Comparitive Analysis of Case Studies for Design Dissertation

No. Function Case Study 4 Case Study 5 Case Study 6

A GENERAL INFORMATION

1 Name of Project Arcadia Education Project Waterfront Tavern Sea-Food Restaurant Art Museum on Market

2 Location Keraniganj, South Kanarchor, Bangladesh Shell Cove, Australia Jiashan, China
N : Vegetation Belt N : Shell Cove Port N : Xitang residential town
Existing elements / context at the S : Dhaleshwari River Bank S : Residential context S : Yangtze river delta
3
external boundaries on all sides E : Alipur Bridge E : Shell Cove Part Parking E : Yangtze river delta
W: Vegetation Belt W : Shell Cove Port Yacht Dock W : Xitang under-construction plot
4 Area of Plot (sqm) 486 sq.m 2400 sq.m 4000 sq.m

5 B.U.A. (sqm) 274 sq.m 1600 q.m 2600 sq.m

6 FSI 1.5 N.A N.A

7 No. of Floors Only G Only 1st G+1

Footprint on site
8 274 sq.m 1600 sq.m 1650 sq.m
(Ratio of built-up : open space)

9 Population or Capacity 75 Pax 600 Pax 500 Pax

10 Total BUA (sqm) / per person 3.6 sq.m 2.6 sq.m 5.2 sq.m

11 Total site area (sqm) / per person 6.5 sq.m 4.0 sq.m 8.0 sq.m

B ARCHITECTURAL INFORMATION

Capacity Area Nos. Area/person Capacity Area Nos. Area/person Capacity Area Nos. Area/person
I ADMINISTRATION
(no. of ppl.) (sq.m) reqd. (sq.m/person) (no. of ppl.) (sq.m) reqd. (sq.m/person) (no. of ppl.) (sq.m) reqd. (sq.m/person)

i Admin Office 5 45 1 9 2 20 1 10.00 2 10 1 5

ii Staff Room N.A N.A N.A N.A 4 20 1 5.00 N.A N.A N.A N.A

Tourists Information Centre/ Waiting


iii N.A N.A N.A N.A N.A N.A N.A N.A N.A N.A N.A N.A
Room
(I) TOTAL 5 45 1 9 6 40 2 15.00 2 10 1 5

Capacity Area Nos. Area/person Capacity Area Nos. Area/person Capacity Area Nos. Area/person
II SERVICES
(no. of ppl.) (sq.m) reqd. (sq.m/person) (no. of ppl.) (sq.m) reqd. (sq.m/person) (no. of ppl.) (sq.m) reqd. (sq.m/person)

i Toilets 12 36 1 3 12 72 1 6 15 65 1 4.3

ii Storage Room N.A N.A N.A N.A N.A 20 2 N.A N.A 20 1 N.A

iii Technical Room N.A N.A N.A N.A N.A 30 1 N.A N.A N.A N.A N.A

iv Freeze Room N.A N.A N.A N.A N.A 20 1 N.A N.A N.A N.A N.A

v Plant Room N.A N.A N.A N.A N.A N.A N.A N.A N.A N.A N.A N.A

vi Kitchen / Pantry N.A N.A N.A 8.5 10 60 1 6 2 5 1 2.5

vii Preparation Room N.A N.A N.A N.A N.A N.A N.A N.A 5 50 1 10

viii Equipment Room N.A 10 1 N.A N.A N.A N.A N.A N.A 18 1 N.A

ix Cleaning Room N.A N.A N.A N.A N.A N.A N.A N.A N.A 5 1 N.A

xii Dressing Room N.A N.A N.A N.A N.A N.A N.A N.A N.A 8 1 N.A

xi Loading Area N.A N.A N.A N.A 10 55 1 5.5 N.A N.A N.A N.A

x Security Room N.A N.A N.A N.A N.A N.A N.A N.A N.A N.A N.A N.A

(II) TOTAL 12 46 1 11.5 22 257 7 12 17 171 3 6.8

Capacity Area Nos. Area/person Capacity Area Nos. Area/person Capacity Area Nos. Area/person
III CIRCULATION
(no. of ppl.) (sq.m) reqd. (sq.m/person) (no. of ppl.) (sq.m) reqd. (sq.m/person) (no. of ppl.) (sq.m) reqd. (sq.m/person)

