REKAP LIST HANDLING TROUBLESHOOTING

MITRA : PT. Step Point Indonesia


KATEGORY : TROUBLESHOOT & MAINTENANCE
PERIODE : Oct-23 INV 0

CATEGORY CASE TANGGAL CRT


NO. (Maintenance/Troubleshoot) PEKERJAAN ( CIRCUIT ID ) NOMOR TICKET DESCRIPTION

1 Troubleshoot 1-Oct-23 - T790041-011023-01 LINK FISHBONE OLT 4 GIVENCY


2 Troubleshoot 5-Oct-23 - T003002-051023-01 LINK BACKBONE HUAWEI MULTATULI
3 Corrective 10-Oct-23 - 043/RMOSP/MDN/XI/2023 Jl. Pasundan Medan Petisah
4 Troubleshoot 12-Oct-23 - T109933-111023-01 PT. Eka Mas Republik
5 Troubleshoot 12-Oct-23 - T237587-121023-01 LINK FISHBONE OLT 1 BRAYAN DOWN
6 Troubleshoot 13-Oct-23 - T003290-131023-01 PT. Primacom Interbuana - BCA KK Johor
7 Troubleshoot 16-Oct-23 - IN161023104933-01 LINK FISHBONE OLT 1 BRAYAN PON
8 Troubleshoot 19-Oct-23 - IN191023101234-01 LINK FISHBONE OLT 3 & 4 MMTC DOWN
9 Corrective 25-Oct-23 - 043/RMOSP/MDN/XI/2023 Jl. sutomo ujung, medan timur
10 Corrective 26-Oct-23 - 043/RMOSP/MDN/XI/2023 Jl. Punak Medan Petisah
11 Troubleshoot 28-Oct-23 - IN281023031906-01 LINK BACKBONE HUAWEI SUNGGAL TO HUAWEI JOHOR DOWN
12 Troubleshoot 29-Oct-23 - IN291023172531-01 LINK FISHBONE OLT 4 GIVENCY PON 1/1/6 DOWN
LOCATION

Jl. titi baru, kecamatan sunggal deli serdang


Jl. Imam Bonjol, Kec. Medan Maimun, Medan.
Jl. Pasundan Medan Petisah
PERUM GLUGUR KOTA JLN. KL. YOS SUDARSO
JL. Platina Deli Medan
Jl. Karya Wisata, Komplek Citra Wisata blok III No.19 Medan
Jl. Krakatau Ujung, Tj. Mulia, Kec. Medan Deli
Jl. Pimpinan No.30, Kec. Medan Perjuangan, Kota Medan
Jl. sutomo ujung, medan timur
Jl. Punak Medan Petisah
Jl. GAGAK HITAM KEC. MEDAN SELAYANG RINGROAD MEDAN
Jl. Besar Hamparan Perak, Klambir Lima Kb., Kec. Hamparan Perak.
Total
MATRIAL

JB Dome 12 Core JB Dome 24 Core JB Dome 48 Core JB Dome 96 Core Fixing Slack test

Rp 1,000,000 Rp 1,100,000 Rp 1,250,000 Rp 1,750,000 Rp 250,000 Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp -

Set Set Set Set Set Mtr Mtr Mtr Mtr Mtr Mtr Mtr Mtr Mtr Mtr Mtr
1
1

0 5 2 2 0 0 0 0 0 0 0 0 0 0 0 0
Rp - Rp - Rp - Rp -

Mtr Mtr Mtr Mtr

0 0 0 0
SERVICE

Instalasi Fixing Slack Buka Tutup Penarikan Kabel FO Penarikan Kabel FO Penarikan Kabel FO Penarikan Kabel FO Pengamanan Tiang Pengamanan Tiang
+ Joint Closure Instalasi DPFO Splicing + OTDR Handhole (HH) 12 Core 24 Core 48 Core 96 Core Aksesoris Tiang 7m 9m

Rp 150,000 Rp 100,000 Rp 50,000 Rp 150,000 Rp 3,000 Rp 3,000 Rp 3,000 Rp 4,000 Rp 100,000 Rp - Rp -

Unit Unit Core Unit Mtr Mtr Mtr Mtr Set Batang Batang
30 80
96

24 179
12 120
12 67
7
1 48 98

160 65
1
0 1 390 0 120 357 67 65 0 0 0
RVICE

Penanaman Tiang Penanaman Tiang


7m 9m

Rp 300,000 Rp 400,000

Batang Batang

0 0
LAIN - LAIN

Pengiriman
Community Fee Material Transportation
TOTAL PRICE
TOTAL PRICE (PPn 11%)

LOT

Rp 200,000 Rp 3,040,000 Rp 3,374,400


Rp 200,000 Rp 6,750,000 Rp 7,492,500
Rp 400,000 Rp 200,000 Rp 600,000 Rp 666,000
Rp 200,000 Rp 4,137,000 Rp 4,592,070
Rp 200,000 Rp 1,160,000 Rp 1,287,600
Rp 200,000 Rp 3,501,000 Rp 3,886,110
Rp 200,000 Rp 550,000 Rp 610,500
Rp 200,000 Rp 5,194,000 Rp 5,765,340
Rp 400,000 Rp 200,000 Rp 600,000 Rp 666,000
Rp 400,000 Rp 200,000 Rp 600,000 Rp 666,000
Rp 200,000 Rp 10,210,000 Rp 11,333,100
Rp 200,000 Rp 250,000 Rp 277,500
0 2400000 Rp 36,592,000
PPN 11% Rp 4,025,120
TOTAL Rp 40,617,120
TEKNISI INSTALLASI TEKNISI INSTALLASI TEKNISI INSTALLASI TEKNISI INSTALLASI RFO
PIC FS SUPPORT 1 SUPPORT 2 SUPPORT 3 SUPPORT 4 ( Case Problem )

Nuryamin Putra Andre G Rifsen S sandi FO Cut cable temporary


Nuryamin Putra Andre G Rifsen S sandi FO Cut 96C DOWNLINK BACKCONE
Nuryamin Putra Andre G Rifsen S sandi Pengamanan Utilitas Tiang 7m impact drainase
Nuryamin Putra Andre G Rifsen S sandi FO Cut
Nuryamin Putra Andre G Rifsen S sandi FO Cut impact tersambar truk muatan tinggi.
Nuryamin Putra Andre G Rifsen S sandi FO Cut Impact Tiang PLN Roboh
Nuryamin Putra Andre G Rifsen S sandi FO cut in ms cut di jarak 3,9km,cut di dalam odp,dan bad Splitter ms
Nuryamin Putra Andre G Rifsen S sandi FO Cut Impact Galian Drainase PU
Nuryamin Putra Andre G Rifsen S sandi Pengamanan Utilitas Tiang 7m impact drainase
Nuryamin Putra Andre G Rifsen S sandi Pengamanan Utilitas Tiang 7m impact drainase
Nuryamin Putra Andre G Rifsen S sandi FO Cut Impact Vandalisme
Nuryamin Putra Andre G Rifsen S sandi Connection ODP Lost

FIBERSTAR

( Ade Roy Siagian ) ( Muhammad Nur )


Head Of Sub Region Reg. Field Operational Coordinator
ACTION

bel permanen 80m, instalasi JB new


enuju tikor FO Cut di jarak 1.1 km, Setting Clossure 96c, jointing 96c, pengecekan kelurusan FO cut OLT 3 Multatuli, pengecekan pengukuran after rejoin, Proses pengamanan closure dan kabel, penganaman kabel dan closure
ilokasi tikor, pengangkatan tiang 7m ke HB SPI Medan
narikan long jumper 179m 24c, peralihan kabel, setting 2 JB New 24c, perpihan dan pengamanan JB, Cek on ODP Cust, report Loss on Cust, Cek JB dan pengukuran redaman di ODP Cust, pengecekan kelurusan (OPM) dari loka
jarak 920m, penarikan dan peralihan kabel impact tersambar truk bermuatan tinggi, Setting JB Existing dan join live core 12c, perapihan dan pengamanan JB existing, Pengamanan JB
ore, analisis FO cut, otdr fo cut jarak 882m, progres setting 2 JB dan join live core JB 24c, pengamanan 2 JB
nalisis fo cut di odp, cek pengukuran OFI di ms, proses peralihan core, proses join 7c,pengukuran redaman inms by ofi,pengamanan ODP,proses pengukuran Inspl dan out spl, analisis fo cut link down suspect pigtail out ms crac
an tikor, temuan ODP MS sudah tidak ada di tikor, Tracing case Link Fishbone Down, temuan titik FO Cut impact galian drainase, prepare kabel jumper progres penarikan long jumper, setting 2 JB, Instalasi New ODP, identify c
ilokasi tikor, pengangkatan tiang 7m ke HB SPI Medan
ndahan tiang, peralihan kabel, odp dan JB , pergeseran tiang, pengamanan kabel dan pencabutan tiang ke 2, pengamanan temporary ODP dan JB, pencabutan tiang ke 2, pengangkatan tiang dri tikor ke HB SPI
active 1 sisi JB 1,Prepare dan join JB 1, penarikan jumper, Setting kabel new 96 c di JB existing, cek kelurusan di JB existing, join JB 2 existing sisi 2, join core active t7 JB 2, analisis core active T7, pengukuran by OFI JB 2 core acti
In MS dan out MS, cek OTDR in MS, repair MS link down, cek redaman Out ODP, cek pengukuran out MS by OFI, rejoin core MS, peralihan core di JB existing, perapihan JB existing, cek redaman dari arah POP, pengamanan JB
KETERANGAN

Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done

PT. Step Point Indonesia

( Rizandri Osmar)
Project Manager
TROUBLESHOOT & MAINTENANCE FO BACKBONE FIBERSTAR
PT. Step Point Indonesia INV : 0

REKAP LIST HANDLING TSHOOT & MAINTENANCE


45200
SUMMARY TROUBLESHOOT ( JABODETABEK )

1 2 3 4 5 6 7 8 9 10
1-Oct-2023 5-Oct-2023 10-Oct-2023 12-Oct-2023 12-Oct-2023 13-Oct-2023 16-Oct-2023 19-Oct-2023 25-Oct-2023 26-Oct-2023
- - - - - - - - - -
T790041-011023-01 T003002-051023-01 043/RMOSP/MDN/XI/2023 T109933-111023-01 T237587-121023-01 T003290-131023-01 IN161023104933-01 IN191023101234-01 043/RMOSP/MDN/XI/2023 043/RMOSP/MDN/X

LINK FISHBONE OLT 4 GIVENCY LINK BACKBONE HUAWEI Jl. Pasundan Medan Petisah PT. Eka Mas Republik LINK FISHBONE OLT 1 BRAYAN PT. Primacom Interbuana - LINK FISHBONE OLT 1 BRAYAN LINK FISHBONE OLT 3 & 4 Jl. sutomo ujung, medan timur Jl. Punak Medan Pe
Harga Satuan MULTATULI DOWN BCA KK Johor PON MMTC DOWN
No. Uraian Satuan
(Rp)

Jl. titi baru, kecamatan Jl. Imam Bonjol, Kec. Medan PERUM GLUGUR KOTA JLN. Jl. Karya Wisata, Komplek Jl. Krakatau Ujung, Tj. Mulia, Jl. Pimpinan No.30, Kec.
Jl. Pasundan Medan Petisah JL. Platina Deli Medan Citra Wisata blok III No.19 Medan Perjuangan, Kota Jl. sutomo ujung, medan timur Jl. Punak Medan Pe
sunggal deli serdang Maimun, Medan. KL. YOS SUDARSO Kec. Medan Deli
Medan Medan

Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty

A MATRIAL
1 JB Dome 12 Core Set Rp 1,000,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 JB Dome 24 Core Set Rp 1,100,000 1 Rp 1,100,000 0 Rp - 0 Rp - 2 Rp 2,200,000 0 Rp - 0 Rp - 0 Rp - 2 Rp 2,200,000 0 Rp - 0
3 JB Dome 48 Core Set Rp 1,250,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 2 Rp 2,500,000 0 Rp - 0 Rp - 0 Rp - 0
4 JB Dome 96 Core Set Rp 1,750,000 0 Rp - 1 Rp 1,750,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
5 Fixing Slack Set Rp 250,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
6 test Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
7 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
8 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
9 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
10 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
11 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
12 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
13 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
14 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
15 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
16 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
17 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
18 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
19 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
20 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL SERVICE Rp1,100,000 Rp1,750,000 Rp0 Rp2,200,000 Rp0 Rp2,500,000 Rp0 Rp2,200,000 Rp0 Rp0

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit Rp 150,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 Instalasi DPFO Unit Rp 100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 1 Rp 100,000 0 Rp - 0
3 Splicing + OTDR Core Rp 50,000 30 Rp 1,500,000 96 Rp 4,800,000 0 Rp - 24 Rp 1,200,000 12 Rp 600,000 12 Rp 600,000 7 Rp 350,000 48 Rp 2,400,000 0 Rp - 0
4 Buka Tutup Handhole (HH) Unit Rp 150,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
5 Penarikan Kabel FO 12 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 120 Rp 360,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
6 Penarikan Kabel FO 24 Core Mtr Rp 3,000 80 Rp 240,000 0 Rp - 0 Rp - 179 Rp 537,000 0 Rp - 0 Rp - 0 Rp - 98 Rp 294,000 0 Rp - 0
7 Penarikan Kabel FO 48 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 67 Rp 201,000 0 Rp - 0 Rp - 0 Rp - 0
8 Penarikan Kabel FO 96 Core Mtr Rp 4,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
9 Aksesoris Tiang Set Rp 100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
10 Pengamanan Tiang 7m Batang Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
11 Pengamanan Tiang 9m Batang Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
12 Penanaman Tiang 7m Batang Rp 300,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
13 Penanaman Tiang 9m Batang Rp 400,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
14 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
15 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
16 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
17 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
18 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
19 0 Mtr Rp - 0 Rp - 0 Rp - 1 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 1 Rp - 2
20 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL MATRIAL Rp1,740,000 Rp4,800,000 Rp0 Rp1,737,000 Rp960,000 Rp801,000 Rp350,000 Rp2,794,000 Rp0 Rp0

C LAIN-LAIN
1 Community Fee Lot 1 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 Transportation 10% 1 0 Rp - 0 Rp - 400000 Rp 400,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 400000 Rp 400,000 400000

TOTAL LAIN-LAIN Rp - Rp - Rp 400,000 Rp - Rp - Rp - Rp - Rp - Rp 400,000 Rp 4

SUBTOTAL Rp 2,840,000 Rp 6,550,000 Rp 400,000 Rp 3,937,000 Rp 960,000 Rp 3,301,000 Rp 350,000 Rp 4,994,000 Rp 400,000 Rp 4
PPN 11% Rp 312,400 Rp 720,500 Rp 44,000 Rp 433,070 Rp 105,600 Rp 363,110 Rp 38,500 Rp 549,340 Rp 44,000 Rp
GRAND TOTAL Rp 3,152,400 Rp 7,270,500 Rp 444,000 Rp 4,370,070 Rp 1,065,600 Rp 3,664,110 Rp 388,500 Rp 5,543,340 Rp 444,000 Rp 4
TROUBLESHOOT & MAINTENANCE FO BACKBONE FIBERSTAR
PT. Step Point Indonesia INV : 0

REKAP LIST HANDLING TSHOOT & MAINTENANCE


45200
SUMMARY TROUBLESHOOT ( JABODETABEK )

10
26-Oct-2023
-
043/RMOSP/MDN/XI/2023

Jl. Punak Medan Petisah


No. Uraian Satuan Harga Satuan
(Rp)

Jl. Punak Medan Petisah

Total

A MATRIAL
1 JB Dome 12 Core Set Rp 1,000,000 Rp -
2 JB Dome 24 Core Set Rp 1,100,000 Rp -
3 JB Dome 48 Core Set Rp 1,250,000 Rp -
4 JB Dome 96 Core Set Rp 1,750,000 Rp -
5 Fixing Slack Set Rp 250,000 Rp -
6 test Mtr Rp - Rp -
7 0 Mtr Rp - Rp -
8 0 Mtr Rp - Rp -
9 0 Mtr Rp - Rp -
10 0 Mtr Rp - Rp -
11 0 Mtr Rp - Rp -
12 0 Mtr Rp - Rp -
13 0 Mtr Rp - Rp -
14 0 Mtr Rp - Rp -
15 0 Mtr Rp - Rp -
16 0 Mtr Rp - Rp -
17 0 Mtr Rp - Rp -
18 0 Mtr Rp - Rp -
19 0 Mtr Rp - Rp -
20 0 Mtr Rp - Rp -

TOTAL SERVICE Rp0

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit Rp 150,000 Rp -
2 Instalasi DPFO Unit Rp 100,000 Rp -
3 Splicing + OTDR Core Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr Rp 4,000 Rp -
9 Aksesoris Tiang Set Rp 100,000 Rp -
10 Pengamanan Tiang 7m Batang Rp - Rp -
11 Pengamanan Tiang 9m Batang Rp - Rp -
12 Penanaman Tiang 7m Batang Rp 300,000 Rp -
13 Penanaman Tiang 9m Batang Rp 400,000 Rp -
14 0 Mtr Rp - Rp -
15 0 Mtr Rp - Rp -
16 0 Mtr Rp - Rp -
17 0 Mtr Rp - Rp -
18 0 Mtr Rp - Rp -
19 0 Mtr Rp - Rp -
20 0 Mtr Rp - Rp -

TOTAL MATRIAL Rp0

C LAIN-LAIN
1 Community Fee Lot 1 Rp -
2 Transportation 10% 1 Rp 400,000

TOTAL LAIN-LAIN Rp 400,000

Rp
SUBTOTAL 400,000
RpPPN 11% 44,000
GRAND
Rp TOTAL 444,000
TROUBLESHOOT & MAINTENANCE FO BACKBONE FIBERSTAR
PT. Step Point Indonesia INV : 0

REKAP LIST HANDLING TSHOOT & MAINTENANCE


45200
SUMMARY TROUBLESHOOT ( JABODETABEK )

11 12 13 14 15 16 17 18 19 20
28-Oct-2023 29-Oct-2023 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
- - 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
IN281023031906-01 IN291023172531-01 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899

LINK BACKBONE HUAWEI LINK FISHBONE OLT 4


SUNGGAL TO HUAWEI JOHOR 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
Harga Satuan GIVENCY PON 1/1/6 DOWN
No. Uraian Satuan DOWN
(Rp)
Jl. GAGAK HITAM KEC. Jl. Besar Hamparan Perak,
MEDAN SELAYANG RINGROAD Klambir Lima Kb., Kec. 0 0 0 0 0 0 0 0
MEDAN Hamparan Perak.

Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty

A MATRIAL
1 JB Dome 12 Core Set Rp 1,000,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 JB Dome 24 Core Set Rp 1,100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
3 JB Dome 48 Core Set Rp 1,250,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
4 JB Dome 96 Core Set Rp 1,750,000 1 Rp 1,750,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
5 Fixing Slack Set Rp 250,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
6 test Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
7 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
8 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
9 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
10 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
11 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
12 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
13 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
14 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
15 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
16 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
17 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
18 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
19 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
20 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL SERVICE Rp1,750,000 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit Rp 150,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 Instalasi DPFO Unit Rp 100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
3 Splicing + OTDR Core Rp 50,000 160 Rp 8,000,000 1 Rp 50,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
4 Buka Tutup Handhole (HH) Unit Rp 150,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
5 Penarikan Kabel FO 12 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
6 Penarikan Kabel FO 24 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
7 Penarikan Kabel FO 48 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
8 Penarikan Kabel FO 96 Core Mtr Rp 4,000 65 Rp 260,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
9 Aksesoris Tiang Set Rp 100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
10 Pengamanan Tiang 7m Batang Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
11 Pengamanan Tiang 9m Batang Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
12 Penanaman Tiang 7m Batang Rp 300,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
13 Penanaman Tiang 9m Batang Rp 400,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
14 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
15 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
16 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
17 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
18 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
19 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
20 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL MATRIAL Rp8,260,000 Rp50,000 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0

C LAIN-LAIN
1 Community Fee Lot 1 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 Transportation 10% 1 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL LAIN-LAIN Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp

SUBTOTAL Rp 10,010,000 Rp 50,000 Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp


PPN 11% Rp 1,101,100 Rp 5,500 Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp
GRAND TOTAL Rp 11,111,100 Rp 55,500 Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp
TROUBLESHOOT & MAINTENANCE FO BACKBONE FIBERSTAR
PT. Step Point Indonesia INV : 0

REKAP LIST HANDLING TSHOOT & MAINTENANCE


45200
SUMMARY TROUBLESHOOT ( JABODETABEK )

20
30-Dec-1899
30-Dec-1899
30-Dec-1899

30-Dec-1899
No. Uraian Satuan Harga Satuan
(Rp)

Total

A MATRIAL
1 JB Dome 12 Core Set Rp 1,000,000 Rp -
2 JB Dome 24 Core Set Rp 1,100,000 Rp -
3 JB Dome 48 Core Set Rp 1,250,000 Rp -
4 JB Dome 96 Core Set Rp 1,750,000 Rp -
5 Fixing Slack Set Rp 250,000 Rp -
6 test Mtr Rp - Rp -
7 0 Mtr Rp - Rp -
8 0 Mtr Rp - Rp -
9 0 Mtr Rp - Rp -
10 0 Mtr Rp - Rp -
11 0 Mtr Rp - Rp -
12 0 Mtr Rp - Rp -
13 0 Mtr Rp - Rp -
14 0 Mtr Rp - Rp -
15 0 Mtr Rp - Rp -
16 0 Mtr Rp - Rp -
17 0 Mtr Rp - Rp -
18 0 Mtr Rp - Rp -
19 0 Mtr Rp - Rp -
20 0 Mtr Rp - Rp -

TOTAL SERVICE Rp0

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit Rp 150,000 Rp -
2 Instalasi DPFO Unit Rp 100,000 Rp -
3 Splicing + OTDR Core Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr Rp 4,000 Rp -
9 Aksesoris Tiang Set Rp 100,000 Rp -
10 Pengamanan Tiang 7m Batang Rp - Rp -
11 Pengamanan Tiang 9m Batang Rp - Rp -
12 Penanaman Tiang 7m Batang Rp 300,000 Rp -
13 Penanaman Tiang 9m Batang Rp 400,000 Rp -
14 0 Mtr Rp - Rp -
15 0 Mtr Rp - Rp -
16 0 Mtr Rp - Rp -
17 0 Mtr Rp - Rp -
18 0 Mtr Rp - Rp -
19 0 Mtr Rp - Rp -
20 0 Mtr Rp - Rp -

TOTAL MATRIAL Rp0

C LAIN-LAIN
1 Community Fee Lot 1 Rp -
2 Transportation 10% 1 Rp -

TOTAL LAIN-LAIN Rp -

Rp
SUBTOTAL -
RpPPN 11% -
GRAND
Rp TOTAL -
TROUBLESHOOT & MAINTENANCE FO BACKBONE FIBERSTAR
PT. Step Point Indonesia INV : 0

REKAP LIST HANDLING TSHOOT & MAINTENANCE


45200
SUMMARY TROUBLESHOOT ( JABODETABEK )

21 22 23 24 25 26 27 28 29 30
30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899

30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
No. Uraian Satuan Harga Satuan
(Rp)

