Design Review, Construction Supervision & Contract Administration for

Rehabilitation of Isebania – Kisii – Ahero (A1) road:


Lot 2: Kisii – Ahero (A1) Road section

SIRARI CORRIDOR ACCESSIBILITY AND ROAD SAFETY IMPROVEMENT


PROJECT: ISEBANIA – KISII – AHERO (A1) ROAD PROJECT
LOT 2: KISII – AHERO (A1) ROAD SECTION
KISUMU COUNTY DEPARTMENT OF HEALTH SITE INSPECTION
Date: 4th October 2023 Time: 3.00 pm Venue Nyabondo Trauma Center

ATTENDANCE LIST
NAME DESIGNATION FIRM
1. Joel Abong’o Chair, County Department of Health CDH-KISUMU
2. Paul Masanga Member, County Department of Health CDH-KISUMU
3. Maurice Ojowi Member, County Department of Health CDH-KISUMU
4. Julius O. Kitoto Assistant Structural Engineer County Public Works
5. Kennedy Samoka Architect AMA JV
6. Noah Aggrey Ochieng Clerk of Works AMA JV
7. Xiao Xuzhou Main Contractor (Deputy Site Agent) CCCC
8. Hamisi Obuya Main Contractor Representative CCCC
9. Elvin Mbaka Main Contractor Representative CCCC
10. Henry Kimemia Biomedical Technician S.JN.M

Page 1 of 3
Design Review, Construction Supervision & Contract Administration for
Rehabilitation of Isebania – Kisii – Ahero (A1) road:
Lot 2: Kisii – Ahero (A1) Road section

ITEM MINUTES ACTION


4.01 INTRODUCTION
4.01.1 All present carried out a site visit. Info
4.02 MATTERS ARISING FROM SITE VISIT
4.02.1 It was recommended that a canopy with a pavement underneath be
constructed to link the Physiotherapy and Radiology services area AMA/CCCC
4.02.2 It was recommended that the following be done in the Theatre Patient
Entry Area :
 The door opening be widened to 2.4m
 A 700mm (stretcher height) block board barrier be erected
with a door above it across the entire length CCCC
4.02.3 It was recommended that all electric conduit end points not in use be CCCC/LED
covered using blanking plates POWER
4.02.4 It was recommended that the areas exhibiting paint defects in the entire
building be repaired CCCC/MILKATE
4.02.5 It was recommended that the nursing office adjacent to the Male
Medical Ward(Grid E-F) be partitioned to a staff changing room, and be
equipped with lockable drawers S.J.N.M
4.02.6 It was recommended that the project beneficiary share the equipment
catalogues with the committee S.J.N.M
4.02.7 It was recommended that the medical gases terminal probes be fitted
with Gas splitters AMA/CCCC
4.02.8 It was recommended that the peeling chlorinated rubber paint in the
Theatres be attended to with immediate effect CCCC
4.02.9 It was recommended that the storm water disposal from the roof
downspouts be effectively directed away from the facility’s proximity CCCC
4.02.1 It was recommended that the airtightness of the Theatre doors leading
0 to the sluice rooms be improved CCCC/MILKATE
4.03 NEXT SITE INSPECTION AND MEETING
4.03.1 The next site inspection date to be determined. Info

Page 2 of 3
Design Review, Construction Supervision & Contract Administration for
Rehabilitation of Isebania – Kisii – Ahero (A1) road:
Lot 2: Kisii – Ahero (A1) Road section

Minutes prepared by

Signature_________ __________________ Date ____04/10/2023____________________________

Noah A. Ochieng
Clerk of Works
FOR: ABDUL MULLICK ASSOCIATES LTD.

Minutes agreed by

Signature___________________________ Date ________________________________

Kennedy Samoka
Architect
FOR: ABDUL MULLICK ASSOCIATES LTD