DATA SHEET

1 Name of Work :- Construction of Concrete Road with R.C.C. drain from Mangrulpir Road to
Pawan Wagh(Mauli Elecrical) to Vishwnath Dhadwe House. Tq. Karanja

2 Subdivision : KARANJA
P. W. SUB.DIVISION, KARANJA

3 Heads :

4 Length of road : Km

5 Width of road : m

Proposed Widening

6 Excavation depth: 0.00 m

7 Leads: Rate of
Material Source of Supply Lead
Carting
Rock & Soling Stone
Km 1 Wahitkhed 7
40 mm & above (80 mm
Hand Broken)
Km 1 Wahitkhed 7

40 mm & above (40 mm


Hand Broken)
Km 1 Wahitkhed 7
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!

Crusher Metal Below 40


mm
Km 1 Wahitkhed 7
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!

Bitumen at site
Km 1 Mumbai refinary to si 579
#REF! Mumbai refinary to si 591
#REF! Mumbai refinary to si 592
#REF! Mumbai refinary to si 593
#REF! Mumbai refinary to si 594
#REF! Mumbai refinary to si 595
#REF! Mumbai refinary to si 596
#REF! Mumbai refinary to si 597

Bitumen at Plant
Mumbai refinary to Pl 587
Crusher Metal
Quarry to Plant #REF! 0.5
Hot mix Material
Km 1 Wahitkhed 7
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!

Hard Murrum
Km 1 Wahitkhed 7
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!

Soft Murrum
Km 1 Wahitkhed 7
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!

Sand Lakhpuri 45
Steel Karanja 0.5
Cement Karanja 0.5
Fly Ash Bricks Balapur 90
Paver Block Karanja 0.5
0 0
8 Abstract total: 2857475.00
Say 2857000.00
Asst. Eng. Gr. -II / Sectional Engineer Junior Engineer
Public Works Sub-Division, Public Works Sub-Division,
Karanja Karanja

Sub Divisional Engineer Executive Engineer


Public Works Sub-Division, Public Works Division,
Karanja Washim

Superintending Engineer Chief Engineer


Public Works Circle, Public Works Region,
Akola Amravati

Er. Vijay U. Patil Sect. Engineer

Er. Pooja Rawale, Assistant Engineer Gr. - II

Er. S. L. Pawar, Junior Engineer

Er. Ajinkya S. Shinde, Assistant Engineer Gr.- II

Er. Harshad Kulsunge, Junior Engineer

Er. P. J. Rathod, Junior Engineer

Er. Pradip J. Lolure, Sect. Engineer

Er. S. S.Mule, Sect. Engineer

Er. Sandesh Jain, Assistant Engineer Gr.- II

DATA SHEET
1 NAME OF WORK :- Construction of Concrete Road
with R.C.C. drain from Mangrulpir
Road to Pawan Wagh(Mauli
Elecrical) to Vishwnath Dhadwe
House. Tq. Karanja
2 Length proposed in kms 2.7 Km
3 Width of side shoulder upto formation edge 1 m
4 Nos of H.P.Culverts 4 Nos
Chainages 18/200, 18/400
5 Nos of Slab Culverts 0 Nos
Chainages 0
6 Cummulative length of causeway / Minor / major 0 Rmt
Chainages and length
7 Cummulative length of Steel railing of Minor / m 0 Rmt
Chainages and length 0
8 Cummulative length of R.C.C. railing of Minor / 0 Rmt
Chainages and length 0
9 Total nos of trees requires cutting of branches 8 Nos

Sub Divisional Engineer


Public Works Sub-Division,
Karanja

NOTE
Fill up the Values in above Data sheet the mts and Abstract will be
generated automatically