0 0 0 0 0 0 0 0 0 0

Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty

A MATRIAL
1 JB Dome 12 Core Set Rp 1,000,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 JB Dome 24 Core Set Rp 1,100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
3 JB Dome 48 Core Set Rp 1,250,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
4 JB Dome 96 Core Set Rp 1,750,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
5 Fixing Slack Set Rp 250,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
6 test Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
7 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
8 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
9 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
10 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
11 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
12 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
13 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
14 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
15 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
16 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
17 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
18 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
19 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
20 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL SERVICE Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit Rp 150,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 Instalasi DPFO Unit Rp 100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
3 Splicing + OTDR Core Rp 50,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
4 Buka Tutup Handhole (HH) Unit Rp 150,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
5 Penarikan Kabel FO 12 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
6 Penarikan Kabel FO 24 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
7 Penarikan Kabel FO 48 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
8 Penarikan Kabel FO 96 Core Mtr Rp 4,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
9 Aksesoris Tiang Set Rp 100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
10 Pengamanan Tiang 7m Batang Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
11 Pengamanan Tiang 9m Batang Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
12 Penanaman Tiang 7m Batang Rp 300,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
13 Penanaman Tiang 9m Batang Rp 400,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
14 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
15 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
16 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
17 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
18 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
19 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
20 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL MATRIAL Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0

C LAIN-LAIN
1 Community Fee Lot 1 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 Transportation 10% 1 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL LAIN-LAIN Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp

SUBTOTAL Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp
PPN 11% Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp
GRAND TOTAL Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp
TROUBLESHOOT & MAINTENANCE FO BACKBONE FIBERSTAR
PT. Step Point Indonesia INV : 0

REKAP LIST HANDLING TSHOOT & MAINTENANCE


45200
SUMMARY TROUBLESHOOT ( JABODETABEK )

30
30-Dec-1899
30-Dec-1899
30-Dec-1899

30-Dec-1899
No. Uraian Satuan Harga Satuan
(Rp)

Total

A MATRIAL
1 JB Dome 12 Core Set Rp 1,000,000 Rp -
2 JB Dome 24 Core Set Rp 1,100,000 Rp -
3 JB Dome 48 Core Set Rp 1,250,000 Rp -
4 JB Dome 96 Core Set Rp 1,750,000 Rp -
5 Fixing Slack Set Rp 250,000 Rp -
6 test Mtr Rp - Rp -
7 0 Mtr Rp - Rp -
8 0 Mtr Rp - Rp -
9 0 Mtr Rp - Rp -
10 0 Mtr Rp - Rp -
11 0 Mtr Rp - Rp -
12 0 Mtr Rp - Rp -
13 0 Mtr Rp - Rp -
14 0 Mtr Rp - Rp -
15 0 Mtr Rp - Rp -
16 0 Mtr Rp - Rp -
17 0 Mtr Rp - Rp -
18 0 Mtr Rp - Rp -
19 0 Mtr Rp - Rp -
20 0 Mtr Rp - Rp -

TOTAL SERVICE Rp0

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit Rp 150,000 Rp -
2 Instalasi DPFO Unit Rp 100,000 Rp -
3 Splicing + OTDR Core Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr Rp 4,000 Rp -
9 Aksesoris Tiang Set Rp 100,000 Rp -
10 Pengamanan Tiang 7m Batang Rp - Rp -
11 Pengamanan Tiang 9m Batang Rp - Rp -
12 Penanaman Tiang 7m Batang Rp 300,000 Rp -
13 Penanaman Tiang 9m Batang Rp 400,000 Rp -
14 0 Mtr Rp - Rp -
15 0 Mtr Rp - Rp -
16 0 Mtr Rp - Rp -
17 0 Mtr Rp - Rp -
18 0 Mtr Rp - Rp -
19 0 Mtr Rp - Rp -
20 0 Mtr Rp - Rp -

TOTAL MATRIAL Rp0

C LAIN-LAIN
1 Community Fee Lot 1 Rp -
2 Transportation 10% 1 Rp -

TOTAL LAIN-LAIN Rp -

Rp
SUBTOTAL -
RpPPN 11% -
GRAND
Rp TOTAL -
TROUBLESHOOT & MAINTENANCE FO BACKBONE FIBERSTAR
PT. Step Point Indonesia INV : 0

REKAP LIST HANDLING TSHOOT & MAINTENANCE


45200
SUMMARY TROUBLESHOOT ( JABODETABEK )

31 32 33 34 35 36 37 38 39 40
30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899

30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
No. Uraian Satuan Harga Satuan
(Rp)

0 0 0 0 0 0 0 0 0 0

Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty

A MATRIAL
1 JB Dome 12 Core Set Rp 1,000,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 JB Dome 24 Core Set Rp 1,100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
3 JB Dome 48 Core Set Rp 1,250,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
4 JB Dome 96 Core Set Rp 1,750,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
5 Fixing Slack Set Rp 250,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
6 test Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
7 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
8 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
9 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
10 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
11 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
12 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
13 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
14 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
15 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
16 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
17 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
18 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
19 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
20 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL SERVICE Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit Rp 150,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 Instalasi DPFO Unit Rp 100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
3 Splicing + OTDR Core Rp 50,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
4 Buka Tutup Handhole (HH) Unit Rp 150,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
5 Penarikan Kabel FO 12 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
6 Penarikan Kabel FO 24 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
7 Penarikan Kabel FO 48 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
8 Penarikan Kabel FO 96 Core Mtr Rp 4,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
9 Aksesoris Tiang Set Rp 100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
10 Pengamanan Tiang 7m Batang Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
11 Pengamanan Tiang 9m Batang Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
12 Penanaman Tiang 7m Batang Rp 300,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
13 Penanaman Tiang 9m Batang Rp 400,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
14 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
15 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
16 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
17 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
18 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
19 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
20 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL MATRIAL Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0

C LAIN-LAIN
1 Community Fee Lot 1 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 Transportation 10% 1 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL LAIN-LAIN Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp

SUBTOTAL Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp
PPN 11% Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp
GRAND TOTAL Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp
TROUBLESHOOT & MAINTENANCE FO BACKBONE FIBERSTAR
PT. Step Point Indonesia INV : 0

REKAP LIST HANDLING TSHOOT & MAINTENANCE


45200
SUMMARY TROUBLESHOOT ( JABODETABEK )

40
30-Dec-1899
30-Dec-1899
30-Dec-1899

30-Dec-1899
No. Uraian Satuan Harga Satuan
(Rp)

Total

A MATRIAL
1 JB Dome 12 Core Set Rp 1,000,000 Rp -
2 JB Dome 24 Core Set Rp 1,100,000 Rp -
3 JB Dome 48 Core Set Rp 1,250,000 Rp -
4 JB Dome 96 Core Set Rp 1,750,000 Rp -
5 Fixing Slack Set Rp 250,000 Rp -
6 test Mtr Rp - Rp -
7 0 Mtr Rp - Rp -
8 0 Mtr Rp - Rp -
9 0 Mtr Rp - Rp -
10 0 Mtr Rp - Rp -
11 0 Mtr Rp - Rp -
12 0 Mtr Rp - Rp -
13 0 Mtr Rp - Rp -
14 0 Mtr Rp - Rp -
15 0 Mtr Rp - Rp -
16 0 Mtr Rp - Rp -
17 0 Mtr Rp - Rp -
18 0 Mtr Rp - Rp -
19 0 Mtr Rp - Rp -
20 0 Mtr Rp - Rp -

TOTAL SERVICE Rp0

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit Rp 150,000 Rp -
2 Instalasi DPFO Unit Rp 100,000 Rp -
3 Splicing + OTDR Core Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr Rp 4,000 Rp -
9 Aksesoris Tiang Set Rp 100,000 Rp -
10 Pengamanan Tiang 7m Batang Rp - Rp -
11 Pengamanan Tiang 9m Batang Rp - Rp -
12 Penanaman Tiang 7m Batang Rp 300,000 Rp -
13 Penanaman Tiang 9m Batang Rp 400,000 Rp -
14 0 Mtr Rp - Rp -
15 0 Mtr Rp - Rp -
16 0 Mtr Rp - Rp -
17 0 Mtr Rp - Rp -
18 0 Mtr Rp - Rp -
19 0 Mtr Rp - Rp -
20 0 Mtr Rp - Rp -

TOTAL MATRIAL Rp0

C LAIN-LAIN
1 Community Fee Lot 1 Rp -
2 Transportation 10% 1 Rp -

TOTAL LAIN-LAIN Rp -

Rp
SUBTOTAL -
RpPPN 11% -
GRAND
Rp TOTAL -
TROUBLESHOOT & MAINTENANCE FO BACKBONE FIBERSTAR
PT. Step Point Indonesia INV : 0

REKAP LIST HANDLING TSHOOT & MAINTENANCE


45200
SUMMARY TROUBLESHOOT ( JABODETABEK )

41 42 43 44 45 46 47 48 49 50
30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899

30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
No. Uraian Satuan Harga Satuan
(Rp)

0 0 0 0 0 0 0 0 0 0

Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty

A MATRIAL
1 JB Dome 12 Core Set Rp 1,000,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 JB Dome 24 Core Set Rp 1,100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
3 JB Dome 48 Core Set Rp 1,250,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
4 JB Dome 96 Core Set Rp 1,750,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
5 Fixing Slack Set Rp 250,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
6 test Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
7 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
8 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
9 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
10 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
11 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
12 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
13 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
14 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
15 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
16 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
17 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
18 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
19 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
20 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL SERVICE Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit Rp 150,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 Instalasi DPFO Unit Rp 100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
3 Splicing + OTDR Core Rp 50,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
4 Buka Tutup Handhole (HH) Unit Rp 150,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
5 Penarikan Kabel FO 12 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
6 Penarikan Kabel FO 24 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
7 Penarikan Kabel FO 48 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
8 Penarikan Kabel FO 96 Core Mtr Rp 4,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
9 Aksesoris Tiang Set Rp 100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
10 Pengamanan Tiang 7m Batang Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
11 Pengamanan Tiang 9m Batang Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
12 Penanaman Tiang 7m Batang Rp 300,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
13 Penanaman Tiang 9m Batang Rp 400,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
14 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
15 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
16 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
17 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
18 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
19 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
20 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL MATRIAL Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0

C LAIN-LAIN
1 Community Fee Lot 1 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 Transportation 10% 1 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL LAIN-LAIN Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp

SUBTOTAL Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp
PPN 11% Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp
GRAND TOTAL Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp
TROUBLESHOOT & MAINTENANCE FO BACKBONE FIBERSTAR
PT. Step Point Indonesia INV : 0

REKAP LIST HANDLING TSHOOT & MAINTENANCE


45200
SUMMARY TROUBLESHOOT ( JABODETABEK )

50
30-Dec-1899
30-Dec-1899
30-Dec-1899

30-Dec-1899
No. Uraian Satuan Harga Satuan
(Rp)

Total

A MATRIAL
1 JB Dome 12 Core Set Rp 1,000,000 Rp -
2 JB Dome 24 Core Set Rp 1,100,000 Rp -
3 JB Dome 48 Core Set Rp 1,250,000 Rp -
4 JB Dome 96 Core Set Rp 1,750,000 Rp -
5 Fixing Slack Set Rp 250,000 Rp -
6 test Mtr Rp - Rp -
7 0 Mtr Rp - Rp -
8 0 Mtr Rp - Rp -
9 0 Mtr Rp - Rp -
10 0 Mtr Rp - Rp -
11 0 Mtr Rp - Rp -
12 0 Mtr Rp - Rp -
13 0 Mtr Rp - Rp -
14 0 Mtr Rp - Rp -
15 0 Mtr Rp - Rp -
16 0 Mtr Rp - Rp -
17 0 Mtr Rp - Rp -
18 0 Mtr Rp - Rp -
19 0 Mtr Rp - Rp -
20 0 Mtr Rp - Rp -

