3.5 On-Ground Cabinet installation

1. DBS installation:
http://ilearning.huawei.com/next/learnCourse.html?courseId=6224&lan=zh_CN#/
video/18684

Copyright © 2014 Huawei Technologies Co., Ltd. All rights reserved. Page1
3.5 On-Ground Cabinet installation

Air Baffle Plate(Physical picture)

Air baffle 1 Air


baffle 2

Copyright © 2014 Huawei Technologies Co., Ltd. All rights reserved.


3.5 On-Ground Cabinet installation
BBU Installation-Boards

Copyright © 2014 Huawei Technologies Co., Ltd. All rights reserved.


Optical Modules

10 /6.144GB
Used to connect BBU
and RRU
device

Used to
connect to

transmission device

Copyright © 2014 Huawei Technologies Co., Ltd. All rights reserved. Page4
⚫ Live Show
1
⚫ Read Site
Clock
Design EHS
In

environment
Check

BBU

DCDU Installation

Installation

Site Sign

Rectifier

& circuit Antenna

breaker Installation and

JumperConnection

Clock out and Clean Site Smart


Cable RRU
leave the site Site Verify QC
Layout Installation

Copyright © 2014 Huawei Technologies Co., Ltd. All rights reserved.


Page5
3.6 On ground preparations
Installation Guide-Waterproof Sealing
http://3ms.huawei.com/km/groups/3362561/blogs/details/9782493?l=zh-

cn&moduleId=496413891002142720&welink_open_uri=aDU6Ly80MjE1NTIzODA3NjgwMDYvaHRtbC92
aWRlby92aWRlby5odG1sP
3BhcmFtPTk3ODI0OTMlNUUwJTVFMzM2MjU2MSU1RTQ5NjQxMzg5MTAwMjE0MjcyMCMlNUU=

Copyright © 2014 Huawei Technologies Co., Ltd. All rights reserved. Page6
Three common waterproof measures

insulation
tape

3+3 or 1+3+3
Step 1 Step 2
insulation Step 3
waterproof
tape Cable tie
tape

Copyright © 2014 Huawei Technologies Co., Ltd. All rights reserved.


Technical point - Make the connectors
⚫ Reference the videos(include make OT/cord end terminal

feeder/RJ45 and E1 connectors)

Copyright © 2014 Huawei Technologies Co., Ltd. All rights reserved. Page8
OT Connector Make Process

1 Cut out surface 2 Take off 3 Install OT connector


4 check outside length

5 Press
Copyright 6 Checking
© 2014 Huawei Technologies Co., Ltd. All rights reserved. 7 PVC tape
8 Finish
OT Terminal

⚫ When using the OT terminal, pay attention to that the flat


side of the OT terminal is attached to the surface of the
workpiece.

Copyright © 2014 Huawei Technologies Co., Ltd. All rights reserved. Page10
The installation of OT terminal and power cable

Copyright © 2014 Huawei Technologies Co., Ltd. All rights reserved. Page11
RJ45 Connector Make process

1 Cut out surface 2 Line arrangement 3 Install


RJ45 4 Press

5 Checking
Copyright © 2014 Huawei Technologies6Co.,
TestLtd. All rights reserved.
RG8U Connector Make process

1 2 3

4 5 6

Copyright © 2014 Huawei Technologies Co., Ltd. All rights reserved.


3.7 On tower installation & equipment commissioning

Antenna installation

There need lifting rope and traction rope, to prevent it hitting from tower

Follow the site design.1、Azimuth 2、Height 3、Down tilt (Mechanical
&Electrical)

Do not
tightly secure
the screws
on the
upper and
lower ,
convenient
azimuth
adjustment
of the

antenna.
And also
avoid the
antenna
drop from
the
pole.

Copyright © 2014 Huawei Technologies Co., Ltd. All rights reserved.


Page14
Technical point - Assemble the antenna

正面

Assemble
the support

Install
the upper support
on the
antenna.

Install
the lower support
on the
antenna.

Copyright © 2014 Huawei Technologies Co., Ltd. All rights reserved. Page15
Technical point --Lay and bind the Cables

Lay and bind the Cables

Use the cable tie with white color indoor and black
color outdoor.