Rates shall be modified only for trible / melghat etc in abstract sheet
Taking the trial pit for roads, alignment, C.D. As
Road Works in earth soil of all sorts, sands gravel, or directed
Survey 1.03 soft murum, including stacking the excavated by
and DPR material including all lifts and necessary back Engineer
As
Taking the trial
filling upto depth pit3.0
formeters
roads, alignment, C.D. in charge
Road directed
Works in Hard murum, including stacking the
Survey 1.04 by
excavated material including all lifts and
and DPR Engineer
As
necessary
Taking theback
trial filling
pit forupto
roads, depth 1.5 meters
alignment, C.D.
Road in charge
directed
Works in Hard murum, including stacking the
Survey 1.05 by
excavated material including all lifts and
and DPR Taking theback
trial filling
pit forupto
roads, alignment, C.D. Engineer
As
necessary depth 3.0 meters
Road Works in Hard murum, and Boulders including in charge
directed
Survey 1.06 stacking the excavated material including all by
and DPR lifts andthe
Taking necessary
trial pit back fillingalignment,
for roads, upto depthC.D. 1.5 Engineer
As
Road meters
Works in Hard murum, and Boulders including in charge
directed
Survey 1.07 stacking the excavated material including all by
and DPR lifts and necessary back filling upto depth 3.0 Engineer
As
Road meterssurvey pegs in earth and all sorts Soil,
Fixing in charge
directed
Survey 1.08 Sand, Gravel, Soft Murum, etc. including by
and DPR conveying, fixingSurvey
Reconnaisance etc. complete.
of Road alignment in Engineer
As
Road plain country including taking three in charge
directed
Survey 1.09 dimensions of apexes, verification of type of by
and DPR land etc. alongwith
Reconnaisance Surveythe of
alignment etc.
Road alignment in Engineer
As
Road complete
plain country(Without Chaining).
including taking three in charge
directed
Survey 1.10 dimensions of apexes, verification of type of by
and DPR Reconnaissance
land etc. alongwith Survey of a road etc.
the alignment alignment Engineer
As
for new hilly road
complete (With Chaining).utilising exsisting forest cart in charge
Road directed
tracks with use of ghat tracer (if found
Survey 1.11 by
necessary),
Reconnaissance takingSurvey
three of dimensions of apexes
road alignment for
and DPR Engineer
As
including
new hilly verification
road utilising ofexsisting
type of land
forestetc.
cart
Road in charge
directed
complete.
tracks with(Without
use of ghat Chaining)
tracer (if found
Survey 1.12 by
necessary), takingSurvey
Reconnaissance three of dimensions of apexes
road alignment in
and DPR Engineer
As
including
hilly roadverification of typeforest
utilising exsisting of land
cartetc.
tracks
Road in charge
directed
complete.
with use of(With Chaining)
ghat tracer (if found necessary),
Survey 1.13 by
taking three dimensions
Reconnaissance Survey of of apexes includingin
road alignment
and DPR Engineer
As
verification of typeexisting
hilly road utilising of land forest
etc. complete.
cart tracks
Road in charge
directed
(Without
with use ofChaining)
ghat tracer . (if found necessary),
Survey 1.14 by
taking three dimensions of apexes including
and DPR Engineer
As
verification
Detailed of type
survey of land
of road etc. complete.
in plain country
Road in charge
directed
(With Chaining)
including chaining . and levelling with cross
Survey 1.15 by
sections at every two chains inclusive of
and DPR Engineer
As
closing ofsurvey
Detailed surveyof each
roadday.
length where
Road in charge
directed
earthwork is partly done including chaining
Survey 1.16 by
and levelling with cross sections at every two
and DPR Engineer
As
chains
Detailed inclusive
survey ofofclosing survey each
road through hilly day.
country
Road in charge
directed
taking cross section at every chains or as
Survey 1.17 by
required including chaining , levelling and
and DPR Engineer
As
closing survey
Detailed survey each day. through hilly country
of road
Road in charge
directed
taking cross section at every chains as desired
Survey 1.18 by
including chaining ,levelling and closing survey
and DPR Engineer
As
each day utilising existing cart track.
Road in charge
directed
Providing and Fixing Wooden survey pegs
Survey 1.19 by
including White washing etc. complete.
and DPR Engineer
As
Road Carrying out catchment area traverse survey in charge
directed
Survey 1.2 of minor stream (not traceable in toposheet) by
and DPR below 100 acres Engineer
As
Road Cutting down branches of trees , bushes etc. in charge
directed
Survey 1.21 stacking the material neatly as directed (For by
and DPR Motarable Road) Engineer
in charge
measurement
1:500 includingofcarrying the plotout andcontour
structures, survey trees,
overdetailed
and head lineEngineering
and under plane ground service
table Survey
amenities
with the help within of 24'theAlidade.
area, with Thetriangular
dolomite area
method
measurement and giving of the detailes
plot and of structures,
the structures, trees,
such head
over as total linearea,
and typeunder ofground
buildingserviceand
distance from
amenities within all the
cornersarea,taking trial pit
with triagular
Road
0.5x0.5x2.00
method and givingm.-2Nos. per acre
detailes of the and collection
structures,
Survey 1.22 MORTH
of
suchrecord
as total from citytype
area, survey / D.I.L.R.and
of building authorities
and DPR Reconnaisance As
distance from allsurvey
and authentication. Theincluding
corners plan
taking shallstudy
bepit
trial of
traced on
Road sheets, maps
75 micron polyster etc. for alignment
filmper andacre directed
including
shallandbe collection
submitted3
0.5x0.5x2.00 m.-2Nos.
Survey 1.23 dimension of apexes, fixing by
along
of withfrom
record three Amonia
city survey / pegs,
prints.
D.I.L.R. chain
The and
contour
authorities
and DPR compass
levels or cross
shall be marked staff survey
atplan with
0.5 Meter Engineer
L-Section
Asintervals.
and authentication. The shall be traced on
Road and
Note:-crossThesection offilm
items includes- alignment in
at becharge
every
directed 30 m
75 micron polyster and1)Traversing
shall work
submitted
Survey 1.24 or
withat
along every
theodolite
with threechange and of
Amonia deviation
steelPlans
tape.and
prints. whichever
2)Theby
Levelling
contour is
and DPR Preparation
less including offlydetailed
levels at 0.5
closing ofEstimates
day, fixingof
Engineer
Grid
levels Work
shall of
be the
markedterrain. at 3)Detailed
Meter Asintervals.
road
Survey
apex including
and of B.M.
Minor typing
bridge
stones in 5size
copies,
including
ofcontouring ammonia
taking
0.20*0.20*0.75
in charge Lof the
m
Road Engineering
Note:- The Survey
items and
includes- directed
1)Traversing work work
prints,
section
in 1:2:4 with
of C.C. colouring
existing
at everyroad of
200 plans,
and m two
andproper
defined filing,
preparation cross
Survey 1.25 Survey
terrain.
with of C.D.
4)Plotting
theodolite works including
work. takingby
5)Collection L-section
of
and DPR
indexing
sections
Survey
of
of alignment
Road,
Record.
and
of,one
major oftoand
paging
upplans
catchment
a) U/s
bridge
steel
etc.all
and
and
area
1terrain.
Acre
tape.
complete
one
including
type
plan
2)
ofbyof
D/s,Levelling
and
takingoneall
compliance
Engineer
Traverse
As vergin
L-
Grid
types
cross Work
of
section of the
compliance,
on if
alternate 3)Detailed
required
proposed from cross
Road section
if required
method
Engineering of existing
from
and Survey road
department.
taking and two
pits of size work of- the
trialcontouringdefined
in cross
charge
directed
Department.
sections and
(one bed
at slope
U/S and of stream
one upto
at D/s) and one
Survey 1.26 1.00x1.00x1.50
terrain. 4)Plotting m including
work. preparationby
5)Collection
and DPR sufficient
vergin
detailed crosslong
Plans distance
section
and on as required
alternate
Estimates in 5 with of
proposed
copies
Engineer chainall
and
Record. b) Above 1 Acre As
and
cross compass.
sections Taking
and bed three
types of compliance if required from the slope trial
of pits
stream
in of
charge size
upto
Road directed
1.00x1.00x3.0
sufficient
Department. long m and collecting
distance as required sampleswith of chain
Survey 1.27 by
materials
and at site for ascertaining
compass.Taking 5 trial pits, three the silt in factor,
bed,
and DPR Engineer
As
unit
two onweightbanks test, specific
of size gravity frommGovt.
2.00x2.00x3.00 for
Road in charge
directed
approved laboratories(
collecting samples of materials testing charges at site for to be
Survey 1.28 borne by
and DPR Surveyby
ascertainingoftheraisedagency)
the silt and preparation
factor,
Causeway unit weight of
including
Engineer
As
test,
detailedgravity
specific
Contour survey
Surveyfrom
reconnaissance, data,
oftaking submission
Govt.
stream approved
U/S
L section and ofD/S
of theof project
existing
Road duly typed and colouring of the in charge
directed
ammonia
laboratories
proposed
road (testing
bridge
one defined onecharges
site including
vergin tolevelling
one be borneatby
alternate
Survey 1.29 prints, site plan and other by
and DPR
the
everyagency)
proposed 30 Xcross
30and preparation
msection
preparing anddrawings
of detailed
contour
stream etc. survey
map
upto
Engineer
with
complete
data,
Autocad prints if
submission required of from
the
etc.complete the
project duly As
Department.
in 5 compass
sets. typed and
sufficient lengths with chain and in charge
Road colouring directed
taking twooftrial
Preparation ammonia
pits of size
of detailed prints, site
andplan
2.00x2.00x3.00
plans and m.of
estimates
Survey 1.3 other drawings etc.complete. And by
all types of
collecting samples at site
Raise Causeway on the basis of the approved ascertaining silt
and DPR compliance if required Engineer
As
factor
detailed and
survey data byfrom
preparation of
competentDepartment.
detailed
in
survey
authority
charge
Road (Excluding
data,submission takingin oftrial bores anddulydirected
contouring)
including typing 5the project
copies ammonia typed
prints
Survey 1.31 colouring of thedrawings
ammoniawith prints,site by plan
site plan other colouring of and
and DPR other drawing etc.complete Engineer
As
if required from
plans proper
Complete surveyfilling ofindexing
stream having and paging
catchment
Road Deparetment. in charge
directed
etc.complete
area upto 1 sq. and mileall including
types of compliance
catchment if
Survey 1.32 required fromnecessary
Department. by
survey taking L.S./C.S. and other
and DPR Engineer
As
details
Complete etc.survey
complete. of stream having catchment
Road in charge
directed
area above 1 sq. Mile and upto 5 sq. Miles
Survey 1.33 by
including taking necessary L.S./C.S. and other
and DPR Engineer
As
details etc. complete.
Reconnaissance survey of alignment in plain
Road in charge
directed
country for approaches to the bridge including
Survey 1.34 by
taking three dimensions of apexes. ( Without
and DPR Engineer
As
chaining )
Road in charge
directed
Survey 1.35 Fly levelling for carrying out bench mark. by
and DPR Engineer
As
Detailed survey of approaches including Chain in charge
Road directed
and Compass survey along bridge alignment
Survey 1.36 Taking longitudinal sectionclosing
of streams by
and approaches including each day
and DPR extending upstream and downstream side of Engineer
As
work.
Road the bridge site, requisite number of cross in charge
directed
Survey 1.37 section of the stream on either sides block by
and DPR contouring and other details etc. complete. Engineer
As
Demarcation
Preparation
(Length of L.S.ofofand
right
Land offor
way (ROW)
Acquisition
C.S. astoper
proposal
contouring be in charge
Road directed
design
workedusing
including total station
collection
out) including
of 7/12 and 8/Acalculation
Survey 1.38 by
of co-ordinates
documents of 30alignment
marking Meter interval on both
on village
and DPR Engineer
As
sides
maps of road.
, area
Preparation calculation, preparation
of Land Acquisition of
proposal
Road in charge
directed
proposal, printing,binding,
including collection of 7/12etc.
andcomplete
8/A and
Survey 1.39 by
submission of
documents 5 setsalignment
marking more everon liasoning
village and Engineer
and DPR As
coordination
maps with revenue
, area calculation, authorities
preparation ofwith
Road in charge
directed
compliance
proposal, if any until finalisation
printing,bindind, of award
etc. complete and
Survey 1.40 including by
submissionJoint
of 5measurement
sets more ever ofliasoning
the and
and DPR alignment. For new alignment. Engineer
coordination with revenue authorities with
in charge
compliance if any until finalisation of award
including Joint measurement of the
alignment. For existing alignment.
using total station along the existing or new
road including taking L-section and cross
section atofevery
Carrying 30 meter
detailed ROW ,taking
topographic survey atby
least
10 spottotal
using levels per cross
station alongsection, pickingorup
the existing newall
existing
road detailstaking
including insideL-section
the Row and
like electric
cross As
telephone
section line , encroachments,
at every 30 meter ROW ,takingstructures
at least
Road directed
etc.spot
10 connecting
levels perallcross
the primary
section,total
pickingstation
up all
Survey 1.41 by
control
existing points
details by G.I.S.Bench
inside the Rowmarks level or
like electric
and DPR Engineer
As
whichever line
telephone available with department
, encroachments, using
structures
Road in charge
directed
auto connecting
etc. level and preparing Auto CAD
all the primary totalplan by
station
Survey 1.42 using above data by
control points bytaking out 1 marks
G.I.S.Bench set of black and
level or
and DPR white printout on 50withmicron polyster film Engineer
whichever available department using
sheet A2 size in charge
auto level andand 2 sets of
preparing coloured
Auto CAD planprintout
by
on A2above
using size submitting
data taking soft
outcopy
1 setallofdata
blackonand
CD.
Plain Terrain
white printoutNewon 50 Alignment
micron polyster film
sheet A2 size and 2 sets of coloured printout
on A2 size submitting soft copy all data on CD.
Plain Terrain Existing Alignment.
GOVERNMENT OF MAHARASHTRA

PUBLIC WORKS REGION, AMRAVATI

PUBLIC WORKS CIRCLE, AKOLA

PUBLIC WORKS DIVISION, WASHIM

P. W. SUB.DIVISION, KARANJA

2857000.00

DETAILED ESTIMATE

Name of Work :-

Construction of Concrete Road with R.C.C. drain from


Mangrulpir Road to Pawan Wagh(Mauli Elecrical) to
Vishwnath Dhadwe House. Tq. Karanja

ESTIMATED COST Rs. :- 2857000.00


ESTIMATE

Division :-

Sanctioned Estimate No. :-

Fund Head :-

Major Head :-

Minor Head :-

Service Head :-

Departmental Head :-

Name of Work :- Construction of Concrete Road with R.C.C. drain from


Mangrulpir Road to Pawan Wagh(Mauli Elecrical) to
Vishwnath Dhadwe House. Tq. Karanja

Rs. 2857000.00

Administratively Approved
Under ................................. :- No. Date

Technically Sanctioned
Under ................................. :- No. Date

Estimate Prepared by :-

and Checked by :-

Call Of Authourity :-

General Report

.......... Attached Seperately ..........

Sub Divisional Engineer Executive Engineer


Public Works Sub-Division, Public Works Division,
Karanja Washim
GENERAL DESCRIPTION

Name of Work :- Construction of Concrete Road with R.C.C. drain from Mangrulpir Road
to Pawan Wagh(Mauli Elecrical) to Vishwnath Dhadwe House. Tq.
Karanja

Estimated Cost :- Rs. 2857000.00


Authority :-

Administrative
Approval
Necessity :-

Provision : Following provisions are made in the estimate.