TOTAL SERVICE Rp0

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit Rp 150,000 Rp -
2 Instalasi DPFO Unit Rp 100,000 Rp -
3 Splicing + OTDR Core Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr Rp 4,000 Rp -
9 Aksesoris Tiang Set Rp 100,000 Rp -
10 Pengamanan Tiang 7m Batang Rp - Rp -
11 Pengamanan Tiang 9m Batang Rp - Rp -
12 Penanaman Tiang 7m Batang Rp 300,000 Rp -
13 Penanaman Tiang 9m Batang Rp 400,000 Rp -
14 0 Mtr Rp - Rp -
15 0 Mtr Rp - Rp -
16 0 Mtr Rp - Rp -
17 0 Mtr Rp - Rp -
18 0 Mtr Rp - Rp -
19 0 Mtr Rp - Rp -
20 0 Mtr Rp - Rp -

TOTAL MATRIAL Rp0

C LAIN-LAIN
1 Community Fee Lot 1 Rp -
2 Transportation 10% 1 Rp -

TOTAL LAIN-LAIN Rp -

Rp
SUBTOTAL -
RpPPN 11% -
GRAND
Rp TOTAL -
TROUBLESHOOT & MAINTENANCE FO BACKBONE FIBERSTAR
PT. Step Point Indonesia INV : 0

REKAP LIST HANDLING TSHOOT & MAINTENANCE


45200
SUMMARY TROUBLESHOOT ( JABODETABEK )

51 52 53 54 55 56 57 58 59 60
30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899

30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
No. Uraian Satuan Harga Satuan
(Rp)

0 0 0 0 0 0 0 0 0 0

Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty

A MATRIAL
1 JB Dome 12 Core Set Rp 1,000,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 JB Dome 24 Core Set Rp 1,100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
3 JB Dome 48 Core Set Rp 1,250,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
4 JB Dome 96 Core Set Rp 1,750,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
5 Fixing Slack Set Rp 250,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
6 test Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
7 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
8 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
9 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
10 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
11 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
12 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
13 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
14 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
15 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
16 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
17 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
18 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
19 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
20 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL SERVICE Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit Rp 150,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 Instalasi DPFO Unit Rp 100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
3 Splicing + OTDR Core Rp 50,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
4 Buka Tutup Handhole (HH) Unit Rp 150,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
5 Penarikan Kabel FO 12 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
6 Penarikan Kabel FO 24 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
7 Penarikan Kabel FO 48 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
8 Penarikan Kabel FO 96 Core Mtr Rp 4,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
9 Aksesoris Tiang Set Rp 100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
10 Pengamanan Tiang 7m Batang Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
11 Pengamanan Tiang 9m Batang Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
12 Penanaman Tiang 7m Batang Rp 300,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
13 Penanaman Tiang 9m Batang Rp 400,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
14 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
15 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
16 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
17 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
18 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
19 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
20 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL MATRIAL Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0

C LAIN-LAIN
1 Community Fee Lot 1 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 Transportation 10% 1 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL LAIN-LAIN Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp

SUBTOTAL Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp
PPN 11% Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp
GRAND TOTAL Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp
TROUBLESHOOT & MAINTENANCE FO BACKBONE FIBERSTAR
PT. Step Point Indonesia INV : 0

REKAP LIST HANDLING TSHOOT & MAINTENANCE


45200
SUMMARY TROUBLESHOOT ( JABODETABEK )

60
30-Dec-1899
30-Dec-1899
30-Dec-1899

30-Dec-1899
No. Uraian Satuan Harga Satuan
(Rp)

Total

A MATRIAL
1 JB Dome 12 Core Set Rp 1,000,000 Rp -
2 JB Dome 24 Core Set Rp 1,100,000 Rp -
3 JB Dome 48 Core Set Rp 1,250,000 Rp -
4 JB Dome 96 Core Set Rp 1,750,000 Rp -
5 Fixing Slack Set Rp 250,000 Rp -
6 test Mtr Rp - Rp -
7 0 Mtr Rp - Rp -
8 0 Mtr Rp - Rp -
9 0 Mtr Rp - Rp -
10 0 Mtr Rp - Rp -
11 0 Mtr Rp - Rp -
12 0 Mtr Rp - Rp -
13 0 Mtr Rp - Rp -
14 0 Mtr Rp - Rp -
15 0 Mtr Rp - Rp -
16 0 Mtr Rp - Rp -
17 0 Mtr Rp - Rp -
18 0 Mtr Rp - Rp -
19 0 Mtr Rp - Rp -
20 0 Mtr Rp - Rp -

TOTAL SERVICE Rp0

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit Rp 150,000 Rp -
2 Instalasi DPFO Unit Rp 100,000 Rp -
3 Splicing + OTDR Core Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr Rp 4,000 Rp -
9 Aksesoris Tiang Set Rp 100,000 Rp -
10 Pengamanan Tiang 7m Batang Rp - Rp -
11 Pengamanan Tiang 9m Batang Rp - Rp -
12 Penanaman Tiang 7m Batang Rp 300,000 Rp -
13 Penanaman Tiang 9m Batang Rp 400,000 Rp -
14 0 Mtr Rp - Rp -
15 0 Mtr Rp - Rp -
16 0 Mtr Rp - Rp -
17 0 Mtr Rp - Rp -
18 0 Mtr Rp - Rp -
19 0 Mtr Rp - Rp -
20 0 Mtr Rp - Rp -

TOTAL MATRIAL Rp0

C LAIN-LAIN
1 Community Fee Lot 1 Rp -
2 Transportation 10% 1 Rp -

TOTAL LAIN-LAIN Rp -

Rp
SUBTOTAL -
RpPPN 11% -
GRAND
Rp TOTAL -
TROUBLESHOOT & MAINTENANCE FO BACKBONE FIBERSTAR
PT. Step Point Indonesia INV : 0

REKAP LIST HANDLING TSHOOT & MAINTENANCE


45200
SUMMARY TROUBLESHOOT ( JABODETABEK )

61 62 63 64 65 66 67 68 69 70
30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899

30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
No. Uraian Satuan Harga Satuan
(Rp)

0 0 0 0 0 0 0 0 0 0

Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty

A MATRIAL
1 JB Dome 12 Core Set Rp 1,000,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 JB Dome 24 Core Set Rp 1,100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
3 JB Dome 48 Core Set Rp 1,250,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
4 JB Dome 96 Core Set Rp 1,750,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
5 Fixing Slack Set Rp 250,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
6 test Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
7 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
8 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
9 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
10 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
11 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
12 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
13 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
14 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
15 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
16 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
17 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
18 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
19 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
20 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL SERVICE Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit Rp 150,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 Instalasi DPFO Unit Rp 100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
3 Splicing + OTDR Core Rp 50,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
4 Buka Tutup Handhole (HH) Unit Rp 150,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
5 Penarikan Kabel FO 12 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
6 Penarikan Kabel FO 24 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
7 Penarikan Kabel FO 48 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
8 Penarikan Kabel FO 96 Core Mtr Rp 4,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
9 Aksesoris Tiang Set Rp 100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
10 Pengamanan Tiang 7m Batang Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
11 Pengamanan Tiang 9m Batang Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
12 Penanaman Tiang 7m Batang Rp 300,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
13 Penanaman Tiang 9m Batang Rp 400,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
14 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
15 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
16 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
17 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
18 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
19 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
20 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL MATRIAL Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0

C LAIN-LAIN
1 Community Fee Lot 1 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 Transportation 10% 1 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL LAIN-LAIN Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp

SUBTOTAL Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp
PPN 11% Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp
GRAND TOTAL Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp
TROUBLESHOOT & MAINTENANCE FO BACKBONE FIBERSTAR
PT. Step Point Indonesia INV : 0

REKAP LIST HANDLING TSHOOT & MAINTENANCE


45200
SUMMARY TROUBLESHOOT ( JABODETABEK )

70
30-Dec-1899
30-Dec-1899
30-Dec-1899

30-Dec-1899
No. Uraian Satuan Harga Satuan
(Rp)

Total

A MATRIAL
1 JB Dome 12 Core Set Rp 1,000,000 Rp -
2 JB Dome 24 Core Set Rp 1,100,000 Rp -
3 JB Dome 48 Core Set Rp 1,250,000 Rp -
4 JB Dome 96 Core Set Rp 1,750,000 Rp -
5 Fixing Slack Set Rp 250,000 Rp -
6 test Mtr Rp - Rp -
7 0 Mtr Rp - Rp -
8 0 Mtr Rp - Rp -
9 0 Mtr Rp - Rp -
10 0 Mtr Rp - Rp -
11 0 Mtr Rp - Rp -
12 0 Mtr Rp - Rp -
13 0 Mtr Rp - Rp -
14 0 Mtr Rp - Rp -
15 0 Mtr Rp - Rp -
16 0 Mtr Rp - Rp -
17 0 Mtr Rp - Rp -
18 0 Mtr Rp - Rp -
19 0 Mtr Rp - Rp -
20 0 Mtr Rp - Rp -

TOTAL SERVICE Rp0

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit Rp 150,000 Rp -
2 Instalasi DPFO Unit Rp 100,000 Rp -
3 Splicing + OTDR Core Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr Rp 4,000 Rp -
9 Aksesoris Tiang Set Rp 100,000 Rp -
10 Pengamanan Tiang 7m Batang Rp - Rp -
11 Pengamanan Tiang 9m Batang Rp - Rp -
12 Penanaman Tiang 7m Batang Rp 300,000 Rp -
13 Penanaman Tiang 9m Batang Rp 400,000 Rp -
14 0 Mtr Rp - Rp -
15 0 Mtr Rp - Rp -
16 0 Mtr Rp - Rp -
17 0 Mtr Rp - Rp -
18 0 Mtr Rp - Rp -
19 0 Mtr Rp - Rp -
20 0 Mtr Rp - Rp -

TOTAL MATRIAL Rp0

C LAIN-LAIN
1 Community Fee Lot 1 Rp -
2 Transportation 10% 1 Rp -

TOTAL LAIN-LAIN Rp -

Rp
SUBTOTAL -
RpPPN 11% -
GRAND
Rp TOTAL -
TROUBLESHOOT & MAINTENANCE FO BACKBONE FIBERSTAR
PT. Step Point Indonesia INV : 0

REKAP LIST HANDLING TSHOOT & MAINTENANCE


45200
SUMMARY TROUBLESHOOT ( JABODETABEK )

71 72 73 74 75 76 77 78 79 80
30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899

30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
No. Uraian Satuan Harga Satuan
(Rp)

0 0 0 0 0 0 0 0 0 0

Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty

A MATRIAL
1 JB Dome 12 Core Set Rp 1,000,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 JB Dome 24 Core Set Rp 1,100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
3 JB Dome 48 Core Set Rp 1,250,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
4 JB Dome 96 Core Set Rp 1,750,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
5 Fixing Slack Set Rp 250,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
6 test Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
7 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
8 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
9 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
10 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
11 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
12 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
13 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
14 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
15 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
16 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
17 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
18 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
19 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
20 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL SERVICE Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit Rp 150,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 Instalasi DPFO Unit Rp 100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
3 Splicing + OTDR Core Rp 50,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
4 Buka Tutup Handhole (HH) Unit Rp 150,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
5 Penarikan Kabel FO 12 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
6 Penarikan Kabel FO 24 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
7 Penarikan Kabel FO 48 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
8 Penarikan Kabel FO 96 Core Mtr Rp 4,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
9 Aksesoris Tiang Set Rp 100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
10 Pengamanan Tiang 7m Batang Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
11 Pengamanan Tiang 9m Batang Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
12 Penanaman Tiang 7m Batang Rp 300,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
13 Penanaman Tiang 9m Batang Rp 400,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
14 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
15 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
16 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
17 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
18 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
19 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
20 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL MATRIAL Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0

C LAIN-LAIN
1 Community Fee Lot 1 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 Transportation 10% 1 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL LAIN-LAIN Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp

SUBTOTAL Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp
PPN 11% Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp
GRAND TOTAL Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp
TROUBLESHOOT & MAINTENANCE FO BACKBONE FIBERSTAR
PT. Step Point Indonesia INV : 0

REKAP LIST HANDLING TSHOOT & MAINTENANCE


45200
SUMMARY TROUBLESHOOT ( JABODETABEK )

80
30-Dec-1899
30-Dec-1899
30-Dec-1899

30-Dec-1899
No. Uraian Satuan Harga Satuan
(Rp)

