GROUP
MANAGING DIRECTOR
IR. TAN CHEE KIAN
ALL ESTATE
MANAGER OPERATION
GAVIN LIM
ASSISTANT MANAGER
INFRASTRUCTURE
SHURIYAN TAN AH CHIANG
SITE SUPERVISOR SITE SUPERVISOR SITE SUPERVISOR SITE SUPERVISOR SENIOR EXECUTIVE
KB 1/ PB KB 2 / KB 3 SA LPM MOHAMAD HANIF
SENIOR CLERK KHAIRUL HAZLIN CHAK WAN MIN HEW KON SANG HAZRIN HAFIZI MAINTENANCE CLERK
ZARINA BT CHE OMAR TENYEL BT ALI
SITE SUPERVISOR
MOHAMAD ZANZUKI
KB 1, KB 2, KB 3, PB SENIOR TECHNICIAN
GENERAL WORKER GANDHI
KUSNADI
DEEDY BIN ANJANG JUNIOR TECHNICIAN
ADI BIN ALANG HAZLIN
HATTAN A/L AMAN AMIRUL
MOHAMAD YATIM
VACANT
LIQUID PALM GROWER
3
SDN.BHD.
KB 1, KB 2, KB 3, PB & SA
Total
Machine Type Total Units Total (Hours)
(%)
Backhoe 7 1455 27%
Bulldozer 2 358 7%
Compactor 1 204 4%
Excavator 6 1272 23%
Grader 3 578 11%
Lorry 10 1610 29%
Grand Total 5477 100%
LIQUID PALM GROWER
5
SDN.BHD.
29%
27%
23%
Hours/% Cmmitment
1610
1455
11%
1272
7%
4% 578
358
204
200
TOTAL HOURS
150
100
50
0 0 0 0
0
BACKHOE GRADER EXCAVATOR BULDOZER COMPACTOR
MACHINERY
LIQUID PALM GROWER
8
SDN.BHD.
400
350
296
TOTAL HOURS
300
250
202 1 UNIT 186
200
150 3 UNITS
1 UNIT
1 UNIT 74
100
1 UNIT
50
0
BACKHOE GRADER EXCAVATOR BULDOZER COMPACTOR
MACHINERY
LIQUID PALM GROWER
9
SDN.BHD.
250
200
TOTAL HOURS
166
2 UNITS
150
1 UNIT
100
18
50
0 0
1 UNIT
0
BACKHOE GRADER EXCAVATOR BULDOZER COMPACTOR
MACHINERY
LIQUID PALM GROWER
10
SDN.BHD.
300
250
TOTAL HOURS
100
50 10
0
0
BACKHOE GRADER EXCAVATOR BULDOZER COMPACTOR
MACHINERY
LIQUID PALM GROWER
11
SDN.BHD.
250
200
TOTAL HOURS
200
176
150
100
50
0 0
0
BACKHOE GRADER EXCAVATOR BULDOZER COMPACTOR
MACHINERY
LIQUID PALM GROWER
12
SDN.BHD.
1600 1610
1400
1200
TOTAL HOURS
1000
10 UNITS
800
600
480
400
2 UNITS 102
200 16 0 0
1 UNITS
2 UNITS
0
BACKHOE GRADER EXCAVATOR BULDOZER COMPACTOR LORRY
MACHINERY & LORRY
LIQUID PALM GROWER
13
SDN.BHD.
LPM, 96 BDS, 0
VAD 3527
LPM, 200 BDS, 32
VAQ 8959
LPM, 176 BDS, 40
VAS 8658
LPM, 176 BDS, 8
VAN 5767
LPM, 96 BDS, 80
BKM 3943
LPM, 190 BDS, 0
VAS 8692
LPM, 236 BDS, 0
VAD 6186
LPM, 78 BDS, 0
VAQ 8577
LPM, 92 BDS, 0
VAQ 9217
LPM, 110 BDS, 0
VAQ 8667
% Hours
TOTAL HOURS
Road Work, 54
Maintenance , 99
FFB Support , 49
KB1
SBH04
Project , 20
Breakdown/Standby, 14
Road Work, 13
Maintenance , 14
FFB Support , 1
KB1
SBH06
SDN.BHD.
Road Work, 8
Maintenance , 27
KB1
SBH07
Breakdown/Standby, 5
Road Work, 53
Maintenance , 41
LIQUID PALM GROWER
KB2
SBH02
Project , 2
Breakdown/Standby, 14
Road Work, 24
Maintenance , 2
FFB Support , 10
KB2
SBH06
Breakdown/Standby, 10
Road Work, 33
Maintenance , 81
FFB Support , 75
KB3
SBH05
Breakdown/Standby, 25
Road Work, 8
Maintenance , 104
KB3
SBH06
Breakdown/Standby, 18
LPM
SBH04
Project , 8
TYPE OF WORK FOR BACKHOE - NOV 2022
Road Work, 70
Maintenance , 126
FFB Support , 24
PB
BH13
Breakdown/Standby, 6
Road Work, 30
FFB Support , 9
SA
Maintenance , 201
SBH03
Breakdown/Standby, 12
Road Work, 40
FFB Support , 2
SA
SBH07
14
LIQUID PALM GROWER
SDN.BHD. 15
MAINTENANCE
ROADWORK
LIQUID PALM GROWER
SDN.BHD. 17
PROJECT
SAPU JALAN
FFB SUPPORT
LIQUID PALM GROWER
SDN.BHD. 18
Grand Total 99,954.25 155,394.71 4,822.30 41,178.08 11,428.38 302,015.92 225,000.00 77,015.92
LIQUID PALM GROWER
SDN.BHD. 19
80,000.00
88,191.86
70,000.00
60,000.00
Cost (RM)
50,000.00
41,534.00
36,070.43
40,000.00
30,000.00
20,000.00 10,565.38
10,000.00
-
Backhoe Bulldozer Compactor Excavator Grader
RENTAL COST (RM) 64,200.00 35,000.00 9,300.00 85,000.00 31,500.00
DIESEL COST (RM) 23,991.86 6,534.00 1,265.38 40,654.25 4,570.43
Machine Type
SG ARING ESTATE
CRUSHER RUN PROGRESS
W1 W2 W3
01-07/12/22
08-14/12/22
15-21/12/22
Material
Road Length Workdone
Item Description Delivered Type Of Work Duration (Days) Start Date End Date
(KM) (KM)
(MT)
= 100.00%
518.59 Note: The above schedule has taken some consideration of weather condition and
Cumulative Tonnage = X 100
1,200.00 Weekly Restday of the Quarry .
43.22%
Balance Crusher Run : 681.41 MT Balance to be dump as Stock Pile along the road as future repair
LIQUID PALM GROWER
23
SDN.BHD.
BEFORE AFTER
LIQUID PALM GROWER
SDN.BHD. 25
BEFORE AFTER
LIQUID PALM GROWER
26
SDN.BHD.
W1 W2 W3 W4
29/10-04/11/21
05-11/11/22
12-18/11/22
19-25/11/22
26-02/12/22
03-09/12/23
Material
Item Description Delivered Type Of Work Duration (Days) Start Date End Date
(MT)
Percentage Complete = 99.53% Note: The above schedule has taken some consideration of weather condition and
KB 3, PB ESTATE
PROJECT PROGRESS
BEFORE
LIQUID PALM GROWER 32
SDN.BHD.
33