1 Excavation for roadway
2 H.M. blanketing
3 WBM in GR I
4 WBM in GR II
5 M 10 bed Concrete
6 Steel Reinforcement
7 M-20 Pavement
8 Provision for R.C.C. drain

Rates and :- The Rates are as per the SSR 2018-19 effective from 19.09.2018. for P.W.D.The
Specifications. testing rates are as per VQCC DSR 2017-18 letter wide no.844 Dated- 30.06.2017.
The work will be carried out as per the standard specifications laid down in PWD and
MORT & H Specificationand time to time instruction by Engineer in Charge.

Sub Divisional Engineer Executive Engineer


Public Works Sub-Division, Public Works Division,
Karanja Washim
Construction of Concrete Road with R.C.C. drain from Mangrulpir Road to Pawan Wagh(Mauli
Elecrical) to Vishwnath Dhadwe House. Tq. Karanja

GENERAL ABSTRACT
Sr No. DESCRIPTION AMOUNT

Rs 2293042.00
1 COST OF IMPROVEMENT

Rs 21773.00
3 COST OF ROYALTY

Rs 11000.00
4 COST OF TESTING CHARGES

Total Rs 2325815.00

5 Centage Charges 5% 114652.00

6 Utility Shifting 5% 114652.00

7 Add for GST 12 % for Road, Bridges &


Residential Building And 18% for Non 12% Rs 279098.00
Residential Building

8 Add for Labour Insurance 1.0% Rs 23258.00

Total Amount Rs. 2857475.00

2857000.00
Say Rs.

Sub Divisional Engineer Executive Engineer


Public Works Sub-Division, Public Works Division,
Karanja Washim
Name of Work :-
Construction of Concrete Road with R.C.C. drain from Mangrulpir Road to Pawan Wagh(Mauli
Elecrical) to Vishwnath Dhadwe House. Tq. Karanja

ABSTRACT FOR ROAD


Sr. No. Item of Work Qty Rate Unit Amount
1 Excavation for roadway in earth, soil of all sorts,
sand, gravel or soft murum including dressing
section to the required grade, camber and side
slopes and conveying the excavated materials with
all lifts upto a lead of 50m. and spreading for
embankment or stacking as directed.

2.11 273.00 74.90 CUM 20448.00


2 Conveying materials obtained from road cutting
including all lifts, laying in layers of 20cm to 30cm.
breaking clods, dressing to the required lines,
curves, grades and section, watering and
compacting to not less than 97% of standard Proctor
density for a lead of over 50m. to 300m. inclusive
from the site of excavation to the site of deposition
as directed.

2.25 191.1 138.30 CUM 26429.00


3 Providing, laying, spreading and compacting stone
aggregates of specific sizes to water bound
macadam specification including spreading in
uniform thickness, hand packing to proper grade
and camber, applying and brooming requisite type
of screening/ binding Materials to fill up the
interstices of coarse aggregate, watering and
compacting with vibratory roller to the required
density. By Mechanical Means - Grading II (Using
Screening Type B (11.2 mm) Aggregate)

3.2 84 1981.90 Mt 166480.00


4 Providing and laying in situ / ready mix cement
concrete of M-10 proportion with trap/ granite/
quartzite/ gneiss metal in foundation including
necessary form work, compacting and curing etc.
complete. (with reversible drum type mixer with
SCADA with fine agreegates of required
specifications (Natural sand / VSI sand finely
washed etc )

11 56.00 4835.60 SQM 270794.00


ABSTRACT FOR ROAD
Sr. No. Item of Work Qty Rate Unit Amount
5 Providing and laying in situ / ready mix M-20
cement concrete of trap /granite /quartzite /gneiss
metal for approach slab / Rigid pavement including
compacting, finishing, curing etc. complete.
(excluding reinforcement) (with reversible drum
type mixer/ concrete batch mix plant (pan mixer)
with SCADA with fine agreegates of required
specifications (Natural sand / VSI sand finely
washed etc ), cement 6.40 bags/cumt)

11.25 112.00 5493.70 CUM 615294.00


6 Cutting transverse contraction joints 3 to 4 mm
wide and depth 60mm. .in concrete slab using
concrete cutting machine with diamond studded saw
within 48 hours of casting of bay / slab etc.
complete including subsequent widening of the
groove 8 to 10 mm. w

5.17 188.00 67.60 Rmt 12709.00


7 Providing to contraction joints polysuphide sealent
(Pouring grade)
5.18 confirming to BS : 5212 - 1989 into 572.00 140.40 Rmt 80309.00
8 Providing soling using 80 mm size trap metal in 15
cm. layer including filling voids with Crushed
sand/grit, ramming, watering etc. complete
21 31.50 1237.65 Sqm 38986.00
9 Providing cast in situ / ready mix M20 grade cement
concrete for headwalls of CD work / retaining walls
etc. including necessary form work,compaction,
finishing and curing etc. complete. (with reversible
11.29 90.30 7312.90 SQM 660355.00
10 Providing, cutting, bending, hooking, tying and
laying in position TMT FE 500 steel bars for
reinforcement for all RCC works as per detailed
drawings etc. complete. 14 6.07 64747.30 CUM 392951.00
11 Providing and fixing board displaying information,
such as 'Name of work, Tender cost, Name of
Contractor, Work completion and liability period
etc', having rectangular shape of 1.20m x 0.90m
size made out 18 gauge (1.25mm) thick mild steel
sheet painted with one coat of Zinc chromate
stoving primer and two coats of enamel paint on
front side and grey stove enamel on back side and
6.36 1.00 8287.00 Nos 8287.00

Total Rs. 2293042.00

Sub Divisional Engineer Executive Engineer


Public Works Sub-Division, Public Works Division,
ABSTRACT FOR ROAD
Sr. No. Item of Work Qty Rate Unit Amount
Karanja Washim
Name of Work :-
Construction of Concrete Road with R.C.C. drain from Mangrulpir Road to Pawan
Wagh(Mauli Elecrical) to Vishwnath Dhadwe House. Tq. Karanja

MEASURMENT SHEET FOR ROAD


Sr. No. Item No No L B D Qty Unit
1 Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including
dressing section to the required grade, camber and side slopes and conveying the
excavated materials with all lifts upto a lead of 50m. and spreading for embankment or
stacking as directed.