Total

A MATRIAL
1 JB Dome 12 Core Set Rp 1,000,000 Rp -
2 JB Dome 24 Core Set Rp 1,100,000 Rp -
3 JB Dome 48 Core Set Rp 1,250,000 Rp -
4 JB Dome 96 Core Set Rp 1,750,000 Rp -
5 Fixing Slack Set Rp 250,000 Rp -
6 test Mtr Rp - Rp -
7 0 Mtr Rp - Rp -
8 0 Mtr Rp - Rp -
9 0 Mtr Rp - Rp -
10 0 Mtr Rp - Rp -
11 0 Mtr Rp - Rp -
12 0 Mtr Rp - Rp -
13 0 Mtr Rp - Rp -
14 0 Mtr Rp - Rp -
15 0 Mtr Rp - Rp -
16 0 Mtr Rp - Rp -
17 0 Mtr Rp - Rp -
18 0 Mtr Rp - Rp -
19 0 Mtr Rp - Rp -
20 0 Mtr Rp - Rp -

TOTAL SERVICE Rp0

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit Rp 150,000 Rp -
2 Instalasi DPFO Unit Rp 100,000 Rp -
3 Splicing + OTDR Core Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr Rp 4,000 Rp -
9 Aksesoris Tiang Set Rp 100,000 Rp -
10 Pengamanan Tiang 7m Batang Rp - Rp -
11 Pengamanan Tiang 9m Batang Rp - Rp -
12 Penanaman Tiang 7m Batang Rp 300,000 Rp -
13 Penanaman Tiang 9m Batang Rp 400,000 Rp -
14 0 Mtr Rp - Rp -
15 0 Mtr Rp - Rp -
16 0 Mtr Rp - Rp -
17 0 Mtr Rp - Rp -
18 0 Mtr Rp - Rp -
19 0 Mtr Rp - Rp -
20 0 Mtr Rp - Rp -

TOTAL MATRIAL Rp0

C LAIN-LAIN
1 Community Fee Lot 1 Rp -
2 Transportation 10% 1 Rp -

TOTAL LAIN-LAIN Rp -

Rp
SUBTOTAL -
RpPPN 11% -
GRAND
Rp TOTAL -
TROUBLESHOOT & MAINTENANCE FO BACKBONE FIBERSTAR
PT. Step Point Indonesia INV : 0

REKAP LIST HANDLING TSHOOT & MAINTENANCE


45200
SUMMARY TROUBLESHOOT ( JABODETABEK )

81 82 83 84 85 86 87 88 89 90
30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899

30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
No. Uraian Satuan Harga Satuan
(Rp)

0 0 0 0 0 0 0 0 0 0

Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty

A MATRIAL
1 JB Dome 12 Core Set Rp 1,000,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 JB Dome 24 Core Set Rp 1,100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
3 JB Dome 48 Core Set Rp 1,250,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
4 JB Dome 96 Core Set Rp 1,750,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
5 Fixing Slack Set Rp 250,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
6 test Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
7 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
8 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
9 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
10 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
11 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
12 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
13 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
14 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
15 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
16 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
17 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
18 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
19 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
20 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL SERVICE Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit Rp 150,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 Instalasi DPFO Unit Rp 100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
3 Splicing + OTDR Core Rp 50,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
4 Buka Tutup Handhole (HH) Unit Rp 150,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
5 Penarikan Kabel FO 12 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
6 Penarikan Kabel FO 24 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
7 Penarikan Kabel FO 48 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
8 Penarikan Kabel FO 96 Core Mtr Rp 4,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
9 Aksesoris Tiang Set Rp 100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
10 Pengamanan Tiang 7m Batang Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
11 Pengamanan Tiang 9m Batang Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
12 Penanaman Tiang 7m Batang Rp 300,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
13 Penanaman Tiang 9m Batang Rp 400,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
14 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
15 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
16 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
17 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
18 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
19 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
20 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL MATRIAL Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0

C LAIN-LAIN
1 Community Fee Lot 1 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 Transportation 10% 1 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL LAIN-LAIN Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp

SUBTOTAL Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp
PPN 11% Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp
GRAND TOTAL Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp
TROUBLESHOOT & MAINTENANCE FO BACKBONE FIBERSTAR
PT. Step Point Indonesia INV : 0

REKAP LIST HANDLING TSHOOT & MAINTENANCE


45200
SUMMARY TROUBLESHOOT ( JABODETABEK )

90
30-Dec-1899
30-Dec-1899
30-Dec-1899

30-Dec-1899
No. Uraian Satuan Harga Satuan
(Rp)

Total

A MATRIAL
1 JB Dome 12 Core Set Rp 1,000,000 Rp -
2 JB Dome 24 Core Set Rp 1,100,000 Rp -
3 JB Dome 48 Core Set Rp 1,250,000 Rp -
4 JB Dome 96 Core Set Rp 1,750,000 Rp -
5 Fixing Slack Set Rp 250,000 Rp -
6 test Mtr Rp - Rp -
7 0 Mtr Rp - Rp -
8 0 Mtr Rp - Rp -
9 0 Mtr Rp - Rp -
10 0 Mtr Rp - Rp -
11 0 Mtr Rp - Rp -
12 0 Mtr Rp - Rp -
13 0 Mtr Rp - Rp -
14 0 Mtr Rp - Rp -
15 0 Mtr Rp - Rp -
16 0 Mtr Rp - Rp -
17 0 Mtr Rp - Rp -
18 0 Mtr Rp - Rp -
19 0 Mtr Rp - Rp -
20 0 Mtr Rp - Rp -

TOTAL SERVICE Rp0

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit Rp 150,000 Rp -
2 Instalasi DPFO Unit Rp 100,000 Rp -
3 Splicing + OTDR Core Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr Rp 4,000 Rp -
9 Aksesoris Tiang Set Rp 100,000 Rp -
10 Pengamanan Tiang 7m Batang Rp - Rp -
11 Pengamanan Tiang 9m Batang Rp - Rp -
12 Penanaman Tiang 7m Batang Rp 300,000 Rp -
13 Penanaman Tiang 9m Batang Rp 400,000 Rp -
14 0 Mtr Rp - Rp -
15 0 Mtr Rp - Rp -
16 0 Mtr Rp - Rp -
17 0 Mtr Rp - Rp -
18 0 Mtr Rp - Rp -
19 0 Mtr Rp - Rp -
20 0 Mtr Rp - Rp -

TOTAL MATRIAL Rp0

C LAIN-LAIN
1 Community Fee Lot 1 Rp -
2 Transportation 10% 1 Rp -

TOTAL LAIN-LAIN Rp -

Rp
SUBTOTAL -
RpPPN 11% -
GRAND
Rp TOTAL -
TROUBLESHOOT & MAINTENANCE FO BACKBONE FIBERSTAR
PT. Step Point Indonesia INV : 0

REKAP LIST HANDLING TSHOOT & MAINTENANCE


45200
SUMMARY TROUBLESHOOT ( JABODETABEK )

91 92 93 94 95 96 97 98 99 100
30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899

30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
No. Uraian Satuan Harga Satuan
(Rp)

0 0 0 0 0 0 0 0 0 0

Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty

A MATRIAL
1 JB Dome 12 Core Set Rp 1,000,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 JB Dome 24 Core Set Rp 1,100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
3 JB Dome 48 Core Set Rp 1,250,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
4 JB Dome 96 Core Set Rp 1,750,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
5 Fixing Slack Set Rp 250,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
6 test Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
7 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
8 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
9 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
10 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
11 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
12 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
13 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
14 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
15 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
16 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
17 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
18 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
19 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
20 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL SERVICE Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit Rp 150,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 Instalasi DPFO Unit Rp 100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
3 Splicing + OTDR Core Rp 50,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
4 Buka Tutup Handhole (HH) Unit Rp 150,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
5 Penarikan Kabel FO 12 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
6 Penarikan Kabel FO 24 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
7 Penarikan Kabel FO 48 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
8 Penarikan Kabel FO 96 Core Mtr Rp 4,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
9 Aksesoris Tiang Set Rp 100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
10 Pengamanan Tiang 7m Batang Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
11 Pengamanan Tiang 9m Batang Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
12 Penanaman Tiang 7m Batang Rp 300,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
13 Penanaman Tiang 9m Batang Rp 400,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
14 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
15 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
16 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
17 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
18 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
19 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
20 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL MATRIAL Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0

C LAIN-LAIN
1 Community Fee Lot 1 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 Transportation 10% 1 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL LAIN-LAIN Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp

SUBTOTAL Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp
PPN 11% Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp
GRAND TOTAL Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp
TROUBLESHOOT & MAINTENANCE FO BACKBONE FIBERSTAR
PT. Step Point Indonesia INV : 0

REKAP LIST HANDLING TSHOOT & MAINTENANCE


45200
SUMMARY TROUBLESHOOT ( JABODETABEK )

100
30-Dec-1899
30-Dec-1899
30-Dec-1899

30-Dec-1899
No. Uraian Satuan Harga Satuan
(Rp)

Total

A MATRIAL
1 JB Dome 12 Core Set Rp 1,000,000 Rp -
2 JB Dome 24 Core Set Rp 1,100,000 Rp -
3 JB Dome 48 Core Set Rp 1,250,000 Rp -
4 JB Dome 96 Core Set Rp 1,750,000 Rp -
5 Fixing Slack Set Rp 250,000 Rp -
6 test Mtr Rp - Rp -
7 0 Mtr Rp - Rp -
8 0 Mtr Rp - Rp -
9 0 Mtr Rp - Rp -
10 0 Mtr Rp - Rp -
11 0 Mtr Rp - Rp -
12 0 Mtr Rp - Rp -
13 0 Mtr Rp - Rp -
14 0 Mtr Rp - Rp -
15 0 Mtr Rp - Rp -
16 0 Mtr Rp - Rp -
17 0 Mtr Rp - Rp -
18 0 Mtr Rp - Rp -
19 0 Mtr Rp - Rp -
20 0 Mtr Rp - Rp -

TOTAL SERVICE Rp0

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit Rp 150,000 Rp -
2 Instalasi DPFO Unit Rp 100,000 Rp -
3 Splicing + OTDR Core Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr Rp 4,000 Rp -
9 Aksesoris Tiang Set Rp 100,000 Rp -
10 Pengamanan Tiang 7m Batang Rp - Rp -
11 Pengamanan Tiang 9m Batang Rp - Rp -
12 Penanaman Tiang 7m Batang Rp 300,000 Rp -
13 Penanaman Tiang 9m Batang Rp 400,000 Rp -
14 0 Mtr Rp - Rp -
15 0 Mtr Rp - Rp -
16 0 Mtr Rp - Rp -
17 0 Mtr Rp - Rp -
18 0 Mtr Rp - Rp -
19 0 Mtr Rp - Rp -
20 0 Mtr Rp - Rp -

TOTAL MATRIAL Rp0

C LAIN-LAIN
1 Community Fee Lot 1 Rp -
2 Transportation 10% 1 Rp -

TOTAL LAIN-LAIN Rp -

Rp
SUBTOTAL -
RpPPN 11% -
GRAND
Rp TOTAL -
TROUBLESHOOT & MAINTENANCE FO BACKBONE FIBERSTAR
PT. Step Point Indonesia INV : 0

REKAP LIST HANDLING TSHOOT & MAINTENANCE


45200
SUMMARY TROUBLESHOOT ( JABODETABEK )

101 102 103 104 105 106 107 108 109 110
30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899

30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
No. Uraian Satuan Harga Satuan
(Rp)

