Perhitungan Lendutan Balok (Tim Asisten Struktur Beton)
Perhitungan Lendutan Balok (Tim Asisten Struktur Beton)
Balok Induk Y
bw 350 mm
hb 500 mm
hf 150 mm
beff 2825 mm
175000 mm2
A
0.175 m2
A1 = bw x hb
= 350 x 500
= 175000 mm2
y1 = hf + 0,5 hb
= 150 + 0.5 500
= 400 mm
A2 = beff x hf
= 2825 x 150
= 423750 mm2
y2 = 0.5 hf
= 75 mm
A1 x y1 + A2 x y2
ytop =
A1 + A2
175000 x 400 + 423750 x 75
ytop =
175000 + 423750
= 169.99 mm
ybottom = hb - ytop
= 500 - 169.99
= 330.01 mm
Titik Pusat Penampang
A1 175000 mm2
A2 423750 mm2
y1 400 mm
y2 75 mm
yt 170 mm
yb 330 mm
y2 = ytop - y2
= 170 - 75
= 95 mm
b x h^3
Ig1 = + b x h x y1^2
12
350 x 1E+08
Ig1 = + 350 x 500 x 52904.8
12
4E+10
= + 9258340311
12
= 1E+10 mm4
beff x hf^3
Ig2 = + beff x hf x y2^2
12
2825 x 3E+06
Ig2 = + 2825 x 150 x 9023
12
1E+10
= + 3823503373
12
= 5E+09 mm4
Ig total = 1.8E+10 mm4
Inersia Gross
y1 = 230 mm
y2 = 95 mm
Ig1 = 12904173645 mm4
Ig2 = 4618034623 mm4
Ig total = 17522208268 mm4
4 Menghitung Momen Retak
DAERAH TUMPUAN
fr x Ig total
Mcr- =
yt
2.7727 x 17522208268
Mcr- =
170
= 285807269.9 Nmm
= 285.8072699 kNm
DAERAH LAPANGAN
fr x Ig total
Mcr+ =
yb
2.7727 x 17522208268
Mcr+ =
330
= 147220350.8 Nmm
= 147.2203508 kNm
Mb+ =
WDL + WSiDL x Ln2 +
P x Ln
14 8
4.2 + 4.2375 x 36 2.52 x 6
Mb+ = +
14 8
= 21.69642857 + 1.89
= 23.586 kNm
Daerah Lapangan Momen Crack Positif
fr = 2.773 N/mm2
yt = 0.0 mm
fr = 0 mm4
147220350.8 Nmm
Mcr- =
147.2203508 kNm
5 Menghitung Icr pada Tengah Bentang
A1 = bw x ( h - hf )
A1 = 350 x ( 500 - 150 )
A1 = 350 x 350
A1 = 122500 mm2
A1 = 0.1225 m2
A2 = beff x ( c - ( h - hf )