2.11 1)
2 140 0.75 1.3 273.00
273.00 Cum
2 Conveying materials obtained from road cutting including all lifts, laying in layers of
20cm to 30cm. breaking clods, dressing to the required lines, curves, grades and section,
watering and compacting to not less than 97% of standard Proctor density for a lead of
over 50m. to 300m. inclusive from the site of excavation to the site of deposition as
directed.
2.25 273.00
273.00 Cum
@ 70% 191.1 Cum

3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water
bound macadam specification including spreading in uniform thickness, hand packing to
proper grade and camber, applying and brooming requisite type of screening/ binding
Materials to fill up the interstices of coarse aggregate, watering and compacting with
vibratory roller to the required density. By Mechanical Means - Grading II (Using
Screening Type B (11.2 mm) Aggregate)

3.20
1 140 4 0.15 84.00
84.000 Cum
4 Providing and laying in situ / ready mix cement concrete of M-10 proportion with trap/
granite/ quartzite/ gneiss metal in foundation including necessary form work, compacting
and curing etc. complete. (with reversible drum type mixer with SCADA with fine
agreegates of required specifications (Natural sand / VSI sand finely washed etc )

11.02
1.00 140.00 4.000 0.100 56.00
2.00 140.00 0.750 0.100 21.00
Total 77.00 Cum
MEASURMENT SHEET FOR ROAD
Sr. No. Item No No L B D Qty Unit
5 Providing and laying in situ / ready mix M-20 cement concrete of trap /granite
/quartzite /gneiss metal for approach slab / Rigid pavement including compacting,
finishing, curing etc. complete. (excluding reinforcement) (with reversible drum type
mixer/ concrete batch mix plant (pan mixer) with SCADA with fine agreegates of
required specifications (Natural sand / VSI sand finely washed etc ), cement 6.40
bags/cumt)

11.25
1.00 140.00 4.000 0.200 112.00
112.00 Cum

6 Cutting transverse contraction joints 3 to 4 mm wide and depth 60mm. .in concrete slab
using concrete cutting machine with diamond studded saw within 48 hours of casting of
bay / slab etc. complete including subsequent widening of the groove 8 to 10 mm. wide at
top having depth of 15 mm. as directed by Engineer incharge.

5.17
47 4.00 188.00
7 Providing to contraction joints polysuphide sealent (Pouring grade) confirming to BS :
5212 - 1989 into sawed groove widened at top for sealent reservoir of specified size and
shape as per detailed drawing including fixing Polyethylene foam backer rod of required
diameter (appraox. 25% larger than the initial 3 mm.to 4 mm. joint) overlaid with bond
breaking tape as per detailed drawing. Item includes cleaning the joints with water jet /
air compressor and allowing joint to become thoroughly dry before sealent is applied and
applying primer. (A) Contraction and longitudinal joints (15 mm. deep x 8 mm.wide)

5.18
Same as item no. 7 188.00

8 Providing soling using 80 mm size trap metal in 15 cm. layer including filling voids with
Crushed sand/grit, ramming, watering etc. complete
21.40
2 140.00 0.75 0.15 31.50
31.50
TOTAL 31.50 Cum
9 Providing cast in situ / ready mix M20 grade cement concrete for headwalls of CD work /
retaining walls etc. including necessary form work,compaction, finishing and curing etc.
complete. (with reversible drum type mixer/ concrete batch mix plant (pan mixer) with
SCADA

11.29 4 140.00 0.15 0.70 58.80


2 140.00 0.75 0.15 31.50
MEASURMENT SHEET FOR ROAD
Sr. No. Item No No L B D Qty Unit
90.30
TOTAL 90.30 Cum
10 Providing, cutting, bending, hooking, tying and laying in position TMT FE 500 steel bars for
reinforcement for all RCC works as per detailed drawings etc. complete.

14.01
Drain 90.30 * 30.000 2709.00
Pavement 112.00 * 30.000 3360.00
6069.00
TOTAL 6.07 MT

11 Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name
of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x
0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc
chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on
back side and border / messages / symbols etc. with approved colour shade paint complete, on
M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size
35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm
x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all
fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm
including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed
by Engineer in Charge

6.36
1 1

Asst. Eng. Gr. -II / Sectional Engineer


Public Works Sub-Division,
Karanja
Name of Work :-
Construction of Concrete Road with R.C.C. drain from Mangrulpir Road to Pawan Wagh(Mauli Elecrical) to Vishwnath
Dhadwe House. Tq. Karanja
RATE ANALYSIS FOR ROAD
1 Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required
grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading for
embankment or stacking as directed.

2.11
Basic rate Rs. 72.00
Add for Municipal Council Area 4.00% Rs. 2.88
Total Rs. 74.88
Say Rs. 74.90 Cum
2 Conveying materials obtained from road cutting including all lifts, laying in layers of 20cm to 30cm. breaking clods,
dressing to the required lines, curves, grades and section, watering and compacting to not less than 97% of standard
Proctor density for a lead of over 50m. to 300m. inclusive from the site of excavation to the site of deposition as directed.

2.25
Basic rate Rs. 133.00
Add for Municipal Council Area 4.00% Rs. 5.32
Total Rs. 138.32
Say Rs. 138.30 Cum

3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification
including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite
type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting with vibratory
roller to the required density. By Mechanical Means - Grading II (Using Screening Type B (11.2 mm) Aggregate)

3.20
Basic rate 1572.00
ADD 4 % FOR M C 4.00% 62.88
Add carting for metal 1.37 Cum @ Rs 239.89 328.65
Add carting for murum 0.080 Cum @ Rs 229.89 18.39
Rs 1981.92 /Cum
Say Rs. 1981.90 /Cum

4 Providing and laying in situ / ready mix cement concrete of M-10 proportion with trap/ granite/ quartzite/ gneiss metal in
foundation including necessary form work, compacting and curing etc. complete. (with reversible drum type mixer with
SCADA with fine agreegates of required specifications (Natural sand / VSI sand finely washed etc )

11.02 Rs 4419.00 Cum


Deduct royalty of sand 0.47 Cum @ Rs 141.34 -66.43
Deduct for SCADA -5% -220.95
ADD 4 % FOR M C 4.00% 176.76
Add carting of sand 47.00% Cum @ Rs 641.96 301.72
Add carting of cement 4.4 bags@rs 0 0.00
Add carting of metal 0.94 Cum @ Rs 239.89 225.50
4835.60
Total Rs 4835.60 Cum

