ANNEXTURE-1
ESTIMATED COST OF CONSTRUCTION
1 Name Of The Owner
2 Location Of Construction
3 Map No.
4 Type Of Construction
5 Use Of Building
6 Cost
Floors Builtup Rupee/Sqmt Total Amount
Area(in sqmt)
Sl No.
1 Basement
2 Ground Floor (Including Mezzanine
Floor)
3 First Floor
4 Second Floor
5 Third Floor
6 Fourth Floor
7 Fifth Floor
8 Sixth Floor
9 Seventh Floor
10 Eight Floor
11 Nineth Floor
12 Tenth Floor
13 Service Floor(If Any) (Add more
floor if requirement)
14 Electrification
15 Water Supply
16 Sanitation
17 Any others
18 Total Cost
Average Cost of Construction = Total Cost/ Total Built-up Area of All floor (sqmt)=
Signature Signature
Architect/Rgd Engineer Owner/Builder
Checked by
Asst. Engineer
GDA