KEYPLAN

14 13

Emergency Exit

A B C D E F
PAVING BLOCK SEGI ENAM WARNA MERAH PAVING BLOCK SEGI ENAM WARNA MERAH

CAMERA CCTV

CAMERA
EL.+0.20M

CCTV

KUSEN ALUMINIUM + KACA


PASS BOX
28500

Sink Wastafel

Sink Wastafel
TERAS

KUSEN ALUMINIUM + KACA

KUSEN ALUMINIUM + KACA

TERAS

6000 6000 6000 5500 5000 Emergency Exit


Emergency Exit

Line Pipa Shell

KUSEN ALUMINIUM + ACRYLIC

Rolling Door

B1
pagar s/s pagar s/s pagar dan pintu s/s

finger screen

LOKET

CAMERA CCTV
pagar s/s

APAR
A
3950

LEGEND
1
14

1000 6400 1700

B1
SECTION-A
C
B1 B PLAFORM
C
13
8100

B1

2
B1
B1

B D D B
B1
13
A E
MR MR C DRAWING STATUS

MR-EXISTING 3 FOR REFERENCE ONLY


4100

525 4050

12
E
SECTION-C
FOR APPROVAL
CONTRACT DRAWING
2000

6000
36150

11
SECTION-B APPROVED DRAWING
FOR CONSTRUCTION
6000

B1
AS BUILT DRAWING

10 SECTION-D
Rev. Description Date Drawn Checked Coord. Approved

PT. BUMITANGERANG MESINDO


325 Jalan Dipati unus No.30 RT 001
Tangerang,Banten 15138
6000

B1 Jawa Barat 41371

4 # M 20 x 50

B1

PT. TOBA BANGUN INDONESIA


JL.BANGKA RAYA NO 42
RT.002 RW 005
JAKARTA SELATAN 12170
150
6000

SECTION-E
Project
PT BUMI TANGERANG MESINDO
MODIFICATION-MONORAIL-ROASTER
8 -AND-ALKALIZER-AREA
Tittle
INSTALLATION
ADDITIONAL-MONORAIL
ROASTER-AREA

PLAN VIEW EL 10500 ROASTER


N.T.S

A02 REV