5 Providing and laying in situ / ready mix M-20 cement concrete of trap /granite /quartzite /gneiss metal for approach slab /
Rigid pavement including compacting, finishing, curing etc. complete. (excluding reinforcement) (with reversible drum
type mixer/ concrete batch mix plant (pan mixer) with SCADA with fine agreegates of required specifications (Natural
sand / VSI sand finely washed etc ), cement 6.40 bags/cumt)

11.25 Rs 4861.00
Deduct royalty of sand 0.425 Cum @ Rs 141.34 -60.07
ADD 4 % FOR M C 4.00% 194.44
Add carting of sand 42.50% Cum @ Rs 641.96 272.83
Add carting of cement 4.4 bags@rs 0.00 0.00
Add carting of metal 0.94 Cum @ Rs 239.89 225.50
5493.70

YSM KRJ889
Construction of Concrete Road with R.C.C. drain from Mangrulpir Road to Pawan Wagh(Mauli Elecrical) to Vishwnath
Dhadwe House. Tq. Karanja
RATE ANALYSIS FOR ROAD
Total Rs 5493.70 Cum
6 Cutting transverse contraction joints 3 to 4 mm wide and depth 60mm. .in concrete slab using concrete cutting machine
with diamond studded saw within 48 hours of casting of bay / slab etc. complete including subsequent widening of the
groove 8 to 10 mm. w

5.17
Basic rate Rs. 65.00
Add for Municipal Council Area 4.00% Rs. 2.60
Total Rs. 67.60
Say Rs. 67.60 Rmt
7 Providing to contraction joints polysuphide sealent (Pouring grade) confirming to BS : 5212 - 1989 into sawed groove
widened at top for sealent reservoir of specified size and shape as per detailed drawing including fixing Polyethylene
foam backer rod of

5.18
Basic rate Rs. 135.00
Add for Municipal Council Area 4.00% Rs. 5.40
Total Rs. 140.40
Say Rs. 140.40 Rmt

8 Providing soling using 80 mm size trap metal in 15 cm. layer including filling voids with Crushed sand/grit, ramming,
watering etc. complete
21.40 969.00 /Cum.
ADD 4 % FOR M C @ 4% Rs 38.76
Add carting above 40 mm 1.00 229.89 229.89
Total Rs 1237.65 /Cum.
Say Rs. 1237.65 /Cum.
9 Providing cast in situ / ready mix M20 grade cement concrete for headwalls of CD work / retaining walls etc. including
necessary form work,compaction, finishing and curing etc. complete. (with reversible drum type mixer/ concrete batch
mix plant (pan mixer) with SCADA

11.29 Rs 6631.00
Deduct royalty of sand 0.425 Total 141.34 -60.07
ADD 4 % FOR M C 4.00% 265.24
Add carting of sand 42.50% Total 641.96 272.83
Add carting of cement 7 bags@rs 0.00 0.00
Add carting of metal 0.85 Total 239.89 203.91
7312.91
Total Rs 7312.90 Cum

10 Providing, cutting, bending, hooking, tying and laying in position TMT FE 500 steel bars for reinforcement for all RCC
works as per detailed drawings etc. complete.

14.01 Rs 62257.00
ADD 4 % FOR M C 4.00% 2490.28
Total Rs 64747.28
Say Rs. 64747.30 Sqm

YSM KRJ889
Construction of Concrete Road with R.C.C. drain from Mangrulpir Road to Pawan Wagh(Mauli Elecrical) to Vishwnath
Dhadwe House. Tq. Karanja
RATE ANALYSIS FOR ROAD
11 Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work
completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick
mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and
grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on
M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted
including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white
bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75
cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge

6.36 7968.00
ADD 4 % FOR M C 4.00% 318.72
8287.00 /No

Sub Divisional Engineer Executive Engineer


Public Works Sub-Division, Public Works Division,
Karanja Washim

YSM KRJ889
Name of Work :-
Construction of Concrete Road with R.C.C. drain from Mangrulpir Road to Pawan Wagh(Mauli Elecrical) to Vishwnath Dhadwe
House. Tq. Karanja

ABSTRACT of Material Requirement

Sr Item Of Work Qty CB HB Sand Murum Bitumen Steel Ceme


no. Metal Metal nt
8 Providing, laying, spreading and
compacting stone aggregates of specific
sizes to water bound macadam
specification including spreading in
uniform thickness, hand packing to
proper grade and camber, applying and
brooming requisite type of screening/
binding Materials to fill up the
interstices of coarse aggregate,
watering and compacting with
vibratory roller to the required density.
By Mechanical Means - Grading II
(Using Screening Type B (11.2 mm)
Aggregate)
84.00 1.37 115.08
0.08 6.72
9 Providing and laying in situ / ready mix
cement concrete of M-10 proportion
with trap/ granite/ quartzite/ gneiss
metal in foundation including necessary
form work, compacting and curing etc.
complete. (with reversible drum type
mixer with SCADA with fine
agreegates of required specifications
(Natural sand / VSI sand finely washed
etc )

56.00 0.47 26.32


0.94 52.64
4.400 246.4

10 Providing and laying in situ / ready mix


M-20 cement concrete of trap
/granite /quartzite /gneiss metal for
approach slab / Rigid pavement
including compacting, finishing, curing
etc. complete. (excluding
reinforcement) (with reversible drum
type mixer/ concrete batch mix plant
(pan mixer) with SCADA with fine 112.00 0.425 47.6
0.85 95.2
7 784
12 Providing soling using 80 mm size trap 31.50 1.00 31.5
metal in 15 cm. layer including filling
voids with Crushed sand/grit, ramming,
watering etc. complete

14 Providing cast in situ / ready mix M20


grade cement concrete for headwalls of
CD work / retaining walls etc.
including necessary form
work,compaction, finishing and curing
etc. complete. (with reversible drum
type mixer/ concrete batch mix plant
90.30 0.85 76.755
0.425 38.378
7.000 632.1
15 Providing, cutting, bending, hooking,
tying and laying in position TMT FE
500 steel bars for reinforcement for all
RCC works as per detailed drawings
etc. complete.
6.07 1.00 6.07
371.175 0 112 6.72 0 6.07 1663
C B Metal HB Sand Murum Bitumen Steel Bricks
Metal

Sub Divisional Engineer Executive Engineer


Public Works Sub-Division, Public Works Division,
Karanja Washim
Name of Work :-
Construction of Concrete Road with R.C.C. drain from Mangrulpir Road to Pawan Wagh(Mauli
Elecrical) to Vishwnath Dhadwe House. Tq. Karanja
ROYALTY STATEMENT
Sr No. Item Materia Estimated Rate of Quantity Rate of Total
l Quantity Consumpti for Royalty Royalty Estimated
on Royalty
Amount