0 0 0 0 0 0 0 0 0 0

Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty

A MATRIAL
1 JB Dome 12 Core Set Rp 1,000,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 JB Dome 24 Core Set Rp 1,100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
3 JB Dome 48 Core Set Rp 1,250,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
4 JB Dome 96 Core Set Rp 1,750,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
5 Fixing Slack Set Rp 250,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
6 test Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
7 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
8 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
9 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
10 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
11 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
12 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
13 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
14 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
15 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
16 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
17 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
18 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
19 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
20 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL SERVICE Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit Rp 150,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 Instalasi DPFO Unit Rp 100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
3 Splicing + OTDR Core Rp 50,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
4 Buka Tutup Handhole (HH) Unit Rp 150,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
5 Penarikan Kabel FO 12 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
6 Penarikan Kabel FO 24 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
7 Penarikan Kabel FO 48 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
8 Penarikan Kabel FO 96 Core Mtr Rp 4,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
9 Aksesoris Tiang Set Rp 100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
10 Pengamanan Tiang 7m Batang Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
11 Pengamanan Tiang 9m Batang Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
12 Penanaman Tiang 7m Batang Rp 300,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
13 Penanaman Tiang 9m Batang Rp 400,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
14 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
15 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
16 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
17 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
18 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
19 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
20 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL MATRIAL Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0

C LAIN-LAIN
1 Community Fee Lot 1 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 Transportation 10% 1 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL LAIN-LAIN Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp

SUBTOTAL Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp
PPN 11% Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp
GRAND TOTAL Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp
TROUBLESHOOT & MAINTENANCE FO BACKBONE FIBERSTAR
PT. Step Point Indonesia INV : 0

REKAP LIST HANDLING TSHOOT & MAINTENANCE


45200
SUMMARY TROUBLESHOOT ( JABODETABEK )

110
30-Dec-1899
30-Dec-1899
30-Dec-1899

30-Dec-1899
No. Uraian Satuan Harga Satuan
(Rp)

Total

A MATRIAL
1 JB Dome 12 Core Set Rp 1,000,000 Rp -
2 JB Dome 24 Core Set Rp 1,100,000 Rp -
3 JB Dome 48 Core Set Rp 1,250,000 Rp -
4 JB Dome 96 Core Set Rp 1,750,000 Rp -
5 Fixing Slack Set Rp 250,000 Rp -
6 test Mtr Rp - Rp -
7 0 Mtr Rp - Rp -
8 0 Mtr Rp - Rp -
9 0 Mtr Rp - Rp -
10 0 Mtr Rp - Rp -
11 0 Mtr Rp - Rp -
12 0 Mtr Rp - Rp -
13 0 Mtr Rp - Rp -
14 0 Mtr Rp - Rp -
15 0 Mtr Rp - Rp -
16 0 Mtr Rp - Rp -
17 0 Mtr Rp - Rp -
18 0 Mtr Rp - Rp -
19 0 Mtr Rp - Rp -
20 0 Mtr Rp - Rp -

TOTAL SERVICE Rp0

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit Rp 150,000 Rp -
2 Instalasi DPFO Unit Rp 100,000 Rp -
3 Splicing + OTDR Core Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr Rp 4,000 Rp -
9 Aksesoris Tiang Set Rp 100,000 Rp -
10 Pengamanan Tiang 7m Batang Rp - Rp -
11 Pengamanan Tiang 9m Batang Rp - Rp -
12 Penanaman Tiang 7m Batang Rp 300,000 Rp -
13 Penanaman Tiang 9m Batang Rp 400,000 Rp -
14 0 Mtr Rp - Rp -
15 0 Mtr Rp - Rp -
16 0 Mtr Rp - Rp -
17 0 Mtr Rp - Rp -
18 0 Mtr Rp - Rp -
19 0 Mtr Rp - Rp -
20 0 Mtr Rp - Rp -

TOTAL MATRIAL Rp0

C LAIN-LAIN
1 Community Fee Lot 1 Rp -
2 Transportation 10% 1 Rp -

TOTAL LAIN-LAIN Rp -

Rp
SUBTOTAL -
RpPPN 11% -
GRAND
Rp TOTAL -
TROUBLESHOOT & MAINTENANCE FO BACKBONE FIBERSTAR
PT. Step Point Indonesia INV : 0

REKAP LIST HANDLING TSHOOT & MAINTENANCE


45200
SUMMARY TROUBLESHOOT ( JABODETABEK )

111 112 113 114 115 116 117 118 119 120
30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899

30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
No. Uraian Satuan Harga Satuan
(Rp)

0 0 0 0 0 0 0 0 0 0

Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty

A MATRIAL
1 JB Dome 12 Core Set Rp 1,000,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 JB Dome 24 Core Set Rp 1,100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
3 JB Dome 48 Core Set Rp 1,250,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
4 JB Dome 96 Core Set Rp 1,750,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
5 Fixing Slack Set Rp 250,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
6 test Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
7 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
8 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
9 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
10 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
11 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
12 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
13 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
14 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
15 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
16 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
17 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
18 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
19 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
20 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL SERVICE Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit Rp 150,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 Instalasi DPFO Unit Rp 100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
3 Splicing + OTDR Core Rp 50,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
4 Buka Tutup Handhole (HH) Unit Rp 150,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
5 Penarikan Kabel FO 12 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
6 Penarikan Kabel FO 24 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
7 Penarikan Kabel FO 48 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
8 Penarikan Kabel FO 96 Core Mtr Rp 4,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
9 Aksesoris Tiang Set Rp 100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
10 Pengamanan Tiang 7m Batang Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
11 Pengamanan Tiang 9m Batang Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
12 Penanaman Tiang 7m Batang Rp 300,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
13 Penanaman Tiang 9m Batang Rp 400,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
14 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
15 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
16 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
17 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
18 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
19 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
20 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL MATRIAL Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0

C LAIN-LAIN
1 Community Fee Lot 1 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 Transportation 10% 1 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL LAIN-LAIN Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp

SUBTOTAL Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp
PPN 11% Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp
GRAND TOTAL Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp
TROUBLESHOOT & MAINTENANCE FO BACKBONE FIBERSTAR
PT. Step Point Indonesia INV : 0

REKAP LIST HANDLING TSHOOT & MAINTENANCE


45200
SUMMARY TROUBLESHOOT ( JABODETABEK )

120
30-Dec-1899
30-Dec-1899
30-Dec-1899

30-Dec-1899
No. Uraian Satuan Harga Satuan
(Rp)

Total

A MATRIAL
1 JB Dome 12 Core Set Rp 1,000,000 Rp -
2 JB Dome 24 Core Set Rp 1,100,000 Rp -
3 JB Dome 48 Core Set Rp 1,250,000 Rp -
4 JB Dome 96 Core Set Rp 1,750,000 Rp -
5 Fixing Slack Set Rp 250,000 Rp -
6 test Mtr Rp - Rp -
7 0 Mtr Rp - Rp -
8 0 Mtr Rp - Rp -
9 0 Mtr Rp - Rp -
10 0 Mtr Rp - Rp -
11 0 Mtr Rp - Rp -
12 0 Mtr Rp - Rp -
13 0 Mtr Rp - Rp -
14 0 Mtr Rp - Rp -
15 0 Mtr Rp - Rp -
16 0 Mtr Rp - Rp -
17 0 Mtr Rp - Rp -
18 0 Mtr Rp - Rp -
19 0 Mtr Rp - Rp -
20 0 Mtr Rp - Rp -

TOTAL SERVICE Rp0

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit Rp 150,000 Rp -
2 Instalasi DPFO Unit Rp 100,000 Rp -
3 Splicing + OTDR Core Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr Rp 4,000 Rp -
9 Aksesoris Tiang Set Rp 100,000 Rp -
10 Pengamanan Tiang 7m Batang Rp - Rp -
11 Pengamanan Tiang 9m Batang Rp - Rp -
12 Penanaman Tiang 7m Batang Rp 300,000 Rp -
13 Penanaman Tiang 9m Batang Rp 400,000 Rp -
14 0 Mtr Rp - Rp -
15 0 Mtr Rp - Rp -
16 0 Mtr Rp - Rp -
17 0 Mtr Rp - Rp -
18 0 Mtr Rp - Rp -
19 0 Mtr Rp - Rp -
20 0 Mtr Rp - Rp -

TOTAL MATRIAL Rp0

C LAIN-LAIN
1 Community Fee Lot 1 Rp -
2 Transportation 10% 1 Rp -

TOTAL LAIN-LAIN Rp -

Rp
SUBTOTAL -
RpPPN 11% -
GRAND
Rp TOTAL -
TROUBLESHOOT & MAINTENANCE FO BACKBONE FIBERSTAR
PT. Step Point Indonesia INV : 0

REKAP LIST HANDLING TSHOOT & MAINTENANCE


45200
SUMMARY TROUBLESHOOT ( JABODETABEK )

121 122 123 124 125 126 127 128 129 130
30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899

30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
No. Uraian Satuan Harga Satuan
(Rp)

0 0 0 0 0 0 0 0 0 0

Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty

A MATRIAL
1 JB Dome 12 Core Set Rp 1,000,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 JB Dome 24 Core Set Rp 1,100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
3 JB Dome 48 Core Set Rp 1,250,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
4 JB Dome 96 Core Set Rp 1,750,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
5 Fixing Slack Set Rp 250,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
6 test Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
7 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
8 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
9 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
10 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
11 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
12 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
13 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
14 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
15 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
16 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
17 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
18 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
19 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
20 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL SERVICE Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit Rp 150,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 Instalasi DPFO Unit Rp 100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
3 Splicing + OTDR Core Rp 50,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
4 Buka Tutup Handhole (HH) Unit Rp 150,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
5 Penarikan Kabel FO 12 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
6 Penarikan Kabel FO 24 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
7 Penarikan Kabel FO 48 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
8 Penarikan Kabel FO 96 Core Mtr Rp 4,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
9 Aksesoris Tiang Set Rp 100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
10 Pengamanan Tiang 7m Batang Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
11 Pengamanan Tiang 9m Batang Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
12 Penanaman Tiang 7m Batang Rp 300,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
13 Penanaman Tiang 9m Batang Rp 400,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
14 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
15 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
16 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
17 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
18 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
19 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
20 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL MATRIAL Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0

C LAIN-LAIN
1 Community Fee Lot 1 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 Transportation 10% 1 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL LAIN-LAIN Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp

SUBTOTAL Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp
PPN 11% Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp
GRAND TOTAL Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp
TROUBLESHOOT & MAINTENANCE FO BACKBONE FIBERSTAR
PT. Step Point Indonesia INV : 0

REKAP LIST HANDLING TSHOOT & MAINTENANCE


45200
SUMMARY TROUBLESHOOT ( JABODETABEK )

130
30-Dec-1899
30-Dec-1899
30-Dec-1899

30-Dec-1899
No. Uraian Satuan Harga Satuan
(Rp)

Total

A MATRIAL
1 JB Dome 12 Core Set Rp 1,000,000 Rp -
2 JB Dome 24 Core Set Rp 1,100,000 Rp -
3 JB Dome 48 Core Set Rp 1,250,000 Rp -
4 JB Dome 96 Core Set Rp 1,750,000 Rp -
5 Fixing Slack Set Rp 250,000 Rp -
6 test Mtr Rp - Rp -
7 0 Mtr Rp - Rp -
8 0 Mtr Rp - Rp -
9 0 Mtr Rp - Rp -
10 0 Mtr Rp - Rp -
11 0 Mtr Rp - Rp -
12 0 Mtr Rp - Rp -
13 0 Mtr Rp - Rp -
14 0 Mtr Rp - Rp -
15 0 Mtr Rp - Rp -
16 0 Mtr Rp - Rp -
17 0 Mtr Rp - Rp -
18 0 Mtr Rp - Rp -
19 0 Mtr Rp - Rp -
20 0 Mtr Rp - Rp -

