKE UP PUMP
pressure Temp
LIST OF HRSG/BOP MECHANICAL INTERFACES (IN PROGRESS)
Attachment 3
Project no.: 196541
File no.: 58.3406.1204
Terminal Point List
DOC. No. :
Page 6 of 6
Marubeni / Maxi therm design parameters GE Design parameters DATA:
Design Design Schedule Type of Design Design
Stress Analysis Design Flow Direction of Class of Schedule Coordinates
No. T.P No. Terminal Point Location Designation P&ID DWG NO. Fluid pressur temper. Diameter (Thickness Material connection/ Transition piece by pressur temper. Diameter Material REMARK
(Iso. DWG. NO.) Continuous/Max interface Flange (Thickness) Location
e (barg) °C ) Standard e (barg) °C
X Y Unit 21 Y Unit 22 Z MSL
1 TP-BM-DM--010 At flange nozzle of Aux boiler Demin water to Deaerator of Aux boiler Demin water 8.25 m3/h 0.50 30* 40 40 CS Flange PN25 BV WILL PROVIDE STUD BOLTS, GASKET AT TERMINAL
POINT.
Service water to Aux boiler (for cooling BV WILL PROVIDE STUD BOLTS, GASKET AT TERMINAL
2 This is a new TP At flange nozzle of Aux boiler Service water 0.2 m3/h 2 30* 25 40 CS Flange PN16
blowdow water) POINT.
At flange nozzle of Aux boiler Blowdown water discharge to Chemical Drian
3 This is a new TP Chem WW 0.12 m3/h 0 200* 50 40 CS BW N/A
blowdown tank Sump
4 TP to be updated At flange nozzle of Aux boiler Instrument air to Aux boiler Instrument air 0.5 Nm3/h 7.00 25* 40 40 CS Flange PN16 BV WILL PROVIDE STUD BOLTS, GASKET AT TERMINAL
POINT.