The distant between two cable tie is between 20cm
to 40cm (less than 25cm in perpendicular
direction), and the tie should be in the same
direction.

Smoothly cut the redundancy of the cable tie
Power cable:

The space between a power cable/ground cable
and a signaling cable outside the cabinet should be
more than 3 cm
good Without
fixed straight appearance cross

Copyright © 2014 Huawei Technologies Co., Ltd. All rights reserved. Page16
Technical point –Cables routing(reference)

Copyright © 2014 Huawei Technologies Co., Ltd. All rights reserved. Page17
⚫ Live Show
1
⚫ Read Site
Clock
Design EHS
In

environment
Check

BBU

DCDU Installation

Installation

Site Sign

Rectifier

& circuit Antenna

breaker Installation and

JumperConnection

Clock out and Clean Site Smart


Cable RRU
leave the site Site Verify QC
Layout Installation

Copyright © 2014 Huawei Technologies Co., Ltd. All rights reserved.


Page18
RRU hoisting video with Movable pulley

Note : Use Two pulley if the RRU Mass is >25 KG

Copyright © 2014 Huawei Technologies Co., Ltd. All rights reserved.


RRU installation

⚫ When lifting the RRU to the tower, use the traction rope to prevent it hitting
from
tower

⚫ When lift the RRU, bind the whole RRU but not only the handle of the RRU

Copyright © 2014 Huawei Technologies Co., Ltd. All rights reserved. Page20
RRU bracket installation

opening holes

Copyright © 2014 Huawei Technologies Co., Ltd. All rights reserved.


RRU installation

Copyright © 2014 Huawei Technologies Co., Ltd. All rights reserved. Page22
GF Site Scenario

Copyright © 2014 Huawei Technologies Co., Ltd. All rights reserved. Page23
RT Site Scenario

Copyright © 2014 Huawei Technologies Co., Ltd. All rights reserved. Page24
⚫ Live Show

⚫ Read Site
Clock
Design EHS
In

environment
Check

BBU
DCDU
Installation

Installation

Site Sign

Rectifier
&
circuit Antenna

breaker Installation and Jumper

Connection

Clock out and Clean Site Smart


Cable RRU
leave the site Site Verify QC
Layout Installation

Copyright © 2014 Huawei Technologies Co., Ltd. All rights reserved.


Page25
3.6 cables systemize & labeling
Cables Systemization
• The RRU power cable runs straightly, • Each grounding
cable is connected at one
and fixed with clip spacing distance 1- point only.
1.5M. Feeder:1.5-2M

Copyright © 2014 Huawei Technologies Co., Ltd. All rights reserved.


Page26
Cable Hoisting

Lift
the Power cable to the tower

Lift the fiber to the tower

tensile rope

Copyright © 2014 Huawei Technologies Co., Ltd. All rights reserved.


Cables Systemization
▪ For rooftop site, if pole have enough space , put CPRI cable excess looping on
the pole
(on the tower), must be fix tight;
▪ if pole have not enough space , put CPRI cable excess looping on the handrail ,
must be
fix tight, figure 2,can not put on the ground.

Copyright © 2014 Huawei Technologies Co., Ltd. All rights reserved. Page28
Cable Layout

Copyright © 2014 Huawei Technologies Co., Ltd. All rights reserved. Page29
Power cable connector of RRU

▪ The cable fixing


▪ Make sure the status can be
positive and observed through
the window ▪ The core wire needs to
expose the quick-
negative poles are
correct install female (crimp type)
connector.
▪ the connector cannot press
the outer
insulation part of the power
cord.
▪ The core wire should not be
exposed too
long or be folded back, as
shown in the
figure.

Copyright © 2014 Huawei Technologies Co., Ltd. All rights reserved.


Power cable connector of RRU

Copyright © 2014 Huawei Technologies Co., Ltd. All rights reserved. Page31
Color ring Principle for the cable

Copyright © 2014 Huawei Technologies Co., Ltd. All rights reserved. Page45
3.7 Service cutover (if swap or expansion scope)

▪ Service cutover is mutual action between field and BO teams


▪ Service cutover for Greenfield site will implemented by layer, Service
for Rooftop site will be implemented by sector
▪ Insure done sector free of alarms and
▪ Be very careful Not to make sector cross/jumper cross