TOTAL SERVICE Rp0

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit Rp 150,000 Rp -
2 Instalasi DPFO Unit Rp 100,000 Rp -
3 Splicing + OTDR Core Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr Rp 4,000 Rp -
9 Aksesoris Tiang Set Rp 100,000 Rp -
10 Pengamanan Tiang 7m Batang Rp - Rp -
11 Pengamanan Tiang 9m Batang Rp - Rp -
12 Penanaman Tiang 7m Batang Rp 300,000 Rp -
13 Penanaman Tiang 9m Batang Rp 400,000 Rp -
14 0 Mtr Rp - Rp -
15 0 Mtr Rp - Rp -
16 0 Mtr Rp - Rp -
17 0 Mtr Rp - Rp -
18 0 Mtr Rp - Rp -
19 0 Mtr Rp - Rp -
20 0 Mtr Rp - Rp -

TOTAL MATRIAL Rp0

C LAIN-LAIN
1 Community Fee Lot 1 Rp -
2 Transportation 10% 1 Rp -

TOTAL LAIN-LAIN Rp -

Rp
SUBTOTAL -
RpPPN 11% -
GRAND
Rp TOTAL -
TROUBLESHOOT & MAINTENANCE FO BACKBONE FIBERSTAR
PT. Step Point Indonesia INV : 0

REKAP LIST HANDLING TSHOOT & MAINTENANCE


45200
SUMMARY TROUBLESHOOT ( JABODETABEK )

131 132 133 134 135 136 137 138 139 140
30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899

30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
No. Uraian Satuan Harga Satuan
(Rp)

0 0 0 0 0 0 0 0 0 0

Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty

A MATRIAL
1 JB Dome 12 Core Set Rp 1,000,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 JB Dome 24 Core Set Rp 1,100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
3 JB Dome 48 Core Set Rp 1,250,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
4 JB Dome 96 Core Set Rp 1,750,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
5 Fixing Slack Set Rp 250,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
6 test Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
7 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
8 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
9 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
10 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
11 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
12 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
13 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
14 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
15 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
16 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
17 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
18 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
19 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
20 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL SERVICE Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit Rp 150,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 Instalasi DPFO Unit Rp 100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
3 Splicing + OTDR Core Rp 50,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
4 Buka Tutup Handhole (HH) Unit Rp 150,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
5 Penarikan Kabel FO 12 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
6 Penarikan Kabel FO 24 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
7 Penarikan Kabel FO 48 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
8 Penarikan Kabel FO 96 Core Mtr Rp 4,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
9 Aksesoris Tiang Set Rp 100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
10 Pengamanan Tiang 7m Batang Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
11 Pengamanan Tiang 9m Batang Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
12 Penanaman Tiang 7m Batang Rp 300,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
13 Penanaman Tiang 9m Batang Rp 400,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
14 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
15 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
16 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
17 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
18 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
19 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
20 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL MATRIAL Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0

C LAIN-LAIN
1 Community Fee Lot 1 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 Transportation 10% 1 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL LAIN-LAIN Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp

SUBTOTAL Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp
PPN 11% Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp
GRAND TOTAL Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp
TROUBLESHOOT & MAINTENANCE FO BACKBONE FIBERSTAR
PT. Step Point Indonesia INV : 0

REKAP LIST HANDLING TSHOOT & MAINTENANCE


45200
SUMMARY TROUBLESHOOT ( JABODETABEK )

140
30-Dec-1899
30-Dec-1899
30-Dec-1899

30-Dec-1899
No. Uraian Satuan Harga Satuan
(Rp)

Total

A MATRIAL
1 JB Dome 12 Core Set Rp 1,000,000 Rp -
2 JB Dome 24 Core Set Rp 1,100,000 Rp -
3 JB Dome 48 Core Set Rp 1,250,000 Rp -
4 JB Dome 96 Core Set Rp 1,750,000 Rp -
5 Fixing Slack Set Rp 250,000 Rp -
6 test Mtr Rp - Rp -
7 0 Mtr Rp - Rp -
8 0 Mtr Rp - Rp -
9 0 Mtr Rp - Rp -
10 0 Mtr Rp - Rp -
11 0 Mtr Rp - Rp -
12 0 Mtr Rp - Rp -
13 0 Mtr Rp - Rp -
14 0 Mtr Rp - Rp -
15 0 Mtr Rp - Rp -
16 0 Mtr Rp - Rp -
17 0 Mtr Rp - Rp -
18 0 Mtr Rp - Rp -
19 0 Mtr Rp - Rp -
20 0 Mtr Rp - Rp -

TOTAL SERVICE Rp0

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit Rp 150,000 Rp -
2 Instalasi DPFO Unit Rp 100,000 Rp -
3 Splicing + OTDR Core Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr Rp 4,000 Rp -
9 Aksesoris Tiang Set Rp 100,000 Rp -
10 Pengamanan Tiang 7m Batang Rp - Rp -
11 Pengamanan Tiang 9m Batang Rp - Rp -
12 Penanaman Tiang 7m Batang Rp 300,000 Rp -
13 Penanaman Tiang 9m Batang Rp 400,000 Rp -
14 0 Mtr Rp - Rp -
15 0 Mtr Rp - Rp -
16 0 Mtr Rp - Rp -
17 0 Mtr Rp - Rp -
18 0 Mtr Rp - Rp -
19 0 Mtr Rp - Rp -
20 0 Mtr Rp - Rp -

TOTAL MATRIAL Rp0

C LAIN-LAIN
1 Community Fee Lot 1 Rp -
2 Transportation 10% 1 Rp -

TOTAL LAIN-LAIN Rp -

Rp
SUBTOTAL -
RpPPN 11% -
GRAND
Rp TOTAL -
TROUBLESHOOT & MAINTENANCE FO BACKBONE FIBERSTAR
PT. Step Point Indonesia INV : 0

REKAP LIST HANDLING TSHOOT & MAINTENANCE


45200
SUMMARY TROUBLESHOOT ( JABODETABEK )

141 142 143 144 145 146 147 148 149 150
30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899

30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899 30-Dec-1899
No. Uraian Satuan Harga Satuan
(Rp)

0 0 0 0 0 0 0 0 0 0

Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty Total Qty

A MATRIAL
1 JB Dome 12 Core Set Rp 1,000,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 JB Dome 24 Core Set Rp 1,100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
3 JB Dome 48 Core Set Rp 1,250,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
4 JB Dome 96 Core Set Rp 1,750,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
5 Fixing Slack Set Rp 250,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
6 test Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
7 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
8 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
9 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
10 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
11 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
12 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
13 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
14 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
15 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
16 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
17 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
18 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
19 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
20 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL SERVICE Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit Rp 150,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 Instalasi DPFO Unit Rp 100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
3 Splicing + OTDR Core Rp 50,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
4 Buka Tutup Handhole (HH) Unit Rp 150,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
5 Penarikan Kabel FO 12 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
6 Penarikan Kabel FO 24 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
7 Penarikan Kabel FO 48 Core Mtr Rp 3,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
8 Penarikan Kabel FO 96 Core Mtr Rp 4,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
9 Aksesoris Tiang Set Rp 100,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
10 Pengamanan Tiang 7m Batang Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
11 Pengamanan Tiang 9m Batang Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
12 Penanaman Tiang 7m Batang Rp 300,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
13 Penanaman Tiang 9m Batang Rp 400,000 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
14 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
15 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
16 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
17 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
18 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
19 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
20 0 Mtr Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL MATRIAL Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0 Rp0

C LAIN-LAIN
1 Community Fee Lot 1 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0
2 Transportation 10% 1 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0 Rp - 0

TOTAL LAIN-LAIN Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp

SUBTOTAL Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp
PPN 11% Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp
GRAND TOTAL Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp
TROUBLESHOOT & MAINTENANCE FO BACKBONE FIBERSTAR
PT. Step Point Indonesia INV : 0

REKAP LIST HANDLING TSHOOT & MAINTENANCE


45200
SUMMARY TROUBLESHOOT ( JABODETABEK )

150
30-Dec-1899
30-Dec-1899
30-Dec-1899

30-Dec-1899
No. Uraian Satuan Harga Satuan
(Rp)

Total

A MATRIAL
1 JB Dome 12 Core Set Rp 1,000,000 Rp -
2 JB Dome 24 Core Set Rp 1,100,000 Rp -
3 JB Dome 48 Core Set Rp 1,250,000 Rp -
4 JB Dome 96 Core Set Rp 1,750,000 Rp -
5 Fixing Slack Set Rp 250,000 Rp -
6 test Mtr Rp - Rp -
7 0 Mtr Rp - Rp -
8 0 Mtr Rp - Rp -
9 0 Mtr Rp - Rp -
10 0 Mtr Rp - Rp -
11 0 Mtr Rp - Rp -
12 0 Mtr Rp - Rp -
13 0 Mtr Rp - Rp -
14 0 Mtr Rp - Rp -
15 0 Mtr Rp - Rp -
16 0 Mtr Rp - Rp -
17 0 Mtr Rp - Rp -
18 0 Mtr Rp - Rp -
19 0 Mtr Rp - Rp -
20 0 Mtr Rp - Rp -

TOTAL SERVICE Rp0

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit Rp 150,000 Rp -
2 Instalasi DPFO Unit Rp 100,000 Rp -
3 Splicing + OTDR Core Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr Rp 4,000 Rp -
9 Aksesoris Tiang Set Rp 100,000 Rp -
10 Pengamanan Tiang 7m Batang Rp - Rp -
11 Pengamanan Tiang 9m Batang Rp - Rp -
12 Penanaman Tiang 7m Batang Rp 300,000 Rp -
13 Penanaman Tiang 9m Batang Rp 400,000 Rp -
14 0 Mtr Rp - Rp -
15 0 Mtr Rp - Rp -
16 0 Mtr Rp - Rp -
17 0 Mtr Rp - Rp -
18 0 Mtr Rp - Rp -
19 0 Mtr Rp - Rp -
20 0 Mtr Rp - Rp -

TOTAL MATRIAL Rp0

C LAIN-LAIN
1 Community Fee Lot 1 Rp -
2 Transportation 10% 1 Rp -

TOTAL LAIN-LAIN Rp -

Rp
SUBTOTAL -
RpPPN 11% -
GRAND
Rp TOTAL -
1
BOQ ( BILL OF QUANTITY )
PROJECT :Troubleshoot
NO TICKET :T790041-011023-01
CRT :-
DESCRIPSI :LINK FISHBONE OLT 4 GIVENCY
LOCATION :Jl. titi baru, kecamatan sunggal deli serdang
DATE :1-Oct-2023
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 1 Rp 1,100,000 Rp 1,100,000
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 30 Rp 50,000 Rp 1,500,000
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 80 Rp 3,000 Rp 240,000
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 3040000
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 3374400
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - Nuryamin Putra
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN Andre G


1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp 2,840,000
PPN 11% Rp 312,400
GRAND TOTAL Rp 3,152,400

Sunday, October 1, 2023


PT. Step Point Indonesia

( Rizandri Osmar)
2
BOQ ( BILL OF QUANTITY )
PROJECT :Troubleshoot
NO TICKET :T003002-051023-01
CRT :-
DESCRIPSI :LINK BACKBONE HUAWEI MULTATULI
LOCATION :Jl. Imam Bonjol, Kec. Medan Maimun, Medan.
DATE :5-Oct-2023
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 1 Rp 1,750,000 Rp 1,750,000
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 96 Rp 50,000 Rp 4,800,000
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 6750000
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 7492500
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - Nuryamin Putra
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN Andre G


1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp 6,550,000
PPN 11% Rp 720,500
GRAND TOTAL Rp 7,270,500

Thursday, October 5, 2023


PT. Step Point Indonesia

( Rizandri Osmar)
3
BOQ ( BILL OF QUANTITY )
PROJECT :Corrective
NO TICKET :043/RMOSP/MDN/XI/2023
CRT :-
DESCRIPSI :Jl. Pasundan Medan Petisah
LOCATION :Jl. Pasundan Medan Petisah
DATE :10-Oct-2023
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 600000
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 666000
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - Nuryamin Putra
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 1 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN Andre G