i Lifts N.A N.A N.A N.A 8 12 1 1.50 6 10 2 1.6

ii Ramps N.A 21 1 N.A N.A N.A N.A N.A N.A N.A N.A N.A

iii Entrance Lobby 2 10 1 5.00 6 30 2 5.00 N.A 200 1 N.A


iv Staircases N.A N.A N.A N.A N.A 20 1 N.A N.A 110 4 N.A

v Service Entrance N.A 10 1 N.A 2 5 1 2.50 5 20 1 4

vi Corridors N.A 40 1 N.A 30 125 1 4.00 N.A 100 1 10

(III) TOTAL 2 80 4 5.00 46 192 6 13.00 11 440 9 15.6

PRIMARY FUNCTIONS Capacity Area Nos. Area/person Capacity Area Nos. Area/person Capacity Area Nos. Area/person
IV
(Please fill asper individual design) (no. of ppl.) (sq.m) reqd. (sq.m/person) (no. of ppl.) (sq.m) reqd. (sq.m/person) (no. of ppl.) (sq.m) reqd. (sq.m/person)

i Bistro-Bar N.A N.A N.A N.A 200 600 1 3 N.A N.A N.A N.A

ii Lounge N.A N.A N.A N.A 100 180 1 1.8 N.A N.A N.A N.A

iii Club House N.A N.A N.A N.A 25 80 1 3.2 N.A N.A N.A N.A

iv Terrace Area 9 45 1 5.00 200 200 2 1 N.A 430 1 N.A

v Multi-functional space N.A N.A N.A N.A N.A N.A N.A N.A 100 480 N.A 4.8

vi Open market space N.A N.A N.A N.A N.A N.A N.A N.A 200 1100 1 5.5

vii Classrooms/Workshop 60 135 3 2.25 N.A N.A N.A N.A N.A N.A N.A N.A

(IV) TOTAL 80 180 4 5.25 525 1060 5 9 100 2010 1 4.8

Capacity Area Nos. Area/person Capacity Area Nos. Area/person Capacity Area Nos. Area/person
V UNBUILT SPACES
(no. of ppl.) (sq.m) reqd. (sq.m/person) (no. of ppl.) (sq.m) reqd. (sq.m/person) (no. of ppl.) (sq.m) reqd. (sq.m/person)

i Parking (Loading-Unloading) N.A N.A N.A N.A N.A N.A N.A N.A N.A N.A N.A N.A

ii Vehicular paths N.A N.A N.A N.A N.A N.A N.A N.A N.A N.A N.A N.A

iii Pedestrian pathways N.A N.A N.A N.A N.A 800 1 N.A N.A 1000 N.A N.A

iv Landscaped areas N.A 212 1 N.A N.A N.A N.A N.A N.A 400 N.A N.A

(V) TOTAL N.A 212 1 N.A 0 800 1 0 0 1400 0 0


C Distribution of Areas

Total area Total area Total area


FUNCTIONS % % %
(sqm) (sqm) (sqm)

I ADMINISTRATION 45 2.0 40 3 10 0.25

II SERVICES 45 2 250 10 171 3.75

III CIRCULATION 80 16 250 10 440 11

IV PRIMARY FUNCTIONS 180 37 1060 44 2000 50

V UNBUILT SPACES 212 43 800 33 1400 35

2% ADMINISTRATION 0% 4% ADMINISTRATION
ADMINISTRATION
8% 11%
8% SERVICES 11% SERVICES
38% SERVICES 33% 35%
10%
14% CIRCULATION CIRCULATION
D PIE CHART
CIRCULATION
PRIMARY 50% PRIMARY
44%
32% PRIMARY FUNCTIONS FUNCTIONS
FUNCTIONS
UNBUILT SPACES UNBUILT SPACES