You are on page 1of 2
TO : Engineer’s Representative Mr. Edmund Kwong CONTRACT NO. 20/WSD/97 YUEN LONG WATER SUPPLY MAINLAYING BETWEEN YUEN LONG AND TAN KWAI TSUEN &Binnie@ CONTRACTOR’S SUBMISSION Title of Submission: Method Statement for Construction of New Bus Bay at CH710 Submission Number CSCE/(20/WSD/9TYCS/925 ‘Specification Reference : Drawing Reference Description of Contents ‘We would submit herewith a method statement for construction of new bus-bay at CHA710 for your approval. ‘Remarks Ref : 4757/(20/WSD/97V/M25/110/ Distribution Date Name [Aston | Comment [into BBVHKL FILE Purpose of Submission For Approval 2 For Information 0 For Record Purposes Date response required by :- FROM : Contractor's Agent NAME : Chris Leung CHINA STATE CONSTRUCTION SIGNATURE: <3 ENGINEERING CORPORATION DATE : 12-6 - 2000 FORM CR-02 ‘Originator : Bryan Submission Number: CSCE/(20/WSD/97)/CS/925 Method Statement for Construction of New Bus Bay at CHA710 Demolish and remove the existing u-channel concrete covers. Demolish the existing 225 u-channel along bus-bay Demolish the existing pavement, excavate the existing sub-base (150mm th.) and ground soil to reach the formation level. Construct new 225 u-channel as per RE’s sketch 4757/(20/WSD/97)/S/DR/524 (SNS13) Laying of KI road kerb as per sketch no. 4757/€20/WSD/97)/S/DR/616B ‘Compact the formation ground and place granular sub-base (150*) Pour concrete to rigid pavement with A393 steel mesh (250mm th.) and the verge (75mm) Installation of stee! bollard and type 2 handrails, Painting of road marking.

You might also like