Professional Documents
Culture Documents
D H2O D-3
W-8
D-1
DW-2
DW-2
H A L L W A Y
CUBICLE CUBICLE WAITING FL-1 EMERGENCY EXIT
22 23 AREA
CUBICLE CUBICLE W-8
ONLY
CW-4 24 25
D-1
CUBICLE CUBICLE
4 3
CUBICLE CUBICLE UP
2 1 W-8 SUPPLY STORAGE
W-8
FL-1
CUBICLE CUBICLE CASH UNIT
FL-1
C 26
CUBICLE
27
CUBICLE
CUBICLE CUBICLE D-5
29 28
4 3 CUBICLE CUBICLE
3 4
CONSTRUCTION W-8
CUBICLE CUBICLE CUBICLE CUBICLE
SECTION 2 1 2 5
FL-1 CUBICLE CUBICLE
CW-4 CUBICLE CUBICLE 6 5 W-7
30 31 CUBICLE CUBICLE
CUBICLE CUBICLE CUBICLE CUBICLE 1 6
32 33 9 10
W-8
CUBICLE CUBICLE SUPPLY OFFICE
8 7
FL-1
HR UNIT
B W-8 CUBICLE CUBICLE CUBICLE
D-5
CUBICLE
CUBICLE
CUBICLE CUBICLE
SECURITY / INFO.
11
8 7 6 D-5
9
34 35
CUBICLE CUBICLE D-2 FL-1 XEROX PANTRY
36 37 MACHINE AREA
CUBICLE
CUBICLE
CW-5 W-8
10
12
D-4
W-8 MONITORING W-7 LOBBY ADMINISTRATIVE
CUBICLE FL-1 D-4
SECTION
15 FL-1
DW-2
CUBICLE
CUBICLE
CUBICLE CUBICLE
13
14
CONSTRUCTION 1 2 ADMINISTRATIVE
CW-2
A CHIEF
CW-2
CHIEF
G R E E N
G R E E N
CW-1 CW-1
500.00
DW-1
ENTRY
CLEAR DIMENSION
150mm X 400mm PORCH
CONCRETE VERTICAL FL-2 I : 12 SLOPE
SUNBREADERS FL-6
RAMP UP
UP
MAIN ENTRANCE
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS LIMUEL SUNDY B. POLIS
CORDILLERA ADMINISTRATIVE REGION CONSTRUCTION OF DPWH (STANDARD ARCHITECT I
A 1
BUILDING DESIGN) ABRA DISTRICT GROUND FLOOR PLAN
PREPARED:
ABRA DISTRICT ENGINEERING OFFICE ENGINEERING OFFICE, BANUED, ABRA EMMANUEL T. COLLADO CHONA LUISA A. RAMOS EDWIN T. BRINGAS JOSELITO T. ARAO 1 9 24
BANGUED, ABRA ENGINEERING II CHIEF, PLANNING AND DESIGN SECTION OIC, ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
JONEL A. BACCALI
ENGINEER II DATE: DATE: DATE: DATE: