Estimated Construction Cost Breakdown

This document provides an estimated cost of construction for a building project. It lists the name of the owner, location, map number, type of construction, use of the building, and then provides a table to estimate the cost for each floor based on the built-up area in square meters and a cost per square meter. It also includes items for electrification, water supply, sanitation, and others. The total cost is calculated by summing the costs for each floor and item, and the average cost per square meter is calculated by dividing the total cost by the total built-up area.

Uploaded by

Abhishek Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
105 views1 page

Estimated Construction Cost Breakdown

This document provides an estimated cost of construction for a building project. It lists the name of the owner, location, map number, type of construction, use of the building, and then provides a table to estimate the cost for each floor based on the built-up area in square meters and a cost per square meter. It also includes items for electrification, water supply, sanitation, and others. The total cost is calculated by summing the costs for each floor and item, and the average cost per square meter is calculated by dividing the total cost by the total built-up area.

Uploaded by

Abhishek Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

ANNEXTURE-1

ESTIMATED COST OF CONSTRUCTION


1 Name Of The Owner
2 Location Of Construction
3 Map No.
4 Type Of Construction
5 Use Of Building
6 Cost
Floors Builtup Rupee/Sqmt Total Amount
Area(in sqmt)
Sl No.
1 Basement

2 Ground Floor (Including Mezzanine


Floor)
3 First Floor
4 Second Floor
5 Third Floor
6 Fourth Floor
7 Fifth Floor
8 Sixth Floor
9 Seventh Floor
10 Eight Floor
11 Nineth Floor
12 Tenth Floor

13 Service Floor(If Any) (Add more


floor if requirement)
14 Electrification
15 Water Supply
16 Sanitation
17 Any others
18 Total Cost
Average Cost of Construction = Total Cost/ Total Built-up Area of All floor (sqmt)=

Signature Signature
Architect/Rgd Engineer Owner/Builder

Checked by
Asst. Engineer
GDA