Rooster Rotasi MP Plant October 2023

W/S, Field, Greasing & Vessel


Nama Jabatan Area Remark Pengganti Jabatan
Jumadin Mech G2 Greasing Cuti 25/09/2023 Rahmat Mech G2
Awan Nur A. F Mech Trainee Greasing Cuti 25/09/2023 Irwansyah Mech G2
Banar Suwondo Mech G2 Greasing Cuti 30/09/2023 Muh. Soleh Fatori Mech G3
Rival Susanto Mech G1 Greasing Site - -
Heri S ( Back up - Luki
Luki Adiansyah P Mech G4 Field Cuti 29/09/2023 -
back to field
Davit Aprilia Mech G2 Field Cuti 29/09/2023 Robby Triatha H Mech G2
Stefanus Ricko Mech G3 Field Site - -
Dimas Setyo Mech G2 Field Site - -
Vany Febrian Mecg G1 Field Site - -
Rahmat Ramadan Mech G2 Vessel Rotasi to Greasing Khofifin Mech G2
Chanif Hidayatur Mech G2 Vessel BMC Ahmad Very Mech G2
Galih Tri Asmoro Mech G2 Vessel Cuti 06/10/2023 Ahmad Zidan Mech G2
Aslan Mech G1 Vessel Rotasi to w/s Igal setiawan Mech G1
Muhajir Mech G4 Rebuild Site - -
Soehib Wiyanto Mech G3 Rebuild BMC Dimas Bagus Mech G3
Robby Triatha H Mech G2 Rebuild Rotasi to field Prandiansyah Mech G2
Jasmal Mech G1 Rebuild On site 05/10/2023 - -

Note :
Jika Ada perubahan atau MP off akan dikondisional kan untuk perubahan MP area

Disusun Oleh Di setujui oleh Diketahui oleh

Khairul Febri Amin Djanur Wulandoko Yayan Hermawan


Foreman PLTs Act. SPV. PLTs Maint. Planner