1 Supplying 80 mm Metal 80mm 0.00 1 0 141.34 0.00


2 P/L 75 mm MPM 40mm 56.00 0.063 3.53 141.34 498.93
3 P/L GSB SM 0 0.256 0 141.34 0.00
4 Gr I & Gr II Sand 84.00 0.08 6.72 141.34 949.80
5 Supplying H,M / S.M. HM 0.00 1 0 141.34 0.00
6 H. M. Sub Base HM 0 1 0 141.34 0.00
7 Shoulder Drain Rubble 0 1 0 141.34 0.00
Sand 0 0.3 0 141.34 0.00
Earthwork E/W 0 1 0 141.34 0.00
80 mm Soling 80 mm 31.50 1 31.5 141.34 4452.21
P/L C.C. M-10 Sand 56.00 0.47 26.32 141.34 3720.07
P/L C.C. M-15 Sand 0.00 0.44 0 141.34 0.00
P/L C.C. M-20 Sand 202.30 0.425 85.98 141.34 12152.41
Total Rs 21773
Material Cum Rate Amount
Earthwork 0 141.34 0
Rubble 0 141.34 0
80/40 mm 35.03 141.34 4951
H.M/S.M. 0 141.34 0
Sand 119.02 141.34 16822
Total Rs 21773

Sub Divisional Engineer Executive Engineer


Public Works Sub-Division, Public Works Division,
Karanja Washim
Name of Work :-
Construction of Concrete Road with R.C.C. drain from Mangrulpir Road to Pawan Wagh(Mauli Elecrical) to Vishwnath Dhadwe House.
Tq. Karanja
FREQUENCY CHART
Sr. Material Quantity Unit Name of Name of No.of No. of test carried out Differenc Rate of Amount
No. test test test e Testing of
Executed required Lab Field Total Testing
as per
frequenc
y
1 2 3 4 5 6 7 8 9 10 11 12 13
1 H.M. (Blanketing) 0.00 Cum Sieve Analysis SA 0 0 0 0 0 600 0
0.00 Cum Liquid Limit & Plastic Limi PI 0 0 0 0 0 1000 0

0.00 Cum Compaction Test(Proctor De CT 0 0 0 0 0 1650 0

0.00 Cum CBR Test with Compaction CBRCT 0 0 0 0 0 6050 0


2 H.M. 0.00 Cum Sieve Analysis SA 0 0 0 0 0 600 0
(Consolidation) Liquid Limit & Plastic
0.00 Cum Limit PI 0 0 0 0 0 1000 0
3 S.M. (Consolidation) 0.00 Cum Sieve Analysis SA 0 0 0 0 0 600 0
0.00 Cum Liquid Limit & Plastic Limi PI 0 0 0 0 0 1000 0
4 Sand Fineness Modulus,Silt &
112.30 Cum Clay Content FM & SC 2 2 0 2 0 1200 2400

112.30 Cum Silt Factor SF 2 2 0 2 0 750 1500


5 80/40 mm Metal Impact Value,Crushing
31.50 Cum Value,Water Absorption CV 0 0 0 0 0 2300 0

31.50 Cum Gradation GR. 1 1 0 1 0 600 600


31.50 Cum Flakiness Index FI 0 0 0 0 0 750 0
6 Water Bound 0.00 Cum Aggregate Impact Value IV 0 0 0 0 0 2300 0
Macadam A)
Aggregate Grade I 0.00 Cum Gradation GR. 0 0 0 0 0 600 0
0.00 Cum Flakiness Index FI 0 0 0 0 0 750 0
7 Water Bound
84.00 Cum Aggregate Impact Value IV 0 0 0 0 0 2300 0
Macadam A)
Aggregate GradeII 84.00 Cum Gradation GR. 1 1 0 1 0 600 600
Water Bound
Macadam A)
Aggregate GradeII

84.00 Cum Flakiness Index FI 0 0 0 0 0 750 0


8 Cement Standard Consistancy
Fineness,Specific
Gravity,Setting Time
83.13 Mt ( Initial & 0 0 0 0 0 3300 0
Final),Compressive
Strength,Soundness.

9 Cement Concrete Concrete Mix Design(With


all Test of Basic
0.00 Cum Materials) MD 0 0 0 0 0 12100 0

a M -10 Compressive Strength 5


56.00 Cum CS 0 0 0 0 600 0
b M - 15 Compressive Strength 0
0.00 Cum CS 0 0 0 0 600 0
c M - 20 Compressive Strength 8
202.30 Cum CS 8 0 0 0 600 4800
d M - 25 Compressive Strength 0
0.00 Cum CS 0 0 0 0 600 0
e M - 30 Compressive Strength 0
0.00 Cum CS 0 0 0 0 600 0
10 Steel Bar Testing

Upto 16 mm (Set of 3 Bars) 6.069 ( Tensile Strength,%


Elongation,Yield
stress,Weight per
meter,Bend/Rebend 1 8 0 0 0 1100 8800
Test,Proof Stress)

Above 16 mm (Set of 3 0 ( Tensile Strength,%


Bars) Elongation,Yield
stress,Weight per
meter,Bend/Rebend
Test,Proof Stress)
0 0 0 0 0 1400 0

Total Rs. 18700

Sub Divisional Engineer Executive Engineer


Public Works Sub-Division, Public Works Division,
Karanja Washim
#REF!
#REF!

MEASURMENTS
Sr. No. Item No No L B D Qty

B) TESTING
A Basic Test of Cement :
1 Standard Consistancy Fineness,Specific
Gravity,Setting Time ( Initial & Final),Compressive 0 0
Strength,Soundness.

