You are on page 1of 2
4) ML ell oY gh dey Jai Dall © 056-7410623 © 056-2861197 AL AKSHA TRANSPORTATION AND GENERAL © Abu Dhabi-U.A.E. MAINTENANCE CONTRACTING ce 2 © alialmannaee’é57@gmail.com Date:22/06/2023 ‘Al Hewar Cont. & Irrigation Est. ‘Al Aksha Transportation And General Maintenance P. O Box 25475, Abu Dhabi, UAE Contracting, Tel : +971 24450707 TRN:100570403400003 Fax : +971 2 4455052 ‘Abu Dhabi Customer TRN:100516057500003 United Arab Emirates Mobil-056-74 10623, 056-2861197 Project: Renovation of Hamdan Bin Zayed School Subject: Invoice for Works . Dear Sir, We are pleased to submit our invoice as we completed the works as our mutual agreement. Scope of works : - S.L. Work Details Qunt. U. Price Amount Swimming poo ind Sport Holl 01 __| Emergency Piping and Wiring 635 Meter | _ 10.00 6350.00 02 | Emergency Wiring 286 Meter | 07.00 2002.00 03 | Emergency Light and Ext Light Fixing 90 Pic 25.00 2250.00 04 | Ceiling Rose 56 Pic 17.00 952.00 05 | CCTV and Data Piping 1476 Meter | 05.00 7380.00 06 _| Switch and Socket Fixing 246 Pic 10.00 2460.00 07__| Water Hiter Socket Fixing 11 Pic 10.00 110.00 08 | Projector Light Removing LS 450.00 09 | Socket Damme Covar 121 Pic | _ 03.00 363.00 [10 | Moon Wall Light 15 Pic 25.00 375.00 11 [| PVC Tranking Fixing 252 Meter_| 04.00 1008.00 12 | Cantain Holl old Light Removing and New | 24 Pic 35.00 840.00 Light Fixing 13 | Isolator connection : 20 Pic 25.00 500.00 14 | Isolator connection with Box Fixing 4Pic 60.00 240.00 15 | Emergency Light Fixing Corridor Area 58 Pic 20.00 1160.00 Cable Pulling O1 | Cable Pulling (4Cx150mm) 505 Meter_|_10.00 5050.00 02 | Cable Pulling (4Cx120mm) 315 Meter | 10.00 3150.00 03 | Cable Pulling (4C x35mm) 142 Meter_| 10.00 1420.00 04 | Cable Puling (4Cx25mm) 70 Meter 10.00 700.00 05 | Cable Pulling (2Cx25mm) 510 Meter | 10.00 5100.00 06 | Cable Pulling (2Cxi6mm) 336 Meter | 10.00 3360.00 07 | Cable Pulling (2Cx1 0mm) 430 Meter_| 10.00 4300.00 1a {aL geal 2} gig Jail L_ucall 9 956-7410628 AL AKSHA TRANSPORTATION AND GENERAL © AbUDNabLUAE. MAINTENANCE CONTRACTING © alialmannaee5657@gmail.com Earth Pulling 1 _| Earth Pulling (1Cx95mm) ‘505 Meter_| 08.00 4040.00 02__| Earth Pulling (1Cx70mm) 315 Meter | 08.00 2520.00 03 | Earth Pulling (IC x2Smm) 70 Meter_| 06.00 420.00 04 | Barth Pulling (IC x 25mm) 142 Meter_|~_ 06.00 852.00 05 | Earth Pulling (1C x16mm) 510 Meter_| 06.00 3060.00 06 | Earth Pulling (1C x 10mm) 430 Meter_| 06.00 2580.00 07 _| Earth Pulling (1Cx10mm) 336 Meter_| 06.00 2016.00 Cable Tray O1 | Cable Tray 60¢ 70 Meter_| 45.00 3195.00 02 | Cable Tray 45¢ 81 Meter 45.00 3645.00 03 [Cable Tray 30¢ 33 Meter 40.00 1320.00 04 | Cable Tray 23c 165 Meter_| 40.00 6600.00 05 | Cable Tray 15¢ 15 Meter 25.00 375.00 06 | Cable Tray 10¢ 60 Meter 25.00 1500.00 07 __| Cable Tray Covar 425 Meter_| 18.00 7650.00 08 | Block Shifting 261 Pic 10.00 2610.00 Total Amount 91,903.00 5% Vat 4,595.15 ‘Total Amount with 5% Vat 96,498.15 AE ety Six Thousand Four Hundred Ninety Eight Dhs and Fifteen Term & Conditon 1. Payment should be done within 10 days after submission of invoice. We are looking forward the better future working relationship with your company. Thanks & best regards, Al Aksha Transportation And General Maintenance Contracting. United Arab Emirates Mobil-056-7410623, 056-2861197 ADCB Bank Brahch : Abu Dhabi Main Account No:12517945920001 IBAN:AE150030012517945920001

You might also like