E. Details on each of the milestones achieved as reported in B Above touching on the (i) Methodology /
Process Development strategy, (ii) Platform Technology used, (iii) Product /Process - analysis of the
results (iv) Current status.
In the current milestone, we have achieved the following:
a. Purchase of all the consumables and equipment has been done.
b. Created and prototyped all the mechanical parts for the neonatal bed with silicone rubber material.
c. Created the electronics sub systems and integrated into it for proper actuation mechanism with
electronic pump.
The detailed reports of neonatal anti sore bed is in Annexure 1
H. Whether all necessary clearances i.e., Regulatory, ethical, Others have been taken. Details of the same may
please be provided.
The Institutional Ethical Clearance (IEC) from Dayanand Medical College & Hospital, Ludhiana, under
Application No. DMCH/R&D/2020/173.
I. Any change in company shareholding during this period? If yes, please share a new shareholding pattern.
List of stakeholders:
J. Has the company received any funding from other source(s) for the same or related project during the
reporting period, if yes, share details?
No
K. Status of assets (equipment) acquired for the project through BIRAC funds or through the company's
contribution.
Signature of Applicant
Rupnagar, Punjab.
Financial Report
1 Tranche
st
15,00,000 13,61,710 01/07/2023
2 Tranche
nd
3 Tranche
rd
4 Tranche
th
5 Tranche
th
Total
Against actual expenditures, following additional details may be furnished on the following template.
Equipment
Consumables
Manpower
S.no. Designation & Job Name of Monthly No. of Mode of Payment Total
description person Salary (a) months (Cheque/online /cash) paid =(a x
(b) b)
1. Intern Mr. 4000 1 Online 4000
Sarvottam
2. Intern Mr. Nishant 5000 1 Cheque 5000
3. Intern Mr. Kunal 5000 1 Cheque 5000
4. Technical consultant Dr. Ashish 25000 & 6 Online 150190
Sahani (5*38=190)
5. Project Assistant Mr. R N 5000 1 Online 5000
Mallick
6. Web development Mr. P C 15000 3 Online 45000
Intern Sankhua
7. Software development Mr. 10000 1 Online 10000
Intern Gurupad
Ray
8. Electronics Engineer Ms. 35000 6 Online 58300
Nathasha V
P
Total 282490
Incubation Costs
IP expenses
Outsourcing
Contingency
Travel
S.no. Travel description Travel dates Mode of Payment Total
(Cheque/online/cash) Expenses
1. Travel expense to chandigarh (Check 16-01-2023 Cheque 3545.50
No. 000000000006)
2. Travel expense to IISF 02-02-2023 Online 22719
3. I2CT registration 15-02-2023 Online 8700.60
4. Registration for TIE chandigarh 11-03-2023 Online 2175
5. Traveling to BIS 31-03-2023 Online 603
6. DMC&H visit 18-04-2023 Online 2800
7. TIE chandigarh visit 02-05-2023 Online 6510
8. IIT Ropar to Ludhiana & back. 05/05/2023 Online 2870
9. IIT Ropar to Chandigarh Rly station 16/02/23 & Online 3380
& back 28/02/23
10. IIT Ropar to Chandigarh 20/03/2023 Online 2310
11. IIT Ropar to Ludhiana & back. 25/05/2023 Online 2660
12. Chandigarh airport to ropar 28/05/2023 Online 1680
13. Ropar to Chandigarh airport drop 24/05/2023 Online 1680
Total 61633.10
Heads Total Sanctioned Expenses in the reporting period Total expenses till
From 28/12/2022 to 01/07/2023 13,61,710
Equipment 1150000 539894.00 610106.00
Signature of Applicant