B
Basic Test of Aggregates
1 Aggragate Impact
0 0
Value
2 Gradation 2 2
3 Flakiness Index 0 0
C Fine Aggregates
1 Fineness Modulus ( Sieve Analysis),Silt & Clay 2 2
2 Content
Silt Factor 2 2
D Paving Block
1 Water Absorption, Compressive Strength (Set of 8 0
E Blocks) / vitrified Tiles
Ceramic
1 Water Absorption Modulus of rupture ( Set of 6 tiles) 0
F Concrete : 0
M - 20 84.00
M - 15 #REF!
#REF! 0
1 Compressive Strength of CC Cubes( Set of Three
Cubes) 8 8

2 Concrete Mix Design(With all Test of Basic 0 0


G Materials)
Stone / Rubble
1 Crushing Value Compressive Strength Water 0 0
H Absorption &:Specific Value
Soil/Murum
1 Sieve Analysis : 0 0
2 Liquid Limit & Plastic Limit 0 0
3 CBR Test(Lab) With Compaction Test 0 0
I Steel Bar Testing
1 Upto 16 mm(Set of 3 Bars)( Tensile Strength,%
Elongation,Yield stress,Weight per 1 1
meter,Bend/Rebend Test,Proof Stress)

2 Above 16 mm(Set of 3 Bars)( Tensile Strength,%


Elongation,Yield stress,Weight per 0 0
meter,Bend/Rebend Test,Proof Stress)
MEASURMENTS
Sr. No. Item No No L B D Qty
J Bitumen 0
Bitumen VG 30 0
Penetration 0 0
50 mm BM 0 0
Extraction
20 mm OGC 0 0
B M Mix Design with all Test on Aggregate
(Excluding Bitumen) 0 0

Asst. Eng. Gr. -II / Sectional Engineer


Public Works Sub-Division,
Karanja
Name of Work :-
Construction of Concrete Road with R.C.C. drain from Mangrulpir Road to Pawan Wagh(Mauli Elecrical) to
Vishwnath Dhadwe House. Tq. Karanja
ABSTRACT FOR TESTING
Sr. No. Item of Work Qty Rate Unit Amount

B) TESTING
10 Testing Charges for Conducting Various tests of materials required for the work as per
Vigilance & Quality Control Circle,Amravati Norms in the Laboratory.
A Basic Test of Cement :
1 Standard Consistancy Fineness,Specific
Gravity,Setting Time ( Initial &
Final),Compressive Strength,Soundness.

0.00 3300.00 1 Test 0.00


B Basic Test of Aggregates
1 Aggragate Impact Value 0.00 2300.00 1 Test 0.00

2 Gradation 2.00 600.00 1 Test 1200.00


3 Flakiness Index 0.00 750.00 1 Test 0.00
C Fine Aggregates
1 Fineness Modulus ( Sieve Analysis),Silt & 2.00 1200.00 1 Test 2400.00
Clay Content
2 Silt Factor 2.00 750.00 1 Test 1500.00
D Paving Block
1 Water Absorption, Compressive Strength (Set 0.00 2200.00 1 Test 0.00
of 8 Blocks)
E Ceramic / vitrified Tiles
1 Water Absorption Modulus of rupture ( Set of 0.00 1900.00 1 Test 0.00
6 tiles)
F Concrete :
M - 20 84.00
M - 15 0.00
84.00
1 Compressive Strength of CC Cubes( Set of 8.00 600.00 1 Test 4800.00
Three Cubes)

2 Concrete Mix Design(With all Test of Basic 0.00 12100.00 1 Test 0.00
Materials)
G Stone / Rubble
1 Crushing Value Compressive Strength Water 0.00 1750.00 1 Test 0.00
Absorption & Specific Value
H Soil/Murum :
1 Sieve Analysis : 0.00 600.00 1 Test 0.00
ABSTRACT FOR TESTING
Sr. No. Item of Work Qty Rate Unit Amount
2 Liquid Limit & Plastic Limit 0.00 1000.00 1 Test 0.00
3 CBR Test(Lab) With Compaction Test 0.00 6050.00 1 Test 0.00
I Steel Bar Testing
1 Upto 16 mm(Set of 3 Bars)( Tensile Strength, 1.00 1100.00 1 Test 1100.00
% Elongation,Yield stress,Weight per
meter,Bend/Rebend Test,Proof Stress)
8mm, 10mm
2 Above 16 mm(Set of 3 Bars)( Tensile 0 1400.00 1 Test 0.00
Strength,% Elongation,Yield stress,Weight per
meter,Bend/Rebend Test,Proof Stress)

11000

Sub Divisional Engineer Executive Engineer


Public Works Sub-Division, Public Works Division,
Karanja Washim
Name of Work :-
Construction of Concrete Road with R.C.C. drain from Mangrulpir Road to Pawan Wagh(Mauli Elecrical) to Vishwnath
Dhadwe House. Tq. Karanja

Lead Statement
Rate for Rate for
Rate of Supply
Sr. No. Material Source of Supply Lead Supply BT/Bld/Bri Unit
Carting Rate
Items dge work

1 Rock & Soling Stone


Wahitkhed 7 293.48 293.48 Cum
40 mm & above
2 (80 mm Hand
Broken)

Wahitkhed 7 229.89 Cum


40 mm & above
3 (40 mm Hand
Broken)
Wahitkhed 7 229.89 275.00 504.89 229.89 Cum
Crusher Metal
4 Below 40 mm
Wahitkhed 7 239.89 239.89 Cum
quarry to plant Sohal 0.5 156.79
5 Hard Murrum
Wahitkhed 7 229.89 248.00 477.89 229.89 Cum
6 Soft Murrum
Wahitkhed 7 229.89 217.00 446.89 229.89 Cum
7 Bitumen at site
Mumbai refinery 615 3185.00
Bitumen at plant 600 3110.00
Hot Mix material Sohal 15 323.85
Sand Lakhpuri 45 641.96 641.96 Cum
Steel Karanja 0 0.00 0.00 Mt
Cement Karanja 0 0.00 0.00 Mt
0.00 Bag
Fly Ash Bricks Balapur 80 2206.04
Paver Block Karanja 0 0.00
CERTIFICATE
1 Certified that the proposed quarries are having sufficent yield of good quality material.
2 Certified that the lead of proposed quarries are calculated by shortest route.

Sub Divisional Engineer Executive Engineer


Public Works Sub-Division, Public Works Division,
Karanja Washim
Lakhpuri
45.0 km TO KARANJA

15.0 km

Shivani 44/00 Sattarsawa


ngi
Ganeshpur
41/00


14/00
6/00 8/00 13/00
0/00 17//000

SH Way 289
MD
R4
1
3/00
2.0 Km
98/400

31/00 103/00 108/00 35/00

Mangrulpir 109/00

6.0 Km Ambapur
26/00 4/00 26/00
Qarry
Pimpri
Quarry 21/00
Dhanora

0/00
5.0 Km
15.0 Km
TO WASHIM

Certificate
1 Certified that quarry holds good quality and sufficent quantity of material.

2 Distances shown in lead statement are correct with shortest route.

Sub Divisional Engineer