1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 400000 Rp 400,000

TOTAL Rp 400,000
PPN 11% Rp 44,000
GRAND TOTAL Rp 444,000

Tuesday, October 10, 2023


PT. Step Point Indonesia

( Rizandri Osmar)
4
BOQ ( BILL OF QUANTITY )
PROJECT :Troubleshoot
NO TICKET :T109933-111023-01
CRT :-
DESCRIPSI :PT. Eka Mas Republik
LOCATION :PERUM GLUGUR KOTA JLN. KL. YOS SUDARSO
DATE :12-Oct-2023
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 2 Rp 1,100,000 Rp 2,200,000
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 24 Rp 50,000 Rp 1,200,000
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 179 Rp 3,000 Rp 537,000
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 4137000
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 4592070
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - Nuryamin Putra
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN Andre G


1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp 3,937,000
PPN 11% Rp 433,070
GRAND TOTAL Rp 4,370,070

Thursday, October 12, 2023


PT. Step Point Indonesia

( Rizandri Osmar)
5
BOQ ( BILL OF QUANTITY )
PROJECT :Troubleshoot
NO TICKET :T237587-121023-01
CRT :-
DESCRIPSI :LINK FISHBONE OLT 1 BRAYAN DOWN
LOCATION :JL. Platina Deli Medan
DATE :12-Oct-2023
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 12 Rp 50,000 Rp 600,000
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 120 Rp 3,000 Rp 360,000
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 1160000
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 1287600
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - Nuryamin Putra
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN Andre G


1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp 960,000
PPN 11% Rp 105,600
GRAND TOTAL Rp 1,065,600

Thursday, October 12, 2023


PT. Step Point Indonesia

( Rizandri Osmar)
6
BOQ ( BILL OF QUANTITY )
PROJECT :Troubleshoot
NO TICKET :T003290-131023-01
CRT :-
DESCRIPSI :PT. Primacom Interbuana - BCA KK Johor
LOCATION :Jl. Karya Wisata, Komplek Citra Wisata blok III No.19 Medan
DATE :13-Oct-2023
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 2 Rp 1,250,000 Rp 2,500,000
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 12 Rp 50,000 Rp 600,000
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 67 Rp 3,000 Rp 201,000
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 3501000
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 3886110
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - Nuryamin Putra
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN Andre G


1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp 3,301,000
PPN 11% Rp 363,110
GRAND TOTAL Rp 3,664,110

Friday, October 13, 2023


PT. Step Point Indonesia

( Rizandri Osmar)
7
BOQ ( BILL OF QUANTITY )
PROJECT :Troubleshoot
NO TICKET :IN161023104933-01
CRT :-
DESCRIPSI :LINK FISHBONE OLT 1 BRAYAN PON
LOCATION :Jl. Krakatau Ujung, Tj. Mulia, Kec. Medan Deli
DATE :16-Oct-2023
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 7 Rp 50,000 Rp 350,000
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 550000
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 610500
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - Nuryamin Putra
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN Andre G


1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp 350,000
PPN 11% Rp 38,500
GRAND TOTAL Rp 388,500

Monday, October 16, 2023


PT. Step Point Indonesia

( Rizandri Osmar)
8
BOQ ( BILL OF QUANTITY )
PROJECT :Troubleshoot
NO TICKET :IN191023101234-01
CRT :-
DESCRIPSI :LINK FISHBONE OLT 3 & 4 MMTC DOWN
LOCATION :Jl. Pimpinan No.30, Kec. Medan Perjuangan, Kota Medan
DATE :19-Oct-2023
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 2 Rp 1,100,000 Rp 2,200,000
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 1 Rp 100,000 Rp 100,000
3 Splicing + OTDR Core 48 Rp 50,000 Rp 2,400,000
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 98 Rp 3,000 Rp 294,000
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 5194000
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 5765340
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - Nuryamin Putra
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN Andre G


1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp 4,994,000
PPN 11% Rp 549,340
GRAND TOTAL Rp 5,543,340

Thursday, October 19, 2023


PT. Step Point Indonesia

( Rizandri Osmar)
9
BOQ ( BILL OF QUANTITY )
PROJECT :Corrective
NO TICKET :043/RMOSP/MDN/XI/2023
CRT :-
DESCRIPSI :Jl. sutomo ujung, medan timur
LOCATION :Jl. sutomo ujung, medan timur
DATE :25-Oct-2023
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 600000
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 666000
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - Nuryamin Putra
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 1 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN Andre G


1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 400000 Rp 400,000

TOTAL Rp 400,000
PPN 11% Rp 44,000
GRAND TOTAL Rp 444,000

Wednesday, October 25, 2023


PT. Step Point Indonesia

( Rizandri Osmar)
10
BOQ ( BILL OF QUANTITY )
PROJECT :Corrective
NO TICKET :043/RMOSP/MDN/XI/2023
CRT :-
DESCRIPSI :Jl. Punak Medan Petisah
LOCATION :Jl. Punak Medan Petisah
DATE :26-Oct-2023
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 600000
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 666000
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - Nuryamin Putra
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 2 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN Andre G


1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 400000 Rp 400,000

TOTAL Rp 400,000
PPN 11% Rp 44,000
GRAND TOTAL Rp 444,000

Thursday, October 26, 2023


PT. Step Point Indonesia

( Rizandri Osmar)
11
BOQ ( BILL OF QUANTITY )
PROJECT :Troubleshoot
NO TICKET :IN281023031906-01
CRT :-
DESCRIPSI :LINK BACKBONE HUAWEI SUNGGAL TO HUAWEI JOHOR DOWN
LOCATION :Jl. GAGAK HITAM KEC. MEDAN SELAYANG RINGROAD MEDAN
DATE :28-Oct-2023
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 1 Rp 1,750,000 Rp 1,750,000
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 160 Rp 50,000 Rp 8,000,000
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 65 Rp 4,000 Rp 260,000 PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 10210000
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 11333100
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - Nuryamin Putra
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN Andre G


1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp 10,010,000
PPN 11% Rp 1,101,100
GRAND TOTAL Rp 11,111,100

Saturday, October 28, 2023


PT. Step Point Indonesia

( Rizandri Osmar)
12
BOQ ( BILL OF QUANTITY )
PROJECT :Troubleshoot
NO TICKET :IN291023172531-01
CRT :-
DESCRIPSI :LINK FISHBONE OLT 4 GIVENCY PON 1/1/6 DOWN
LOCATION :Jl. Besar Hamparan Perak, Klambir Lima Kb., Kec. Hamparan Perak.
DATE :29-Oct-2023
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 1 Rp 50,000 Rp 50,000
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 250000
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 277500
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - Nuryamin Putra
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN Andre G


1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp 50,000
PPN 11% Rp 5,500
GRAND TOTAL Rp 55,500

Sunday, October 29, 2023


PT. Step Point Indonesia

( Rizandri Osmar)
13
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
14
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
15
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
16
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
17
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
18
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
19
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
20
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
21
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
22
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
23
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
24
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
25
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
26
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
27
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
28
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
29
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
30
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
31
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
32
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
33
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
34
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
35
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
36
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
37
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
38
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
39
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
40
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
41
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
42
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
43
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
44
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
45
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
46
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
47
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
48
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
49
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
50
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
51
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
52
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
53
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
54
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
55
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
56
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
57
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
58
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
59
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
60
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
61
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
62
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
63
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
64
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
65
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
66
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
67
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
68
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
69
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
70
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
71
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
72
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
73
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
74
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
75
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
76
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
77
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
78
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
79
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
80
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
81
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
82
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
83
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
84
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
85
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
86
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
87
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
88
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
89
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
90
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
91
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
92
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
93
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
94
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
95
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
96
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
97
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
98
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
99
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
100
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
101
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
102
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
103
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
104
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
105
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
106
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
107
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
108
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
109
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
110
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
111
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
112
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
113
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
114
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
115
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
116
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
117
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
118
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
119
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
120
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
121
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
122
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
123
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
124
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
125
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
126
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
127
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
128
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
129
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
130
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
131
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
132
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
133
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
134
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
135
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
136
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
137
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
138
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
139
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
140
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
141
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
142
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
143
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
144
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
145
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
146
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
147
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
148
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
149
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
150
BOQ ( BILL OF QUANTITY )
PROJECT :0
NO TICKET :0
CRT :0
DESCRIPSI :0
LOCATION :0
DATE :30-Dec-1899
DISIAPKAN OLEH : PT. Step Point Indonesia

NO URAIAN Satuan Volume Unit Price Total Remark


A MATRIAL OSP
1 JB Dome 12 Core Set 0 Rp 1,000,000 Rp -
2 JB Dome 24 Core Set 0 Rp 1,100,000 Rp -
3 JB Dome 48 Core Set 0 Rp 1,250,000 Rp -
4 JB Dome 96 Core Set 0 Rp 1,750,000 Rp -
5 Fixing Slack Set 0 Rp 250,000 Rp -
6 test Mtr 0 Rp - Rp -
7 0 Mtr 0 Rp - Rp -
8 0 Mtr 0 Rp - Rp -
9 0 Mtr 0 Rp - Rp -
10 0 Mtr 0 Rp - Rp -
11 0 Mtr 0 Rp - Rp -
12 0 Mtr 0 Rp - Rp -
13 0 Mtr 0 Rp - Rp -
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp -
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp -
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp -

B SERVICE
1 Instalasi Fixing Slack + Joint Closure Unit 0 Rp 150,000 Rp -
2 Instalasi DPFO Unit 0 Rp 100,000 Rp -
3 Splicing + OTDR Core 0 Rp 50,000 Rp -
4 Buka Tutup Handhole (HH) Unit 0 Rp 150,000 Rp -
5 Penarikan Kabel FO 12 Core Mtr 0 Rp 3,000 Rp -
6 Penarikan Kabel FO 24 Core Mtr 0 Rp 3,000 Rp -
7 Penarikan Kabel FO 48 Core Mtr 0 Rp 3,000 Rp -
8 Penarikan Kabel FO 96 Core Mtr 0 Rp 4,000 Rp - PIC FIBERSTAR
9 Aksesoris Tiang Set 0 Rp 100,000 Rp - 0
10 Pengamanan Tiang 7m Batang 0 Rp - Rp -
11 Pengamanan Tiang 9m Batang 0 Rp - Rp - PIC MITRA
12 Penanaman Tiang 7m Batang 0 Rp 300,000 Rp - 0
13 Penanaman Tiang 9m Batang 0 Rp 400,000 Rp - 0
14 0 Mtr 0 Rp - Rp -
15 0 Mtr 0 Rp - Rp - RFO
16 0 Mtr 0 Rp - Rp -
17 0 Mtr 0 Rp - Rp - 0
18 0 Mtr 0 Rp - Rp -
19 0 Mtr 0 Rp - Rp -
20 0 Mtr 0 Rp - Rp - ACTION

C LAIN - LAIN 0
1 Community Fee LOT 1 0 Rp -
2 Transportation LOT 1 0 Rp -

TOTAL Rp -
PPN 11% Rp -
GRAND TOTAL Rp -

Saturday, December 30, 1899


PT. Step Point Indonesia

( Rizandri Osmar)
1

DOKUMENTASI
No. Ticket T790041-011023-01
Descripsi LINK FISHBONE OLT 4 GIVENCY
On site Inspection
CRT -
Date Sunday, October 1, 2023

Picture of Damage

Proses Proses

Comment Comment

Proses Proses

Comment Comment

Picture Proses Of Repair

Proses Proses

Comment Comment

*1 foto / kolom hal 1


Proses Proses

Comment Comment

Proses Proses

Comment Comment

Picture After Of Repair

Proses Proses

Comment Comment

Proses Proses
Comment Comment

*1 foto / kolom hal 2


Picture Used New Cable

Proses Proses

Comment Comment

Proses Proses

Comment Comment

*1 foto / kolom hal 3


1

MAPPING RESTORASI
No. Ticket T790041-011023-01
On site Inspection Descripsi LINK FISHBONE OLT 4 GIVENCY
Date Sunday, October 1, 2023

TIKOR JB 1
TIKOR JB 2
TIKOR DPFO